Sriram M +91 9986021012 BI Architect & Manager [email protected]

Certified in Informatica, Cognos.

SUMMARY:

 9+ years of IT experience in Business Intelligence.  Worked as Onsite Project Coordinator for 5+ years which has job responsibility of Pre Sales, Delivery Ownership and Sales.  Proven experience in leading all stages of system development efforts, including requirement Design, Architecture, Testing, Maintenance and Support.  Performed project level design, data analysis and application performance analysis.  Strong knowledge of dimensional modeling, data analysis, data quality, ETL & reporting.  Strong functional and technical experience in Client Server and Data Warehousing Technologies.  In-depth understanding of data warehousing concepts, Kimball methodologies, including dimensional modeling, star schema design and implementation.  Demonstrated technical expertise in popular business intelligence, data modeling tools such as Informatica, Business Objects, Cognos, Qlikview.and Erwin.  Hands on experience working with Cognos 8 & 10 BI Suite (Report Studio, Analysis Studio, Query Studio, Business Insight & Advance, Framework Manager, Event Studio).  Good knowledge of Data extracts strategies, Cognos EP (Impromptu, Cognos Scheduler, Access Manager, Dashboard, Upfront and Cognos Visualizer).  Hands on experience working with Informatica 7.1/7.3/8.1/8.6/9.1 (Power Center Designer, Workflow Manager and Workflow Monitor).  Hands on experience working with Business Objects XI R2 (Web Intelligence and Desktop Intelligence) and Crystal Reports.  Hands on experience working with Qlikview. Worked on QVD and QVW creations  Expertise in Framework Manager Modeling (DMR and Relational Models) and Complex Report building with Report Studio.  Having good knowledge of Logical models and implementation of Star schema and Snowflake schema concepts  Expert level understanding of Oracle Database Capabilities and DW best practices including appropriate use of Index, Partition, Materialized Views etc.  Excellent Business Analysis skills, communication skills and problem solving skills.  Expert level understanding in JAROS Analytical Solutions.  Expert level understanding in Data Quality concepts  Demonstrated technical expertise in popular Data Quality tools like Data Quality Inspector, IQ Insight and exposure to Talend, Backoffice and Informatica Data Quality tools.

TECHNICAL SKILLS:

Business Intelligence Informatica 9.x/8.x/7.x, Cognos 10.x/8.x/7.x,Qlikview11, Cognos Report Net1.1, BO XI R2, Crystal and Actuate Reports RDBMS Oracle 11i/10g/9i/8i Languages PL/SQL, C++/C, Shell Scripting Data Modeling Erwin 3.5.2 DQ Tools DQI, IQ Insight, Backoffice, Informatica DQ and Talend Other Tools PLSQL Developer, HPSD, Appworx, Visual Source Safe OS/Environment Windows 9X, DOS, UNIX Others JAROS/Noetix Analytics

Certifications:

 Cognos 8.x /10.x - Cognos BI Author  Informatica 8.x - Advanced Mapping Design (2009)

Resume of Pavan R Page 1 of 12 Sriram M +91 9986021012 BI Architect & Manager [email protected]

 Informatica 8.x - Mapping Design (2009)  Cognos Report Net - Authoring Product Professional (2007)

Achievements:

 Superlative Performer Award for the year 2010.  Valuable Contribution Award for the year 2008 and 2012.  Dream Team for the year 2005 and 2008.

Education:

 Bachelors in Engineering (Computer Science)

PROFESSIONAL EXPERIENCE:

Project Coordinator GE Energy Management – Digital Energy, Atlanta, GA Oct 13 – Till Date

Project: Services Dashboard

Description: GE Energy Management is a division within the General Electric Company. GE Energy Management is the world's leading manufacturer of commercial Energy Equipment. The company produces and services large and small Energy companies.

All DE Global Services KPIs such as: resource management, financial performance, and service performance (IR, RMA, Utilization, Call Center, EHS, etc.) are extracted from multiple data sources and build a reporting solution on Qlikview.

Environment : Informatica Power Center (Designer 9.1,Repository Manager 9.1,Workflow Manager 9.1), Oracle, PL/SQL and JAROS Data warehouse, Qlikview 11.

Responsibilities:

 Involved in gathering Requirement specifications by having Interactive Sessions with the business.  Capture the specific needs from various services stakeholders for the successful delivery of a structured BI decision support system  Effectively lead the functional to technical requirement conversion and identify the granular project task execution trees.  Create, own and manage high level and low level Project Plans and drive successful & timely closure on deliverables.  Extensively put my prior technical expertise to implement state of the art solutions. Work with different source teams for Integration of ERP and legacy data into the warehouse.  Develop custom ETL designs (functional and technical) for the new system integrations.  Architect, design and deliver ETL framework for MDW solution.  Architect, design and deliver Reporting QVD in Qlikview.  Define and implement project level standards and guidelines and ensure adherence to enterprise level policies.  Lead and mentor the team in designing, developing, and delivering ETL framework to implement MDW Solution.

Resume of Pavan R Page 2 of 12 Sriram M +91 9986021012 BI Architect & Manager [email protected]

 Helping the team for Informatica best practices guidelines for all ETL developers.  Conduct peer reviews for ETL code and testing strategies.  Own, plan and manage the entire lifecycle from requirements into production.  Achieved success by implementing Agile Methodology in rapid development turnaround times. Lead the Scrum calls and plan mitigations for in-risk tasks.  Conduct peer reviews for code and testing strategies.  Architect, design and deliver Database/ETL/Cognos framework for MDW solution.  Conduct User Acceptance testing for the report functionality.  Conduct Weekly status review with the Digital Energy BI Team.  Create Change Management Requests using Service Now for migration activity.  Represent Digital Energy in Change Management and Quality Meetings. Onsite Project Lead GE Energy Management – Digital Energy, Atlanta, GA Mar 13 – Oct 13

Project: Commercial Data warehouse Phase I

Description: GE Energy Management is a division within the General Electric Company. GE Energy Management is the world's leading manufacturer of commercial Energy Equipment. The company produces and services large and small Energy companies

There is a need to have one application for Commercial Users to manage the information and produce Metrics accurately and timely as a part of their activities. In addition, the problems impact their productivity.

Therefore, this program is designed to build Commercial Reporting functionality. This program will work towards building a single platform for Sales & Commercial Data and improving the Commercial team’ productivity by streamlining the processes.

Environment : Informatica Power Center (Designer 9.1,Repository Manager 9.1,Workflow Manager 9.1), Oracle, PL/SQL and JAROS Data warehouse, Cognos10.

Responsibilities:

 Involved in gathering Requirement specifications by having Interactive Sessions with the business.  Capture the specific needs from various Commercial stakeholders for the successful delivery of a structured BI decision support system  Effectively lead the functional to technical requirement conversion and identify the granular project task execution trees.  Architect, Design and Develop the data model, ETL and reporting solution.  Lead and mentor the team in designing, developing, and delivering ETL/COGNOS framework to implement MDW Solution.  Helping the team for best practices guidelines for all ETL/COGNOS developers.  Extensively used Informatica- Power center for extracting data from various source systems like database, flat file etc, transforming and loading into data mart.  Designing different Mappings according to Requirements.  Schedule the Informatica Jobs and Cognos Cube in informatica using UNIX scipting.  Worked on Informatica tool Source Analyzer, Data Warehousing designer, Mapping Designer, Workflow Monitor, Workflow Manager and Repository Manager.  Used Source Analyzer and Warehouse designer to import the source and target database schemas.  Used the Mapping Designer to map the sources and target.  Worked extensively on different types of transformations like Source qualifier, Expression, Filter, Aggregator, Lookup, Sequence generator, Router and Joiner.  Created Reusable mapplets and Reusable transformations to leverage the coding efforts

Resume of Pavan R Page 3 of 12 Sriram M +91 9986021012 BI Architect & Manager [email protected]

 Created email notifications. Set up Workflow to schedule the loads at required frequency using Power Center Workflow Manager, Generated completion messages and status reports using Workflow Manager.  Analyzed the reports in report studio for as per the requirements  Developed the reports using cognos report studio  Implemented data level security in Sales Manager Performance Report  Created Cognos cube to provide Adhoc analytical capabilities for commercial users  Conduct peer reviews for code and testing strategies.  Conduct User Acceptance testing for the report functionality.  Conduct Weekly status review with the Digital Energy BI Team.  Create Change Management Requests using Service Now for migration activity.  Represent Digital Energy in Change Management and Quality Meetings.

Onsite Project Lead GE Energy Management – Digital Energy, Atlanta, GA Jun 12 – Feb 13

Project: Sourcing Integration

Description: GE Energy Management is a division within the General Electric Company. GE Energy Management is the world's leading manufacturer of commercial Energy Equipment. The company produces and services large and small Energy companies

The focus of this Project will be to provide a Business Intelligent reporting function to DE Sourcing and Payments. DE Sourcing data extracted from Oracle Bravo, APEX, SSP5, Rochester, Bilbao and Riazzino & Poland would be used by the Cognos reporting tool to create reports and dashboards The primary objectives of the Project are to: Leverage capabilities of Cognos as a Business Intelligence (BI) tool to provide the implemented DE-Sourcing Data Integration, Analysis and Reporting capability. Create a platform for further reporting and dashboard capability development on DE Sourcing Data using Cognos

Environment : Informatica Power Center (Designer 8.1,Repository Manager 8.1,Workflow Manager 8.1), Oracle, PL/SQL and JAROS Data warehouse, Cognos10.

Responsibilities:

 Involved in gathering Requirement specifications by having Interactive Sessions with the business.  Design and Implement the data warehouse architecture including ETL, Reporting end-to-end solutions.  Interacted heavily with sourcing business users and gather the requirements.  Data capture included identifying multiple heterogeneous sources into the staging and transformation thereafter into the target data warehouse.  Lead and mentor the team in designing, developing, and delivering ETL framework to implement MDW Solution.  Helping the team for Informatica best practices guidelines for all ETL developers.  Conduct peer reviews for ETL code and testing strategies.  Identifying Performance bottlenecks and fine-tuning ETL mappings and workflows to improve performance for existing ETL’s.  Creation of complex Views and materialized views for the reporting needs.  Designing of complex reports using Report Studio with multiple Prompts and different type of charts and graphs.  Enhance the existing Report Studio reports based on the new requirements.  Prepare test cases for the ETL and Reports.  Leading the Data Quality team (Data Profiling and Business Rules Set up) in Digital Energy Business Intelligence.

Resume of Pavan R Page 4 of 12 Sriram M +91 9986021012 BI Architect & Manager [email protected]

 Involved in Data Profiling using IQ Insight.  Setup business rules in Data Quality Inspector  Conduct User Acceptance testing for the report functionality.  Conduct Weekly status review with the Digital Energy BI Team.  Create Change Management Requests using HPSD for migration activity.  Represent Digital Energy in Change Management and Quality Meetings.

Onsite Project Lead GE Energy Management – Digital Energy, Atlanta, GA Sep 11 – May 12

Project: Quality Integration Phase I & II

Description: GE Energy Management is a division within the General Electric Company. GE Energy Management is the world's leading manufacturer of commercial Energy Equipment. The company produces and services large and small Energy companies

Business wants to see the Gensuite or Quality, Finance or GL information in Digital energy Cognos portal. This project is to integrate Gensuite data with digital energy and need to show the Dash boards and reports in Cognos portal.

Environment : Informatica Power Center (Designer 8.1,Repository Manager 8.1,Workflow Manager 8.1), Oracle, PL/SQL and JAROS Data warehouse, Cognos10.

Responsibilities:

 Involved in gathering Requirement specifications by having Interactive Sessions with the business.  Capture the specific needs from various Commercial stakeholders for the successful delivery of a structured BI decision support system  Effectively lead the functional to technical requirement conversion and identify the granular project task execution trees.  Architect, Design and Develop the data model, ETL and reporting solution.  Lead and mentor the team in designing, developing, and delivering ETL/COGNOS framework to implement MDW Solution.  Helping the team for best practices guidelines for all ETL/COGNOS developers.  Extensively used Informatica- Power center for extracting data from various source systems like database, flat file etc, transforming and loading into data mart.  Designing different Mappings according to Requirements.  Schedule the Informatica Jobs and Cognos Cube in informatica using UNIX scipting.  Worked on Informatica tool Source Analyzer, Data Warehousing designer, Mapping Designer, Workflow Monitor, Workflow Manager and Repository Manager.  Used Source Analyzer and Warehouse designer to import the source and target database schemas.  Used the Mapping Designer to map the sources and target.  Worked extensively on different types of transformations like Source qualifier, Expression, Filter, Aggregator, Lookup, Sequence generator, Router and Joiner.  Created Reusable mapplets and Reusable transformations to leverage the coding efforts  Created email notifications. Set up Workflow to schedule the loads at required frequency using Power Center Workflow Manager, Generated completion messages and status reports using Workflow Manager.  Analyzed the reports in report studio for as per the requirements  Developed the reports using cognos report studio  Conduct User Acceptance testing for the report functionality.  Conduct Weekly status review with the Digital Energy BI Team.  Create Change Management Requests using HPSD for migration activity.

Resume of Pavan R Page 5 of 12 Sriram M +91 9986021012 BI Architect & Manager [email protected]

 Represent Digital Energy in Change Management and Quality Meetings.

Onsite Technical Project Lead GE Energy – Digital Energy, Atlanta, GA Aug 10 – Sep 11

Project: Digital Energy – BI Reporting

Description: Digital Energy is one sub business under GE Energy. DE uses an ERP system named as BRAVO to maintain required functionality for their business. This system keeps track of the Customer orders, sales, Purchase Orders, Manufacturing etc. JAROS analytic solution will bring the ERP to ODS and DM. This project will focus on Few Initiatives during 2010-2011 for Digital Energy Business Intelligence.

Environment : Informatica Power Center (Designer 8.1,Repository Manager8.1,Workflow Manager 8.1), COGNOS 8, Oracle, PL/SQL and JAROS Data warehouse.

Responsibilities:

 Involved in gathering Requirement specifications by having Interactive Sessions with the business.  Develop custom ETL designs (functional and technical) for the new system integrations.  Architect, design and deliver ETL framework for MDW solution.  Define and implement project level standards and guidelines and ensure adherence to enterprise level policies.  Lead and mentor the team in designing, developing, and delivering ETL framework to implement MDW Solution.  Helping the team for Informatica best practices guidelines for all ETL developers.  Conduct peer reviews for ETL code and testing strategies.  Identifying Performance bottlenecks and fine-tuning ETL mappings and workflows to improve performance for existing ETL’s.  Creation of complex Views and materialized views for the reporting needs.  Designing of complex reports using Report Studio with multiple Prompts and different type of charts and graphs.  Enhance the existing Report Studio reports based on the new requirements.  Prepare test cases for the ETL and Reports.  Leading the Data Quality team (Data Profiling and Business Rules Set up) in Digital Energy Business Intelligence.  Involved in Data Profiling using IQ Insight.  Setup business rules in Data Quality Inspector  Conduct User Acceptance testing for the report functionality.  Conduct Weekly status review with the Digital Energy BI Team.  Create Change Management Requests using HPSD for migration activity.  Represent Digital Energy in Change Management and Quality Meetings.

Onsite Technical Project Lead GE Energy – Digital Energy, Atlanta, GA Nov 10 – Sep 10

Project: BO Decommission

Description: Digital Energy is sub business under GE Energy. DE uses an ERP system named as BRAVO to maintain required functionality for their business. This system keeps track of the Customer orders, sales, Purchase Orders, Manufacturing etc. JAROS analytic solution will bring the ERP to ODS and DM. This project will focus on migrating the Business Objects to Cognos8 and decommission Business Objects.

Resume of Pavan R Page 6 of 12 Sriram M +91 9986021012 BI Architect & Manager [email protected]

Environment: Informatica Power Mart (Designer 8.x, Repository Manager 8.x, Workflow Manager 8.x), COGNOS 8,Oracle, PL/SQL, MS-Visual Source Safe (VSS)

Responsibilities:  Involved in gathering Requirement specifications (Based on Business Object Reports) by having Interactive Sessions with the business.  Perform GAP Analysis to identify missing attribute and Entity in JAROS warehouse.  Develop custom ETL designs (functional and technical) to fix the GAPS in warehouse.  Architect, design and deliver ETL framework for MDW solution.  Define and implement project level standards and guidelines and ensure adherence to enterprise level policies.  Helping the team for Informatica best practices guidelines for all ETL developers.  Conduct peer reviews for ETL code and testing strategies.  Design to convert Business Objects Adhoc universes to Cognos Query Studio Package.  Creation of complex Views and materialized views for the reporting needs.  Designing of complex reports using Report Studio with multiple Prompts.  Build Cognos Cubes in Cognos 7.4 and Publish upfront for User Access.  Migrate the business objects report to Cognos Report Studio reports.  Conduct User Acceptance testing for the report functionality.  Conduct Weekly status review with the Digital Energy BI Team.  Prepare test cases for the ETL and Reports.  Create Change Management Requests using HPSD for migration activity.  Represent Digital Energy in Change Management meeting.

Data Quality Lead GE Energy – Aero Derivatives, Bangalore, India May 09 – Oct 09

Project: IPCS Data Quality

Description: The project involves data quality team to profiling the data, identify the business and set up the business rules.

Environment: Informatica Power Mart (Designer 8.x, Repository Manager 8.x, Workflow Manager 8.x), Oracle 9i, PL/SQL, Data Quality Inspector and IQ Insight.

Responsibilities:  Preparation of Technical Architecture Document  Preparation of Technical Design Document.  Preparation of Functional specifications.  Identify the business rules by profiling the data using IQ Insight.  Creation of customized tables to load data in staging area.  Creation of new studies and surveys in QA instance of DQI setup on Supply Chain instance.  Creation of Informatica mapping, Use Mapplets and Reusable Transformation to reduce the coding efforts.  Designing, developing and testing Different Mappings according to Requirements.  Worked extensively on different types of transformations like Source qualifier, Expression, Filter, Aggregator, Lookup, Sequence generator, Router and Joiner.  Created and scheduled Worklets, Configured email notifications. Set up Workflow to schedule the loads at required frequency using Power Center Workflow Manager, Generated completion messages and status reports using Workflow Manager.

Resume of Pavan R Page 7 of 12 Sriram M +91 9986021012 BI Architect & Manager [email protected]

 Development of a shell script to copy / ftp the file containing the Foxtrot data extract from the Production server to the desired QA server.  Test Plans & Test Cases.  Test the business rules in Development instance.  User training on Data Quality Inspector.  SIT and UAT of the DQ solution in QA environment.  Creation of CMR’s and WO’s for creation / movement of applicable code to Dev/QA/Production environments.  Creation of detailed project plan and communicating the same to GE and the project team.  Weekly status report reviews with GEA IM Project Leader, Business team, as appropriate.

Onsite Technical Project Lead GE Transportation Jul 08 – Apr 09

Project: Commercial Reporting

Description: GE Transportation is a leading supplier of surface transportation equipment to move people and material. The Sales, Finance and Product teams are among the major users for the Commercial Metrics. They rely to a great extent on the data made available through these metrics for their day-to-day / periodic reporting. Along with other activities the major activities performed by the teams are in the following areas:  Orders received Information.  Orders Promised and Sales Information.  IOPs & Estimations.  ITO Pipeline Analysis.  Sales Incentive Calculations.

Environment: Informatica Power Mart (Designer 8.x, Repository Manager 8.x, Workflow Manager 8.x), Cognos 7.1, Oracle, PL/SQL, JAROS and Appworx

Responsibilities:

 Analyzing existing ETL Process, and write ETL specifications for JAROS ETL.  Extensively used Informatica- Power center for extracting data from various source systems like database, flat file etc, transforming and loading into data mart.  Designing different Mappings according to Requirements.  Schedule the Informatica Jobs and Cognos Cube in Appworx.  Worked on Informatica tool Source Analyzer, Data Warehousing designer, Mapping Designer, Workflow Monitor, Workflow Manager and Repository Manager.  Used Source Analyzer and Warehouse designer to import the source and target database schemas.  Used the Mapping Designer to map the sources and target.  Worked extensively on different types of transformations like Source qualifier, Expression, Filter, Aggregator, Lookup, Sequence generator, Router and Joiner.  Created Reusable mapplets and Reusable transformations to leverage the coding efforts  Created email notifications. Set up Workflow to schedule the loads at required frequency using Power Center Workflow Manager, Generated completion messages and status reports using Workflow Manager.  Identifying & removing the Bottle Necks, Tuning the Mappings and Sessions for improving performance.  Fixing production bugs and issues.  Design the Cognos Model File for Orders, Backlog and Sales.  Unit Testing and Integration Testing for application  Represent GE Rail BI team in Change Management meetings.  Cognos Point of contact expertise for GE Transportation.  Cognos training for Commercial Reporting business users.

Resume of Pavan R Page 8 of 12 Sriram M +91 9986021012 BI Architect & Manager [email protected]

 Conduct User Acceptance testing for the report functionality.  Conduct Weekly status review with the GET IM Project Manager.  Create Change Management Requests using HPSD for migration activity.

ETL and Reporting Lead GE Consumer & Industrial, Bangalore, India Sep 07 - Jun 08

Project: CMS BO Phase II

Description: Lighting had a manual spreadsheet and email based information system for collecting and viewing the logistical status. The amount and diversity of product that was sourced offshore was rapidly increasing and it was no longer possible to continue with the manual process.

C&I business also had a need for integrating existing Container Management System (CMS) with SMART (Lighting) data.

Environment: Business Objects XI, Informatica Power Center 7.1, and Oracle 9i.

Responsibilities:  Responsible to interact with the business user for Requirement Gathering.  Detailed Analysis of the requirement and transform the business requirements to technical specification.  Design the data mart integrating SMART and CMS systems.  Build the data model in Erwin 3.5.2  Prepare High Level and Low Level Design Documents for ETL Loads in data mart.  Prepare Detail Level Design document for BO Universe, and BO XI DeskI.  Developed ETL & Informatica best practices guidelines for all ETL developers.  Involved in design and development of common framework for error logging and parameter management for the project.  Conduct peer reviews for ETL code and testing strategies.  Identifying Performance bottlenecks and fine-tuning ETL mappings and workflows to improve performance.  Creation of Informatica mapping, Use Mapplets and Reusable Transformation to reduce the coding efforts.  Designing, developing and testing Different Mappings according to Requirements.  Worked extensively on different types of transformations like Source qualifier, Expression, Filter, Aggregator, Lookup, Sequence generator, Router and Joiner.  Created and scheduled Worklets, Configured email notifications. Set up Workflow to schedule the loads at required frequency using Power Center Workflow Manager, Generated completion messages and status reports using Workflow Manager.  Prepare ETL and BO reports test cases.  Involved in SIT and UAT of the reports.  Maintain Source Safe (VSS) for Version Control.  Conduct User Acceptance testing for the report functionality.  Conduct Weekly status review with the GE C&I IM Project and Business managers.  Create Change Management Requests using HPSD for migration activity.  Represent CMS BO team in TG1 – TG5 reviews.

Report Developer GE Consumer & Industrial, Bangalore, India Apr 07 - Sep 07

Project: STC Development

Resume of Pavan R Page 9 of 12 Sriram M +91 9986021012 BI Architect & Manager [email protected]

Description: This project will automate the top-level performance reporting as well as improving the detailed analysis of all STC data to identify opportunities for improvement. All data streams accessed from same location such that querying and reporting from all parts is seamless. The Goals and Objectives of this project are to improve System response time, Data accuracy/ Consistency and System reliability. To enable Ad Hoc reporting, eliminate manual data gathering processes and to eliminate manual data summary/calculation

Environment: Business Objects XI, Crystal Reports XI, and Oracle 9i.

Responsibilities:  Responsible to interact with the business user for Requirement Gathering.  Detailed Analysis of the requirement and transform the business requirements to technical specification.  Involved in BO Universe design for new requirement, which include Classes, Sub Classes and Objects (Dimensions and Measures).  Prepare Detail Level Design document for BO Universe, BO XI DeskI and Crystal Reports.  Developed standard Reports in BO DeskI.  Performance tuning of SQL queries used in Crystal Reports.  Developed freehand SQL based reports in Crystal Reports and scheduled the reports in Infoview (Web Portal).  Developed test cases and tested the reports.  Involved in SIT and UAT of the reports.  Maintain Source Safe (VSS) for Version Control.  Conduct User Acceptance testing for the report functionality.  Conduct Weekly status review with the GE C&I Project Lead.  Create Change Management Requests using HPSD for migration activity.  Represent STC Reporting team in TG3 and TG4 reviews.

ETL and Report Developer GE Consumer & Industrial, Bangalore, India Aug 06 - Apr 07

Project: CMS Lighting Integration

Description: Lighting had a manual spreadsheet and email based information system for collecting and viewing the logistical status. The amount and diversity of product that was sourced offshore was rapidly increasing and it was no longer possible to continue with the manual process.

C&I business also had a need for integrating existing Container Management System (CMS) with the lighting business and converting existing Actuate reports to Business Objects.

The newly developed Business Objects reports would provide fast, versatile data access and exporting capability to xls and pdf formats.

Environment: Informatica Power Center 7.1, Actuate Reports, Business Objects XI, Crystal Reports XI, and Oracle 9i.

Responsibilities:  Responsible to understand the existing report requirements in Actuate Reports (in OLTP).  Detailed Analysis of the requirement and transform to technical specification.  Involved in BO Universe design for new Adhoc requirement, which include Classes, Sub Classes and Objects (Dimensions and Measures).  Prepare Detail Level Design document for BO Universe, and Crystal Reports.  Developed ETL & Informatica best practices guidelines for all ETL developers.  Involved in design and development of common framework for error logging and parameter management for the project.

Resume of Pavan R Page 10 of 12 Sriram M +91 9986021012 BI Architect & Manager [email protected]

 Conduct peer reviews for ETL code and testing strategies.  Identifying Performance bottlenecks and fine-tuning ETL mappings and workflows to improve performance.  Creation of Informatica mapping, Use Mapplets and Reusable Transformation to reduce the coding efforts.  Designing, developing and testing Different Mappings according to Requirements.  Worked extensively on different types of transformations like Source qualifier, Expression, Filter, Aggregator, Lookup, Sequence generator, Router and Joiner.  Created and scheduled Worklets, Configured email notifications. Set up Workflow to schedule the loads at required frequency using Power Center Workflow Manager, Generated completion messages and status reports using Workflow Manager.  GAP analysis to identify the gaps in warehouse.  Developed standard Reports in Crystal Reports (in DWH).  Performance tuning of SQL queries used in Crystal Reports.  Developed freehand SQL based reports in Crystal Reports and scheduled the reports in Infoview (Web Portal).  Developed test cases and tested the reports.  Involved in SIT and UAT of the reports.  Maintain Source Safe (VSS) for Version Control.  Conduct User Acceptance testing for the report functionality.  Conduct Weekly status review with the GE C&I Project Lead.  Create Change Management Requests using HPSD for migration activity.

ETL and Data Quality Developer GE Aviation, India Feb 06 - Aug 06

Project: BOM Compare Application Phase IV

Description: Planning BOM compare is a web-enabled user interface used to perform Bill of Material (BOM) Compares between Engineering Assemblies (ENACT) and Manufacturing Assemblies (CAS). Data Quality Inspector is tool that helps the analysts to view and analyze the anomalies in data between the Manufacturing and Engineering assemblies.

Planning BOM compare application is created using Java web technology using which the Configuration Specialists can run the BOM compares by exploding the parts to the desired level.

Environment: Informatica 7.1, Data Quality Inspector, Appworx, Unix and Oracle 9i.

Responsibilities:  Responsible to understand the business rules for Bill of Materials.  Detailed Analysis of the requirement and transform to technical specification.  Developed ETL & Informatica best practices guidelines for all ETL developers.  Involved in design and development of common framework for error logging and parameter management for the project.  Conduct peer reviews for ETL code and testing strategies.  Creation of Informatica mapping, Use Mapplets and Reusable Transformation to reduce the coding efforts.  Designing, developing and testing Different Mappings according to Requirements.  Worked extensively on different types of transformations like Source qualifier, Expression, Filter, Aggregator, Lookup, Sequence generator, Router and Joiner.  Created and scheduled Worklets, Configured email notifications. Set up Workflow to schedule the loads at required frequency using Power Center Workflow Manager, Generated completion messages and status reports using Workflow Manager.  Understand the DQI tool Architecture to implement Bill of Material Comparison.  Develop the mechanical compare business rules using PL/SQL in Oracle 8i to compare Engineering and Manufacturing parts.

Resume of Pavan R Page 11 of 12 Sriram M +91 9986021012 BI Architect & Manager [email protected]

 Develop the studies, surveys and Business Rules for mechanical compares in Data Quality Inspector  Tested the mechanical compare rules in DQI tool.  Involved in SIT and UAT of the DQI Study report.  Develop the shell script to explode the BOM engineering and Manufacturing parts to different level  Schedule the ETL, DQI Studies in Appworx.  Maintain Source Safe (VSS) for Version Control.  Conduct User Acceptance testing for the business rule functionality.  Conduct Weekly status review with the GEA Project Lead.

Data Quality Developer GE Aviation, India Jun 05 - Aug 06

Project: DQI Application Support

Description: Data Quality Inspector (DQI) is an Oracle tool used for comparing the quality of the data in a system or between systems and to generate a report based on it.

In this project, DQI is used to compare the data of various systems. Since the Supply Chain project have interfaces with different systems like CAS, ISSES, IMPACT, WMS, PSS, SSS, OCTA, etc, DQI compares the data within these systems and also between any two systems. DQI does the HEALTH check, Mechanical and Inline check when needed. This helps GE to know about the accuracy and validity of the data and can predict more about the performance of the system.

Environment: Informatica 7.1, Data Quality Inspector, Appworx, Unix and Oracle 9i.

Responsibilities:  Responsible to understand the business rules for supply chain project.  Detailed Analysis of the requirement and transform to technical specification.  Creation of Informatica mapping, Use Mapplets and Reusable Transformation to reduce the coding efforts.  Designing, developing and testing Different Mappings according to Requirements.  Worked extensively on different types of transformations like Source qualifier, Expression, Filter, Aggregator, Lookup, Sequence generator, Router and Joiner.  Created and scheduled Worklets, Configured email notifications. Set up Workflow to schedule the loads at required frequency using Power Center Workflow Manager, Generated completion messages and status reports using Workflow Manager.  Understand the DQI tool Architecture.  Develop the health check and mechanical compare business rules using PL/SQL in Oracle 8i.  Develop the studies, surveys and Business Rules in Data Quality Inspector  Tested the business rules in DQI tool.  Involved in SIT and UAT of the business rules.  Maintain Source Safe (VSS) for Version Control.  Conduct User Acceptance testing for the business rule functionality.  Supported DQI tool in GE Aviation.  Bug Fix and Break Fix in DQI Application Support.  Track all the issues in HPSD service calls

**References available upon request**

Resume of Pavan R Page 12 of 12