To: All At&T Installation Suppliers s4
Total Page:16
File Type:pdf, Size:1020Kb
AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-276 TO: ALL AT&T INSTALLATION SUPPLIERS Date: 06/18/2015
EFFECTIVE DATE: 5 days from posted date or as per Supplier’s Contract
Submitter’s Name: Henry Patino
TP: TP76300 Subject: Video Equipment Labels Action: Add: Modification: Delete:
Section: L Section Title: Designation Requirements Subsection: 1 Section Title: General Subsection: 1.2 Subsection Title: Requirements
Prior to Change: 1.2.12 i) 4.Video equipment longitudinal labels are required on Cat 5/6, and Coax cables and the Brady label/sleeve system is the required label for video applications.
5. Video equipment high density applications requiring the use of BNC and FConnector- removal tools.
6. Approved longitudinal labels used in video equipment installations shall be accessible and readable; the placement of the 1st label from the equipment connector shall be a minimum of 6 in. away and no further than 10 in. away.
Post Change: 1.2.12 i) 4. Video equipment longitudinal labels shall be placed on Cat 5/6 and Coax cables.
5. The Brady-style label/sleeve system shall be utilized for all video applications.
6. Video equipment high density applications requiring the use of BNC and FConnector- removal tools.
7. Approved longitudinal labels used in video equipment installations shall be accessible and readable; the placement of the 1st label from the equipment connector shall be a minimum of 6 in. away and no further than 10 in. away.
Questions relative to this IRCN should be addressed to Serena Kwong at 510-796-1097
Serena Kwong Specialist- Technical Process & Quality [email protected] Access the TP's on the Extranet Site - https://ebiznet.sbc.com/sbcnebs
Concurred Area Mgr Eng Network Quality Implementation Eng & Common Systems Date: 06-15-15 (Mike Cassidy)
Area Manager Network Engineering (Subject Matter) Date: 06-06-15 (Henry Patino)
Page 1 of 2 AT&T INSTALLATION REQUIREMENT CHANGE NOTIFICATION - ATT-TP-76300-276
Release Approved Specialist- Technical Process & Quality Date: 06-18-15 (Serena Kwong)
Page 2 of 2