Vy Prefiled Rebuttal Testimony

Total Page:16

File Type:pdf, Size:1020Kb

Vy Prefiled Rebuttal Testimony STATE OF VERMONT PUBLIC UTILITIES COMMISSION Joint Petition of NorthStar Decommissioning Holdings, LLC, NorthStar Nuclear Decommissioning August 30, 2017 Company, LLC, NorthStar Group Services, Inc., LVI Parent Corp., NorthStar Group Holdings, LLC, Docket No. 8880 Entergy Nuclear Vermont Investment Company, LLC, and Entergy Nuclear Operations, Inc., any other necessary affiliated entities to transfer ownership of Entergy Nuclear Vermont Yankee, LLC, and certain ancillary approvals pursuant to 30 V.S.A. Sections 107, 231, and 232. PREFILED REBUTTAL TESTIMONY OF ARNOLD GUNDERSEN ON BEHALF OF NEW ENGLAND COALITION Mr. Gundersen outlines his professional opinions regarding the proposed ownership transfer and decommissioning plans for the Vermont Yankee Atomic Power Reactor. He further provides informed perspectives on the presence of radioactive contamination on the Vermont Yankee (VY) site, the use of rubblization rather than removal of radioactivity from the VY site, comparisons of contamination between Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) decommissioning. In addition, Mr. Gundersen opines on the financial risks to the State of Vermont by the proposed NorthStar LLC purchase of Vermont Yankee from Entergy LLC, funding of the actual Vermont Yankee decommissioning project and a separately funded Department of Energy Interim Spent Fuel Storage Installation, and the overall lack of corporate experience and capabilities of NorthStar as the proposed prime decommissioning contractor. Mr. Gundersen’s analysis indicates that granting the Petition as it stands would not on balance serve the public good. Docket 8880 1 Joint Petition of NorthStar Decommissioning Holdings, LLC 2 3 4 STATE OF VERMONT 5 PUBLIC UTILITIES COMMISSION 6 7 In the matter of 8 9 Joint Petition of NorthStar Decommissioning 10 Holdings, LLC, NorthStar Nuclear Decommissioning August 30, 2017 11 Company, LLC, NorthStar Group Services, Inc., LVI 12 Parent Corp., NorthStar Group Holdings, LLC, Docket No. 8880 13 Entergy Nuclear Vermont Investment Company, LLC, 14 and Entergy Nuclear Operations, Inc., any other 15 necessary affiliated entities to transfer ownership of 16 Entergy Nuclear Vermont Yankee, LLC, and certain 17 ancillary approvals pursuant to 30 V.S.A. Sections 18 107, 231, and 232. 19 20 21 TESTIMONY OF ARNOLD GUNDERSEN SUPPORTING 22 THE NEW ENGLAND COALTION: 23 AN EVALUATION OF THE FINANCIAL RISKS TO VERMONT 24 IN THE PROPOSED SALE OF 25 THE ENTERGY NUCLEAR VERMONT YANKEE POWER PLANT SITE 26 TO NORTHSTAR DECOMMISSIONING HOLDINGS, LLC 27 28 29 WITNESS BACKGROUND 30 Q1. Please state your name and residence. 31 A. My name is Arnold Gundersen, and I live in Burlington, Vermont 32 Q2. What is the purpose of your testimony? 33 A. The New England Coalition has retained Fairewinds Associates, Inc to evaluate 34 the financial risks associated with the proposed sale of the Entergy Nuclear Vermont 35 Yankee (ENVY) Power Plant to NorthStar, LLC for the proposed purpose of 36 decommissioning Vermont Yankee. As an employee of Fairewinds Associates, and 37 its chief engineer, I performed this risk assessment for New England Coalition. 38 Q3. Please summarize your educational and professional experience. 39 A. I earned my Bachelor Degree in Nuclear Engineering from Rensselaer 40 Polytechnic Institute (RPI) cum laude. I earned my Master Degree in Nuclear 41 Page 2 of 24 Engineering from RPI via an Atomic Energy Commission Fellowship. Cooling 1 tower operation and cooling tower plume theory were my area of study for my 2 Master Degree. 3 I began my career as a reactor operator and instructor in 1971 and progressed to 4 the position of Senior Vice President for a nuclear licensee prior to becoming a 5 nuclear engineering consultant and expert witness. An updated Curriculum Vitae 6 is attached as Exhibit 1. 7 I have testified as a nuclear engineering expert witness before the Nuclear 8 Regulatory Commission (NRC) Atomic Safety and Licensing Board (ASLB) and 9 Advisory Committee on Reactor Safeguards (ACRS), in Federal Court, the State 10 of Vermont Public Service Board, the State of Vermont Environmental Court, and 11 the Florida Public Service Commission. 12 I am an author of the first edition of the Department of Energy (DOE) 13 Decommissioning Handbook. I was a member of an NRC Licensee’s Radiation 14 Safety Committee responsible for decommissioning nuclear facilities throughout 15 the United States. I am the author of a peer reviewed scientific paper entitled 16 Radioactively-hot particles detected in dusts and soils from Northern Japan by 17 combination of gamma spectrometry, autoradiography, and SEM/EDS analysis 18 and implications in radiation risk assessment published in the Journal (STOTEN) 19 Science of the Total Environment. 20 As an appointee of Vermont State Legislature for two years, I was charged with 21 serving in an oversight role of Entergy Nuclear Vermont Yankee and an advisory 22 role on nuclear reliability issues to the Vermont State Legislature. 23 I have more than 45-years of professional atomic power engineering experience 24 as delineated in my attached CV. 25 26 Q4. Have you ever testified before the Vermont Public Utility Commission 27 Page 3 of 24 (VTPUC) or Vermont Public Service Board (VTPSB)? 1 A. Yes, I have testified in several Vermont Yankee Dockets heard before the 2 VTPSB. 3 4 Q5. Have you read the Application and Prefiled Testimony of Entergy and 5 NorthStar? 6 A. Yes. 7 8 Q6. What are your preliminary observations and conclusions? 9 A. NorthStar’s lack of experience in decommissioning boiling water reactors 10 (BWRs) has led me to conclude that there is a significant financial risk to the 11 State of Vermont and its citizens if Vermont Yankee were to be decommissioned 12 and dismantled with the petitioners’ approach. 13 14 Q7. Did you review NorthStar’s claimed proprietary material? 15 A. Yes, but I found none of the material was useful in reaching any conclusions, so it 16 is not incorporated into this report. 17 18 Q8. According to prefiled testimony by petitioners NorthStar and Entergy, both 19 petitioners claim that the proposed change in ownership of the shutdown 20 Entergy Vermont Yankee (ENVY) atomic power reactor will allow its 21 decommissioning to move forward more quickly following the transfer of 22 ownership. Furthermore, the parties claim that the transfer of ownership of 23 ENVY from Entergy to NorthStar will reduce decommissioning costs by 24 hundreds of millions of dollars and also reduce the length of time required to 25 dismantle Vermont Yankee by approximately 30 years. Does the proposed sale 26 of ENVY from Entergy to NorthStar provide these claimed benefits? 27 A. No, selling Vermont Yankee to NorthStar, a corporation that is inexperienced in 28 atomic power reactor and nuclear power plant decommissioning does not produce 29 Page 4 of 24 any of the claimed financial or schedule benefits. Entergy’s TLG subsidiary or 1 any one of many newly formed decommissioning competitors all are capable of 2 hiring a team of subcontractors to completely dismantle VY by the early 2030’s 3 within the funds available in the Decommissioning trust. In fact, Entergy has 4 acknowledged that its TLG subsidiary is a highly experienced nuclear industry 5 leader in decommissioning. 6 JACKSON, Miss., Sept. 7 /PRNewswire/ -- Entergy Corporation 7 (NYSE: ETR) has agreed to buy TLG Services Inc. of Bridgewater, 8 Conn., in a deal that will make Entergy one of the most experienced 9 companies in decommissioning in the U.S. nuclear industry, the 10 two companies jointly announced today. 11 "TLG Services is a globally recognized expert in decommissioning 12 engineering, related cost estimation, and field services. Their 13 expertise strengthens Entergy's capabilities as one of the nation's 14 premier nuclear operators," said Jerry Yelverton, chief executive 15 officer of Entergy Nuclear. 16 "We already are doing decommissioning work in the utility industry, 17 and acquiring TLG solidifies our position as an industry leader. 18 "Yelverton pointed out the expertise of TLG Services will reduce 19 the decommissioning risk, a potentially significant liability, at 20 Entergy Nuclear's existing nuclear plants and the additional plants it 21 buys as Entergy pursues its principal growth strategy of acquiring 22 more nuclear generation. 23 "TLG's knowledge is necessary for a national nuclear company 24 and fits well with our growth strategy," he said. (emphasis added) 25 26 Q9. Entergy and NorthStar have claimed a series financial and schedule savings 27 due to NorthStar’s proposed plan. Are the claimed Entergy and NorthStar 28 savings correct? Are the presumptions and cost analysis delineated by Entergy 29 and NorthStar and that underlie the claimed savings correct? 30 A. No, both the claimed financial savings and schedule reduction and the underlying 31 presumptions and cost analysis being used to justify the proposed sale of VY are 32 incorrect. 33 34 In 2012, Entergy provided the State of Vermont with a Yankee decommissioning 35 Page 5 of 24 planning document entitled Decommissioning Cost Analysis for the Vermont 1 1 Yankee Nuclear Power Station , written by TLG Services. A literal reading of this 2 Entergy document led Vermont State policymakers to reach erroneous 3 conclusions regarding the timing of Entergy’s program for decommissioning 4 Vermont Yankee. Decommissioning Cost Analysis for the Vermont Yankee 5 Nuclear Power Station speculates that the costs associated with decommissioning 6 Vermont Yankee are so excessive and exorbitant that it will take at least 60-years 7 for the underfunded trust fund to finally accumulate adequate funds to address the 8 excessive cost estimates of decommissioning the 40-year-old plant. 9 10 Formerly an independent decommissioning services company, TLG Services is 11 now a wholly- owned subsidiary of Entergy Corporation. Beginning in 2012, 12 TLG Services created a series of spurious financial premises released in its 2012 13 VY report that allowed Entergy to reach its erroneous financial and schedule 14 conclusions.
Recommended publications
  • Final Gundersen Affidavit Diablo Canyon 2014-10-8
    ATTACHMENT 2 AFFIDAVIT AND CURRICULUM VITAE OF ARNOLD GUNDERSEN, MSNE, RO Docket No. 50-275-LR Docket No. 50-323-LR BEFORE THE UNITED STATES NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the matter of ) PACIFIC GAS & ELECTRIC COMPANY ) Docket No. 50-275-LR ) Docket No. 50-323-LR (Diablo Canyon Nuclear Power Plant, Units 2 and 3) ) October 10, 2014 (License Renewal Application) GUNDERSEN AFFIDAVIT SUPPORTING FRIENDS OF THE EARTH’S PETITION TO INTERVENE I, Arnold Gundersen, being duly sworn, state: 1 WITNESS BACKGROUND 2 Q1. Please state your name. 3 A. Arnold Gundersen 4 Q2. Please state your residential address. 5 A. Burlington, Vermont 6 Q3. What is the purpose of your testimony? 7 A. The purpose of my testimony is to examine the recently published Central 8 Coastal California Seismic Imaging Project to see if its assessment is congruent 9 with previous statements made by Pacific Gas and Electric (PG&E) regarding 10 Diablo Canyon in its License Renewal Application. Page 2 of 41 1 Q4. Please summarize your educational and professional experience. 2 A. I earned my Bachelor Degree in Nuclear Engineering from Rensselaer 3 Polytechnic Institute (RPI) cum laude. I earned my Master Degree in Nuclear 4 Engineering from RPI via an Atomic Energy Commission Fellowship. 5 I began my career as a reactor operator and instructor in 1971 and progressed to 6 the position of Senior Vice President for a nuclear licensee prior to becoming a 7 nuclear engineering consultant and expert witness. An updated Curriculum Vitae 8 is attached as Exhibit 1.
    [Show full text]
  • Post Accident AP1000 Containment Leakage an Unreviewed Safety Issue
    Post Accident AP1000 Containment Leakage An Unreviewed Safety Issue Fairewinds Associates, Inc, April 7, 2010 A Report by Arnold Gundersen, March 26, 2010 Chief Engineer, Fairewinds Associates, Inc Affidavit by Rudolf H. Hausler, PhD, Corro-Consulta Re. Post Accident AP1000 Containment Leakage: An Un-reviewed Safety Issue Attachments: Attachment 1 – Curriculum Vitae Attachment 2 – Table 1 from Detection of Aging Nuclear Power Plant Structures Attachment 3 – Table 35-4 Summary Of Release Category Definitions Attachment 4 – Declaration Of Arnold Gundersen Supporting Citizen Power’s Petition Attachment 5 – Declaration Of Arnold Gundersen Supporting Connecticut Coalition Against Millstone In Its Petition For Leave To Intervene, Request For Hearing, And Contentions Post Accident AP1000 Containment Leakage An Unreviewed Safety Issue A Report by Arnold Gundersen1 March 26, 2010 1. Introduction The AP1000 design has no secondary containment to provide for fission product control following a design basis accident. The purpose of this report is to describe the basis for concerns regarding an apparently unreviewed safety issue raised by the AP1000 containment system design (Revision 18). My four concerns are: • Recent experience with the current generation of nuclear reactors shows that containment corrosion, cracking, and leakage are far more prevalent and serious than anticipated by the U.S. Nuclear Regulatory Commission (NRC) in establishing its regulatory program for the safe operation of nuclear reactors. • By design, the AP1000 containment has an even higher vulnerability to corrosion than containment systems of current reactor designs because the outside of the AP1000 containment is subject to a high-oxygen and high-moisture environment conducive to corrosion and is prone to collect moisture in numerous inaccessible locations that are not available for inspection.
    [Show full text]
  • Final Gundersen Fermi NPP 3
    Docket No. 52-033 SUPPLEMENTAL PETITION CONTENTION 15 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the matter of The Detroit Edison Company ) December 8, 2009 Fermi Nuclear Power Plant Unit 3 ) Docket No. 52-033 Combined License Application ) DECLARATION OF ARNOLD GUNDERSEN SUPPORTING SUPPLEMENTAL PETITION OF INTERVENORS CONTENTION 15: DTE COLA LACKS STATUTORILY REQUIRED COHESIVE QA PROGRAM I, Arnold Gundersen, declare as follows: 1. My name is Arnold Gundersen. I am sui juris. I am over the age of 18-years-old. 2. I have been retained by Petitioners Beyond Nuclear, Citizens for Alternatives to Chemical Contamination, Citizens Environmental Alliance of Southwestern Ontario, Don’t Waste Michigan, and the Michigan Chapter of the Sierra Club to determine the root cause of Quality Assurance (QA) problems that the NRC has recently identified on the Fermi 3 COL application. If the QA problems are indeed significant, I have been asked to determine what remedies might be applicable to mitigate those Root Cause deficiencies. 3. I earned my Bachelor’s Degree in Nuclear Engineering from Rensselaer Polytechnic Institute (RPI) cum laude. I earned my Master’s Degree in Nuclear Engineering from RPI via an Atomic Energy Commission Fellowship. Cooling tower operation and cooling tower plume theory were my area of study for my Master’s Degree. 4. I began my career as a reactor operator and instructor in 1971 and progressed to the position of Senior Vice President for a nuclear licensee prior to becoming a nuclear Page 2 of 33 engineering consultant and expert witness. My Curriculum Vitae is Exhibit 1.
    [Show full text]
  • Docket No. 8880 NEC Reply To: Joint Petitioners' First Set of Discovery
    Docket No. 8880 NEC Reply to: Joint Petitioners’ First Set of Discovery Requests to the New England Coalition Relating to Testimony of Arnold Gundersen September 7, 2017 REQUESTS FOR NEC Q.JP:NEC. 1-1: With respect to the witnesses for whom prefiled testimony was submitted on behalf of the NEC and who were identified as experts in this proceeding, to the extent not already produced: a. Produce a curriculum vitae or resume; b. Identify and produce all publications prepared, written, authored, co-authored, peer-reviewed, and/or contributed to by the witness within the preceding ten years, whether or not included in his or her respective curriculum vitae; and c. Identify all matters in the last five years in which the witness has been designated and/or has testified as an expert at hearing or trial, or by deposition, and identify and produce any transcripts, affidavits, testimony or other written statements by the witness in connection with the matters. Objection by counsel. VRCP 26(b)(1) states: (1) Scope in General. -- Parties may obtain discovery regarding any nonprivileged matter that is relevant to any party's claim or defense and proportional to the needs of the case, considering the importance of the issues at stake in the action, the amount in controversy, the parties' relative access to relevant information, the parties' resources, the importance of the discovery in resolving the issues, and whether the burden or expense of the proposed discovery outweighs its likely benefit. Mr. Gundersen’s CV is attached to the original filing. Mr. Gundersen has already identified all publications written, authored, co-authored, peer-reviewed, and/or contributed to by the witness within the preceding 10-years in his CV.
    [Show full text]
  • 2014-03-09 Gundersen St Lucie Unit 2 Declaration
    UNITED STATES OF AMERICA BEFORE THE NUCLEAR REGULATORY COMMISSION ___________________________________ ) In the Matter of: ) Florida Power & Light Co. ) Docket No. 50-389 St. Lucie Plant, Unit 2 ) ) DECLARATION OF ARNOLD GUNDERSEN Under penalty of perjury, I, Arnold Gundersen, hereby declare as follows: I. INTRODUCTION 1. My name is Arnold Gundersen. I am Chief Engineer for Fairewinds Associates, a paralegal services and expert witness firm. I have been retained by Southern Alliance for Clean Energy (SACE) to evaluate safety and licensing issues related to the replacement steam generators (RSGs) that Florida Power & Light Co. (FPL) installed in the Unit 2 St. Lucie nuclear reactor in 2007. 2. As discussed below and demonstrated in my attached Curriculum Vitae (Exhibit 1), I am qualified by training and experience in the field of nuclear reactor engineering. 3. I earned my Bachelor Degree in Nuclear Engineering from Rensselaer Polytechnic Institute (RPI) cum laude. I earned my Master Degree in Nuclear Engineering from RPI via an Atomic Energy Commission Fellowship. Cooling tower operation and cooling tower plume theory were my area of study for my Master Degree in Nuclear Engineering. 4. I began my career as a reactor operator and instructor in 1971 and progressed to the position of Senior Vice President for a nuclear licensee prior to becoming a nuclear engineering consultant and expert witness. 5. I have testified before the Nuclear Regulatory Commission (NRC) Atomic Safety and Licensing Board (ASLB) and Advisory Committee on Reactor Safeguards (ACRS), the State of Vermont Public Service Board, the State of Vermont Environmental Court, the Florida Public Service Commission, the State of New York Department of Environmental Page 2 of 31 Conservation, and in Federal Court.
    [Show full text]
  • Gundersen Declaration Dominion Millstone 3-15-08, Page 2 of 31
    Attachment 5, AP1000 Post Accident Containment Leakage, DECLARATION OF ARNOLD GUNDERSEN SUPPORTING CONNECTICUT COALITION AGAINST MILLSTONE... EXHIBIT A UNITED STATES NUCLEAR REGULATORY COMMISSION In the matter of DOMINION NUCLEAR CONNECTICUT INC. ) MILLSTONE POWER STATION UNIT 3 ) Docket No. 50-423 LICENSE AMENDMENT REQUEST ) STRETCH POWER UPRATE ) DECLARATION OF ARNOLD GUNDERSEN SUPPORTING CONNECTICUT COALITION AGAINST MILLSTONE IN ITS PETITION FOR LEAVE TO INTERVENE, REQUEST FOR HEARING, AND CONTENTIONS I, Arnold Gundersen, declare as follows: 1. My name is Arnold Gundersen. I am sui juris. I am over the age of 18-years-old. I have personal knowledge of the facts contained in this Declaration. 2. I reside at 376 Appletree Point Road, Burlington, Vermont. 3. The Connecticut Coalition Against Millstone has retained me as an expert witness in the above captioned matter. 4. I have a Bachelor’s and a Master’s Degree in Nuclear Engineering from Rensselaer Polytechnic Institute (RPI) cum laude. 5. I began my career as a reactor operator and instructor at RPI in 1971 and progressed to the position of Senior Vice President for a nuclear licensee. I am a vetted expert witness on nuclear safety and engineering issues. My more than 37- years of professional nuclear experience include and are not limited to: nuclear Attachment 5, AP1000 Post Accident Containment Leakage, DECLARATION OF ARNOLD GUNDERSEN SUPPORTING CONNECTICUT COALITION AGAINST MILLSTONE... safety expert witness testimony; nuclear engineering management and nuclear engineering management
    [Show full text]
  • 08-30-17 Arnold Gundersen Prefiled Testimony
    STATE OF VERMONT PUBLIC UTILITIES COMMISSION Joint Petition of NorthStar Decommissioning Holdings, LLC, NorthStar Nuclear Decommissioning August 30, 2017 Company, LLC, NorthStar Group Services, Inc., LVI Parent Corp., NorthStar Group Holdings, LLC, Docket No. 8880 Entergy Nuclear Vermont Investment Company, LLC, and Entergy Nuclear Operations, Inc., any other necessary affiliated entities to transfer ownership of Entergy Nuclear Vermont Yankee, LLC, and certain ancillary approvals pursuant to 30 V.S.A. Sections 107, 231, and 232. PREFILED REBUTTAL TESTIMONY OF ARNOLD GUNDERSEN ON BEHALF OF NEW ENGLAND COALITION Mr. Gundersen outlines his professional opinions regarding the proposed ownership transfer and decommissioning plans for the Vermont Yankee Atomic Power Reactor. He further provides informed perspectives on the presence of radioactive contamination on the Vermont Yankee (VY) site, the use of rubblization rather than removal of radioactivity from the VY site, comparisons of contamination between Boiling Water Reactor (BWR) and Pressurized Water Reactor (PWR) decommissioning. In addition, Mr. Gundersen opines on the financial risks to the State of Vermont by the proposed NorthStar LLC purchase of Vermont Yankee from Entergy LLC, funding of the actual Vermont Yankee decommissioning project and a separately funded Department of Energy Interim Spent Fuel Storage Installation, and the overall lack of corporate experience and capabilities of NorthStar as the proposed prime decommissioning contractor. Mr. Gundersen’s analysis indicates that granting the Petition as it stands would not on balance serve the public good. Docket 8880 1 Joint Petition of NorthStar Decommissioning Holdings, LLC 2 3 4 STATE OF VERMONT 5 PUBLIC UTILITIES COMMISSION 6 7 In the matter of 8 9 Joint Petition of NorthStar Decommissioning 10 Holdings, LLC, NorthStar Nuclear Decommissioning August 30, 2017 11 Company, LLC, NorthStar Group Services, Inc., LVI 12 Parent Corp., NorthStar Group Holdings, LLC, Docket No.
    [Show full text]
  • Summation 2009-2010 Legislative Year
    Summation for 2009 to 2010 Legislative Year For the Joint Fiscal Committee Reliability Oversight Entergy Nuclear Vermont Yankee (ENVY) Fairewinds Associates, Inc Arnold Gundersen, MSNE, RO Chief Engineer Margaret Gundersen, Paralegal July 26, 2010 Page 2 of 21 Contents Introduction Executive Summary Report: Section 1. Brief Plant Status Section 2. Tritium Leak Status 2.1. Five separate problems caused the tritium leak. 2.2. Current leak status 2.3. NRC Regulatory Information Conference - buried pipes v underground Section 3. Slow Progress Toward Developing Action Plans Section 4. Decommissioning Issues: Costs and Greenfield 4.1. Decommissioning Fund Status with Graph 4.2. Fairewinds review of TLG Engineering Services Decommissioning Analysis 4.3. July 2, 2010 Testimony by the Department of Public Service to the Public Service Board appears to be incorrect 4.4. Possible impact on decommissioning in Enexus aftermath Section 5. MLB Report statements made by Department of Health Section 6. NPSH (Net Positive Suction Head) Section 7. MSIV (Main Steam Isolation Valve) Leakage Section 8. The Timeline of Events Section 9. Background Attachments: Attachment 1. Dr. Ahlfeld Letter to Legislature and Biographical Sketch Attachment 2. NY Times Article Attachment 3. Vanags DPS prefiled testimony as filed Page 3 of 21 Introduction Fairewinds Associates, Inc began its contract with the Joint Fiscal Committee (JFC) and the Joint Fiscal Office (JF0) in July 2009 in order to review the progress made by Entergy Nuclear Vermont Yankee (ENVY) toward addressing the challenges identified by Act 189: An Act Relating To A Comprehensive Vertical Audit (CVA) And Reliability Assessment Of The Vermont Yankee Nuclear Facility, and to present ongoing information and analysis regarding reliability issues with Entergy’s Vermont Yankee Nuclear Power Plant.
    [Show full text]
  • Gundersen SACE Florida Testimony 7-15-09 Jw
    BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION In re: Nuclear Plant Cost ) Recovery Clause ) DOCKET NO. 090009-EI ) FILED: July 15, 2009 ____________________________________) DIRECT TESTIMONY OF ARNOLD GUNDERSEN ON BEHALF OF SOUTHERN ALLIANCE FOR CLEAN ENERGY (SACE) E. LEON JACOBS, JR. GARY A. DAVIS Florida Bar No. 0714682 N.C. Bar No. 25976 WILLIAMS & JACOBS, LLC JAMES S. WHITLOCK 1720 S. Gadsden Street MS 14 N.C. Bar. No. 34304 Suite 201 GARY A. DAVIS & ASSOCIATES Tallahassee, FL 32301 PO Box 649 Tel: (850) 222-1246 Hot Springs, NC 28779 Fax: (850) 599-9079 Tel: (828) 622-0044 Email: [email protected] Fax: (828) 622-7610 Email: [email protected] [email protected] (Qualified Representative Requests Pending) !" IN RE: NUCLEAR PLANT COST RECOVERY CLAUSE #" BY THE SOUTHERN ALLIANCE FOR CLEAN ENERGY $" FPSC DOCKET NO. 090009-EI %" &" DIRECT TESTIMONY OF '" ARNOLD GUNDERSEN (" )" I. INTRODUCTION AND QUALIFICATIONS *" Q. Please state your name and business address. !+" A. My name is Arnold Gundersen. My business address is Fairewinds Associates, Inc, !!" 376 Appletree Point Road, Burlington, VT 05408. !#" !$" Q. Please tell us how you are employed and describe your background. !%" A. I am employed as a nuclear engineer with Fairewinds Associates, Inc and as a part- !&" time college professor with Community College of Vermont. I have a Bachelor’s and a !'" Master’s Degree in Nuclear Engineering from Rensselaer Polytechnic Institute (RPI) cum !(" laude. I began my career as a reactor operator and instructor in 1971 and progressed to !)" the position of Senior Vice President for a nuclear licensee. A copy of my Curriculum !*" Vitae is attached as Exhibit AG-1.
    [Show full text]
  • 2011.12.22 Gunderson Prefiled Testimony
    UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION ATOMIC SAFETY AND LICENSING BOARD ___________________________________________ ) In the Matter of ) ) Entergy Nuclear Operations, Inc. ) Docket Nos. (Indian Point Nuclear Generating ) 50-247-LR Units 2 and 3) ) and 50-286-LR ___________________________________________ ) PREFILED DIRECT TESTIMONY OF ARNOLD GUNDERSEN REGARDING CONSOLIDATED CONTENTION RK-EC-3/CW-EC-1 (SPENT FUEL POOL LEAKS) On behalf of Riverkeeper, Inc. (“Riverkeeper”) and Hudson River Sloop Clearwater, Inc. (“Clearwater”), Arnold Gundersen submits the following testimony regarding Riverkeeper and Clearwater’s Consolidated Contention RK-EC-3/CW-EC-1: 1 INTRODUCTION 2 Q. Please state your name and address. 3 A. My name is Arnold Gundersen and my business addresses are 376 Appletree Point Road, 4 Burlington, VT 05408 and 96 South Union Street, Burlington, VT 05401. 5 6 Q. Please state your occupation. 7 A. I am an independent nuclear engineering and safety expert at Fairewinds Associates, Inc. 8 My title is Chief Engineer. 9 10 Q. Please describe your educational and professional background and qualifications. 11 A. I have a Bachelor and Master Degree in Nuclear Engineering from Rensselaer 12 Polytechnic Institute (RPI) cum laude. I was awarded an Atomic Energy Commission 13 Fellowship to pursue my Master Degree in Nuclear Engineering. 14 15 After beginning my career as a reactor operator and instructor in 1971, I progressed to the 16 position of Senior Vice President for a nuclear licensee before moving into independent 17 consulting work. I have testified as an expert witness before the Nuclear Regulatory 18 Commission (NRC) Atomic Safety and Licensing Board (ASLB) and Advisory Committee on 1 Reactor Safeguards (ACRS), the State of Vermont Public Service Board, the State of Vermont 2 Environmental Court, the Florida Public Service Commission, and in Federal Court.
    [Show full text]
  • Gundersen SACE Testimony 7-7-2010
    BEFORE THE FLORIDA PUBLIC SERVICE COMMISSION In re: Nuclear Plant Cost ) Recovery Clause ) DOCKET NO. 100009-EI ) FILED: July 8, 2010 ________________________________ ) DIRECT TESTIMONY OF ARNOLD GUNDERSEN ON BEHALF OF SOUTHERN ALLIANCE FOR CLEAN ENERGY (SACE) E. LEON JACOBS, JR. GARY A. DAVIS Florida Bar No. 0714682 N.C. Bar No. 25976 WILLIAMS & JACOBS, LLC JAMES S. WHITLOCK 1720 S. Gadsden Street MS 14 N.C. Bar. No. 34304 Suite 201 GARY A. DAVIS & ASSOCIATES Tallahassee, FL 32301 PO Box 649 Tel: (850) 222-1246 Hot Springs, NC 28779 Fax: (850) 599-9079 Tel: (828) 622-0044 Email: [email protected] Fax: (828) 622-7610 Email: [email protected] [email protected] !" IN RE: NUCLEAR PLANT COST RECOVERY CLAUSE #" THE SOUTHERN ALLIANCE FOR CLEAN ENERGY $" FPSC DOCKET NO. 100009-EI %" &" DIRECT TESTIMONY OF '" ARNOLD GUNDERSEN (" )" I. INTRODUCTION AND QUALIFICATIONS *" Q. Please state your name and business address. !+" A. My name is Arnold Gundersen. My business address is Fairewinds Associates, Inc, !!" 376 Appletree Point Road, Burlington, VT 05408. !#" !$" Q. Please tell us how you are employed and describe your background. !%" A. I am employed as a nuclear engineer with Fairewinds Associates, Inc and as a part- !&" time college professor with Community College of Vermont. I have a Bachelor’s and !'" a Master’s Degree in Nuclear Engineering from Rensselaer Polytechnic Institute !(" (RPI) cum laude. I began my career as a reactor operator and instructor in 1971 and !)" progressed to the position of Senior Vice President for a nuclear licensee. A copy of !*" my Curriculum Vitae is attached as Exhibit AG-1.
    [Show full text]
  • Supplemental Report of the Public Oversight Panel Regarding the Comprehensive Reliability Assessment of the Vermont Yankee Nuclear Power Plant
    Supplemental Report of the Public Oversight Panel Regarding the Comprehensive Reliability Assessment of the Vermont Yankee Nuclear Power Plant July 20, 2010 Page 2 of 21 TABLE OF CONTENTS 1. INTRODUCTION 4 2. VERMONT YANKEE PERFORMANCE SINCE THE MARCH 2009 PUBLIC OVERSIGHT PANEL REPORT 6 3. THE LEAKAGE OF TRITIATED WATER 7 4. RESPONSE TO LEGISLATIVE QUESTIONS 8 4.1 REEXAMINATION OF THE MARCH 2009 REPORT 8 4.2 METHODOLOGY 8 4.3 NSA CONCLUSIONS 9 4.3.1 PANEL CONCERN #1‐ RESOURCE ALLOCATION 9 4.3.2 PANEL CONCERN #2‐ INADEQUATE QUESTIONING ATTITUDE 10 5. MISLEADING INFORMATION 12 6. POSSIBILITY OF OTHER INCORRECT INFORMATION 16 7. PUBLIC OVERSIGHT PANEL CONCLUSIONS 17 Page 3 of 21 1. INTRODUCTION The Vermont Legislature required a comprehensive vertical audit and reliability assessment of Vermont Yankee in Act 189, enacted June 5, 2008. Act 189 created a Public Oversight Panel (the Panel). The original Panel members were appointed in July 2008 to work with the Department of Public Service (DPS) and its contractor, Nuclear Safety Associates (NSA) to implement Act 189. During the fall of 2008 and the early winter of 2009 the Vermont Yankee Public Oversight Panel consisted of Peter Bradford, adjunct professor at Vermont Law School and former NRC Commissioner, appointed by former Speaker of the House Gaye Symington; Arnold Gundersen, Chief Nuclear Engineer of Fairewinds Associates, Inc, appointed by Senate President Pro-tem Peter Shumlin; William Sherman, former Vermont State Nuclear Engineer, appointed by Governor Jim Douglas; David Lochbaum, Director of the Union of Concerned Scientists Nuclear Safety Project, and Dr.
    [Show full text]