The Typical Project Day Schedule for MEAP: Time Activities Description 8:00 to 9:00 a.m. Check in and attendance  Materials that the students need for that day are passed out  Safety equipment for the day may be needed and passed out 9:00 to 12:00 p.m. Classroom lecture  At times a presenter will come and bring in equipment  And present information on new technology such as hybrid vehicles.  Students take notes and examine equipment such as Electric batteries.  Students summarize their observations on the computer OR Hands on project  Students work in teams on projects such as building a bridge.  Students learn and use software to simulate what the project may have as a result such as analyzing a bridge structure.  Students use materials such as glue, rope, wood, and construction paper provided to start a first step of a multistage project 12:00 to 1:00 p.m. Lunch (all students have lunch under supervision of MEAP staff)  Students may bring lunch or purchase lunch from campus food court  Parents will be notified when and if lunch is provided for a session 1:00 to 4:00 p.m. Classroom lecture or Hands on project 4:00 to 05:00 p.m.  Student work independently on ongoing projects until picked up.  Students put away materials, students store project items.  Dismissal which includes notes to parents about the next day

The Typical Tour Day Schedule for MEAP: Time Activities Description 8:00 to 09:00 a.m. Check in and attendance  Materials that the students need for that day are passed out  Safety equipment for the day may be needed and passed out 9:00 to 12:00 p.m. Tour  Get on the bus, travel to a tour site & check in at company  Interact with panel of industry representatives  View company sites  Get on the bus and travel back to IUPUI 12:00 to 1.00 p.m. Lunch (all students have lunch under supervision of MEAP staff)  Students may bring lunch or purchase lunch from campus food court  Parents will be notified when and if lunch is provided for a session 1:00 to 4:00 p.m. Classroom lecture or Hands on project 4:00 to 5:00 p.m.  Student work independently on ongoing projects until picked up.  Students put away materials, students store project items.  Dismissal which includes notes to parents about the next day