ELECTRICAL TESTING AND AUTOMATION DIVISION Page No. 1 of MONTHLY ACTIVITY REPORT 10 MONTH: January YEAR: 2007

I. ET & A METERING / PROTECTION / TESTING / COMMISSIONING SECTION.

A. PERFORMANCE INDICES: -

This YTM- Sr. YTM- INDICES month Jan 06 previous Target No. FY 07 Jan 07 year 1 Protection Performance Index (%) 96.97 % 100 % 98.73 % 97.96% 98.8 %

2 Protection Diagnostic testing Index (%) 4.74 % 4.39 % 50.30 % 58 % 83.3 %

3 Equipment Diagnostic testing Index (%) 6.43 % 8.85 % 45 % 52 % 83.3 %

Energy meter Diagnostic testing 4 49.12 % 27.47 % 49.12 % 27.47 % 100 % Index (%) External Customer Complaint 6 3.11 2.92 2.83 3.59 3.00 Resolution Time (Avg.) in Days Customer Complaint Satisfaction 7 4.21 4.5 4.45 4.59 4.60 Index (on the scale of 0 – 5)

B. ACCEPTANCE TESTING IN LAB:-

ETA LAB TOTAL ACCEPTED REJECTED REMARKS No. of Relays/jobs ABB make VIR 12 JA 26 25 1 Tested in Relay Lab. Trip Sup relay No of Meters in Meter 0 0 0 Lab. No. of CT / PT tested in 0 0 0 HT Lab. No. of Instruments MEGGER make 5 kV 4 3 1 Tested in HT/ RLY Lab. Insulation tester No. of Oil Sample Tested Bor - Trf # 2 , TR - DT # 26 22 4 in Oil Testing Lab. 5 & 6 Calibration of Testing 0 0 0 instruments ELECTRICAL TESTING AND AUTOMATION DIVISION Page No. 2 of 10 MONTHLY ACTIVITY REPORT MONTH: January YEAR: 2007

C. MAJOR COMMISSIONING: -

Commissioned In Cumulative up to Meters this month this month Energy Meters 1 Whole Current 0 3 Commissioning CT Based 26 79 Trivector 1 27

2 Consumer Sub  07/01/2007: IL & FS- New 415 V Distribution Panel Stations  11/01/2007: Maneka Silk- 3 way RMU (replacement of existing RMU due to SF6 low pressure) Commissioning  13/01/2007: Intelnet -2-1250 KVA Transformer re-commissioning after repairs  21/01/2007: Indiana- Replacement of 3 way Siemens RMU by 4 way Schnider RMU  25/01/2007: Indiana- 1250 KVA Tr-2, Feeder Pillar 3 Equipment  Trombay B: a) Unit #6, VFD for LP Heater drain pump commissioned Commissioning. b) Unit # 7: 220 KV CVT for ST # 7 commissioned c) Unit # 8: Construction Trf # 2 commissioned  Dharavi: a) 22KV Feeder-19 Retrofitting( Siemens 22KV VCB)  Bhira: a) At Mulshi, 500 KVA Transformer ( Kirloskar make ) , 22kV/433 V on HW line-2 b) 110 KV PT (Crompton make) on 110 KV Bus-1 ‘C Phase’ was replaced by similar make PT after abnormal noise noticed on PT  Khopoli: SCADA Energy Meter commissioning on 22 KV DT-7,HW- 1,SAT-1&2,Unit-2 & 3,110 KV DT-5&7,CRSE,Group Transformer1-2

4 Protection  Salsette: 220 kV TR-Sal- 1 ,2 & Kalwa-Sal-1, 2 lines:Main-II System / relays Distance Relays of Siemens make Distance Relay in place of ABB make RAZOA relays. Commissioning.  Parel: Parel DT-6 & 7 Buchholtz alarm & trip contacts put in series for Trip.  Borivli: Auto reclosure relays commissioned on 110 kV Bor- Malad lines- 1 & 2 to facilitate line outage for reconductoring.  Malad: Line Under Voltage scheme commissioned on 110 kV Bor- Malad-1 & 2 as a part of autoreclosure scheme. 5 Metering  BEST feeder wise meters were commissioned at Grant Road & activities Back Bay.  Site visits for AMR project implementation  Meeting with MERC regarding provision of meters for TPC-D & TPC-G.  02 BEST feeders Dharavi retrofitting job completed.  No of meters re-programmed for TOD as per MERC directive: Meter reprogramming for TOD as per new tariff order Secure Meters - 2 nos, Spectra Meters - 12 nos, L&T BVMs - 1660 nos.  52 Nos. of Spectra meters (with communication defect) are replaced.  Defective meters were replaced at J.P.Morgan, Intelent & ELECTRICAL TESTING AND AUTOMATION DIVISION Page No. 3 of 10 MONTHLY ACTIVITY REPORT MONTH: January YEAR: 2007

Landmark.  Direct summation metering scheme commissioned at BDB.  DAS meters were commissioned in series with existing Check meters at 5 locations.  SAP trials to include TOD changes in billing. New Register Groups created for TOD feature.  Acceptance Test on Meter Reading instrument (CMRI) in Lab.  Meeting with REL regarding replacement of Billing Meters.  Visit to the consumer "Hutch" fed from Morarji Gokuldas#1 S/S to resolve Power Quality Issues.  Commissioning of Meters (4 nos.) for recording construction activities of Unit#8  Joint Testing of ABT Meters of MSETCL along with L&T Engineer in Trombay Lab. Follow up with MSETCL for ABT Meter Panel modifications.

D. MAJOR OCCURRENCES & INVESTIGATION: -

DIVISION OCCURRENCES / INVESTIGATION Parel s/s  On 04/01/07, 22kV Bus Fault zone-II relay operated. Investigation revealed failure of C-phase CT in Feeder-62 due to ageing. At the same time, Trf-7 also tripped by Buchholtz relay mal-operation on oil surge. Buchholtz trip circuit has been modified to have alarm and trip contacts in series to prevent operation on oil surge, as an interim measure for both Trfs- 6 & 7. New Buchholtz relays of better design are being procured. Mahalaxmi S/S  On 14/01/07, 22kV Bus-II got shutdown due to operation of zone-II Bus fault relay. Trf-3 also tripped by Differential relay. Investigation revealed bursting of A & B phase poles of Trf-3 LT breaker-2 (22kV ABB make type HPA) due to insulation failure. Detailed investigation is being carried out alongwith ABB.

Vikhroli S/S  On 22/01/07, 110kV Bus Fault Zone-2 operated due failure A-phase CGL make LA on the bus.

Malad S/S  On 28/01/07, 110kV Bor-Malad line-2 tripped inadvertently during trials for commissioning of U/V scheme on Bor-Malad-1. The procedure for trial operation is being reviewed. Bhivpuri G/S  On 04/01/07 at 10.39 hrs, Unit no. 9 tripped on excitation problem. Investigation revealed failure of the inverter which was feeding 415 VAC auxiliary supply to excitation control. The standby 415 VAC supply did not come in service because of gradual voltage drop of inverter output. The unit was taken into service on standby auxiliary supply at 12.31 Hrs. after removing the damaged inverter. New inverter unit was installed and taken in service on 5/01/07 after necessary trials . Bhira G/S  On 29/01/07, BPSU 200 MVA GT, which was kept backcharged from 220kV, tripped on 11 KV Earth fault protection. The GT was charged after checking IR of 11kV circuit. Open delta voltage appearing across the 11kV E/F relay is ELECTRICAL TESTING AND AUTOMATION DIVISION Page No. 4 of 10 MONTHLY ACTIVITY REPORT MONTH: January YEAR: 2007

possibly due to voltage unbalance caused by capacitive effect or high resistance grounding of PT neutral on primary side. The relay setting is also being reviewed. Consumer s/s  On 05/01/07, Morarji Gokuldas-1, HBB breakers and Station Battery, At the time of occurrence, even though bus fault relay operated, breaker did not trip. Observed battery was discharged and trip coil of the breaker was burned. Replaced the trip coil and battery.  On 23/01/07, GC-1 Feeder at BKC, Feeder tripped by B/U E/F inst. 7SJ pickup did not appear. Found that B/U E/F setting was kept low. 7SJ600 relay found OK.  On 27/01/07, Western Sector-1 (BARC), Transformer tested OK. Fault was on one of the 415V O/G feeder. Consumers LV relay setting was on the higher side. Hence transformer must have tripped on VIP35 E/F.

E. FAULTS / ABNORMALITIES DETECTED DURING DIAGNOSTIC TESTING:-

Total No of faults detected. : - 01 nos. Significant Defects Detected::- Dharavi: a) 22KV Cap-1 bkr B-ph pole contact res. Found high during Maintenance checks. 22KV Cap-1 bkr B-ph pole contact res. Found high during Maintenance checks.

F. FACTORY INSPECTION /ACCEPTANCE TEST :-

Sr. FACTORY / EQUIPMENT & FINDINGS / LEARNINGS No. DIVISION BHEL, PPK: AVR inspection at on 17th & 18th Jan 07 for Haldia Project. 1. Bangalore VAS: 08 nos VOLTAMP make distribution transformer inspection at Voltamp- 3. Vadodara for Haldia Project on 12 &13/01/07 Vadodara VAS : 6.6 KV SIEMENS make 13 panel switchboard inspection at Kalwa 4 Siemens- Kalwa factory for Haldia project on 17&18/01/07

AM: On 22/01/07, Visited Crompton Greaves for evaluation of New 220 5 CGL Nasik kV Breakers with spring mechanism for Unit #7. GTJ & SSF: Inspection of NDPL’s Distribution transformers at Tarapur Tarapur 6 Transformer . Tarnsformers

G. COST SAVING :-

Relay Lab : Relay Lab : Rs. 2000 /- (Fluke make DMM 75 ) HV Lab: HV Lab: Rs. 1000/- (Metrohm make 5 kV Megger ) ELECTRICAL TESTING AND AUTOMATION DIVISION Page No. 5 of 10 MONTHLY ACTIVITY REPORT MONTH: January YEAR: 2007

H: - COST OF POOR QUALITY / REWORK : NIL Division Description of poor quality / rework No. of man hours spent

I: - NDB PARAMETERS New Different Better SFRA and HV tan delta test carried out for BEST Trfs-1 and 2 at Grant Road s/s

J. MAN POWER DEVELOPMENT / ADMINISTRATION:-

AM: a) On 16-18/01/07, Attended DOUBLE-India Conference at Vadodara and presented paper titled “Approach Toward Maximising the Availability of Equipment and Optimise the cost of Condition Monitoring-Experience of TATA POWER” co-authored by S G Patki, J D Shrotri and A Mukherji. b) On 29/01/07, Visited Power Plant at Dhuvaran (GSECL) for knowledge exchange session after 140 MW Unit shut down DD: Attended a 5 days training course on "NABL Accreditation for Meter Lab" at YMPL, Udaipur ELECTRICAL TESTING AND AUTOMATION DIVISION Page No. 6 of 10 MONTHLY ACTIVITY REPORT MONTH: January YEAR: 2007

II. SCADA SECTION

A: - PERFORMANCE INDICES

This month YTM- YTM- INDICES Jan06 Target Jan 07 FY 07 prev. year Availability Index (%) Overall 99.22% 85.4% 99.38% 85.26% 99.60% T&D 98.55% LDC 99.78%

SCADA system not Date No of Hours Reasons and action taken available for operations 1. Dharavi 08-Jan-07 8Hrs 50 Mins Being analysed. 16-Jan-07 45 Mins . 27-Jan-07 18 Hrs File system corruption. Repaired. 28-Jan-07 01 Hr

2 Khopoli SAT in  Master Replacement work in progress progress.

B: - COMMISSIONING & OTHER ACTIVITIES

Station / Equipment / Scheme Location Condition  Backups-63.3% completed based  Maintenance-42% completed Maintenance Distribution  Site Validation checks for Borivli D A completed for 24 out of 38 stations. Automation  Site Validation Checks for Saki Distribution Automation completed for 1 out of 17 stations after shifting the Work Station to Saki. BKC  Configuration of 2Nos additional Ports in BKC D-200 RTUs for connectivity to New Master at LD carried out and tested with existing Master. Trombay’A’  Configuration of 2Nos additional Ports in 100KV D-200 RTUs for connectivity to New Master at LD carried out and tested with existing Master..

C: –MAJOR FAILURES, PROBLEMS & INVESTIGATION

A total of 22 Calls were attended in January 2007.. NELCO Engineers were associated for attending to 6 calls with TPC Engineers, 3calls were attended by only NELCO and 13 calls were attended by TPC. ELECTRICAL TESTING AND AUTOMATION DIVISION Page No. 7 of 10 MONTHLY ACTIVITY REPORT MONTH: January YEAR: 2007

Dharavi SCADA not available on Total time of File system corruption was noticed during 4 occasions failure-28hrs investigation and repaired 35 mins Trombay Master View-2 failure 6 hrs Power supply and CPU hardware failure- ’B’ replaced H/W

D: - MANPOWER DEVELOPMENT /ADMN Ms Deepa Joshi attended two days in-house training on SAP Project Module at Carnac, from 24th Jan to 25th Jan 2007.

III. COMMUNICATION SECTION

1. COMMUNICATION AVAILABILITY: -

Communication January January Achieved for Target for System Indices 2007 (%) 2006 (%) FY 2007 the FY 2007 Protection Channels 100 99.73 99.74 99.9 Data channels 100 99.77 99.41 98.0 Voice system 98.87 99.94 99.25 99.0

Remarks:

Availability System / Channels affected Figure 1 Protection Nil 2 Data Nil 3 Voice FOX U Chassis was damaged at Lonavala Office due to entry of rodent and needed replacement which is already done

2. MAJOR INVESTIGATION & OCCURRENCES: -

Date Division / OCCURRENCES / INVESTIGATION Station 20th Dec Khopoli The mother board of FOX U chassis at Lonavala Office 07 – 10th got damaged due to entry of rodent inside the panel. The Jan 07 Khopoli division has been advised to take corrective action by blocking the cable entries in the panel as well as room. Maintaining and Checking of proper and adequate Air Conditioning for the Carrier Rooms in their division.

3. COMMISSIONING / PROJECT ACTIVITIES : - ELECTRICAL TESTING AND AUTOMATION DIVISION Page No. 8 of 10 MONTHLY ACTIVITY REPORT MONTH: January YEAR: 2007

Date Division Description 1. New Telephone exchanges for the system 13, 25 Jan 4 wire E& M tie lines connected between OXE exchanges at Carnac , 2007 Trombay Salsette, Parel , Mahalaxmi . 19th Jan OXE (type) Voice Hub has been tested for lower cut off voltage & was 2007 verified to be 44 volts. 10 , 24 Jan WAN link between Khopoli & Dharavi upgraded to 100 Mbps on 24th Jan 2007 07. Thereby WAN bandwidth for Khopoli, Lonavala & Bhivpuri is now 100 Mbps. Jan 07 WEB based Communication Call Center launched in Jan 07 Jan 07 WEB based Global Telephone Directory launched in Jan 07 2. Distribution Automation System Jan 2007 84 DAS stations out of 87 have gone online on CDMA.

4. RETROFITTING JOBS: -

Date Division Description 7th Jan Khopoli FOP underground cable at Khopoli Headwork’s 2007 near railway crossing was diverted due to railway construction work

5. BREAKDOWN MAINTENANCE ACTIVITIES : -

Date Division Description Resolutio n time 10th Jan Lonavla FOX U Chasis at Lonavala which was damaged 240 2006 has been replaced with new spare chassis. Voice & Data applications from Lonavla FOX U are put back in service. 6. PREVENTIVE MAINTAINANCE ACTIVITIES.

Date Station / Link Description Nil

Preventive Maintenance Completion Percentage

Percentage completion of PM for April 2006 – March 2007. System April 05-March Till Last Month Till end of this month 06 Fiber Optic 37.10 % 3.23% 3.23% Microwave 25 % 80.00 % 80.00 % PLCC 56.25 % 0.00 % 0.00 % Total 38.30 % 14.89 14.89 Condition based maintenance for FOP, MW, PLCC initiated from October 2006.

7. MAN POWER DEVELOPMENT /ADMN. ELECTRICAL TESTING AND AUTOMATION DIVISION Page No. 9 of 10 MONTHLY ACTIVITY REPORT MONTH: January YEAR: 2007

Date Name Description 24 Jan C Selvin Mr C Selvin attended State level PTCC (Power & 2007 Telecom Coordination Committee) meeting on behalf of Tata Power.

(J. D. Shrotri) AGM(ET&A)

SKP:JDS

Station Wise Diagnostic testing Index 2006 - 2007 ELECTRICAL TESTING AND AUTOMATION DIVISION Page No. 10 of 10 MONTHLY ACTIVITY REPORT MONTH: January YEAR: 2007

Sr. No. Station Diagnostic Testing indices Equipment Protection Overall

(%) (%) (%)

1 Ambernath 47 65 60 2 Backbay-Tata 38 60 56 3 Bhira 3 14 9 4 Bhivpuri 74 79 77 5 Borivli 29 45 42 6 Carnac 70 76 75 7 Chembur 0 0 0 8 Chola 0 31 25 9 Dharavi 77 45 53 10 Grant Road 0 100 100 11 Kalyan 78 88 85 12 Khopoli 9 10 10 13 Kundli 100 100 100 14 Kolshet 100 100 100 15 Mahalaxmi 38 49 47 16 Malad 61 71 68 17 Mankhurd 67 20 30 18 Panvel 100 100 100 19 Parel 74 68 70 20 Saki 50 61 57 21 Salsette 71 69 70 22 Trombay-A 8 30 25 23 Trombay-B 32 33 33 24 Versova 42 56 54 25 Vikhroli 35 32 33 26 Consumer-Saki 45 82 77 27 Consumer-Salsette 0 0 0 28 Consumer-Borivli 44 60 54 29 Dist.+BKC+BMC 50 93 86

Total 45 50 49