Risk Assessment - Minor Works

Total Page:16

File Type:pdf, Size:1020Kb

Risk Assessment - Minor Works

Company Name RISK ASSESSMENT – MINOR WORKS

Contract : Title of Contract Method Statement No: Method Statement No. Client : Name of Client For the attention of : Name of Recipient Date : Contract Date From: Name of Author Contract No: Contract Number Proposed Start Date: Start Date Review Date: Review Date Description: Description of works

Details of tasks to be carried Potential Hazard A B Overall Control Measures Action Revised out Likelihood Severity Risk Risk Rating Rating Rating A x B 1. Mark out survey grid using total 1.1 Injury from using hammer 4 3 12 Wear protective clothing Gloves and safety spectacles to 2x1=2 station. Installation of control points knocking in road pins. Moderate be worn by survey assistant Low using road pins. 1.2 Injury from site traffic as 2 5 10 Wear high visibility clothing. Ensure high visibility outer 1x1=1 result of working in access road Moderate garments worn at all times Low including wet-weather gear 1.3 Tripping 3 2 6 Engender an awareness of risk Keep site tidy with regard to 2X2=4 Low from tripping tapes and survey lines. Keep Low away from bunds 2. Collection of radar data along 2.1 Sparks from connecting 2 4 8 Set up procedure for connecting Establish safe area where transects 1m by 2m centres 12volt battery supply to control Moderate battery battery can be connected orthogonally. Survey corridor 5m unit igniting flammable vapour. wide centred on site access roads 2.2 Injury from site traffic as 1 5 5 Wear high visibility clothing. Ensure high visibility outer 1X3=3 result of working in access road Low garments worn at all times Low

COMPANY NAME Tel: Tel No. E-mail: Email Address

Registration No: Reg. No. Registered Office: Reg. Address Page 1 Company Name RISK ASSESSMENT – MINOR WORKS

Contract : Title of Contract Method Statement No: Method Statement No. Client : Name of Client For the attention of : Name of Recipient Date : Contract Date From: Name of Author Contract No: Contract Number Proposed Start Date: Start Date Review Date: Review Date Description: Description of works

Details of tasks to be carried Potential Hazard A B Overall Control Measures Action Revised out Likelihood Severity Risk Risk Rating Rating Rating A x B 3. Search survey corridor and 3.1 Sparks from connecting 2 4 8 Set up procedure for Establish safe area where 1x1=1 adjacent verges using nicad battery supply to Moderate connecting battery battery can be connected Low Radiodetection equipment and detector or signal generator mark detected service positions igniting flammable vapour. onto road using spray paint. 3.2 Injury from site traffic as 1 5 5 Wear high visibility clothing. Ensure high visibility outer 1x3=3 result of working in access Low garments worn at all times Low road 4. Lift inspection chamber 4.1 Injury from lifting cover 4 3 12 Ensure correct lifting Use hydraulic lifter 2X2 covers to inspect visually to incorrectly Moderate procedure is adhered to Low determine nature, size and depth of service entering and 4.2 Danger from gases 4 4 16 Establish procedure to Direct instruction to all site 1x4=4 leaving chamber. accumulating in chamber High ensure no entry into staff not to enter chamber Low chamber by personnel even if shallow 4.3 Danger of falling into 2 3 6 Guard all open chambers Provision of barriers to 1x3=3 open chamber Low prevent casual access to Low vicinity of open chamber

COMPANY NAME Tel: Tel No. E-mail: Email Address

Registration No: Reg. No. Registered Office: Reg. Address Page 2

Recommended publications