NORTH WESTERN RAILWAY STATEMENT SHOWING THE PROGRESS OF ORIGINAL WORKS FOR CAO(C) JP – April, 2014

ALL WORKS COSTING RS. 1 CRORE & ABOVE.

CE(C) I-JP Dy. CE/C/GC-JP Sr. No. Name of Estimated Ten %age Above/ Below Agreement Agency Date of Date of Phy. Name of Engg. In Remarks work. Cost. dere Sch. of Rates No. & Date. comme completion Progr charge. d ncemen ess of Cost t work. . 1. 1 2. 2 3. 3 4. 5. 5 6. 6 7. 7 8. 9. 9 10. 11. 11 12. 12 4 8 10

1 DY.CE/C/GC/ 413.54 Rate @ 640.00 per 03 /NWR/Dy. M/s. Jai Mata 17.08.2 30.11.2012 100% Sh. O. P. Work NWR/2011/T-3 397.54 Lakhs. cum CE/C-GC/JP / Construction 011 Ext. 31.8.13 Meena completed Supplying and Lakhs. Rebate @ 1.5% 2011-12/JP- Co. Dy CE./C/ GC- on stacking 65mm SIKR-CUR & House No. JP 26.08.13. gauge stone ballast SIKR-LHU dt. 14169, Stree machine crushed 23.09.2011. No. 8A, (hard stone) Ganesh conforming to RDSO Nagar, specifications Bhatinda between Km.279.722 to Km. 325.415 on SIKR- LHU section in connection with JP- SIKR-LHU & SIKR- CUR GC project. 2. DY.CE /C/ GC/ NWR/ 361.66 361.66 @12.69 % Below. 11/NWR/Dy. M/s Surabhi 29.3.20 15.10.2012. 92% Sh. O. P. Work in 2011/T-14 Lakhs. Lakhs. CE/C-GC/JP / Maheshwar 12. Ext. 31.10.13 Meena progress. Construction of New 2012-13/JP- rao, Dy CE./C/ GC- Major Bridge of span SIKR-CUR & C-58, Road JP 12 X 6.10 m (Km. SIKR-LHU dt. No. 1, 319/6-7) and 04.07.12 Film strengthening of Nagar,Jublee Bridge no. 165 Hills, (3x6.10 M at Km. Hyderabad. 268/5-6) and PSC Slabs as super- structure including earth work in approaches and other ancillary works in Sikar- Loharu section in connection with Jaipur-Sikar- Loharu & Sikar- Churu Gauge conversion Project.

3. DY.CE /C/ GC/ 606.44 606.44 @ 15.71% Below. 16/NWR/Dy. M/s Bharwal 20.7.12 06.03.13 78% Sh. O. P. Work in NWR/ 2011/T-18 Lakhs. Lakhs. CE/C-GC/JP / Lal Bijarnia, 31.10.2013 Meena progress. Dismantling of 2012-13/JP- Villgae- Dy CE./C/ GC- existing MG track, SIKR-CUR & Raipur, Post- JP Laying and linking SIKR-LHU dt. Prewari, of Broad gauge 27.09.12 Distt. main line, loop lines Nagour. including points and crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-II (Km. 267.50 to Km. 314.00) including Dundlod Mukundgarh, Nua & Jhunjhunu yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project 4. DY.CE /C/ GC/ 545.08 545.08 @ 13.05% Below. 13/NWR/Dy. M/s Laxyo 20.7.12 06.03.13 72% Sh. O. P. Work in NWR/ 2011/T-19 Lakhs. Lakhs. CE/C-GC/JP / Energy Pvt. 30.9.13 Meena progress. Dismantling of 2012-13/JP- Ltd., Dy CE./C/ GC- existing MG track, SIKR-CUR & 113, JP Laying and linking SIKR-LHU dt. Bakhatgarh of Broad gauge 03.08.12 Tower, 10/A, main line, loop lines New Plasia, including points and Indore (MP) crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-III (Km. 314.00 to Km. 360.70) including Ratan Shahar, Chirawa, Surajgarh & Loharu yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project. 5. DY.CE /C/ GC/ 394.71 394.71 @ 16.15% Below. 12/NWR/Dy. CE/ M/s Shupal 06.09.1 04.04.13 90% Sh. O. P. Work in NWR/ 2011/T-17 Lakhs Lakhs C-GC/JP /2012- Kumawat, 2 31.12.2013 Meena progress. Dismantling of 13/JP-SIKR-CUR Rly. Dy CE./C/ GC- existing MG track, & SIKR-LHU dt. Contractor, JP Laying and linking 03.08.12 Village & of Broad gauge Post.- main line, loop lines Badhal, including points and Distt.- Jaipur. crossings in yards, spreading of ballast, tamping of track, transportation of P. Way materials and other ancillary works in Sikar -Loharu section Zone-I (Km. 237.50 to Km. 267.50) including Sikar & Nawalgarh yards in connection with Jaipur-Sikar-Loharu & Sikar - Churu Gauge conversion project. 6. Dy.CE/C/GC/2012 460.51 460.51 @ 16.50% Above. 14/NWR/Dy. M/s Hanuman15.07.1 19.06.13 6% Sh. O. P. Under /T-23 Lakhs. Lakhs. CE/C-GC/JP / Construction 2 Ext. 31.7.13 Meena process for Transportation of 2012-13/JP- Company, Dy CE./C/ GC- Work short various type of BG SIKR-CUR & Bhootra JP closed due PSC sleepers from SIKR-LHU dt. Niwas, new to fund sleeper factory 16.08.12 market problem. such as Khatu, Nokha. Marwar Chapari, Degana, Churu or any other sleeper factory/place and P. way materials i.e. rails, switches & crossing and other P. Way fittings etc. from various locations including loading, unloading and and stacking at site in Sikar (inclusive) - Churu (inclusive) section in connection with Jaipur-Sikar- Loharu and Sikar- Churu Gauge Conversion project. 7. Dy.CE/C/GC/2011 295.47 295.47 @ 8% Above. 17/NWR/Dy. M/s 09.08.1 23.01.13 81.2% Sh. O. P. Final bill /T-12R Lakhs. Lakhs. CE/C-GC/JP / Kamakhaya 2 Meena delay for Supplying and 2012-13/JP- Trading Co. Dy CE./C/ GC- want of ‘No stacking 65mm SIKR-CUR & House No. JP Due gauge stone SIKR-LHU dt. 32, Patel Certificate ballast machine 03.10.12 Nagar, of Mining crushed (hard Bhiwani. dept. from stone) conforming contractor. to RDSO specifications between 59.901 (L. C. 51) to Km. 90.46 (Churu Station) on Sikar – Churu section in connection with Jaipur-Sikar- Loharu and Sikar- Churu Gauge Conversion project. 8. Dy.CE/C/GC/2012 707.55 707.55 10.80% Above. 18/NWR/Dy. M/s RSB 18.9.12 10.3.13 58% Sh. O. P. Work in /T-26 Lakhs. Lakhs. CE/C-GC/JP / Project Ext. 30.9.13 Meena Progress. Residual work of 2012-13/JP- Limited, RSB Dy CE./C/ GC- construction SIKR-CUR & Plaza, JP including addition SIKR-LHU dt. SCO,,30.31, and alteration of 22.11.12 Sector -16 station buildings, Faridabad Staff quarters, (Haryana) passenger platforms, platform surfacing, and all other ancillary works between Jhunjhunu (excl.)- Loharu (incl.) stations of Sikar- Loharu section in connection with Jaipur-Sikar- Loharu & Sikar- Churu GC project

9 NWR/S&C/SIKR- 1213.13 1213.13 13.25% Above NWR M/s RSB 25.09.1 20.3.2013 57% Sh. O. P. Work in LHU/GC/T/9 Lakhs Lakhs /S&C/CA/119 Project 2 Ext. Meena Progress. Residual work of dtd.20.11.12 Limited, RSB 30.10.13 Dy CE./C/ GC- construction Plaza, JP including addition SCO,,30.31, and alteration of Sector -16 station buildings, Faridabad Staff quarters, (Haryana) passenger platforms, platform surfacing, and all other ancillary works between Sikar(Incl.)- Jhunjhunu (incl.) stations of Sikar- Loharu section in connection with Jaipur-Sikar- Loharu & Sikar- Churu GC project 10 Dy.CE/C/GC/2012/T- 106.44 106.44 @ 12% Above. 19/NWR/Dy. M/s Bharwal 04.9.12 03.01.2012 60% Sh. O. P. Work in 28 Lakhs Lakhs CE/C-GC/JP / Lal Bijarnia, Ext. 30.9.13 Meena Progress. Residual earth work 2012-13/JP- Jaulsa Kua Dy CE./C/ GC- in bank, Cutting and SIKR-CUR & Road, Near JP lead bank utilising SIKR-LHU dt. Tagore B. Ed. cut spoils for 21.12.12 College, widening/ Tegore construction of BG Nagar, formation including Kuchaman side drains, trolley City, Distt. refuses, cess wall Nagour. etc. and other ancillary works between Sikar (Incl.)-Loharu (Incl.) stations of Sikar- Loharu section in connection with Jaipur-Sikar-Loharu & Sikar-Churu GC project. 11 Dy.CE/C/GC/2012 276.87 276.87 9% above. 21/NWR/Dy. M/s Surabhi 26.02.2013 95% Sh. O. P. Work in /T-29 Lakhs. Lakhs. CE/C-GC/JP / Maheshwar 03.10. Ext. Meena Progress. Residual work for 2012-13/JP-SIKR- Rao, 12 31.08.13 Dy CE./C/ GC- construction of CUR & SIKR-LHU C-58, Road JP minor bridges dt. 19.01.13 No. 1, including Film dismantling of Nagar,Jublee existing bridges, Hills, construction of Hyderabad return/wing walls, launching of already casted & transported RCC box and other ancillary works between Sikar(Incl.)- Loharu (Incl.) and Sikar(Incl.)-Churu (Incl.) stations of Sikar- Loharu & Sikar – Churu section in connection with Jaipur-Sikar- Loharu & Sikar- Churu GC project. 12 Dy.CE/C/GC/2012 205.26 205.26 31.20% below. 22/NWR/Dy. M/s Creative 20.12.1 19.12.15 55% Sh. O. P. Work in /T-27 Lakhs Lakhs. CE/C-GC/JP / Engineers, F- 2 Meena Progress. Providing in situ 2012-13/JP-SIKR- 189, Road Dy CE./C/ GC- Glued joints of G-3 CUR & SIKR-LHU No. 5, IP, JP ( L) type as per dt. 22.02.13 Industrial RDSO drawings for area, Kota. 60 kg & 52 kg rails with all fittings etc complete in Jaipur- Sikar - Loharu & Sikar - Churu section in connection with Jaipur - Sikar - Loharu & Sikar - Churu Gauge Conversion project 13 Dy. CE /C/ GC/ 102.90 102.90 1.51% Below. 24/NWR/Dy. M/s Shree 23.1.2 15.5.13 100% Sh. O. P. Work has NWR / 2012/T-33 Lakhs Lakhs CE/C-GC/JP / Shyam 013 Meena been Supplying and 2012-13/JP-SIKR- Engineering Dy CE./C/ GC- completed stacking 65mm CUR & SIKR-LHU Company, JP Final bill gauge stone dt. 08.03.13 Punia Colony, delay for ballast machine Churu want of ‘No crushed (hard Due stone) conforming Certificate to RDSO of Mining specifications at dept. from Jhunjhunu station contractor. on Sikar - Loharu section in connection with Jaipur-Sikar- Loharu and Sikar- Churu Gauge Conversion project. 14 Dy. CE /C/ 224.00 224.00 4.90% Below. 23/NWR/Dy. M/s Devendra 03.02.2 28.7.13 100% Sh. O. P. Work has GC/NWR/ 2012/T- Lakhs Lakhs CE/C-GC/JP / Singh 013 Meena been 31 2012-13/JP-SIKR- Contractor, Dy CE./C/ GC- completed Supplying and CUR & SIKR-LHU 7, pratap JP Final bill stacking 65mm dt. 08.03.13 nagar, Saket delay for gauge stone Colony, want of ‘No ballast machine Rajgarh Due crushed (hard Raod, Hissar Certificate stone) conforming of Mining to RDSO dept. from specifications at contractor. Nawalgarh station on Sikar - Loharu section in connection with Jaipur- Sikar- Loharu and Sikar- Churu Gauge Conversion project 15 DO-JP- 565.00 565.00 13% Above. NWR M/s. 19.1. 01.07.09 82.30% Sh. O. P. Work FL/Doubling/8 Lakhs. Lakhs. /S&C/CA/91 Navketan 09& Ext. Meena transfer dtd.04.12.07 Private 25.3. 30.9.13 Dy CE./C/ GC- from Flash Butt Welding Limited, 12 JP Dy.CE/C- of 52Kg./60Kg. 1, A. J. C. II/JP unit New rail at site Bose Road, using Mobile Flash Kolkata – Butt Welding plant 700 020 in connection with Dausa - Jaipur - Phulera doubling project. 16 NWR/S&C/JP- 992.27 992.27 15.25% NWR/S&C/JP- M/s Rahee 02.10.1 26.7.14 18.28% Sh. O. P. Work RGS- Lakhs. Lakhs. below RGS-SIKR/GC/T- Infratech 2 Meena transfered SIKR/GC/T/05 05 dt. 04.12.13 Limited, Dy CE./C/ GC- from Flash Butt Welding 4,Ho-Chi, JP Dy.CE/C-II/ of 52Kg. /60Kg. Kolkata JP. new rails at depot/site using Mobile Flash Butt Welding plant in Jaipur – Ringas- Sikar – Churu & Loharu Section in connection with Jaipur-Sikar- Loharu and Sikar- Churu Gauge Conversion project.

17. Tender No. Dy. CE 717.46 717.46 3.10% Below. 28 /NWR/ M/s Rishab 19.03.1 07.10.13 20% Sh. O. P. Work in /C/GC/ NWR/ Lakhs. Lakhs. Dy.CE/C- Construction 3 Meena progress 2012/ T-24R-1 GC/JP/13-14/JP- (Pvt.) Ltd. Dy CE./C/ GC- Construction SIKR-CUR & SIKR- 53-54, JP including LHU dated Shopping Fabrication of 27.07.2013 Centre, FOBs and platform Janata shelters in SIKAR- Colony, LOHARU section in Jaipur connection with JP-SIKR-LHU and SIKR-CUR Gauge Conversion Project. Dy. CE/C/III-JP

Sr. Name of work. Estimated Tender %age Above/ Agreem Agency Date of Date Physical Name of Engg. in Remarks No. Cost. ed Below Sch. of ent No. commencemen of progress charge. Cost. Rates & Date. t com of work. pleti on 1. AF/BKI/GC/JP/4R- 3.27 crores 2.98 Sch. A- 81% CPM/JP/ M/s 4.1.2000 31.3. 100% A.K.Gupta Work Construction Cr above KTT/CA/ Jugendra 2004 Dy. CE(C)III/JP completed, strengthening & Sch. B- 21% 16 dt. Singh & Co. Final bill rebuilding M/bridges Below 15.2.20 Etah under between Nadbai- 00 preparation BTE with Sh. J.K.Jain SSE/C/W/Si rohi

2 AF/BKI/GC/JP/68- 178.72 1.83 2.79% above NWR/S& M/s RSV 5.11.04 31.5. 100% -do- Work Laying and linking Lakhs Cr C/CA/51 Constructio 2005 completed. BG track between dated n(P) Ltd., Final bill / BTE-AH section 4.01.05 Hyderabad Final variation under Technically check Since 19.5.2012.

3 AF/BKi/GC/JP/69- 177.40 1.58 50% below on NSR/S& M/s 28.10.04 30.1 100% - do - Final bill Laying and linking Cr NS/3 (a), 22, 23 C/CA/49 Engipress 1.20 awaited BG track between – & 24 dated Rail links 05 from AH-IDH section 7% below for 24.12.0 (Jv) Gwalior XEN/C/AWR remaining items 4 & (Sh. S.K. Mittal).. Final bill awaited from XEN/C/AWR & (Sh. S.K. Mittal).. . 4 AF/BKI/GC/JP36- 1.06 1.02 Sch. ‘A’ 3% Dy.CE(C M/s India 12.10.03 30.6. 100% -do- Final bill Welding of rail Crores Cr Below )/JP/CA/ Thermit 2004 technically joints bet BKI-Kherli 77 welding checked, dated Corp., Final 7.10.03 Kanpur variation /Final bill under process for finance vetting. 5 HSI-RE/Doubling/1 47.42 50.81 Sch.A 13% NWR/S& M/s ARSS- 3.11.08 31.1 95% -do- Work is in Construction of Crore Cr. above C/CA/10 Triveni(JV) 0.20 progress. Major Bridge minor Sch.B AT PAR 1 dated Bhubanesh 12 Further bridge R/wall earth Sch.C =44% 23.10.0 war extension is work station above 8- awaited building ballast Sch.D 15% above from supply , track Sch.E AT PAR agency. linking etc. Sch.F 45% Letter to above HQ for Sch.G 45% obtaining above Approval of Sch.H 45% C.A. for above termination Sch.I 30% of contract above on Sch.J 45% 21.6.2013. above 6 AWR- 21.17 21.24 Sch.A AT PAR NWR/S& M/s ARSS 27.10.08 31.0 100% -do- Work HSI/Doubling/6 Crore Cr Sch.B AT PAR C/CA/10 Infra 5.12 completed. Construction Sch.C =44% 2 dated structure Final bill station building above 23.10.0 project Ltd. under Misc. structure Sch.D 15% above 8 Bhubanesh technically ballast supply track Sch.E AT PAR war check. linking etc. Sch.F 45% (Orissa) above Sch.G 45% above Sch.H 45% above Sch.I 30% above Sch.J 45% above 7 HIS-RE/Doubling/2 3.10 Cr 4.16 Sch.A Dy M/S 22.2.09 31/1 95% -do- Work is in Const/Extension of Cr NS-A- 4, CE/C- Sanjeev 2/12 progress. FOB&PF shelter 6 & 7, JP/CA/2 Brothers, shed bet. RE-HIS. 4.5% above 24 dt. Jaipur. NS-A-5, 19.65% 19.03.0 ab0ve 9 Rest items AT PAR Sch.B AT PAR

8 NWR/S&C/T/13 28.48 Cr. 28.88 1.41% Above CE/S&C M/s Balaji 16.7.09 30.5. 100% -do- Work Construction of 72 Cr. /CA/27 Builders & 2013 completed units Type-II, 108 dt. Developers & Final bill units Type- 8.9.200 (JV) Jaipur passed. III, 36 units Type- 9 IV in Multistoried Towers & HEALTH Unit, shopping complex 9 NWR/S&C/T/30 28.99 Cr. 27.25 6% below NWR/S& M/s MBL - 30.1 15% -do- Work in Cr. C/CA/11 Infrastructu 1.20 progress. 7 dt res Ltd 14 13.7.12 Delhi.

10 NWR/S&C/T/1/ROB 4.70 crore 1% Above Dy M/s Shree 14.5. 40% -do- Work in -53 Construction of 4.75 CE/C/III Goutam 14 progress ROB- 53-B on Crore I/JP/CA/ Constructio 28.5.13 Biwani- Rohtak line. 242 dt. n Co. Ltrd. Construction of 11.9.20 ROB- 53-B on 13 Biwani- Rohtak line.

11 NWR/S&C/T/1/RRI 2.01 crore 1.93 4.11% below M/s Shree 1.6.13 17.5. Building. Crore Dy Shayam 14 40% -do- Work in Construction of RRI CE/C/III Engg progress building at satroad I/JP/CA/ & Bhiwani sattion 241 dt. yard. 13.8.20 13

Dy. CE/C/II-JP

1 DO- 1.27 1.30 Sch.-A Item Dy. CE M/s. Sanjeev 14/2/07 15/0 100% Sh. Sunil Physically completed JP/Doubling Crore Crore No.1028, 3501 (C)-II/ Brothers, 4/08 Singh /8 - & 3502=40% CA/4 dtd. Vaishali Nagar, Exte Constructio above base & 18/04/07 Jaipur. nded n of FOB further 300% upto bet. DO-JP Above & 15/1 section remaining 0/20 =40% Above 10 base rate & further 9% Above.

2 NWR/S&C/J 23.38 Crors 21.41 Sch. A= NWR/S&C Giriraj Civil 7/4/11 10/8 0.7% Sh. Sunil Work terminitated P-SIKR Crors 22.75% Below /CA/110 Developers Pvt /201 Singh -LHU Sch. A= 8.65% Dated Ltrd. 2 &SIKR- Below 16/08/11 BorivaliBombay CUR/GC/T/ Sch. C= 1 RR 16.10% Above Constructio for item 1 &2 n of Minor rest 18% beow Bridges , Sch. D= 7.15% Wing beloe /Return Sch. E= 9% walls.E/wor Above k in Sch. F=23.15% formation Above for item construction 6 a&b rest 9% including abovve addition Sch. G= 39% altretation Above for ite no oing 401f , Passanger 403f,409f, latforms 609,610,611 etc.Between rest item JP-RGS 17.6% below Sch. H=27% below

3 NWR/S&C/J 17.50 Crors 17.24 Sch. A= 18% NWR/S&C Modi 2.01.12 26/0 12% Sh. Sunil Work short closed . P-SIKR Crors below /CA/116 Construction(JV 4/20 Singh -LHU Sch. B= 17% Dated ) Jaipur 13 &SIKR- Above 27/03/12 CUR/GC/T/ Sch. C= 15% 5 RR Above Constructio Sch. D= 9% n of Minor below Bridges , Sch. E= At par Wing Sch. F= At par /Return walls.E/wor Sch. G= 4% below Sch. H=At par

k in formation construction including addition altretation 4 NWR/S&C/J 15.99 15.36 3.99% Below NWR/S&C M/s V.K.Sood 22/4/13 10/4 10% Sh. Sunil Work in progress P/RUB- Crors Crors /CA/127 Engineers & /201 Singh 82&83/T- Dated contractor 4 1]: 25/06/ Panchkula Constructio 2013 n of Road Under Bridge including providing road approaches, covering shed, retaing wall, pedestrian path way, height gauge, drainage arrangemen t, sump etc complete in lieu of level crossing No.- 82 & 83 in Jaipur - Sawai Madhopur Railway section. 5 Tender No. 6.73 6.50 3.4% below NWR/S&C M/S Biharilal 16/5/13 29/0 40% Sh. Sunil Work in progress. NWR/S&C/R crores Crore RPC/ menghani,New 4/20 Singh PC/ROB- s ROB- Delhi 18 14 149 C/T- 149/CA/T/ 01Construct 01 dtd. ion of 2 05/09/13 lane Road over bridge (3span) with RCC deck slab on composite &PSC girder super structure including pile foundation & RCC sub structure & related allied works, in lieu of Level crossing No.C-149 at Km 212/0 - 1 near Phulera in Rewari - Ringus - Phulera (RPC) section. CE/C/II-JP

Dy. CE/C/I-UDZ

Sr. Name of work. Estimated Tendere %age Above/ Agreement No. Agency D Date of Phy.P Name of Remarks No. Cost in d Cost. Below Sch. of & Date. at completion rog.o Engg. Lacs of In Lacs Rates e f incharge. Rs. of Rs. of work co m m en ce m en t

1 T.NO.UDZ- 1476.00 1568.04 Sch-2% Above, NWR/S&C/ M/S Om Prakash 1 29.11.12 65% Sh. In Progress HMT/GC/MB/T-1- Sch.-B 6.75% CA/111 Dt. Goyal & Co. 0. 31.12.13 S.L.Meena Construction of Above, Sch.-C, 9.9.11 Neemach 8. 31. 12. 14 Dy.CE/C/UD Major bridges from 7% above, 1 Z DNRP-HMT in Sch.D-10% 1 connection with Above, Sch.- UDZ-HMT section. E,AT Par,Sch.- F,AT Par & ,Sch.-G,AT Par,

2 T.NO.UDZ- 1323.00 1212.56 Sch.A=15% NWR/S&C/ M/S Braham 3 27.9.12 27.06.13 55% Sh. In HMT/GC/MB/T-2- Below, Sch.- CA/109 Dt. Prakash Modi, 0. 31.03.2014 S.L.Meena Progress) Const., minor B=7% Below, 16.8.11 Jaipur 4. Applied for up to Dy.CE/C/UD bridges from Km. Sch.-C=5% 1 30.09.14) Z 160/0 to 187/0 in Below,Sch.- 1 in connection with D=5% UDZ-HMT Section Above,Sch.-E to G=At Par,Sch.- H=10% Below

3 T.NO.UDZ- 1769.00 1665.08 Sch.A=4.5% NWR/S&C/ Amit-Mass (JV), 0 20.01.2013 Sh. Contract HMT/GC/EW/T-3- above, Sch.- CA/112 Vadodara 3. S.L.Meena terminated Construction of B=18.01% Dt.21.10.11 8. Dy.CE/C/UD on Minor bridges frm Below, Sch.- 1 Z 07.11.2012 Km. 270/0 to 320/0 C=24% 1 in connection with Above,Sch.- UDZ-HMT section. D=9% Above & Sch.-E to G=At Par, 4 T.NO.UDZ- 3310.00 3045.2 Sch.A=0.5% NWR/S&C/ M/s Rahee- 2 7.02.2013 30% Sh. In Progress HMT/GC/EW/T-4- Above, Sch.- CA/113 Triveni (J/V) 3. 30.11.2013 S.L.Meena Construction of B=20% Below, Dt.21.10.11 Kolcutta 8. 31.07.2014 Dy.CE/C/UD Minor bridges frm Sch.-C=3% 1 Z Km. 207/0 to 250/0 Above,Sch.- 1 in connection with D=20% UDZ-HMT section. Above,Sch.-E =At Par, Sch.- F=10% above & Sch.-G=AT Par

5 UDZ- 190.03 199.54 Schedule A to Dyce/C/UDZ/CA/ M/S Aakrati 1 09.05.2012 75% Sh. In Progress HMT/GC/BLDG/T-6-R C=5% 15 dated Builders & 28.02.2014 S.L.Me -Provision of office above 23.11.12 Associates 31.05.2014 ena & residential J.K.House, Dy.CE accommodatio 121, , /C/UD n at UDZ in Fatehpura, Z connection Udaipur with UDZ-HMT section GC Project

6 T.NO.UDZ- 1795.00 1919.40 Schedule A to M/S M.G. 2 06.02.2014 40% Sh. In Progress HMT/GC/EW/T/11 C=6.95% Contractors 31.12.2014 S.L.Me -Construction of above , Pvt., Ltd., ena Minor bridges Panchkula Dy.CE & earthwork /C/UD from Z Km.187/0 to 207 in connection with UDZ-HMT section GC Project

7 T.NO.UDZ- 3381.91 3517.86 Schedule A to NWR/S&C/ M/S Ravi 3. 17.1.2014 45% Sh. In Progress HMT/GC/EW/T/12 C=4.02% above CA/123 Infrabuild 1 30.11.2014 S.L.Meena Dt.13.2.2013 Projects Pvt, 1. Dy.CE/C/UD -Construction of Ltd., sector-11, 1 Z Minor bridges & Udaipur 2 earthwork from Km. 250/0 to 270/0 in connection with UDZ-HMT section GC Project 8. T.NO.UDZ- 5284.00 5652.55 Schedule A to NWR/S&C/ M/S 2 30.04.2015 15% Sh. In Progress HMT/LHS/T-14- C=6.97% above CA/126 M.G.Contractors 5. S.L.Meena & Non- Dt.19.6.2013 Pvt., Ltd.1721, 6. Dy.CE/C/UD -Construction of Schedule- Sector-4 1 Z Limited hight Sub- D,6.97% Above Panchkula- 3 ways in lieu of L- 134109 xings in UDZ-HMT (Haryana section.

DY. CE/C/DNPR

Sr. No. Name of Estimated Tend %age Above/ Below Agreement Agency Date Date of Phy. Name of Engg. Remarks work. Cost. ered Sch. of Rates No. & Date. of completion Progres In charge. Cost. comm s of encem work. ent

1 Dy. 71.82 Crore 56.74 21% below NWR/S&C/ M/s Nayak 06-11- 09-07-15 15% M.K. Meena, Work is in CE/C/DN Crore CA/129 Infrastructure 2013 Dy. CE/C/ progress. RP/ RTM- Dated 31- Pvt. Ltd., DNRP DNRP/EW 10-2013 Guwahati / NL/T-8:- E/W in cutting and filling for formation & all other ancillary works etc. from Km. 0.00 to Km. 17.00 between Dungarpu r-Nawa Gaon station in c/with DNRP- RTM New BG Rail Line Project.

2 DyCE/C/U 5.67 Cr. 4.99 Sch A 14.50% below NWR/S&C/ M/s S.M. 28.11. 13-11-12 & 90% M.K.Meena Work is in DZ/DNRP- Cr CA/114 Dt. Consultant 11 Extended Dy.CE/C/ DNRP progress. RTM/ Sch B- 8.50% below 27-02-12 Bhubaneswar upto 30-07- FLS/2011 14 /T/1 Sch C-14.50% below 3. T. No. 42.82 Crores 38.06 11.11% below Accepted M/s Gannon - 03-04-16 - M.K. Meena, Work Dy.CE/C/ Crore on 04-04- Dunkerley & Dy. CE/C/DNRP awarded on DNRP/RT s 2014 Co. Ltd., 04-04-2014. M- Ahmedabad DNRP/MB /NL/T/ 10 – Const. of minor bridges, RUB & other ancillary works etc. from Km. 0.00 to 17.00 bet. Dungarpu r to Nawa Gaon stations in c/with DNRP- RTM New BG Rail Line Project.

Dy. CE/C/BNSW

Sr. No. Name of Estima Tendered %age Above/ Below Agreement Agency Date of Date of Phy. Name of Remarks work. ted Cost. Sch. of Rates No. & Date. commence completion Progress Engg. In Cost. ment of work. charge.

- NIL - CE/C/III-JP

Dy. CE/C/I-AII

Sr. Tender No. & Estimated Tender %age Agreement Agency Date of Date of Physical Name of Remarks No. Name of work cost. ed Above/Belo No. & Date. comencem completion Progres Engineer Cost w ent s of Incharge work 1 2 3 4 5 6 7 8 9 10 11 12 1 AII/BHL/GC/T/ 94.07 109.30 Sch.A=15% Dy.CE(C)/ M/s 17-11-06 05-04-07 30- 70% Shri Work 68-Providing Lacs Lacs Above the AII/COR/ Akrati 04-07 15-07- K.L.Meena Terminated, B.G.Pit line in B/Rate CA/36 dtd. Engineer 07 30-09-07 Dy. the case is Ajmer yard and Sch.B= 51% 09-01-07 s, 31-12-07 15- CE/C/I/AII under addition/alteratio Above SOR 28-B, 04-08 31- vigilance n/modification to Sarala 07-08 investigatio FOB near C&W Bagh n workshop gate at Extensio Ajmer and other n, ancillary works Dayal for platform etc. Bagh, in connection Agra. with Ajmer- Chittaurgarh Gauge Conversion Project. 2 T.No.AII/Const. Rs 3424.43 Rs Sch.A, A-1- NWR/S&C/CA M/s 27.03.2010 22/04/2012 70% -"- Work under /Loco/Mod/T/1 Lacs 3424.4 1.00% Above, /31 Dtd. Bharat extended up progress. : Construction & 3 Lacs Sch.–B 10% 17.06.2010 GPT(JV), 06/11/2012, fabrication of Above, Sch. – Jaipur 30/06/2013, various sheds C 13.70% 31/12/2013 & with or without Above, Sch.– 31/12/2014 tracks for EOT D-4.00% cranes of Above, Sch.– different E-33.00% capacity and Above, 149% contruction of above on SOR Offices, Toilets items.. including laying of BG tracksand dismantling of existing structures/ sheds, BG/MG tracks in connection with Modernisation of Loco Workshop at Ajmer.

3 AII/Const./C& Rs 1758.77 Rs Sch.A-15% NWR/S&C/CA Prem 5/9/2011 05/12/2012, 65% -"- Work under W/Mod/T/3(R) Lacs 1524.9 below, A-1- /34dtd.07-09- Fabricat 31/12/2013, progress. : Construction & 7 Lacs 6.00% below, 2011 or's, 31/12/2013 & fabrication of Sch.–B 8% 301, 30/07/2014 various sheds below, Sch. – Meera with or without C 15% below, Manon tracks for EOT Sch.–D-At Arcude, cranes of Par, Sch.–E- Near different 60% above Krupa capacity and on SOR Petrol construction of items.. Pump Offices, Toilets Parimal including laying Garden, of BG tracks Ellis and dismantling Bridge, of existing Ahmeda structures/shed bad- s, BG/MG tracks 380006 in connection with Modernisation of C&W Workshop at Ajmer. 4 AII/BHL/GC/T/ 268.04 250.54 Sch.A=1 % NWR/S&C/CA M/S Kalu 2/11/03 25-08-04 6% Shri Final 11-R-Earth Lacs Below the /33 Ram K.L.Meena variation work in banks B/Rate with dt. 09/01/04 Contract Dy. submitted and cutting for 8% rebate on or. CE/C/I/AII to accounts formation all items of Jodhpur for vetting including side Sch.A,except on drains, trolley item 03/04/2012 refuges, toe No.NS/11 & . walls etc., NS/12. construction, Sch.B=15% extension, Above SOR. strengthening of minor bridges of span 0.31m to 1.83 m, casting, supplying & erecting in position RCC boxes/slabs/Ba llast retainers etc. in Mandapiya – Chanderia section in connection with Ajmer- Chittaurgarh Gauge conversion project. 5 AII/BHL/GC/T/ 274.96 283.32 Sch.A=2% NWR/S&C/CA M/S 1/12/03 12-09-04 10% -"- Final bill is 7-R-Earth work Lacs Lacs. Above the /32 Shiva Extended 30- awaited in banks and B/Rate on all dt. 31-12-03 Construc 06-05 from cutting for items except tion. XEN/C- formation NS/12 For Pvt. Ltd. II/BER. including side NS/12=4.95 381,Nay drains, trolley % Above a refuges, toe B/Rate Bazar,Aj walls etc., Sch.B= 22% mer. construction, Above SOR extension, strengthening of minor/major bridges of span 0.31m to 6.50 m, casting, supplying & erecting in position RCC boxes/slabs/Ba llast retainers/PSC slabs in Bijainagar- Lambia section in connection with Ajmer- Chittaurgarh Gauge conversion project. 6 AII/BHL/GC/T/ 548.50 511.72 Sch.A=10.18 NWR/S&C/CA RSV- 15/11/04 10/5/2005 5% -"- Final 22 Lacs Lacs. % Below the /42 RRC variation -Construction of B/Rate dt. 12-08-05 Joint statement New Major Sch.B=9% Venture, vetted on Bridge no.140 Above B/Rate 102, 14/05/13, with 6 X Sch.C= 18% Kamalag put up to 30.50M. PSC Above SOR iri CA for BOX GIRDER on Towers, sanction. diverted F-56, alignment Madhura including Nagar, earthwork on Hydraba the approaches d and Construction /Extension of minor bridges between Mandal – Bhilwara section with Railway’s design & drawing in connection with Ajmer- Chittaurgarh Gauge conversion project 7 T.No.AII/BNGM `2080.76 `1592. Sch.A :NS NWR/S&C/CA M/s SB- 01/02/11 18/07/2012, 98% Shri Work under - Lacs. 08 1,4,5(i)= 38 dated SHC- 31/12/2012,31 K.L.Meena progress. RAS/NL/T/2:Co Lacs. 25% Below 09.12.2011 MCDPL(J /08/2013,31/0 Dy. nstruction of the B/Rate, V)c-10, 1/2014 & CE/C/I/AII major bridge NS 2= 39% Vaishali 31/03/2014 including earth Below the Nagar, work on the B/Rate, NS Jaipur. approaches 3= 20% between BNGM Below the (Excl.)-RAS B/Rate, NS (incl.) section 5(ii) & (iii)= in c/with 60% Below BNGM-RAS New the B/Rate, B.G. rail line Sch.B : 13% project. Below the B/Rate, Sch.C : 2.15% Below the B/Rate, Sch.D- 1=52% Below the B/Rate, D-2=41% Below the B/Rate, D-3 At Par, Sch.E : 23% Below the B/Rate, Sch.F : 200 Above the B/Rate & Sch.G : 70% Above the SOR Rate.

8 T.No.AII/BNGM ` 1584.31 ` Sch.A :2% NWR/S&C/CA M/s Jai 05/05/11 16/06/2012, 99% -"- Work under -RAS/NL/T/4: Lacs 1103.4 Below the -37 dated Mata Di 31/12/2012, progress. Earthwork in 9 Lacs B/Rate, with 16.12.2011 Energy 31/05/2013, bank/cutting special rebate System, 30/09/2013,31 and of 70% on (JV) /12/2013,28/0 construction of NS/A-1(a), VPO- 2/2014 & minor bridges 50% on Narodar 30/04/2014 including, NS/A-1(b), a, ancillary works 30% on Tehsil- between NS/A-2(a), Laxman Bangurgram- 40% on garh, RAS (Km. 10.50 NS/A-3(a), Sikar to 20.50 ) 40% on (Raj.). section in NS/A-3(b), connection with 30% on Bangurgram- NS/A-4(b), RAS new BG 99% on Rail Link NS/A-4(c), Project. 99% on NS/A-8, Sch.B : 55% Below the B/Rate, Sch.C : 22% Below the B/Rate, Sch.D=20% Above the B/Rate, Sch.E : 38% Below the B/Rate, & Sch.F : 200% Above the SOR Rate. 9 T.No.AII/BNGM ` ` Sch.A :45% NWR/S&C/CA M/s 04/07/11 16/06/2012, 85% -"- Work under -RAS/NL/T/5: 1310.69.6 825.62 Below the /37 dated Jandu 31/12/2012, progress. Earthwork in 2 Lacs Lacs B/Rate, Sch.B 08.12.2011 Construc 30/06/2013,31 bank/cutting : 42% Below tion /10/2013, and the B/Rate, Compan 28/02/2014 & construction of Sch.C : 5% y,305, 30/06/2014 minor bridges Below the Model including, B/Rate, Town ancillary works Sch.D=17% Mandi, between Below the Adampu Bangurgram- B/Rate, r, Hisar. RAS (Km. 20.50 Sch.E : 21% to 28.50) Below the section in B/Rate, & connection with Sch.F : 21% Bangurgram- Above the RAS new BG SOR Rate. Rail Link Project. 10 T.No.AII/BNGM ` 1565.69 ` Sch.A :35% NWR/S&C/CA M/s 10/11/11 30/10/2012, 90% -"- Work under -RAS/NL/T/3 Lacs 1060.4 Below the /36 dated Jandu 31/03/2013, progress. (R) : Earthwork 3 Lacs B/Rate, Sch.B 08.12.2011 Construc 31/07/2013,31 in bank/cutting : 42% Below tion /10/2013,31/0 and the B/Rate, Compan 1/2014 & construction of Sch.C : 5% y,305, 30/04/2014 minor bridges Below the Model including, B/Rate, Town ancillary works Sch.D=17% Mandi, between Below the Adampu Bangurgram- B/Rate, r, Hisar. RAS (Km. 0.00 Sch.E : 22% to 10.50) Below the section in B/Rate, & connection with Sch.F : 25% Bangurgram- Above the RAS new BG SOR Rate. Rail Link Project. 11 T.No.AII/BNGM ` 457.50 ` Sch.A :` Dy.CE(C)AII/ M/s. 08/02/12 25/12/2012, 100% -"- Work under -RAS/NL/T/8 : Lacs 406.50 406.50 per BNGM- Rajesh 31/03/2013, progress. Supplying and Lacs Cum.. RAS/NL/CA/7 Kumar 30/06/2013 & Stacking 3 dated Gupta, 30/09/2013 machine 12.03.2012 54, crushed stone Nehru track Ballast in Nagar, stacks as per Kush Railways’ Marg, specifications Alwar between Km. (Raj.)- 0.00 to 28.50 301001 [Bangurgram to Ras] in connection with Bangurgram- Ras new rail line project.

12 T. No. ` 3135.86 ` 7.13 % above NWR/S&C/CA M/s. 23/11/12 21/10/2013, 75% -"- Work under AII/BNGM- Lakh 3359.4 base rate. /46 dated Varaha 28/02/2014 & progress. RAS/NL/T/12:C 5 Lakh 24/12/2012 Infra 30/06/2014 onstruction of Ltd., Road under Umesh Bridges & Road Smriti, Over Bridges 6- Jalam including earth Vilas work & Road Scehem work on the e, Paota, approaches & B-Road, miscellaneous Jodhpur works in (Raj.) connection with Bangurgram- Ras New BG line project 13 AII/BNGM- ` 585.53 ` 14 % above - M/s. - 14/09/2013,28 40% -"- Work under RAS/NL/T/11 Lakh 667.50 base rate. Bhanwar /02/2014 & progress. R2:Laying and Lakh Lal 31/05/2014 linking of Broad Bijarnia gauge main Village line, loop lines Rajpura, including points Tehsil and crossings in Nawa, yards, Dist.- spreading of Nagaur ballast, tamping (Raj.) of track, transportation of P-way materials, construction of station building & platform and other ancillary works between Bangurgram and Ras stations in connection with Bangurgram- Ras New Broad Gauge Line Project.

14 AII/Const./DFC Rs. Rs. 9% Above - M/s. 13/03/13 17/08/2014 35% Shri CIL/T/1-R: 228,137,7 248,67 RSB K.L.Meena Construction of 44.37 0,141.3 Projects Dy. staff Quarters 6 Limited, CE/C/I/AII including RSB electric work, Plaza, Under Ground SCO-30- Water Tank, 31, Road work, Sector- Boundary Wall 16, etc. between Faridaba Madar-Guriya d- Section in 121002 connection with shifting of utilities for DFCCIL. 15 AII/Const./DFC Rs. Rs. 9.97% Above - Ravi 14/12/13 04/02/2015 2% Shri CIL/T/3R2: 228,137,7 248,67 Infra K.L.Meena Shifting of track 44.37 0,141.3 Projects Dy. between Madar 6 Pvt. CE/C/I/AII & Durai stations Ltd., 95, & shifting MG Hiran yard at Marwar Magri, Jn. i.c.w. DFC. Sector- 11, Udaipur. 16 AII/Const./DFC Rs. Rs. 6.48% Below - M/s. 15/09/13 05/03/2015 1% Shri CIL/T/6: 440,230,6 411,70 Rama K.L.Meena Construction of 31.24 3,686.3 Construc Dy. station building 4 tion Co., CE/C/I/AII & staff quarters H-240, in c/w shifting Ashok of utilities for Vihar, DFCCIL. Phase-I, Delhi 17 AII/Const./LHS Rs. Rs. 6.99% Above - M/s. Lall 18/02/14 15/12/2015 0% Shri /T/3: Providing 427,813,1 457,71 Construc K.L.Meena limited height 96.89 7,339.3 tion Co., Dy. subways in lieu 5 Govern CE/C/I/AII of existing level ment & crossins Railway between Madar Contract & Haripur ors, AA- stations of 105, Madar-Marwar Shalimar section in Bagh, connection with Delhi - elimination of 110088 existing level crossin gates.. Dy. CE/C/II-Ajmer

Sr. Tender No. & Estimated Tende %age Agreement Age Date of Date of completion Ph Name of Remarks No. Name of work cost. red Above/Below No. & Date. ncy comenceme ysi Engineer Cost nt cal Incharge Pr og re ss of wo rk 1 T.No.AII/ROB/A 479.09 Lacs 605.1 Sch.–A = 24.10%, Dy.CE(C) M/S 10/12/2008 29.06.09, 29.09.09, 10 Sh. M. M. Final Bill BR/T/1 0 Lacs Sch.-B=20.50%, AII/ABR San 31.01.10, 31.05.10, 0 Upadhyay passed. Construction of Sch.-C=11.50%, CA/ROB/56 wari 15.08.10, 15.10.10, % Dy. ROB (Two Lane) Sch.-D= 7.00%, dtd.31.3.09 ya 30.11.10, 30.01.11 & CE/C/II/AII in lieu of L.C. Sch.-E= 45.70%, Infr 10.04.12 no. 134/B Km. Sch.-F = 7.00% astr 601/7-8 near Sch.-G=70.00% & uct Abu Road. Sch.-H=70.00% ure Above base rate. s Pvt. Ltd. Uda ipur . 2 T.No.AII/KVJ- 408.81 Lacs. 377.0 Sch.A : 7.77% Dy.CE(C)AII/ M/s 22.10.11 14.04.2012, 85 -"- Work under KRJD/I/BG 5 Below the B/Rate. KVJ- Lax 30.09.2012, % progress Doubling/T/8-R: Lacs. SRPJ/BGD/CA yo 30.04.2013,31/10/20 Dismantling of /71 Dtd. Ene 13 & 30/05/2014 existing BG 05.12.11 rgy track, laying and Pvt. linking of Broad Ltd. gauge main line, , loop lines 46/ including points 1, and crossings at TIT various yards, Roa spreading of d, ballast, tamping Ratl of track, am transportation of (M. P.Way materials P.) and other ancillary works between Keshavganj – Swarupganj (both incl.) section in connection with Keshavganj– Swarupganj BG Patch Doubling Project.

3 T.No.AII/KVJ- `804.14 Lacs. `898. Sch.A : 11.78% - M/s 23.10.12 14/06/2013, 50 -"- Work under KRJD/I/BG 86 Above the B/Rate. Var 30/09/2013, % progress Doubling/T/14- Lacs. aha 31/12/2013 & R: Addition, Infr 30/04/2014 alteration and a construction of Ltd. S&T structures, , Pass. Platform, Um Platform esh Shelters, station Smr Building, staff iti-6 Quarters, water Jala Huts, toilets, m Hand Pumps, Vila FOBs, Level s Crossing works, Sch Km Post, em Gradient Posts & e, Hectometer Poa Posts etc. ta between B. Keshavganj – Roa Swarupganj d, (both incl.) Jod section and hpu Officer Rest r House at Aburoad Station in connection with Keshavganj– Swarupganj BG Patch Doubling Project. 4 T.No.AII/Const/ 103420675.0 11226 8.55% NWR/S&C/CA M/s 19/12/2012 11.05.2013,10.12.20 70 Shri M.M. - LHS/T/1: 0 3142. /50 dated . 13 & 31/05/2014 % Upadhyay, Construction of 71 21/02/2013 Rav Dy.CE(C)- Limited Height i II, Ajmer Subway in lieu Infr of existing LC abui No. 101 (Km ld 548/5-6), LC Proj No. 102 (Km ects 550/7-8), LC Pvt. No. 107 (Km Ltd. 562/6-7), LC Offi No. 109 (Km ce 568/9-10), LC 95, No. 110 (Km Hira 571/2-3) & LC n No. 111 (Km Mag 572/5-6) ri between Sec stations tor- Keshavganj- 11, Swarupganj of Uda Marwar- ipur PalanPur Section - in connection 313 with elimination 002 of level crossing (Raj gates. .). 5 T.No.AII/Const./ 180858376.3 17904 -1.00% NWR/S&C/CA M/s 14/09/2013 07/04/2014 15 Shri M.M. - LHS/T/2: 1 9792. /58 dated . % Upadhyay, Construction of 6 18/03/2013 Rav Dy.CE(C)- Limited Height i II, Ajmer Subway in lieu Infr of existing LC abui No. 58, 60, 61, ld 62, 64, 65, 66, Proj 67, 68, 69, 71, ects 72 & 73(13 Nos) Pvt. between Ltd. stations Marwar Offi to Rani of ce Marwar- 95, Palanpur Section Hira in connection n with elimination Mag of level crossing ri gates. Sec tor- 11, Uda ipur - 313 002 (Raj .).

6 T.No.AII/GRI- 380870338.5 35417 -7.01% NWR/S&C/CA M/s 31/12/2012 04/03/2014 20 Shri M.M. Work under MJ/BGD/T/1: 4 1327. /51 dated . % Upadhyay, progress. Earthwork in 80 14/03/2013 Bra Dy.CE(C)- embankment for ha II, Ajmer cutting & filling, m Blanketing for Pra bank, Addition, kas alteration and h construction of Mod S&T structures, i, Pass. Platform, 74 Platform Sud Shelters, station ars Building, staff han Quarters, water pur Huts, toilets, a, Hand Pumps, Ind FOBs, TMC Rest ustr house etc. ial between Are Guriya–Marwar a, Jn. stations Bais (both excl.) and god Officer Rest am, House at Mawar Jaip Jn. Station in ur- connection with 06 Guriya-Marwar Jn. BG Patch Doubling Project. 7 T.No.Tender No. 327680538.8 32404 -1.11% NWR/S&C/CA M/s 06/12/2013 28/01/2015 2 Shri M.M. Work under AII/GRI- 7 3284. /62 dated . % Upadhyay, progress. MJ/BGD/T/2:- 89 06/01/2014 PNC Dy.CE(C)- Construction of Infr II, Ajmer Important/Major atec Bridges h including Ltd. earthwork, - blanketing on Jain the approaches Con between stru stations Guriya ctio to Marwar n Junction with Co Railway’s/Contra mp ctor’s design & any drawing in (JV) connection with 761 Guriya-Marwar /30, Junction BG Akla Patch Doubling nk Project. Hou se, Nea r Mal God own , Tika m Gan j, Ajm er 8 T.No.AII/Const./ 22639869.10 18338 -19.00% NWR/S&C/CA M/s 02/02/2013 06/07/2013 & 35 Shri M.M. Work under FLS/T/1: 293.9 /57 dated . S. 31/03/2013 % Upadhyay, progress. Marking out of 7 07/11/2013 M. Dy.CE(C)- center line, Con II, Ajmer taking levels sult including all ants details, Carrying , out Geotech Plot investigation, No. designing of - foundation and 130 sub – structures , / super S.M structure of . Minor / Major Tow bridges/LHS, er, preparation of Man land plans & che proposal, swa Preparation of L- r section & yard Ind plans etc. & ustr submitting ial detailed working Esta drawings in te, connection with Ras Bangurgram to ulga Guriya & Marwar rh, to Rani Doubling Bhu projects and bne Various shifting shw of utility works ar of DFCCIL & LHS (Odi works between sha Kishangarh & ) Palanpur stations. 9 T.No.AII/Const/ 66576000.00 69904 5.00% Dy.CE(C)AII/ M/s 13/11/2013 18/03/2015 10 Shri M.M. Work under FBW/T/1: Flash 800.0 FBW/CA/85 . % Upadhyay, progress. butt Welding of 0 dated The Dy.CE(C)- 60/52 Kg. 21/10/2013 Indi II, Ajmer New/SH,(72/90 a UTS ) Rail joints The by using mobile rmit flash butt Cor welding plant in pn. connection with Ltd. various , sanctioned 84/ works of Ajmer 22, unit of Faz construction al organization. Gan j, Kan pur- 208 012 10 T.No.AII/Const./ `28,89,56,11 `2947 2.00% NWR/S&C/CA M/s 03/06/2013 19.11.2014 40 Shri M.M. Work under DFCCIL/T/8: 1.00 35233 /55 dated . % Upadhyay, progress. Construction of .22 20/09/2013 RSB Dy.CE(C)- staff Quarters proj II, Ajmer including electric ect work, Under Limi Ground Water ted, Tank, Road RSB work, Boundary Plaz Wall etc. a, between SC Chandawal O (incl.) – Nana 30- (incl.) Section in 31, connection with sect shifting of or- utilities for 16, DFCCIL. Fari dab ad- 121 002

11 T.No.AII/Const./ `18,16,62,33 `1871 NWR/S&C/CA M/s - 19.08.2014 15 Shri M.M. Work under DFCCIL/T/9: 4.21 12204 /57 dated . % Upadhyay, progress. Construction of .24 07/11/2013 RSB Dy.CE(C)- staff Quarters proj II, Ajmer including electric ect work, Under Limi Ground Water ted, Tank, Road RSB work, Boundary Plaz Wall etc. a, between Nana SC (excl.) – O Palanpur (excl.) 30- Section in 31, connection with sect shifting of or- utilities for 16, DFCCIL. Fari dab ad- 121 002 12 T.No.AII/Const./ `31,08,16,52 `3077 -1.00% NWR/S&C/CA M/s 14/06/2013 28/11/2014 10 Shri M.M. Work under DFCCIL/T/7: 1.95 08356 /54 dated . % Upadhyay, progress. Shifting of .73 20/09/2013 RSB Dy.CE(C)- different utilities proj II, Ajmer in connection ect with Limi infringements in ted, the DFCCIL RSB alignment, by Plaz dismantling of a, service SC buildings, Over O Head/ 30- Underground 31, water Tanks, sect diesel Shed, or- Cycle stand etc. 16, & reconstruction Fari of the same dab utilities, ad- construction of 121 Road, boundary 002 wall, drains, septic tanks, pathways & extension of FOB's etc as per requirement on shifted locations between Madar- Palanpur stations.

DY.CE/C/JU

S. Name of work Estimated Cost Tendered %age Above/ Agreement Agency Date of Date of Physical Name of Remarks No. (Rs.) cost Below Sch. of No. & date commenc completion progress of Engineering In Rates ement work charge (JAG level) 1. T.NO.JU/Const./09R/ 289.66 lacs. 33553869/ Detail Not prepared M/s Bhanwar Lal 10.10.11 29.09.12 Work in Sh.R.B.Benda 2010-11 - E/Work in - below. Bijarnia. 31.1.13 progress JE(W) cutting & filling for 30.4.13 Sh.Gaurav formation ,const. of 31.07.13 Kapoor RUB,etc MKN-BIDD 31.12.13 AXEN/C- section 31.03.14 Sch-.A" -10.77%above , Sch--B- 15.70% above, Sch – C- 16% above, Sch- -D- 16.47% above, Sch -E-25% above , Sch.-F-23%, above, Sch.- G-12 % above, Sch-H- 18 5% above( all SOR items1996) Note :- 1.27% S. Name of work Estimated Cost Tendered %age Above/ Agreement Agency Date of Date of Physical Name of Remarks No. (Rs.) cost Below Sch. of No. & date commenc completion progress of Engineering In Rates ement work charge (JAG level) rebate on the cost of NS items, as offered by contractor has been accepted by the competent authority . 2. Construction of ROB 354.23 lacs. 329.43 7% below Dy.CE/C/ JU/ Parul 25.10.12 09.07.13 Work Sh.K.L.Meena Work under at LC No. C-323-A 04/2012-13, Construction Co., 15.09.13 completed onSSE(W)/C finalization. (at Barmer dtd. Mehsana 31.10.13 10.03.14 Sh.M.K.Baweja 08.01.13 07.01.14 XEN/C- 10.03.14 3. Work of remodeling of 110.48 132.02 19.50% Dy.CE/C/ Sh.Girdhari Ram 11.11.12 16.6.13 Work in Sh.Ramesh JU yard including all above JU/03/2012- S/o Sh. Sajjan 31.10.13 progress Chand,JE(P.Way work related to P. 13, dtd. Ram, Jodhpur 30.04.14 ) way, AT welding 13.12.12 Sh.M.K.Baweja XEN/C- 4. Work of remodeling of 375.71 414.97 10.45% Dy.CE/C/ M/s Kalu Ram 7.12.12 15.8.13 Work in Sh.K.L.Meena JU yard including all above JU/05/2012- Contractor, E-15, 15.12.13 progress SSE(W) work related to Civil 13, dtd. Shastri Nagar, 31.03.14 Sh.M.K.Baweja works 08.01.13 Jodhpur XEN/C- 5. - Residual work of 185.30 166.97 9.89% Dy.CE/C/ M/s Jai Mata De 01.02.13 10.4.13 Work in Sh.K.L.Meena extension of Bay No.4 Below JU/09/2012- Energy System, 31.08.13 progress SSE(W) inside Diesel Shed 13, dtd. VP. Narodara 30.11.13 Sh.M.K.Baweja BGKT 30.03.13 (Laxman garh), 28.02.14 XEN/C- Sikar

6 Carrying out 25.10 18.87 25% Below Dy.CE/C/ JU/ M/s C.S. 7.2.13 28.04.13 Work in Sh.R.B.Benda Geotechnical /2012-13, Engineers & 30.11.13 progress JE(W) investigation for ROB dtd. Consultants, 31.03.13 Sh.Gaurav on LC No.21 & LC .13 Shakarpur, DELHI Kapoor No.61 – 110 092 AXEN/C- 7. Preparation of GAD 21.26 20.19 5.03% Dy.CE/C/ JU/ M/s Theme 15.04.13 06.07.13 Work in Sh.R.B.Benda and Soil Testing for Below /2012-13, Engineering 30.11.13 progress JE(W) RUBs in various dtd. 07.13 Services Pvt. 31.03.14 Sh.Gaurav Ltd., Jaipur sections of Jodhpur Kapoor division AXEN/C- 8. Staking out 90.68 90.68 At Par Dy.CE/C/ JU/ M/s Spage 10.09.13 05.03.14 Work in Sh.R.B.Benda alignment, detail /2012-13, Consultancy, progress JE(W) Engg. Construction dtd. 10.13 Jodhpur. Sh.Gaurav S. Name of work Estimated Cost Tendered %age Above/ Agreement Agency Date of Date of Physical Name of Remarks No. (Rs.) cost Below Sch. of No. & date commenc completion progress of Engineering In Rates ement work charge (JAG level) survey in c/w new line Kapoor between Thaiyat AXEN/C- Hamira - Sanu (58.50 Kms.)

CE/C/IV-JP Dy. CE/C/BKN

S. No. T.No. & Estimated Tendered % Agreement Agency Date of Date of Physical Name of Remarks Name of cost cost/Accep above/bel No. & date commence completion progress Engineerin work s ted cost ow ment work g In location Schedule charge of rates ( JAG applicable level)

1 T.No.Const/ Rs 341.76 Rs 341.76 29.77% 102- M/S 01.06.10 15.03.13 100% Sh Lal Final bill BKN/18/200 lakhs lakhs/ Rs above on NWR/Dy V.K.Const. Chand , Dy passed. 9-10/RE- 416.36 Sch-A & CE/C-II/BKN Co.2-D,37, CE/C/BKN HSR/Std-II lakhs 13.77% Dt Jawahar Const. of above on 19.07.2010 Nagar , Sri Station Sch-B Ganganagar biliding and other service buildimnngs etc. between Rewari ( excluiding ) to Hansi in c/with RE- HSR Std-II panel interlocking.

2 T.No. Rs 375.41 Rs 375.41 Sch-A = 103- M/S Jitender 01.11.10 30.09.12 35% Sh Lal Launching Const/BKN/ lakhs lakhs/ Rs 10% below , NWR/Dy Singh V& Chand , Dy of PSC slabs 01/SDRA/20 366.52 Sch-B = 9% CE/C- PO- Kakoda, CE/C/BKN of Br. No. 10-11 :- lakhs below, Sch- II/BKN/201 Distt 11 is Const. of C = At par, 0-11 Dt Jhunjhunu balance. station Sch-D = 8% 13.12.2010 building , below, Sch- passenger E = at par, platforms, Sch-F = 1% stafdf above quarters , duty huts for L- Xing etc. in c/with Provision of B class station at Sudhrana

3 Const/BKN/ Rs Rs Rs 555.00 172- M/S Jai 10.01.12 31.12.13 82% Sh Lal 47140 cum 04/2011- 341.2035 341.2035 per cum NWR/Dy Mata Chand , Dy has been 12/BKN- lakhs lakhs/ Rs CE/C- Const.Co. CE/C/BKN supplied. SDLP-RTGH- 305.25 I/BKN/2010 H.No.14169 SRDR:- lakhs -11//RTGH- Street no.8A Supplying SRDR Dt Ganesh and stacking 09.03.12 Nagar 55000 cum Bhatinda( P 65mm b) gauge stone ballast machine crushed (hard stone) confirming to RDSO specification s between Ratangarh & Ratangarh West & Ratangarh West to km.19.00 on Ratangarh- Sardarshaha r section in connection with Bikaner- Sadulpur- Ratangarh- Sardarshaha r gauge conversion project

4 Const/BKN/ Rs Rs Schedule-A 174- M/S LVJ 05.01.12 31.03.14 44% Sh Lal Work is in 05/2011- 562.9770 562.9770 (NS) = 5% NWR/Dy Projects Chand , Dy progress. 12/BKN- lakhs lakhs/ Rs below, CE/C- Private CE/C/BKN SDLP-RTGH- 534.82 I/BKN/2010 Limited, 1 & SRDR:- lakhs Schedule-B -11//RTGH- 2, 1st Floor, Earthwork ( USSOR SRDR Dt Shri Krishna in banks items) – 31.03.12 Centre , and cutting 5% below Near for Mithakhari formation Six Roads , including Navrangpur side drains , a, trolley Ahemadaba refuges, toe d-380009 , walls/ Gujrat retaining wall , stone pitching etc. in Ratangarh ( including) to Sardarshaha r (including) section in connection with Bikaner- Sadulpur- Ratangarh- Sardarshaha r gauge conversion project

5 T.No.Const/BKN/03/2 Rs Rs (i) Sch-A 09/NWR/Dy M/S 15.12.10 30.06.12 100% Sh Lal Final bill to be 010-11:- Dismantling 203.818 203.818lakhs / - At par CE/C- Bhanwar Chand , Dy recorded in of existing MG track, lakhs Rs 178.57 with 3% III/BKN/SRPR- Lal CE/C/BKN MB. laying and linking of lakhs rebate on SGNR dated Bijarniya , broad gauge main Ns item 09.03.2011 Village - line, loop lines No.6,6(a), Rajpura including points and 25% Post- crossings in yards, above Parewadi spreading of ballast, with 3% , Tehsil tamping of track, rebate on Nawa transportation of NS item Distt p.way materials and No.29 & Nagour other ancillary works 12.60% ( Raj) in Zone-03 below ( Km.81.00 to 115.00 with 3% including Sri rebate Karanpur & Keasri (ii) Sch-B Singhpur station - 40% yard) on Suratgarh – below Sri Ganganagar with 3% section in connection rebate with Sarupsar-Sri (iii) Sch-C Ganganagar gauge - 10% conversion project above with 3% rebate.

6 T.No.Const/BKN/13/2 Rs Rs 113.159 Sch-A = 17-NWR/Dy M/S 28.08.11 15.11.13 95% Sh Lal Work in 010-11/SRPR- 113.159 lakhs / Rs 60.6 % CE/C- India Chand , Dy progress SGNR :- Supply of 52 lakhs 181.732 lakhs above III/BKN/SRPR- Thermit CE/C/BKN kg /90 UTS SKV SGNR dated Corporati welding portions to 28.02.2012 on Ltd. the Railways for 84/22, welding of rail joints Fazal from km 20.500 to Ganj, 138.00 between Kanpur Sarupsar ( including) to Sri Ganganagar ( including) in connection with Sarupsar to Sri Ganganagar Gauge conversion project

7 T.No.Const/BKN/12/2 Rs Rs 166.332 Sch-A = 132-NWR/Dy M/s 24.02.11 28.08.13 100% Sh Lal Final bill 010-11/SRPR-HMH- 166.332 lakhs / Rs 0.50% CE/C-II/BKN dt Poonia Chand , Dy passed. SURP:- Construction, lakhs 166.114 lakhs below 07.03.12 Const Co. CE/C/BKN Strengthening/extens Sch-B = 30, ion of existing Minor 0.50% Sector- bridges and below 13, Part- placement of PSC Sch-C = II, Hisar slabs with RCC 0.50% ballast retainers of below span upto 6.10m including earthwork in approaches of bridges and other ancillary works in Diplana (excluding) to Suratpura (including) section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura- Hanumangarh- Sriganganagar gauge conversion project

8 T.No.Const/BKN/10/2 Rs Rs 546.197 Sch-A = 122-NWR/Dy The Birhi 24.03.11 30.06.13 50% Sh Lal Contract 010-11/SRPR-HMH- 546.197 lakhs / Rs 9% below CE/C-II/BKN Kalan L/C Chand , Dy terminated on SURP:- Earthwork in lakhs 510.15 lakhs Sch-B = Dt Co Op. CE/C/BKN 24.04.2013. banks and cutting for 8% below 26.11.2011. Society formation including Sch-C = Ltd. Birhi side drains, trolley At par Kalan, refuges, toe Tehsil- walls/retaining wall Charkhi etc, including supply Dadri, of cement between Distt- Diplana (excluding) Bhiwani to Suratpura (including) to section i.e. from Km. 88.00 to Km 175.00 in connection with Suratpura- Hanumangarh- Sriganganagar gauge conversion project

9 T.No.Const/BKN/20/2 Rs130.33 Rs 130.33 Schedule- 79-NWR/Dy M/s 12.06.09 28.02.12 100% Sh Lal Final bill 008-09/SOG-BTI :- lakhs lakhs / A = 34% CE/C-II/BKN Karnani Chand , Dy passed. Addition and Rs174.63 above dated Const. CE/C/BKN alteration to station lakhs Schedule- 17.08.2009 New Line, yards, insertion of B = 34 % Ganga fan shaped turnouts, above Shahar, linking of track, sand Bikaner humps and overruns, shifting of and other miscellaneous works at all stations in c/w Standard–III and MACL signaling work at Rangmahal, Pilibanga, Dabli Rathan, Maneksar, Sangaria and Dhaban stations on Suratgarh-Bathinda section.

10 T. No. Const/BKN/ Rs Rs 398.658 Sche-A 126-NWR/Dy M/S 11.10.11 15.09.13 100 % Sh Lal Final variation 03/2011-12/SURP- 398.658 lakhs/ Rs ( SOR) – CE/C-II/BKN Agarwal Chand , Dy in process. HMH-SGNR :- lakhs 418.60 akhs 6.41% dated Const Co. CE/C/BKN Construction / above 11.01.2012 Dudhwa modification of Khara , station building & Sch- Churu structures i.e. S&T B( NS)- buildings, platforms, 4.51% PF shelters , duty above bunk and other ancillary works Sch-C between Tehsil ( Steel & Bhadra ( excluding) Cement) to Sidhmukh -2.61% (including) section in above connection with Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project 11 T.No. Const/BKN/ Rs Rs 300.026 Sche-A Contract Agmt M/S Pyare 05.11.11 15.09.13 100% Sh Lal Final variation 02/SURP-HMH- 300.026 lakhs / Rs ( SOR) – No. 129/11-12 Lal Dhaka Chand , Dy in process. SGNR/11-12:- lakhs 315.48 lakhs 6.51% dated Const. CE/C/BKN Construction / above 02.02.2012 Co. Churu modification of of /Dy CE/C- station building & Sch- II/BKN structures i.e. S&T B( NS)- buildings, platforms, 4.50% duty bunk and other above ancillary works between Sidhmukh Sch-C ( excluding) to ( Steel & Suratpura Jn. Cement) (including) section in -3.21% connection with above Suratpura- Hanumangarh – Sri Ganganagar Gauge conversion project

12 Te No. Rs Rs 528.675 9.54% 178-NWR/Dy M/S Shree Work is in 31.12.13 65% Sh Lal Work is in Const/BKN/06®/201 528.675 lakhs / Rs below CE/C-/BKN Dt Nahar progress Chand , Dy progress. 1-12/BKN-SDLP- laks 587.67 lakhs 18.08.12 Const. Co. CE/C/BKN RTGH-SRDR :- A-328, Dismantling of Shastri existing MG track, Nagar Laying and linking of Jodhpur Broad gauge main line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, transportation of P.Way materials & BG PSC sleepers from sleeper factory at Khatu, Shambhupura & Churu or any other sleeper factory/place including loading, unloading and stacking at site and leading, loading & unloading of rails from various places in Rajasthan or out side of Rajasthan and other ancillary works in section & at LC’s from Ratangarh to Sardarshasar including Ratangarh & Sardarshahar station yards) on Ratangarh – Sardarshahar section in connection with Bikaner Sadulpur Ratangarh Sardarshahar Gauge conversion project

13 T. No. Rs 580.55 Rs 580.55 11.50% 177-NWR/Dy M/S 06.07.12 31.08.14 55% Sh Lal Work is in Const/BKN/09(R)/20 lakhs lakhs/ Rs above on CE/C-/BKN Dt Maheshwar Chand , Dy progress 11-12/BKN-SDLP- 647.31 lakhs Sch-A & B 07.08.12 i Const. Co. CE/C/BKN RTGH-SRDR :- Bikaner Construction and Road, modification of Nokha station buildings, ( Bikander platform, platform shelter level crossings and earthwork in filling for platforms between Ratangarh ( including ) to Sardarshahar (including) in Ratangarh- Sardarshahar section in connection with Bikaner-Sadulpur- Ratangarh- Sardarshahar gauge conversion project 14 T. No. Rs 675.00 Rs 675 .00 Rs 968.00 01-NWR/Dy M/S Jai 06.08.12 31.12.13 100% Sh Lal Final variation Const/BKN/32®/201 lakhs lakhs/ Rs per cum CE/C-/BKN/SU Mata Chand , Dy in process. 1-12/SURP-HMH- 544.50 lakhs RP-DPLN-HMH Const. CE/C/BKN SGNR:- Supplying Dt 12.09.12 Co, and stacking 75000 14169, cum 65mm gauge Street stone ballast machine no.8-A, crushed (hard stone) Ganesh conforming to RDSO Nagar , specifications Bathinda between Km. 132.00 to 175.00 on Hanumangarh– Suratpura section in connection with Suratpura- Hanumangarh-Sri Ganganagar Gauge Conversion project

15 Te.No Const/ Rs 149.78 Rs 149.78 Rs 921.00 20/NWR/Dy M/S 15.11.12 25.12.13 56% Sh Lal Work is in BKN/01/2012- lakhs lakhs/ Rs per cum CE/C/BKN/201 R.K.Infras Chand , Dy progress. 13/SRPR-SGNR 137.94 lakhs for SOG 2-13/SRPR- tructure, CE/C/BKN Dated– & Rs SGNR Dated 407, Pink 22.05.2012 :- 1011.00 19.10.2012 Tower, Supplying and per cum Tonk stacking 14000 cum for SGNR Road, 65mm gauge stone Jaipur ballast machine crushed (hard stone) conforming to RDSO specifications at Suratgarh yard & near Sri Ganganagar yards in connection with Sarupsar -Sri Ganganagar Gauge Conversion project

16 Te.No Const/ Rs 1.208 Rs 1.208 9.07% 21-NWR/Dy M/S 26.10.12 31.12.13 67% Sh Lal Work is in BKN/05/2012- Crores Crores/ 1.317 above on CE/C/BKN/SRP V.K.Const Chand , Dy progress 13/SRPR-SGNR Crores Sch-A to R-SGNR Dt Co, 2-D- CE/C/BKN Dated– 22.05.2012 D 06.12.13 37,Jawah Dismantling & arnagar reconstruction of Sri parcel office, Ganganag extension of waiting hall, construction of ar platform shelters, improvement of platform surfacing of Island platform and other ancillary works at Sri Gangsanagar in connection with Sarupsar -Sriganganagar Gauge Conversion Project.

17 T.No. Const/BKN/02/ Rs 8.989 Rs 8.989 12.25% NWR/S&C/CA/ M/S 26.10.12 30.04.14 82% Sh Lal Work is in Crores Crores/ above on 45 dated Pragati Chand , Dy progress SRPR-SGNR/2012-13 10.0905 Sch-A to 07.12.12. Constructi CE/C/BKN Crores D on :- Dismantling & Consultan Construction of BG ts, 28/12, Washing line coach East care complex,BG Punjabi goods platform with Bagh, approach road, Main Ring electrical sub-station Road, building,building New Delhi extension of high -110026 level passenger platform, water hydrants on washable apron,drainage pipe line and other ancillary works at Sri Gangsanagar station yard in connection with Sarupsar -Sriganganagar Gauge Conversion Project. 18 T.No Const/BKN/03/ Rs 11.488 Rs 11.488 10.25% NWR/S&C/CA/ M/S 26.10.12 31.05.14 55% Sh Lal Work is in Crores Crores/ 12.666 above on 44dated Pragati Chand , Dy progress SRPR-SGNR/2012-13 Crores Sch-A to 07.12.12. Constructi CE/C/BKN D on Construction of BG Consultan Sick line shed , ts, 28/12, Dismantling of MG East sheds & MG goods PF Punjabi at Sri Ganganagar, Bagh, Foot Over bridge at Main Ring Sri Ganganagar & Road, Suratgarh station, New Delhi and other ancillary -110026 works at Sriganganagr station yard in connection with Sarupsar- Sriganganagar Gauge Conversion Project

19 T.No. Rs 6.305 Rs 6.305 Rs 954.00 02/NWR/Dy Devender 17.10.12 11.06.13 100% Sh Lal Work Const/BKN/33(R)/20 Crores Crores / Rs per cum CE/C/BKN/201 Singh Chand , Dy completed. 11-12/SURP-HMH- 6.201 Crores 2-13/SURP- Contracto CE/C/BKN Final variation sanctioned. SGNR :- Supplying HMH Dated r, 7 Final bill is to and stacking 65000 20.11.12 Pratap be paased after cum 65mm gauge Nagar, submission of stone ballast machine Saket Mining NOC by crushed (hard stone) Colony, contractor. conforming to RDSO Rajgarh specifications at Road, Paharsar halt, Hisar Hansiawas Halt, Anupshahar & any other suitable location between Km. 132.00 to 175.00 on Hanumangarh– Suratpura section in connection with Suratpura- Hanumangarh-Sri Ganganagar Gauge Conversion project 20 T.No. Const/BKN/01 Rs 4.405 Rs 4.405 Rs 960.00 03/NWR/Dy M/S 15.11.12 10.07.13 100% Sh Lal Work (R)/2011-12/SURP- Crores Crores / Rs per cum CE/C/BKN/201 R.K.Infras Chand , Dy completed.Final DPLN-HMH-SGNR 3.993 Crores 2-13/SURP- tructure , CE/C/BKN variation in process.. dated 26.07.2012:- HMH Dated Near Supplying and 11.12.12 Sangam stacking 41600 cum Chouraha, 65mm gauge stone Sardarsha ballast machine har Road, crushed (hard stone) Ratangarh conforming to RDSO Distt specifications at Churu Sidhmukh, Narwasi & Gogameri depots on Hanumangarh– Suratpura section in connection with Suratpura- Hanumangarh-Sri Ganganagar Gauge Conversion project

21 T.No. Rs 5.165 Rs 5.165 7.07% 06/NWR/Dy M/S Work is in 08.11.13 65% Sh Lal Work is in Const/BKN/01/2012- crores Crores/ 5.531 above CE/C/BKN/201 Laxyo progress 31.03.14 Chand , Dy progress 13/SURP-DPLN-HMH- Crores 2-13/SURP- Energy CE/C/BKN SGNR dated DPLN dated Pvt. Ltd 08.08.12:- 20.02.2013 46/1 TIT Dismantling of Road existing MG track, Ratlam laying and linking of (MP) broad gauge main line, loop lines, including points and crossings in yards, spreading of ballast tamping of track, transportation of P.Way materials and other ancillary works in Zone-3 (Ch.88000 to 132000 including Gogameri, Tehsil Bhadra & Anupsahar station yard) on Hanumangarh- Suratpura section in connection with Suratpura- Hanumangarh- Sriganganagar gauge conversion project

22 T.No. Rs 4.831 Rs 4.831 8% above 05/NWR/Dy M/S Work is in 08.11.13/ 65% Sh Lal Work is in Const/BKN/02/2012- crores Crores/ 5.217 CE/C/BKN/201 Bhairav progress 31.05.14 Chand , Dy progress. . 13/SURP-DPLN-HMH- Crores 2-13/SURP- Constructi CE/C/BKN SGNR dated 08.08.12 DPLN dated on Co, :- Dismantling of 08.02.2013 Sukh existing MG track, sagar , laying and linking of Arya broad gauge main Samaj line, loop lines, Road, including points and Gulab crossings in yards, Bari < spreading of ballast Kota tamping of track, ( Raj) transportation of P.Way materials and other ancillary works in Zone-4 (Ch.132000 to 175000 including Sidhmukh, Narwasi, Suratpura & Sadulpur By-pass station yard) on Hanumangarh- Suratpura section in connection with Suratpura- Hanumangarh- Sriganganagar gauge conversion project

23 Tender No. Rs 2.132 Rs 2.132 8.40% 07/NWR/Dy M/S 15.03.13 11.11.13/ 55% Sh Lal Work is in Const/BKN/02 Crores Crores / Rs above CE/C/BKN/201 Ganpati Chand , Dy progress R/2012-13/RE-HSR 2.31 Crores 2-13/SURP- Const Co. 31.03.14 CE/C/BKN STD III dated DPLN dated H.No. 03.01.2013 :- 07.05.2013 430-B/1, Dismantling of Shanti existing BG track, Nagar, laying and linking of Bathinda Broad Gauge main line, loop lines, -151001 including points and crossings in yards, spreading of ballast, tamping of track, addition and alteration to station yards, insertion of fan shaped turn outs, shifting of existing turn outs, leading of p.way material and other miscellaneous works at Manheru, Bawani Khera, Jitakheri & Hansi yards in connection with Standard –II R Interlocking works of Rewari – Hisar section

24 T.No. Rs 10.36 Rs 10.36 1.47% NWR/S&C/CA/ M/S 27.10.12 15.11.13/ 70% Sh Lal Work is in Const/HMH/09/2012- Crores Crores / Rs above 48 dated Ramesh Chand , Dy progress 13/SURP-HMH-SGNR 10.51 Crores 28.01.2013 Kumar 31.03.14 CE/C/BKN Dated 16.07.12:- Bansal, Construction/modific 182, ation of station Vinoba buildings & structures Basti, i.e. S&T buildings, Near Platforms, duty bunk Dhan and other ancillary Mandi works between Gate, Sri Diplana (excluding) Ganganag to Tehsil Bhadra ar (including) section in connection with ( Raj) Suratpura- Hanumangarh- Sriganganagar gauge conversion project 25 Const/ Rs 2.619 Rs 2.619 12.50% 22-NWR/Dy M/S P.C. 07.04.13 25.11.13/ 55% Sh Lal Work is in BKN/04®/2012- Crores Crores/ Rs above CE/C/BKN/SRP Sharma, Chand , Dy progress 13/SRPR-SGNR 2.94 Crores R-SGNR A-87, 31.03.14 CE/C/BKN Dated– 07.12.12:- Dt15.05.13 Sector- Dismantling of 49, Noida, existing MG track, Gautam Laying and linking of Budh Broad gauge main Nagar,UP line, loop lines including points and crossings in yards, spreading of ballast, tamping of track, Addition and alteration to station yards, insertion of fan shaped turnouts, shifting of existing turnouts, leading of P.way material and other miscellaneous works in Suratgarh Yard on Suratgarh -Sriganganagar section in connection with Sarupsar – Sriganganagar Gauge conversion project

26 Const/BKN/03/2013- Rs 2.83 Rs 2.83 3.77% PG submitted M/S Work is in 12.07.14 Work is Sh Lal Work is in 14/SURP-HMH-SGNR Crores Crores/ Rs below V.K.Const progress in Chand , Dy progress dated 12.11.13 :- 2.72 Crores Co, 2-D- progress CE/C/BKN Balance work of 37,Jawah earthwork in banks arnagar and cutting for Sri formation including Ganganag side drains, trolley ar refuges, toe walls/ retaining wall etc. between Diplana (excluding) to Suratpura ( including) section i.e. from km 88.00 to km 175.00 in connection with Suratpura- Hanumangarh-Sri Ganganagar gauge conversion project

27 Const/BKN/04/2013- Rs 2.779 Rs 2.779 12.89% PG submitted M/S Work is in 23.07.14 Work is Sh Lal Work is in 14/SRPR-SGNR Crores Crores/ Rs below Aditya progress in Chand , Dy progress Dated 21.11.2013:- 2.94 Crores Traders, progress CE/C/BKN Widening & Extension 38, of platform no. 3,4 & Guruudwa 5, construction of ra Gali, approach road to Hanuman goods platform, garh Jn dismantling , modification & Re- erecting of platform shelters, drainage work & any other miscellaneous works in Suratgarh station yard in connection with Sarupsar -Sri Ganganagar gauge conversion project

Dy. CE/C/HMH

S. Tender No. and Estimated cost Tendered % Above/ Acceptance Agency Date Date of completion Physical Name of Remarks. No Name of work (in lakh) cost below letter/ of progress Engineerin schedule Agreement com of work. g Incharge of No. & date menc % (JAG level) Rates emen applicable t. 1 Rebuilding, 425.565 425.565 Scd –A:-@ No. M/s Poonia Const 24.11 04.02.12 55 Sh. Baljeet Work is in Construction, of PSC 425.56 At par Const/BKN/1 Co. .11 30.09.13 Singh, progress slabs with RCC Scd –B:-@ 3/2010- 30, Sector-13, XEN/C/ ballast retainers of At par 11/SGNR- Part-II, Hisar HMH span upto 6.10m in Scd –C:-@ HMH-SURP (Haryana) Hanumangarh At par Dated: - (excluding) to 05.02.11 Diplana (incl.) section i.e. from Km. 0.00 to Km 88.00 in c/w SURP-HMH- SGNR GC project.” 2 Supplying and 636.75 636.75 Rs.915/- No. Const/ M/s Jaimata 07.05 06.05.12 100 Sh. Baljeet Work has stacking 75000 cum 686.25 per cum BKN/22/201 Const. Co. .11 30.04.13 Singh, been 65mm gauge stone 0-11 H.No. 14169 XEN/C/ completed & ballast machine Dt. 07.05.11 Street No. 8A, HMH final bill crushed (hard stone) Ganesh Nagar, under conforming to RDSO Bathinda, (Pb). process specifications between Km. 44.00 to 88.00 on HMH– SURP section in c/w SURP-HMH-SGNR GC project.”

3 Construction/Rebuild 1404.976 1404.976 NS- 1 to 4 Const/BKN/2 M/s Jaimata Di 01.02 14.07.12 62 Sh.Baljeet Work is in ing of substructure 13,34,93 = 10% 9/2010- Energy System, .12 14.07.13 Singh, progress. of Bridge No. 40 (1 x below 11 /Vol 0 JV, VPO Narodara, XEN/C/HM 45.70 m Open Web NS 5 to 8 Dated: Teh. Laxmangarh, H Girder) at km = -15.07.2011 Dist. Sikar 141.515 on Gang 25% Canal, Bridge No. 2- Below A (2 x 61.0 m Open NS-9 to 11 Web Girder) at km & 13 to 22 2.347 on Ghaggar River, Bridge No. 14- B (2 x 61.0 m Open Web Girder) at km 18.345 on Ghaggar River and Bridge No. 21-A (1 x 76.20 m Open Web Girder) at km 28.638 on Indira Gandhi Main Canal including other ancillary works in c/w SURP-HMH- SGNR GC project. 4 Construction of Foot 273.881 273.881 (i) USSOR Const/BKN/ M/s Sajneev 20.03 15.12.12 46 Sh.Baljeet Work is in Over Bridge and 30.287 itemNo. 16/2011- Brothers, .12 31.07.13 Singh, progress. Platform Shelter at 011010 to 12/SURP- C-10, Vaishali XEN/C/HM Hanumangarh 045014 HMH-SGNR Nagar, H Junction, =33% Dated: - Jaipur Hanumangarh Town, above 16.12.2011 Ellenabad and Nohar ii)USSOR station in connection item with Suratpura- No.08101 Hanumangarh- 0 to Sriganganagar gauge 081360= conversion project.” 5% above iii) Rest of items =1% above 5 Supply & stacking 372.70 372.70 NS-1(a)- Const/ M/s Jai Mata Const. 17.12 13.06.12 100 Sh. K.D. Work has 40000 cum 65mm 439.70 1140/- BKN/ Co., House No. .11 15.04.13 Swami, been gauge stone ballast per cum 09(R)/ 14169, Street No. AEN/C/HM completed & machine crushed NS-1(b)- SURP-HMH- 8A, Ganesh Nagar, H final bill (hard stone) 1120/- SGNR/ 2011- Bathinda under conforming to RDSO per cum 12 Dated – process specifications at NS-1(c)- 14.12.2011 . Banwali, Fateh 1097/- Singhwala, Budh per cum Singhwala & between NS-1(d)- Km.201.00 to 202.00 1040/- Depot on Sri per cum Ganganagar–Diplana section in connection with Suratpura- Hanumangarh-Sri Ganganagar Gauge Conversion project.

6 Dismantling of 851.286 851.286 7.77% Const/HMH/2 M/s RAVI 01.02 21.01.13 90 Sh. K.D. Work is in existing MG track, 904.54 above on 3/SURP-HMH- INFRABUILD .12 31.07.13 Swami, progress Laying and linking of schedule SGNR/2011- PROJECTS PVT. AEN/C/HM Broad gauge main 12 LTD., 95, Hiran H line, loop lines Dated:- Magri Sector-11, including points and 22.01.12 Udaipur crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in section & at LC’s of Zone-1 (Ch. 138.000 to 204.130) on Sri Ganganagar- Hanumangarh section c/w SURP- HMH-SGNR GC project.

7 Supplying and 694.53 694.53 Rs.1057/- Const/HMH/2 M/s Sura Const. 25.02 23.10.12 100 Sh.Baljeet Work stacking 65000 cum 681.59 per cum 0(R-2)/SURP- Co., Sector-13, .12 15.02.13 Singh, complited 65mm gauge stone HMH- 1323/1133, Hisar. XEN/C/HM final bill ballast machine SGNR/2010- H under crushed (hard stone) 11 Dated process. conforming to RDSO 24.02.12 specifications between Km.171.00 to 204.130 (including Hanumangarh) on Sri Ganganagar– Hanumangarh section in connection with Suratpura- Hanumangarh-Sri Ganganagar Gauge Conversion project.

8 Supplying and 833.40 833.40 Rs.971.90 Const/HMH/ Sh. Devender 01.06 08.05.13 100 Sh.Baljeet Work has stacking 90000 cum 974.71 per cum 25/SURP- Singh, 7, Pratap .12 Singh, been 65mm gauge stone HMH- Nagar, Saket XEN/C/HM completed & ballast machine SGNR/2011- Colony, Rajgarh H final bill crushed (hard stone) 12/Vol-I Road, Hisar. under conforming to RDSO Dated: process specifications in 09.05.12 . various Depots i.e. near Hanumangarh Junction, Talwara Jhil, Ellenabad, Nohar, Diplana & any other location on Hanumangarh- Diplana section in connection with Suratpura- Hanumangarh-Sri Ganganagar Gauge Conversion project. 9 Construction / 768.90 768.90 7.77% Const/HMH/ M/S. V.K. 01.11 3.08.2013 22 Sh.Baljeet Work is in modification of 828.64 above on 5/SURP- Construction Co, .12 Singh, progress. station buildings & schedule HMH-SGNR/ 2-D-37, Jawahar XEN/C/HM structures i.e. S&T 2011-12/ Nagar, Sri H & K.D buildings, Platforms, Dated: Ganganagar Sawami duty bunk and other 09.07.12 AEN/C/HM ancillary works H between Hanumangarh Town (excluding) to Talwara Jhil (including) section in connection with Suratpura- 10 Construction / 635.92 635.92 8.71% Const/HMH/ M/S. V.K. 01.11 23.07.13 26 Sh.Baljeet Work is in modification of 691.31 above on 6/SURP- Construction Co, .12 Singh, progress. station buildings & schedule HMH-SGNR/ 2-D-37, Jawahar XEN/C/HM structures i.e. S&T 2011-12/ Nagar, Sri H buildings, Platforms, Dated: Ganganagar duty bunk and other 09.07.12 ancillary works between Hanumangarh Town (excluding) to Talwara Jhil (including) section in connection with Suratpura- Hanumangarh- Sriganganagar gauge conversion project. 11 Construction / 718.91 718.91 8.40% Const/HMH/ P.S. Infrabuild 4.11. 12.7.13 36 Sh.Baljeet Work is in modification of 779.30 Above 7/ 12- PVT. LTD 15. 12 Singh, progress. station buildings & 13/SURP- Jaat Dharmshala XEN/C/HM structures i.e. S&T HMH-SGNR Complex G.T. H buildings, Platforms, Dated,13.09 Road Fatehabad duty bunk and other .2012 ( Haryana) ancillary works between Talwara Jhil (excluding) to Khinaniyan (including) section in connection with Suratpura- Hanumangarh- Sriganganagar gauge conversion project 12 Transportation, 486.32 486.32 1.90% Const/HMH/ M/S Kiran Infra 1.10. 16.9.13 12 Sh.Baljeet Work is in Assembling, 495.56 Above 1/ 12- engg.Lted B-141 12 Singh, progress. Erection, Cambering, 13/SURP- Road no 9D VKI XEN/C/HM Riveting (with HMH-SGNR area JP H contractor’s rivets) Dated painting and 17.9.12 launching (as per contractor’s approved scheme) of open web through steel girders on Bridge No. 2-A (2 x 61.00m) at km. 2.347 on Ghaggar River, Bridge No. 14- B (2 x61.00m) at km. 18.345 on Ghaggar River and Bridge No. 21-A (1x 76.20m) at Km. 28.638 on Indira Gandhi Main Canal (Girder components will be supplied by Railway) with supplying & fixing of bearings and supplying, fabricating & fixing of galvanized steel channel sleepers 13 Construction / 575.83 575.83 2.17% Const/HMH8 M/S Shree 29.10 12.07.13 36 Sh.Kanwar Work is in modification of 588.33 Above / 12- Shyam .12 Singh, progress. station buildings & 13/SURP- Engineering AEN/C/SD structures i.e. S&T HMH-SGNR Co.29 Poonia LP buildings, Platforms, Dated Colony duty bunk and other 09.7.2012, Churu(Raj) ancillary works between Khinaniyan (excluding) to Diplana (including) section in connection 14 Dismantling of 667.816 575.83 6.30% Const/HMH M/S Bhanwar Lal 22.11 30.10.13 15 Sh.Baljeet Work is in existing MG track, 709.88 Above /09/SURP- Bijarnia, village- .12 Singh, progress Laying and linking of HMH- Rajpura, Tehsil XEN/C/HM Broad gauge main SGNR/2012- nawa. H line, loop lines 13 Dated – Distt.Nagaur (Raj) including points and 05.08.12 crossings in yards, spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-1 (Ch. 0.000 to 44.000 including Hanumangarh, Hanumangarh town, Sherekan, Talwara Jhil & Ellenabad station yard) 15 Dismantling of 488.298 488.29 9 % Const M/S. P.C.Sharma 23.10 21.10.13 42 Sh.Kanwar Work is in existing MG track, 444.35 Below /HMH / A-87-sector 49 .12 Singh, progress. Laying and linking of 10 /SURP - Noida Distt. AEN/C/SD Broad gauge main HMH - SGNR Gautum Budh LP line, loop lines /2012-13 Nagar including points and Dated crossings in yards, 05.08.12 spreading of ballast, tamping of track, transportation of P.way materials and other ancillary works in Zone-2 (Ch. 44 to 88 including Khinaniyan, NHR DPLN station yard) 16 Construction of Road 689.99 689.99 3.13 % Const/HMH1 M/S Gawar 17.11 6.04.13 80 Sh. K.D. Work is in under Bridges in lieu 668.40 Below 1/ 12- const. ltd. S.F-1, .12 15.07.13 Swami, progress of existing Level 13/SURP- JMD Galleria. AEN/C/HM crossing No.122 (km HMH-SGNR Sector 48. Sohna H 140/5-6), 135 (km Dated road. Gurgaon 152/4-5), 142 (km 26.9.2012 160/11-12), 169 (km 193/2-3)and 178 ( km.201 / 12-13 ) on Sriganganagar - Hanumangarh section

17 Construction of Road 852.45 852.45 At par Const/HMH1 M/s Hari Singh & 10.02 10.11.13 30 Sh.Baljeet Work is in under Bridges in lieu of 852.45 3/ 12- Co.,H.No.101, .12 Singh, Progress existing Level crossing 13/SURP- Model Town, XEN/C/HM No.33 at km. 47.420, HMH-SGNR Narwana, Distt- H & 38 at km. 55.032, 40 Dated Jind. Sh.Kanwar at km. 67.620, 48 at 22.10.12 Singh, km. 75.564, 53-1 at AEN/C/SD km.93.197, 56 at km. LP 99.028, 74 at km. 132.745 & 81 at km. 143. 380 on Hanumangarh- Sadulpur section in connection with elimination of level crossing gates 18 Transportation of BG 213.95 213.95 14% Const/HMH1 M/S Karnani const 25.3. 04.08.13 20 Sh.Baljeet Work is in PSC sleepers from 243.90 Above 2 ( R) / 12- New lane BKN 13 Singh, Progress various sleepers 13/ SURP- XEN/C/HM factories or any other HMH-SGNR H & places or yards Dated Sh.Kanwar including loading, 07.12.12 Singh, unloading and AEN/C/SD stacking / spreading at LP site from KM 0.000 to 88.000 and Transportation of Rails from various places in North Western Railway and other Railways like N C Railway, W C Railway etc. including loading, leading, unloading and stacking in station yards /between block sections of Hanumangarh Junction-Diplana (KM 0.000 to 88.000) in connection with Gauge Conversion Project 19 Flash Butt Welding of 577.81 577.81 12.36% Const/HMH/ M/s Speed Crafts - 01.10.14 2 Sh.Baljeet Work is in 52 Kg / 60 Kg rails at 506.39 Below + 02 (R) Limited, Layak Singh, Progress site / depot using Service SURP-HMH- Bhawan Boring XEN/C/HM Mobile Flash Butt Tax SGNR/2012- Canal Road Patna- H & Welding Plant between 13 dated – 800001 Sh.Kanwar Sri Ganganagar station 19.11.2012 Singh, (including)- AEN/C/SD Hanumangarh LP Junction-Suratpura station (including) in connection Suratpura -Hanumangarh- Sri Ganganagar gauge conversion project

20 Supplying and stacking 308.98 342.94 9.90% Const/HMH/ M/s Sura 10.10 26.3.14 3 Sh.Baljeet Work is in 33000 cum 65mm 308.98 Below 4) SURP- const.Co., Sector .13 Singh, Progress gauge stone ballast HMH- no 13 H.No.1133, XEN/C/HM machine crushed (hard SGNR/13-14 Hissar H & stone) conforming to dated – Sh.Kanwar RDSO specifications in 04.7.13 Singh, the section of AEN/C/SD Hanumangarh-Diplana LP in connection with Suratpura- Hanumangarh- SriGanganagar Gauge Conversion Project

21 Construction of Road 730.558 720.98 1.31% Const/HMH/ M/s Mohla Const. - 25.09.14 - Sh.Baljeet Work yet to under Bridges in lieu of Below 02/SURP- Co., 476,Sector Singh, be started 07 Nos. of Level HMH- 15-A Hisar XEN/C/HM Crossing Gates on SGNR/2013- H & Hanumangarh - 14 dated Sh.Kanwar Suratpura section in 04.07.2013 Singh, connection with AEN/C/SD elimination of level LP crossing gates

CE/C/HQ-JP

Dy. CE/C/DO

Sr. Name of work. Estimat Tender %age Above/ Below Agreement Agency Date of Date of Physical Name of Remarks No. ed ed Sch. of Rates No. & Date. commence complet progress Engg. in Cost. Cost. ment ion of work. charge.

1 T.N. DO/GGC/NL/8- 6.71 6.33 5.55% Below NWR/S&C/C M/s Jain 04.04.06 20.05.07 40% Sh. Baldev Final Construction of Crore Crore A/78 dated construction extended up Ram Dy. variation minor bridgtes from 27.06.06 Co.(JV) tp 20/08/07 CE/C/DO and risk & Chainage 00.00 to Ajmer cost 30000 Between statement Dausa and Lalsot in has been connection with DO- submitted GGC new BG Line to HQ for approval. 2 DO/GGC/NL/9 7.66 6.45 19.47% Below for NWR/S&C/C M/s Kewai 12.07.06 26.09.07 54% -Do- Work Construction of BG Crore Crore Sch.’ A’ A/781dated Constructio Extended terminated formation from 13% Below for Sch.’ 06.09..06 n (JV) upto on Chainage 1150 to B/ Jodhpur 31/11/2011 24/11/2011 15000 between . Final Dausa Kala- measureme Shekhpura in nts have connection with DO- been taken GGC new BG line but project. contractor did not turn up for signature 3 DO/GGC/NL/10 7.74 6.39 19.47% Below for NWR/S&C/C M/s Parma 11.05.06 17.07.07 68% - do - Work Construction of BG Crore Crore Sch.’ A’ A/79 dated Ram Bhakar Extended terminated formation from 13% Below for Sch.’ 30.06.06 Jodhpur. upto on Chainage 15000 to B/ 31/11/2011 24/11/2011 28000 between . Final Dausa and Lalsot in measureme connection with DO- nts have GGC new BG line been taken project. but contractor did not turn up for signature. 4 DO/GGC/NL/14- 42.97 41.63 Sch. A- 10% below NWR/S&C/C M/s Atlanta- 20/02/200 16/09/2009 100% - do - Work Construction of crore crore Sch. B- 5% below A/94 dated ARSS, 8 Extended completed. Major Bridges with Sch C- 5% below 18/02/2008 Bhubneshw upto Final bill 1200mm dia cast in Sch. D- AT PAR ar (Orissa) 31/10/2012 under situ board piles & Sch. E- 10% below with token process PSC girder Sch. F- 5% below penalty superstructure of18.30 M between DO-GGC in c/with DO –GGC NLBG Project 5 DO/GGC/NL/15- 5.58 5.30 5% below on Sch. A, Dy. M/s ARSS 24/01/200 09/06/2009 100% - do - Work Construction of crore crore B, C, D, E & F CE/C/I/JP//C Infrastructu 8 Extended completed. Minor Bridges from A/16 dated re Projects upto Final chainage 30000.00 29/02/2008 Limited, 31/08/2011 variation to 38500.00 & Bhubneshw under Construction of BG ar approval of Formation from HQ chainage 28000.00 to 38500.00 between Dausa and Lalsot in connection with DO-GGC New BG line Project 6 DO/GGC/NL/18- 18.89 5% below on Sch. A, NWR/S&C/C M/s Atlanta- 14/03/08 20/07/2009 93% as - do - Work in Construction of crore 17.95 B, C, D, E & F A/97 dated ARSS, extended per progress Broad Gauge crore 03/03/2008 Bhubneshw upto amende Formation & Minor ar (Orissa) 30/06/2014. d value Bridges from Chainage 41000.00 to 45000.00 between Dausa and Lalsot in connection with Dausa- Gangapur City New Broad Gauge line project. 7 DO/GGC/NL/21- 8.85 8.41 5% below on Sch. A, NWR/S&C/C M/s ARSS 15/03/08 20/03/2009 91% - do - Work in Construction of BG crore crore B, C, D, E & F A/95 dated Infrastructu Extended progress formation and Minor 18/02/2008 re Projects upto Bridge from Limited, 30/06/2014. chanaige 45000 to Bhubneshw 60000 bet. Lalsot ar and Gangapur City in connection with DO-GGC New B G line Project 8 DO/GGC/NL/22- 7.06 6.71 5% below on Sch. A, Dy. M/s ARSS 10/03/200 10/03/200 87% - do - Work held Construction of BG crore crore B, C, D, E & F CE/C/I/JP//C Infrastructu 8 Extended up. formation and Minor A/17 dated re Projects upto Bridge from 29/02/2008 Limited, 30/06/2014 chanaige 60000to Bhubneshw 75000 bet. Lalsot ar and Gangapur City in connection with DO-GGC New B G line Project 9 DO/GGC/NL/23- 9.01 8.56 5% below on Sch. A, NWR/S&C/C M/s ARSS 15/03/08 20/03/2009 65% - do - Work held Construction of BG crore crore B, C, D, E & F A/96 dated Infrastructu Extended up. formation and Minor 18/02/2008 re Projects upto Bridge from Limited, 31/03/2014. chanaige 75000 to Bhubneshw Further 90000 bet. Lalsot ar extension and Gangapur City under in connection with process DO-GGC New B G line Project 10 T.N. DO/GGC/NL/8 4.125 5.98 45% Above on Sch- Dy. M/s Kewai 28/08/08 01/01/2009 41% - do - Work (R&C)-Construction crore crore A CE/C//DO/C Constructio Extended terminated of minor bridgtes A/ n Co. (J/V), upto on from Chainage 20 Dated Jodhpur 31/08/2012 12/07/2012 00.00 to 30000 23/06/2008 Between Dausa and Lalsot in connection with DO-GGC new BG Line 11 DO/GGC/NL/29- 6.25 5.47 Sch. A-15% Below Dy. M/s Bharat- 07/08/09 04/08/2010 98% -do- Work in Construction of crore crore Sch.B-10% Below CE/C/DO/CA Kamal Extended progress. platforms, (Revis Sch.C-5% Below /35 dated (J/V), Jaipur upto Cost ed earthwork in Sch.D-19% Below 15/10/2009 30/04/2014 revised in cost platforms between Rs. Sch E- 7.75% Below variation. Dausa- 625.1 Gangapurcity 0) station in connection with Dausa- Gangapurcity new BG line project. 12 DO/GGC/NL/36 1.74 1.50 Sch. A-13.71% Dy. M/s Mohan 07/04/201 05/12/2010 42% -do- Contract Construction of crore crore Below CE/C/DO/CA Singh Jat, 0 Extended has been Broad Gauge Sch.B-13.71% Below /43 dated Gangapurcit upto terminated. Formation & Minor Sch.C-13.71% Below 07/04/2010 y 06/12/2011 Bridges from Sch.D-13.71% Below Chainage 90000 to Sch E- 13.71% Below 92700 between Sch F- 13.71% below Lalsot and Gangapurcity in connection with Dausa- Gangapurcity New Broad Gauge line Project. 13 DO/GG/NL/31- 14.82 13.44 Sch. A-8.50% Below NWR/S&C/C M/s Shree 03/10/201 29/02/2012. 85% - do- Work in Construction of Crore Crore A/105 dated Ram Kripa 1 Extended progress. Road Over Bridges Sch.B -02 % Below 22/11/2010 Constructio upto across Railway Sch.C-15% Below n Jaipur 31/03/2014. track at Chainage Sch.D-06% Below Further 37034, 3925 & Sch E- 11% Below extension 37936 and Drainage Sch F- 50% below under overpass at process Chainage 3660 & 37520 between Salempura Udaikalan stations in connection with Dausa- Gangapurcity new Broad Gauge line project.

14 DO/GGC/NL/32- 16.73 15.65 Sch. A- 08% Below NWR/S&C/C M/s L.N. 19/10/201 31/03/2012. 43% - do- Work in Construction of 150 Crore Crore Sch.B- 04% Below A/107 dated Agrawal- 0 Extended progress units type-II 7 units Sch.C-NS/1 @ 28/03/2011 MCD Pvt. upto type-III staff 47300/- Per MT Ltd., (J/V) 31/03/2014. quarters & IOW NS/2@ 55000/- per Jaipur Further office and other MT & NS/3 to NS/8 extension ancillary works like @ 6.60% Below under water supply, Sch.D-8.40% Below process. sewerage, drainage, Sch E- 8.40% Below roads, parking, Sch F- 8.40% below sanitary and Sch G- 8.40% Below provision of Sch. H- 8.40% Below electrical/communic ation conduits & metal boxes for North Western Railway residential colony at various stations between Dausa (including) to Gangapurcity (including) in connection with Dausa- Gangapurcity new BG line project. 15 DO/GGC/NL/30- 65.69 53.02 Sch. A-33.50% NWR/S&C/C M/s 27/09/2012 46% -do - Work in Construction of Crore Crore Below A/106 dated Valecha- extended progress. single line BG Sch.B-03% Below 29/12/2010 Transtonelst upto swtandard straight Sch.C-07% Above roey (J/V) 30/09/2014 alignment tunnel in Sch.D-17% Below Mumbai soil and rock Sch E- 31.32% Below including ccut and Sch F- 76.40% below cover portion between Chainage 38/720 to 40/840, including side drains and other papproaches of tunnel between Didwana- Lalsot Railway stations in connection with Dausa- Gangapurcity new BG line project.

16 DO/GGC/NL/26- 5.10 4.74 Sch. A- 7% Below M/s R.K. 30/05/201 06/04/2012. 50% - do - Work Supplying and Crore Crore Dy.CE/C/DO Infra (J/V), 1 Extended terminated stacking 50mm /CA/54 Jaipur upto on gauge machine dated 31/12/2013 13/02/2014 crushed stone track 22/07/11 ballast in stacks as per Railway’s specification between Km. 1.00 to 41.00 (Dausa- Lalsot) section in connection with Dausa- Gangapurcity new BG line project. 17 DO/GGC/NL/28- 6.87 6.03 Sch.A-8% Below M/s Jagdish 17/10/11 26/04/12. 65% -do- Proposal for Construction of crore crore Sch. B- 6% Below Prasad Extended closing of Broad gauge Sch.C- 1.50% Below Agrawa, upto contract formation in Sch.D- 15% Below Alwar 30/12/2013 has been cutting, Sch E-15% Below initiated construction of rail Sch F- AT PAR and side drain, catch pending water drain & slope with HQ. protection work from chainage 36000 to 38500 between Dausa and Lalsot in connection with Dausa- Gangapurcity new BG line project 18 DO-GGC/NL/40 6.13 5.65 Sch.A- 9.02% Below Dy.CE/C/DO M/s Goel 13/09/11 01/08/12 50% -do- Work in Laying and linking crore Sch(SOR).- B- 29% /CA/56 Brothers Extended progress linking of BG track above dated Rail Infra upto and transportation 18/10/11 Pvt. Ltd., 31/05/2014 of P.Way material, Bareilly PSC sleepers etc between Dausa- Deedwana section in connection with Dausa- Gangapurcity new BG line project. 20 DO/GGC/NL/39RR- 8.80 8.25 Sch.A-31% below - M/s Bharat- - 28/02/2013. 15% -do- Work in Construction of Crore Crore Sch.B-15% Below Kamal (JV), Extended progress station buildings, Sch.C-5% Above Udaipur upto signaling structures Sch.D-AT PAR 31/03/2014. and miscellaneous Sch.E-5% Below Further structures etc. at Sch.F-7% Below extension various stations Sch.G-15% Above under between Dausa Sch.H-11% Below process. (excl.) to Sch.I- 15% Below Gangapurcity (excl.) in connection with Dausa Gangapurcity new BG line project. 22 DO/GGC/NL/9 3.98 4.60 Sch.A- AT PAR Dy.CE/C/DO M/s Jai 04-05-12. 3% -do- Work (R&C)- Crore Crore Sch.B- 19.25% /CA/58 Salasar extended terminated Construction of Above dated Balaji upto on Broad Gauge 21/02/2012 Constructio 04/09/2012 12/07/2012 Formation from n (JV), with penalty . chainage 1150.00 Jaipur to 15000.00 between Dausa Kala and Shekhpura Villages in connection with Dausa-Gangapur City New Broad Gauge line Project(Risk & Cost tender). 23 DO/GGC/NL/10 2.59 2.95 Sch.-A AT PAR Dy.CE/C/DO M/s Jai 04-05-12. 4% -do- Work (R&C)- crore crore Sch.-B- 23% Above /CA/59 Salasar Extended terminated Construction of dated Balaji upto on Broad Gauge 21/02/2012 Constructio 04/09/2012 12/07/2012 Formation from n (JV), with penalty . chainage 15000 to Jaipur 28000.00 between Dausa and Lalsot in connection with Dausa-Gangapur City New Broad Gauge line Project(Risk & Cost tender). 24 DO/GGC/NL/44RRW 4.66 4.66 AT Par for Sch. A Dy.CE/C/DO M/s The 18/02/2014. - - Agreement elding of rail joints crore Crore /CA/71 India Further executed. through flash butt dated Thermit extension Linking is in process between 19/07/2013 Corporation under progress Dausa- Ltd, Kanpur process Gangapurcity section 25 DO/GGC/NL/9(R&C) 4.46 5.47 17.51% Above on - M/s 21/03/201 05/07/2013. 90% --do- Work in R-Construction of Crore Crore Schedule A+B Meenesh 3 Extended progress broad gauge Contractor upto formation from & 31/03.2014. chainage 1150 to Developers Further 15000 in Pvt. Ltd., extension connection with Jaipur. under Dausa process. Gangapurcity new line project (Risk & Cost tender). 26 DO/GGC/NL/10(R& 2.79 3.30 17.51% Above on - M/s MCD 21/03/201 05/07/2013. 70% --do- work in C)R-Construction Crore Crore Schedule A+B Pvt. Ltd. & 3 Extended progress. of broad gauge Aastha ;upto formation from Constructio 15/03/2014. chainage 1150 to n Co. (JV), Further 15000 in Jaipur. extension connection with under Dausa process. Gangapurcity new line project (Risk & Cost tender). 27 DO/GGC/NL/60R- 4.46 4.74 6.25% Above Dy.CE/C/DO M/s Shree 26-12- 10/06/2014 40% -do- Work in Construction of Crore Crore /CA/74 Ram Kripa 2014 progress minor bridges from dated Constructio chainage 00 to 14/03/2014 ns, Jaipur 30000 between Dausa- Lalsot in connection with Dausa- Gangapurcity new BG line project 28 DO/GGC/NL/48R- 11.35 10.72 5.6% Below - M/s 29-03-2015 5% -do- work in Construction of 12 Crore Crore HGIEPL- progress nos LHS between COLOSSAL Dausa- Deedwana (JV), Jaipur section in connection with 11.35Dausa- Gagnapurcity new BG line project. For CAO/C/JP