Facility Risk Assessment This document was printed on 5/23/2018 @ 6:28:50 AM and is no longer valid. The most recent version can be found at http://www.bnl.gov/pga/OSH Name(s) of Risk Team Members: Richard Backofen, Mona S. Rowe Point Value → 1 2 3 4 5 Parameter ↓ Area/Facility Description Title: Photography area of Building 493 Occupancy or Use
Likelihood Very Unlikely Unlikely Possible Probable Multiple Approved by: Date: 10/20/06 Rev #1 Reason for Revision (if applicable): Comments:
Risk with Additional Risk with Controls in Place Controls in Place A A C C C C
x x B B y y
d d c c B B y y o o t t n n x x i i o Control(s) Added to o % Risk a a r r A A
Physical Item or h h
e e p p i i * * Hazard(s) Control(s) l Reduce Risk l Reduction v v u u k k Activity e e e e c c s s k k i i i i c c S S L L R R O O
General Unsafe storage, obstructed Safety walkthroughs by 5 2 2 20 housekeeping issues. walkways, manager.
Adjustable chairs, ergonomically designed keyboards and mouse, keyboard and mouse wrist Ergonomic analysis of Ergonomic issues Repetitive stress, eyestrain 5 4 2 40 TBD cushions, proper lighting, work areas work breaks, proper prescription eyewear if applicable
Lack of telephone in Working alone in negative storage area. PG Consider on site None 2 3 2 10 Negative storage area staff sometimes works in telephone extension the building alone.
Page 1 of 2 Facility Risk Assessment This document was printed on 5/23/2018 @ 6:28:50 AM and is no longer valid. The most recent version can be found at http://www.bnl.gov/pga/OSH Risk with Additional Risk with Controls in Place Controls in Place A A C C C C
x x B B y y
d d c c B B y y o o t t n x n x i i o Control(s) Added to o % Risk a a r r A A
Physical Item or h h
e e p p i i * * Hazard(s) Control(s) l Reduce Risk l Reduction v v u u k k Activity e e e e c c s s k k i i i i c c S S L L R R O O *Risk: 0 to 20 21 to 40 41-60 61 to 80 81 or greater Negligible Acceptable Moderate Substantial Intolerable
Further Description of Controls added to Reduce Risk:
Lessons Learned from this Risk Assessment; Improvements, Positive Feedback: