Public Utilities Commission of the State of California s47

Total Page:16

File Type:pdf, Size:1020Kb

Public Utilities Commission of the State of California s47

ALJ/ek4 DRAFT Agenda ID# 16013 10/12/2017 Item 1

PUBLIC UTILITIES COMMISSION OF THE STATE OF CALIFORNIA

Resolution ALJ 176-3406 Administrative Law Judge Division October 12, 2017

R E S O L U T I O N

RESOLUTION ALJ 176-3406. Preliminary determinations of category and need for hearing for proceedings initiated by application pursuant to Rule 7.1 of the Commission’s Rules of Practice and Procedure.

Senate Bill (SB) 960 (Leonard, ch. 96-0856) requires, among other things, that the Commission categorize proceedings and determine the need for hearing for purposes of determining the applicable restrictions on ex parte communications and other applicable rules. The rules implementing these requirements are found, for the most part, in Articles 7 and 8 of the Commission’s Rules of Practice and Procedure.

Rule 7.1 requires the Commission to preliminarily determine, for a proceeding initiated by application, the proceeding’s category and whether the proceeding requires a hearing. The Commission has reviewed the initial pleading of the utility applicants and makes the preliminary determinations of category and need for hearing as shown in the attached Preliminary Determination Schedule, consistent with the requirements of Rule 7.1.

No public review or comment is required for this resolution pursuant to Rule 14.7.

IT IS ORDERED that:

1. The category and need for hearing for each proceeding initiated by application listed in the attached Schedule of Preliminary Determinations are preliminarily determined, as noted. 2. This resolution is effective today.

I certify that the foregoing resolution was duly introduced, passed, and adopted at a conference of the Public Utilities Commission of the State of California held on October 12, 2017, the following Commissioners voting favorably thereon:

196698592 1 ALJ/ek4 DRAFT

TIMOTHY J. SULLIVAN Executive Director

A17-09-017 Ratesetting Ratesetting YES California High- Speed Rail Authority, Application of the California High- Speed Rail Authority for Approval to Construct Two New Grade Separated Crossings Over the Proposed High-Speed Rail Tracks Operated by California High- Speed Rail Authority at Elkhorn Avenue (MP 210.2) and Fowler Avenue (MP 210.7) Located in the County of Fresno, State of California.

A17-09-018 Ratesetting Ratesetting YES Southern California Edison Company, Application of SOUTHERN CALIFORNIA

2 ALJ/ek4 DRAFT

EDISON COMPANY (U338E), a California Corporation, for an Order Authorizing the Sale and Conveyance of Certain Electric Streetlight Facilities Pursuant to Public Utilities Code Section 851. (City of Santa Clarita)

A17-09-019 Ratesetting Ratesetting YES Southern California Edison Company, Application of SOUTHERN CALIFORNIA EDISON COMPANY (U338E), a California Corporation, for an Order Authorizing the Sale and Conveyance of Certain Electric Streetlight Facilities Pursuant to Public Utilities Code Section 851. (City of Temecula)

3 ALJ/ek4 DRAFT

A17-09-022 Ratesetting Ratesetting NO DAMARIS EXPRESS INC., Application of Damaris Express, Inc. (PSG36953) for authority to operate as an On-Call passenger stage corporation between points in San Diego County, Riverside County, Orange County, Los Angeles County and San Bernardino; and to establish a Zone of Rate Freedom.

A17-10-003 Ratesetting Ratesetting YES Ducor Telephone Company, In the Matter of Application of Ducor Telephone Company (U1007C) to Review Intrastate Rates and Charges, Establish a New Intrastate Revenue Requirement and Rate Design, and Modify Selected Rates.

A17-10-004 Ratesetting Ratesetting YES Foresthill Telephone Co., In the Matter of Application of Foresthill Telephone Co. (U1009C) to Review Intrastate Rates and Charges, Establish a New Intrastate Revenue Requirement and Rate Design, and Modify Selected Rates.

4

Recommended publications