BOARD OF EDUCATION OF HARFORD COUNTY

MONTHLY REPORT ON CONTRACTS SIGNED BY THE SUPERINTENDENT

NOVEMBER, 2010 —FOR DECEMBER 13, 2010 BOARD OF EDUCATION BUSINESS MEETING

* Signed by Board President. N/A – Not Applicable

Date Funds Signed Location/Purpose Amount Available Contact 11/01/10 Edgewood High Replacement School – Change Orders: Yes Harry Miller 3A-4 – Sody Concrete – Add ceramic tile at planter due to variations in concrete. $ 845 16A-29 – 1st Electric – Electrical changes, smoke detectors, and motor starters. 32,056 ______TOTAL $ 31,211 11/08/10 Bel Air Elementary School – Site Improvements -- Change Order: Yes Alice Burley 6 – MRP Contractors – Change Request #14 – Cost to modify the ramp handrails. $ 9,399 11/08/10 Red Pump Elementary School – Change Orders: Yes Charles Grebe 2A-8 – American Infrastructure – WWTP Generator $ 79,672 16A-7 – Key Systems – WWTP Generator 7,118 ______TOTAL $ 86,790 11/08/10 Bel Air High Replacement School – Change Orders: Yes Christopher Morton 2C-8 & 2C-9 – C.E.R., Inc. – Additional building demolition and athletic fields. $ 38,396 11/10/10 Edgewood High Replacement School – Change Order: N/A Harry Miller 2B-4 – Dixie Construction Co. – Damage to portables/fiber line. $ 5,104 11/12/10 Hickory Annex Snow Damage – Change Order: Yes Christopher Morton 1 – Smolen-Emr-Ilkovitch Architects – Design services for the addition of a toilet $ 920 facility and utility sink in the modular building design. 11/12/10 Campus Hills Elementary School – Architect Change Order: Yes Ronald Kauffman 2 – GWWO, Inc./Architects – Forest Conservation Plan for School and Park Parcels $ 37,070 [$17,246]; A/E Services for Demolition of Former Residential Properties [$19,824].

1 Date Funds Signed Location/Purpose Amount Available Contact 11/12/10 Deerfield Elementary Replacement School – Change Orders: N/A Harry Miller 7A-7 – Cole Roofing Co., Inc. – Replace damaged ceiling tiles throughout building. $ 578 9D-4 – Leonard A. Kraus – Replace damaged ceiling tiles throughout building. $ 578 11/15/10 Red Pump Elementary School: Yes Christopher Morton GWWO, Inc./Architects – Proposal for additional design services to demolish the $ 98,444 existing Cedarwood pump station, convert the temporary septic system area to ball fields, to do as-built survey drawings, and to design a new connection to the Blake’s Legacy gravity sanitary sewer line. 11/22/10 Edgewood High Replacement School – Change Orders: Yes Harry Miller 9B-4 – Shoemaker Brothers – Additional ceramic tile due to variations in concrete. $ 845 9B-5 – Shoemaker Brothers – Repairs to ceramic tile (damage by 15A contractor). 1,553 ______TOTAL $ 2,398 11/22/10 Various Locations: Yes Jeffrey LaPorta Young Audiences of Maryland, Inc. -- To provide instructional professional $ 141,600 (Grant development services designed to improve Reading and Math student performance at the Funds) elementary grade levels as approved by Board of Education of Harford County at November 22, 2010 business meeting. 11/29/10 Bel Air High Replacement School – Change Order: N/A Christopher Morton 9D-1 – A & B Flooring – Return unused portion of the contract allowance to the Owner. $ 10,163

*Signed by Board President.

N/A – Not Applicable

RMT/nw -- 12/08/10

2