Inspect Slab Prep
Subdivision ______Lot ______Date ______
Superintendent ______
1. Footings dug neat and true to dimensions on plans. Be certain footing trench depths and widths are correct per plans and soils report. Make sure rebar is 3 inches away from the forms and dirt banks. Make sure trenches are free of debris and dirt clods. Neatly trim sides and bottoms of trenches and remove any loose dirt prior to placing concrete.
2. Grade beams installed per plan
3. Rebar placed on chairs in footings and grade beams
4. Vapor barrier installed.
5. Check for screed pins or grade stakes at proper spacing
6. Make certain all screed boards are straight
7. Check for even screed. There should be no highs or lows
8. Make sure slab is screeded evenly and tamped with 3/8-inch mortar at the surface
9. When grading for the slab area, be sure all footings, including interior footings, are exposed and cleaned of all loose dirt. Keep the polyethylene vapor barrier off all footings. Check the mil size of the polyethylene vapor barrier. Make sure outside footings are 3 inches away from the forms. Check the soils report to see if pre-saturation is required on any pads. Prior to using the polyethylene vapor barrier and sand or gravel fill, install the copper waterlines. Check for the following
10. Check electrical, telephone, television, gas sleeve, and ground rod locations. Check steel to verify proper size and location. Make sure steel is hung properly and cleaned prior to the local agency’s (county-city) footing inspection. Verify that all bars have 20 times the diameter or Class “B” splices (minimum) and that all horizontal splices are staggered per UBC Sec. 2612-P.
11. Recheck forms for correct elevations. Check building for backfill with the proper sand or gravel at raised the slab area. Check the vapor barrier and repair any holes or rips. Next, sand or gravel fill over the polyethylene vapor barrier, if required. Check sand for proper coverage (1 or 2 inches) and for proper moisture content. Some areas of the country require termite spraying under the polyethylene vapor barrier. String-line all slab areas for 4-inch nominal slab. Always wet sand prior to pour, especially if it is a hot day. Make sure interior trenches are wheel-rolled and filled with nonexpansive native soil or imported sand. Make sure plumbing trade contractor’s trenches have double-wire mesh, if required. Make sure wire mesh is per contract and soils report. Check electrical conduit and floor boxes. Make sure all plumbing and electrical wiring is tied down so that it cannot move or float during the pour. Schedule a preslab inspection
12. Check for a minimum 3-inch slope in 20 feet, or per plans and specs (check form boards for the slope prior to the pour.
2018年4月29日 Page 1 of 2 Inspect Slab Prep
Basement
1. Verify stoop arms are installed per plans/specs
2. Wall sleeved for water and/or sewer line
3. Damp-proofing complete and drain tiles exposed
4. Wall backfilled to allow drainage away from foundation