Meridian on Sand Key Monthly Manager’s Report October 23, 2017
Vent Stack I received a quote from Swept Away for $3,780 to clean the dryer and exhaust fan vents in the garage and roof. This also includes unit dryer vents, which was last done in March of Cleaning 2014. I think we should consider doing this soon.
Pool Table The pool table was recovered with new bumpers. We did purchase new pool balls that are superior to what we had.
SM Door SM Door will be replacing the metal door on the North side of the building on Monday.
Pool Spa Heaters Triangle Pool performed the annual maintenance on the pool and spa heaters.
Marble Marblelife will be here all week to refinish the marble on the first floor.
Lightning Rod Still waiting for the lightning rod system to be repaired after the storm damage. Repair
Dry Wall Repair Lawson Construction will be repairing the drywall on the ceiling of the 21st floor of the East tower.
Roof McEnany started the roof repairs and resurfacing but the surface product needed has not been available. There is also some metal work that needs to be done by them because of Irma.
Boardwalk Munyan will be here on Monday to start pressure washing the boardwalk. After that Creamer Construction will begin the repairs.