ECP 11-0209 Interlocks Test Form
Total Page:16
File Type:pdf, Size:1020Kb
Document Number: ECP 11-0209
Version: 3.0
Date: 30/01/2017
INTERLOCKS TEST FORM
Substation Name Substation Number Circuit
General Data
Interlocking circuit diagram number
Mechanical interlocks ( or n/a)
Circuit Breakers
Check keys and locks with interlocking schematic Circuit breaker number Keys trapped in intermediate position and only released in fully open or fully closed position as appropriate to the particular interlock
Isolators
Isolator number Check keys and locks and their function with interlocking circuit diagram Keys trapped in intermediate position and only released in the fully open or fully closed position as appropriate to the particular interlock Subject to the energising of the magnetic bolt, bolt release requires the application of all keys
Earth Switches
Earth switch number Check keys and locks and their function with interlocking circuit diagram Keys released only in the fully open or fully closed position Removal of any key prevents operation
Maintenance Earthing Devices
Maintenance earthing device number Check keys and locks and their function with interlocking circuit diagram All keys required for operation
Key Exchange Boxes Key exchange box ID Check keys and locks and their function with interlocking circuit diagram
Excess Keys
Confirm that not more than the correct number of keys are available
Electrical interlocks ( or n/a)
Local Auxiliary Switch Chains
Check to circuit diagram number…………………… Each alternative chain of auxiliary switches when closed permits operation, and opening of any one contact prevents operation
Auxiliary Switch Chains for Parallel Operation
Check with interlocking circuit diagram Each alternative chain of auxiliary switches when closed permits operation, and any one contact open prevents operation
Electrical Bolts Operational Tests
Check operation of all bolts at standing batter volts
Comments
Certification ()
All tests have been completed satisfactorily
Contractor Commissioning Engineer (if applicable)
Organisation Name
Date Signature
UK Power Networks Commissioning Engineer
Name Signature Date