ECP 11-0209 Interlocks Test Form

ECP 11-0209 Interlocks Test Form

<p>Document Number: ECP 11-0209</p><p>Version: 3.0</p><p>Date: 30/01/2017</p><p>INTERLOCKS TEST FORM</p><p>Substation Name Substation Number Circuit </p><p>General Data</p><p>Interlocking circuit diagram number </p><p>Mechanical interlocks ( or n/a)</p><p>Circuit Breakers</p><p>Check keys and locks with interlocking schematic Circuit breaker number Keys trapped in intermediate position and only released in fully open or fully closed position as appropriate to the particular interlock</p><p>Isolators </p><p>Isolator number Check keys and locks and their function with interlocking circuit diagram Keys trapped in intermediate position and only released in the fully open or fully closed position as appropriate to the particular interlock Subject to the energising of the magnetic bolt, bolt release requires the application of all keys</p><p>Earth Switches </p><p>Earth switch number Check keys and locks and their function with interlocking circuit diagram Keys released only in the fully open or fully closed position Removal of any key prevents operation</p><p>Maintenance Earthing Devices</p><p>Maintenance earthing device number Check keys and locks and their function with interlocking circuit diagram All keys required for operation</p><p>Key Exchange Boxes Key exchange box ID Check keys and locks and their function with interlocking circuit diagram</p><p>Excess Keys </p><p>Confirm that not more than the correct number of keys are available</p><p>Electrical interlocks ( or n/a)</p><p>Local Auxiliary Switch Chains</p><p>Check to circuit diagram number…………………… Each alternative chain of auxiliary switches when closed permits operation, and opening of any one contact prevents operation</p><p>Auxiliary Switch Chains for Parallel Operation</p><p>Check with interlocking circuit diagram Each alternative chain of auxiliary switches when closed permits operation, and any one contact open prevents operation</p><p>Electrical Bolts Operational Tests </p><p>Check operation of all bolts at standing batter volts</p><p>Comments</p><p>Certification ()</p><p>All tests have been completed satisfactorily</p><p>Contractor Commissioning Engineer (if applicable)</p><p>Organisation Name</p><p>Date Signature</p><p>UK Power Networks Commissioning Engineer</p><p>Name Signature Date</p>

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    2 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us