5.2.9 Recreation Resources
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
SUGGESTED DAY HIKES High Sierra Ranger District
PACIFIC SOUTHWEST REGION Restoring, Enhancing and Sustaining Forests in California, Hawaii and the Pacific Islands Sierra National Forest SUGGESTED DAY HIKES High Sierra Ranger District HUNTINGTON LAKE AREA Drive up Highway 168 from Shaver Lake. These first four trails are on the right hand side: Coyote Lake: 16 miles RT* (from Hwy 168, and 10 miles RT from the beginning of the 4WD road). The jeep road to Coyote Lake is well traveled but an extremely rugged jeep road. The setting is alpine, glacial, partly timbered in shallow rolling forest. Red Lake: 13 miles RT (from Hwy 168, and 8 miles RT from beginning of the 4WD road). This is a small lake, open and sparsely timbered with a rocky and meadow type shoreline. You can drive by the way of the Red Mountain Off-Highway Vehicle Route. You can also reach West and Strawberry Lakes from this trail. Indian Pools: 2 miles RT. The trail starts from the China Peak Ski Resort, heading east along Big Creek. This is the only hike in the area that is considered easy since the trail is basically flat. Rancheria Falls: 2 miles RT. The trailhead is approximately 1.2 miles up the Rancheria Falls road. The trail is of a gentle grade and is 1 mile in length. Elevations range from 7,760 fee at the trailhead to 8,120 feet at the end of the trail near the base of the Falls. HUNTINGTON LAKE DAM AREA On the west end of the lake. Mushroom Rock: Approximately 2 miles from the Huntington Lake Dam on the Huntington Lake Road (going toward Big Creek) turn on road 8S32. -
Mill Creek Reservoir
Upper San Joaquin River Basin Storage Investigation Mill Creek Reservoir Surface Storage Option Technical Appendix to the Phase 1 Investigation Report A Joint Study by: Bureau of Reclamation California Department Mid-Pacific Region of Water Resources In Coordination with: The California Bay-Delta Authority October 2003 Upper San Joaquin River Basin Storage Investigation Mill Creek in the Vicinity of the Potential Dam Site Mill Creek Reservoir Surface Storage Option Technical Appendix to the Phase 1 Investigation Report A Joint Study by: Bureau of Reclamation California Department Mid-Pacific Region of Water Resources In Coordination with: Prepared by: The California Bay-Delta Authority October 2003 SURFACE WATER STORAGE OPTION TECHNICAL MEMORANDUM MILL CREEK RESERVOIR UPPER SAN JOAQUIN RIVER BASIN STORAGE INVESTIGATION TABLE OF CONTENTS Chapter Page ACRONYMS AND ABBREVIATIONS ..................................................................... iv EXECUTIVE SUMMARY..................................................................................... ES-1 CHAPTER 1. INTRODUCTION..............................................................................1-1 OPTION SUMMARY ..................................................................................................... 1-1 EXISTING FACILITIES ................................................................................................. 1-1 SUMMARY OF PREVIOUS INVESTIGATIONS............................................................ 1-4 POTENTIAL IMPROVEMENTS CONSIDERED........................................................... -
Kings River Channel Improvement Project, Cole Slough-Laton Area, California
FINAL ENVIRONMENTAL STATEMENT KINGS RIVER CHANNEL IMPROVEMENT PROJECT COLE SLOUGH-LATON AREA CALIFORNIA U.S. ARMY ENGINEER, DISTRICT SACRAMENTO,CALIFORNIA FEBRUARY 1975 DEPARTMENT OF THE ARMY SACRAMENTO DISTRICT. CORPS OF ENGINEERS 650 CAPITOL MALL SACRAMENTO. CALIFORNIA 95814 28 February 1^75 STATEMENT OF FINDINGS Kings River Channel Improvement Proj ect Cole Slough - Latcn Area California 1, As District Engineer of the Sacramento District, Corps of Engineers, I have reviewed and evaluated, in light of the overall public interest, the information presented in the environmental statement, other documents concerning the King3 River Channel Improvement Project, and the views of other agencies, organizations and individuals on the environmental and other impacts of the proposed work and alternatives. The consequences of constructing the proposed work as well as each of the alternatives, were studied and evaluated for engineering feasibility, environmental effects and social well-being. Specific attention was given to the fulfillment of the flood control, irrigation and related purposes for which the Kings River Project was authorized by Congress, while also considering the requirements of the National Environmental Policy Act. 2* In making my evaluation, the following factors were considered per- "Cinent to the analysis: a. Alternatives. - Of the various alternatives investigated, the levee construction and bank protection alternative provides for the desired flood protection needs more completely and satisfactorily than other methods of flood protection. b. Authority and function. - The proposed work is part of the Kings River Project, which was authorized by the Flood Control Act of 1944, is functionally adequate for current needs and provides flexibility for future flood protection requirements of the area. -
5-Year Summary Water Bodies
Lakes 5-Year Total 2000 2001 2002 2003 2004 County Acc. Inj. Dead Acc. Inj. Dead Acc. Inj. Dead Acc. Inj. Dead Acc. Inj. Dead Acc. Inj. Dead Lake Shasta 242 149 8 48 33 0 57 27 3 60 35 1 51 32 2 26 22 2 Shasta Lake Berryessa 178 118 5 29 21 1 23 21 1 33 20 1 60 33 2 33 23 0 Napa Lake Perris 146 89 5 13 11 1 34 25 0 42 27 1 27 10 1 30 16 2 Riverside Folsom Lake 105 56 3 22 15 0 24 11 1 21 12 0 25 13 2 13 5 0 Placer/El Dorado/Sacramento Lake Tahoe 85 39 6 15 8 0 15 5 0 20 14 0 18 5 4 17 7 2 Placer/El Dorado Castaic Lake 84 61 1 40 34 0 13 9 0 17 7 0 11 11 1 3 0 0 Los Angeles Lake Don Pedro 73 61 2 22 16 2 9 8 0 11 8 0 18 16 0 13 13 0 Tuolumne Lake Nacimeinto 64 40 0 12 5 0 10 5 0 10 3 0 28 24 0 4 3 0 San Luis Obispo Millerton Lake 61 38 6 11 4 0 21 12 1 8 8 3 16 11 0 5 3 2 Fresno/Madera Clear Lake 57 51 5 14 14 0 10 7 1 10 9 3 14 12 1 9 9 0 Lake Lake Oroville 57 31 1 16 8 0 14 11 0 4 1 0 14 10 0 9 1 1 Butte Lake Tulloch 47 24 0 17 7 0 9 6 0 7 1 0 10 7 0 4 3 0 Calaveras/Tuolumne Woodward Lake 43 30 2 9 5 0 12 8 2 8 2 0 10 11 0 4 4 0 Stanislaus Trinity Lake 42 35 0 9 9 0 5 5 0 15 11 0 5 6 0 8 4 0 Trinity New Melones 41 32 7 11 11 1 10 9 1 7 5 3 7 3 2 6 4 0 Calaveras/Tuolumne Bass Lake 36 26 0 5 3 0 14 10 0 13 10 0 3 2 0 1 1 0 Madera Big Bear Lake 35 21 2 13 6 1 9 4 0 2 2 0 9 7 1 2 2 0 San Bernardino Pyramid Lake 35 26 1 9 2 0 11 9 0 9 7 1 2 4 0 4 4 0 Los Angeles Lake Isabella 34 18 1 9 5 0 6 2 1 3 1 0 9 6 0 7 4 0 Kern Lake San Antonio 32 13 1 3 1 0 3 2 0 9 4 0 14 4 0 3 2 1 Monterey Lake Camanche 31 20 2 12 7 2 4 5 0 1 1 0 8 3 0 6 4 0 Amador/Calaveras/San -
Water Budgets for Major Streams in the Central Valley, California, 1961-77
WATER BUDGETS FOR MAJOR STREAMS IN THE CENTRAL VALLEY, CALIFORNIA, 1961-77 By James R. Mullen and Paul Nady U.S. GEOLOGICAL SURVEY Open-File Report 85-401 Regional Aquifer-System Analysis oo i i l o o Sacramento, California 1985 UNITED STATES DEPARTMENT OF THE INTERIOR DONALD PAUL HODEL, Secretary GEOLOGICAL SURVEY Dallas L. Peck, Director For additional information write to: Copies of this report can be purchased from: District Chief U.S. Geological Survey Open-File Services Section Federal Building, Room W-2234 Western Distribution Branch 2800 Cottage Way U.S. Geological Survey Sacramento, California 95825 Box 25424, Federal Center Denver, CO 80225 (Telephone: [303] 236-7476) CONTENTS Page Abstract--------- --------------------------------------------------- i Introduction----- ------------------------------------------ ______ i Method --- --- --- --- --- ------- -- - 4 Base period------------------------------------------------------ 5 Acknowledgments-------------------------------------------------- 5 Selected references--------------------------------------------------- 6 Schematics, explanations, and water-budget tables--------------------- 7 Kern River------------------------------------------------------------ 9 Tule River -- - - --- ------- 13 Kaweah River---------------------------------------------------------- 17 Main stem-------------------------------------------------------- 17 St. Johns River --- ------ 21 Kings River----------------------------------------------------------- 25 San Joaquin River------------------------------------- -
Go with the Flow
ss Bureau of Reclamation 2800 Cottage Way, MP-170 Sacramento, Calif. 95825-1898 San Joaquin River Restoration Program Water Year 2013 Interim Flow Releases Update and Seepage Hotline Information This notice is to inform you of the current Water Year (WY) 2013 Interim Flow releases scheduled by the Bureau of Reclamation and provide the phone number for Reclamation’s seepage hotline. Reclamation is continuing Interim Flow releases from Friant Dam at Millerton Reservoir, marking the fourth year of the experimental releases. Current Interim Flow Release Schedule From Friant Dam From March 1, 2013, to February 28, 2014 All values are in cubic feet per second (cfs) Estimated Interim Estimated Riparian Total Releases from Date Flow Releases (cfs) Release (cfs) Friant Dam (cfs) March 1 – 21 220 130 350 March 22 570 130 700 March 23 – 31 910 130 1,040 April 1 – 30 910 150 1,060 May 1 – 11 910 190 1,100 May 12 860 190 1,050 May 13 650 190 840 May 14 480 190 670 May 15 350 190 540 May 16 240 190 430 May 17 – 28 160 190 350 May 29 – June 30 160 190 350 July 1 – August 31 120 230 350 September 1 – 30 140 210 350 October 1 – 31 190 160 350 November 1 – 10 570 130 700 Nov. 11 – Dec. 31 230 120 350 Jan. 1 – Feb. 28 2014 250 100 350 These flows are consistent with the Stipulation of Settlement. All Interim Flows will be limited such that no flooding or seepage impacts are expected to occur. Reclamation is prepared to reduce flows, if necessary, if information from the groundwater monitoring network or from local landowners indicates that impacts may occur. -
Sierra National Forest EIS CE
Schedule of Proposed Action (SOPA) 04/01/2018 to 06/30/2018 Sierra National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact R5 - Pacific Southwest Region, Occurring in more than one Forest (excluding Regionwide) Inyo, Sequoia and Sierra - Land management planning In Progress: Expected:11/2017 12/2017 Nevia Brown National Forests Land DEIS NOA in Federal Register 7075629121 Management Plans Revision 05/27/2016 [email protected] EIS Est. FEIS NOA in Federal Register 11/2017 Description: The Inyo, Sequoia and Sierra National Forests propose to revise their land management plans as guided by the 2012 Planning Rule Web Link: http://www.fs.usda.gov/project/?project=3375 Location: UNIT - Sequoia National Forest All Units, Sierra National Forest All Units, Inyo National Forest Units, Inyo National Forest All Units. STATE - California, Nevada. COUNTY - Fresno, Inyo, Kern, Kings, Mono, Tulare, Esmeralda, Mineral. LEGAL - Not Applicable. Entire Inyo National Forest, entire Sequoia National Forest outside of the Giant Sequoia National Monument, and the Sierra National Forest. Mountain Yellow-legged frog - Special use management Developing Proposal Expected:06/2017 06/2017 Kary Schlick research Special Use Permit on - Research and Development Est. Scoping Start 05/2017 707-441-3625 the Inyo and Sierra National [email protected] Forests Description: Dr. Ronald Knapp from UC Santa Barbara%u2019s Sierra Nevada Aquatic Research Laboratory (SNARL) CE proposes to continue monitoring, research, and recovery activities for the mountain yellow-legged frog on the Inyo and Sierra National Forests. -
Creek Fire Changes Landscape, Massive Restoration Underway Open for Business!
Shaver Lake times Shaver Lake Times News for Travelers on Where To Shop, Eat, Stay and Play in the Local Sierra Nevada Issue #2 Spring, Summer, Fall 2021 A Talahi Publication Open for Business! Come Play and Stay With Family and Friends Shaver Lake is surrounded by land click Things to Do to get information managed by Southern California Edi- on over 30 different exciting adven- son and the U.S. Forest Service. It is tures that await you. the gateway to several wilderness re- Take advantage of the Regional Map gions. Here you will find an art gallery, on page 17 of this paper. It will give lodging, camping, dining, gift shops, you an opportunity to plan ahead on hardware store, sports bars, a sporting what you might wish to visit or where goods store, real estate offices and gro- you might like to stay while here. cery stores. It is a blessing to all of us, visitors, The Central Sierra businesses and residents alike, that Resiliency Fund the many outdoor recreational activi- The Central Sierra Resiliency Fund ties that make this area so popular are supports long-term Creek Fire recov- available again in 2021. ery efforts in communities within the So come take advantage of fish- vicinity of Fresno County’s Central ing, hiking, boating, sailing, hunting, Sierra region including, but not limit- rock climbing, horseback riding, bird ed to, Huntington Lake, Lakeshore, Big watching, off road vehicle treks, sight- Creek Fire Changes Landscape, Creek, Shaver Lake, Pine Ridge, Mead- seeing, water sports and much more. ow Lakes, Alder Springs, and Auberry. -
Sierra National Forest This Report Contains the Best Available Information at the Time of Publication
Schedule of Proposed Action (SOPA) 10/01/2019 to 12/31/2019 Sierra National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact R5 - Pacific Southwest Region, Occurring in more than one Forest (excluding Regionwide) Sequoia and Sierra National - Land management planning In Progress: Expected:03/2021 04/2021 Fariba Hamedani Forests Land Management DEIS NOA in Federal Register 707-562-9121 Plans Revision 06/28/2019 [email protected] EIS Est. FEIS NOA in Federal *UPDATED* Register 06/2020 Description: The Sequoia and Sierra National Forests propose to revise their land management plans as guided by the 2012 Planning Rule Web Link: http://www.fs.usda.gov/project/?project=3375 Location: UNIT - Sequoia National Forest All Units, Sierra National Forest All Units. STATE - California. COUNTY - Fresno, Kern, Kings, Tulare. LEGAL - Not Applicable. Entire Sequoia National Forest outside of the Giant Sequoia National Monument and entire Sierra National Forest. Sierra National Forest, Forestwide (excluding Projects occurring in more than one Forest) R5 - Pacific Southwest Region Ferguson Roadside Hazard - Forest products In Progress: Expected:09/2019 10/2019 Judith Tapia Project - Fuels management Scoping Start 04/15/2019 559-297-0706 - Road management [email protected] CE Description: removal of hazardous dead, dying, and damaged trees in the Project area Web Link: http://www.fs.usda.gov/project/?project=55710 Location: UNIT - Sierra National Forest All Units. STATE - California. COUNTY - Mariposa. LEGAL - All or portions of: Township 4 South, Range 21 E, section 36; T4S R21E, section 32; T5S, R20E, section 1; T5S, R21 E, sections 1, 4, 5, 6, 7, 8, 9. -
For First Responders
FOR IMMEDIATE RELEASE CONTACT: Sahara Saude-Bigelow [email protected]| C: 559.567.5854 Local Group Raises Additional Funds to Make First Annual Hero Day ‘Free’ for First Responders Central Sierra Resiliency Fund’s “Hero Day” is a community event in partnership with China Peak and Tioga-Sequoia Brewing Company to honor Creek Fire First Responders and support ongoing recovery and revitalization efforts. SHAVER LAKE, CALIFORNIA – MARCH 24, 2021... When a local group of avid skiers and cabin owners in the Shaver Lake area heard about the first-ever Central Sierra Resiliency Fund “Hero Day” at China Peak, they wanted to help further. As a result of independent fundraising, lift tickets for first responders will be even less than the unprecedented $25 special Hero Day rate – they will be free. To date the group, calling themselves “Friends of Hero Day”, have fundraised through individuals to make the first 175 first responders’ lift tickets of the day free. The group will continue outreach and fundraising with the hope to raise additional funds before the event Friday, March 26 from 9:00 a.m. to 5:00 p.m. at China Peak. The founder of “Friends of Hero Day” Brian Nichols said, “Our homes and cabins are still here because of these men and women. When everyone else was leaving the area because of the fire, these people stayed and worked through it. We wanted to give something back to say thank you.” The first 175 first responders will receive free lift tickets on March 26 and thereafter, tickets, ski/board rentals and lessons for first responders and their immediate family at the $25 Hero Day rates. -
Creek Fire Incident Update
Creek Fire Incident Update Date: 10/02/20 Time: 7:00 AM aM Public Information /North Zone Media : 844-668-3473 @CAL_FIRE @Sierra_NF South Zone/ Fresno Media line: 559-790-6374 @FresnoSheriff @MaderaSheriff Incident Email: [email protected] Incident Websites: www.fire.ca.gov @CALFIREMMU Https: Https://inciweb.nwcg.gov/incident/7147/ @CALFIREFresnoCoFire INCIDENT FACTS Incident Start Date: 09/04/2020 Incident Start Time: 6:33 P.M. Incident Type: Wildland Fire Cause: Under Investigation Incident Location: Both sides of the San Joaquin River near Mammoth Pool, Shaver Lake, Big Creek and Huntington Lake. Forest/CAL FIRE Units: Sierra National Forest, CAL FIRE Units: Fresno-Kings, Madera-Mariposa-Merced Unified Command Agencies: US Forest Service, CAL FIRE, Fresno County Sheriff, Madera County Sheriff Size: 311,703 Acres Containment: 45% Expected Full Containment: 10/31/2020 Civilian Injuries: 0 Fatalities: 0 Firefighter Injuries: 9 (minor) Fatalities: 0 Structures Threatened: 4,576 Structures Destroyed: 856 Structures Damaged: 71 CURRENT SITUATION Current GENERAL INFORMATION Situation: The reported fire growth was 1,907 acres on the Creek Fire during yesterday’s operational period. Tonight there will be a Creek Fire Update Briefing hosted by the Sierra National Forest FaceBook Page at 7:00 PM. As areas under evacuation warning and orders are repopulated residents, business owners and others returning to the area must do so safely. Emergency personnel and equipment continue to work in the area. Please be cautious and drive safely. NORTH ZONE Continued hot and dry weather under high pressure, low Rh recovery will maintain potential for scattered flare ups, short range spotting, and undermining of tree roots. -
Kern River Basin
Contents Introduction..................................................................................................................................................... 4 Affected Environme nt ..................................................................................................................................... 4 Characterization of Monument Watersheds ............................................................................................ 14 Climate....................................................................................................................................................... 16 Changes in the Modern Climate Regime .................................................................................................. 19 Kings River Basin........................................................................................................................................ 20 UPPER KINGS RIVER BASIN........................................................................................................................ 20 Kaweah River Basin ................................................................................................................................... 61 UPPER KAWEAH BASIN .............................................................................................................................. 61 Kern River Basin......................................................................................................................................... 75 UPPER KERN RIVER BASIN .........................................................................................................................