APPROPRIATION TO IN THE 2012 NATIONAL BUDGET

MINISTRY, PROJECTS AMOUNT DEPARTMENT AND LOCATION AGENCY MINISTRY OF EDUCATION (1)CONSTRUCTION OF SEVEN (7NOS.) OF ONE BLOCK OF TWO CLASSROOM JIGAWA SOUTH WEST 38,000,000

(2)CONSTRUCTION OF A BLOCK OF 3 CLASSROOM AT PRIMARY SCHOOL KARKASHI VILLAGE, TSIRMA WARD, / LGA 15,000,000

CONSTRUCTION OF SEVEN (7NOS.) OF ONE BLOCK OF TWO CLASSROOM JIGAWA SOUTH WEST. 38,000,000

CONSTRUCTION OF 3 CLASSROOM WITH VIP TOILET / FEDERAL CONSTITUENCY, JIGAWA STATE 35,000,000

CONSTRUCTION OF BLOCKS OF 2 CLASSROOMS /MIGA FEDERAL CONSTITUENCY, JIGAWA STATE 50,000,000 CONSTRUCTION OF STATE BRANCH BUILDINGS IT IS AN ONGOING PROJECT APPROPRIATE FOR 475,000,000 JIGAWA,KATSINA,GOMBE,OSHOBO,CALARBAR&BAYELSA SUPPY OF 600 NOS. STUDENTS DESKS AND CHAIRS FGC 1,192,104 SUPPY OF 40 DESKTOP AND 20 LAPTOP COMPUTERS FGC KAZAURE 1,862,663 RENOVATION OF MOREMI HOSTEL FGC KAZAURE 2,235,196 PROVISION OF 2500M PERIMETER FENCING FGC KAZAURE 35,821,880 PROVISION OF 1NO. NEW BOREHOLE AND RETICULATION TO SICK BAY AND FGC KAZAURE 1,788,157 OLD SITE MINISTRY OF INFORMATION COMPLETION OF NTA SUB-STATION LGA 150,000,000 OFFICE OF THE AUDITOR GENERAL REHABILITATION OF JIGAWA STATE BRANCH OFFICE BUILDING JIGAWA. (NO LGA SPECIFIED) 1,700,000 OF THE FEDERATION MINISTRY OF WATER RESOURCES VALLEY IRRIGATION PROJECT. JIGAWA 198,184,000 EU-ASSISTED WATER SUPPLY AND SANITATION SECTOR REFORM. ANAMBRA, CROSS RIVER, OSUN, JIGAWA, , AND YOBE STATES 30,000,000 CONSTRUCTION OF SHAGARI IRRIGATION PROJECT NO LGA WAS SPECIFIED 39,272,000 MIDDLE RIMA VALLEY IRRIGATION PROJECT, PHASE II. NO LGA WAS SPECIFIED 554,546,000 USMAN DAN FODIO UNIVERSITY SOKOTO USMAN DANFODIO UNIVERSITY(DETAILS OF PROJECT NOT SUPPLIED) 20,000,000 TYPA GRASS REMOVAL HADEJIA-NGURU WET ALND JIGAWA AND YOBE 10,000,000 DEVELOPMENT OF CLIMATE CHANGE MODEL FOR THE EIGHT [BORNO, YOBE, JIGAWA, KANO, BAUCHI, GOMBE] LAGOS, OGUN, OSUN, OYO, 4,800,000 HYDROLOGICAL AREAS WITH FOCUS ON HYDROLOGICAL AREAS 8 (CHAD ONDO EDO BASIN) AND HA 6 (WESTERN LITTORAL) IN 2012 CONSTRUCTION OF TEN (10NOS.) SOLAR POWER BOREHOLES WITH OVER NO LGA WAS SPECIFIED 100,000,000 HEAD TANKS AND THREE (3NOS.) HAND PUMP

2012 Federal Capital Project Pull Out for North West Page 1

WATER SUPPLY SCHEME IN JIGAWA NORTH-WEST NO LGA WAS SPECIFIED 100,000,000 DRILLING AND EQUIPPING OF SOLAR BOREHOLES NO LGA WAS SPECIFIED 100,000,000 COMPLETION OF SMALL IRRIGATION SCHEMES NO LGA WAS SPECIFIED 38,000,000 DESIGN/TENDER DOCUMENT OF EARTH DAM OR RAIN HARVEST ABUNABO VILLAGE GURU LGA 15,000,000 CONSTRUCTION OF HAND PUMP BOREHOLES BARUBA AND GARKI LGA 30,000,000 SMALL SCALE IRRIGATION SCHEME BARUBA AND GARKI LGA 10,000,000 COMPLETION OF THE CONSTRUCTION OF SINDIMINA DAM, LGA 70,000,000 CONSTRUCTION OF HAND PUMP BOREHOLES IN MALAM LACATION WAS ALSO TAGGED VARIOUS 5,000,000 MADORI/KAUGAMA FEDERAL CONSTITUENCY. CONSTRUCTION OF HAND PUMP BOREHOLES DUTSE /KIYAWA FEDERAL CONSTITUENCIES 70,000,000 CONSTRUCTION OF SOLAR POWERED BOREHOLES KIRIKASAMA,BIRNIWA,GURI FEDERAL CONSTITUENCIES 40,000,000 DESIGN OF EARTHDAM KIRIKASAMA/GURI LGAS 30,000,000 CONSTRUCTION OF A SMALL SCALE IRRIGATION SCHEME HADEJIA// LGAS 70,000,000 EROSION CONTROL AT WASAI DAM MINJIBIR LGA 70,000,000 EROSION CONTROL SINDIMINA VILLAGE, BRNIN KUDU LGA 80,000,000 CONSTRUCTION OF DAGOLO DAM BIRNIN KUDU LGA 50,000,000 COMMUNITY BASED WATER SUPPLY WITH PUBLIC STAND POST BIRNIWA LGA 17,850,000 (MOTORISED) HAND PUMP BOREHOLE FULANIN KARABAGE, LGA 1,700,000 PROVISION OF 12 NOS. HAND PUMP BOREHOLS KYAWA LGA 20,400,000 COMMUNITY BASED WATER SUPPLY (SOLAR POWERED K/TSALLE TAURA LGA 22,500,000 CONSTRUCTION OF 18 NOS. HAND PUMP BOREHOLE BRINING KUDU/BUJI FEDERAL CONSTITUENCY 30,000,000

MOTORISED BOREHOLES MIGA/JAHUN FEDERAL CONSTITUENCY 30,000,000 MOTORISED BOREHOLES DUTSE/IKIYAWA FEDERAL CONSTITUENCY 30,000,000 ESTABLISHMENT OF SMALL SCALE IRRIGATION SCHEME KANO, JIGAWA AND BAUCHI 53,229,000 PROVISION OF SOLAR POWERED BOREHOLES , TAURA, AND GARKI LGAS 200,000,000

PROVISION OF SOLAR POWERED BOREHOLES , SULETANKARKAR, , MAIGATARI LGAS 200,000,000

PROVISION OF SOLAR POWERED BOREHOLES RONI, , AND KAZAURE LGAS 200,000,000

SOLAR POWERED/HANPUMPS BOREHOLES HADEJA/AUYO/KAFIN HAUSA LGAS 100,000,000 PROVISION 10NO HANDPUMP BOREHOLES BIRNIWA/GURI/KIRIKASAMMA LGAS 12,000,000 PLANTS AND MACHINERY, 1 NO. CAT 3305 EXCAVATOR KANO, JIGAWA AND BAUCHI 10,582,000

2012 Federal Capital Project Pull Out for North West Page 2

REHABILITATION OF LARGE SCALE IRRIGATION INFRASTRUCTURE (KRIP & KANO, JIGAWA AND BAUCHI 60,837,104 HVIP) CONSTRUCTION/COMPLETION OF EARTH DAM/IRRIGATION PROJECTS AND GWARAM LGA 200,000,000 WATER SUPPLY REHABILITATION OF LARGE DAM (TIGA DAM, RUWAN KANYA RESERVOIR, KANO, JIGAWA AND BAUCHI 100,690,000 CHALLAWA GORGE DAM AND HADEJIA BARRAGE) AND GALALA

WATER SUPPLY KANO, JIGAWA AND BAUCHI 320,000 HYDROMET PROGRAMME KANO, JIGAWA AND BAUCHI 7,800,000 FLOOD/EROSION CONTROL PROJECTS, CONSTRUCTION OF 338M DRAINAGE KANO, JIGAWA AND BAUCHI 14,840,000 PROCUREMENT OF SPECIALISED EQUIPMENT, ACCESSORIES FOR AQUATIC NORTH WEST, NORTH EAST & NORTH CENTRAL WAS LISTED (BUT ONLY KANO 9,569,747 WEEDS CONTROL AND MANAGEMENT IN ’S NATURAL WATER AND JIGAWA WAS SPECIFIED) BODIES

PILOT CONSTRUCTION, CHANNELIZATION & STABILIZATION OF NIGERIA'S JIGAWA, BORNO, YOBE, BAUCH 10,054,621 RIVERS IN 8 CATCHMENT AREAS AS MODELS FOR THE REGULATION, MAINTENANCE OF A SOUND ECOSYSTEM AND QUALITY CONTROL

DESIGNING OF RESERVOIR OPERATION MODELS FOR (I)DAMS IN KANO, JIGAWA, YOBE, , BAUCHI, BORNO, PLATEAU 8,739,495 KOMADUGU-YOBE BASIN; AND (II) KAINJI, JEBBA & SHIRORO DAMS; AND (III) OTHER LARGE DAMS IN THE CATCHMENT AREAS FOR OPTIMIZATION OF THE SYSTEMS MINISTRY OF WOMEN AFFAIRS SKILLS ACQUISITION CENTRE GALAMBI LGA 9,829,159

COMPLETION OF STATE HQ COMPLEX IN DAMATURU YOBE STATE, DUTSE JIGAWA STATE, JALINGO TARABA STATE, 201,278,368 ZONE 4 HQ MAKURDI AND ZONE 9 HQ UMUAHIA POLICE FORMATION AND CONSTRUCTION OF HELIPAD IN 6 LOCATIONS: OTUKPO, FUGAR, YOLA, BENUE, BORNO, ADAMAWA, JIGAWA, OGUN, OSUN 48,000,000 COMMAND RINGIM, ABEOKUTA AND ELEWERAN OBALUFE WITH INFRASTUCTURES AND BRIDGES OFFICE OF THE SECRETARY POVERTY ALLEVIATION PROGRAMME GWARAM LGA 50,000,000 GENERAL OF THE FEDERATION MINISTRY OF HEALTH CONSTRUCTION OF COMPREHENSIVE PRIMARY HEALTH CENTER DUNARI, MALAM MADORI LGA, JIGAWASTATE 30,600,000

FEDERAL MEDICAL CENTRE JIGAWA PROCUREMENT OF THEARTER AND RADIOLOGY EQUIPMENT JIGAWA 15,534,589 PROCUREMENT OF INTENSIVE CARE UNIT (ICU) EQUIPMENT AND OTHER JIGAWA 15,000,000 MAJOR MEDICAL EQUIPMENT PROCUREMENT OF ORTHORPHAEDIC EQUIPMENT JIGAWA 15,000,000 CONSTRUCTIONAND EXTENTION OF WORKS AND SERVICES DEPARTMENT. JIGAWA 15,000,000

BUILDING, EXTENTION AND EQUIPPING OF PHARMACY JIGAWA 15,000,000 BLOCK/COMPOUNDING UNIT

CONSTRUCTION OF 250 TONS CAPACITY WAREHOUSE JIGAWA 14,000,000

2012 Federal Capital Project Pull Out for North West Page 3

RENOVATION OF 5NOS BLOCKS OF FLATS AND THE MD'S RESIDENCE. JIGAWA 30,000,000

MINISTRY OF POWER GAGARAWA 2X60 MVA, 132/33 KV SUBSTATION, JIGAWA STATE JIGAWA 154,100,000

SUPPLY OF UNDERGROUND CABLE KANO, KATSINA AND JIGAWA 30,000,000 SUPPLY OF HT CABLES KANO, KATSINA AND JIGAWA 20,000,000 SUPPLY OF TERMINATION KIT 9,822,331 REPLACEMENT OF OBSOLATE SWITCGEAR (33K)) KANO, KATSINA AND JIGAWA 35,000,000 PROVISION OF ABOUT 10 KITS OF TEST EQUIPMENT KANO, KATSINA AND JIGAWA 33,000,000 PURCHASE OF FIRE EXTINGUISHERS KANO, KATSINA AND JIGAWA 10,000,000 SUPPLY OF 4WAY FEEDER PILLAR KANO, KATSINA AND JIGAWA 10,000,000 REHABILITATION OF DISTRIBUTION SUBSTATION (SUPPLY OF TRANSFORMER KANO, KATSINA AND JIGAWA 20,000,000 OIL) TRACE CLEARING FOR LT LINES KANO, KATSINA AND JIGAWA 15,000,000 RECONDUCTORING OF 30KM OF 11KV AND 25KM OF 33KV OVERHEAD KANO, KATSINA AND JIGAWA 4,500,000 LINES

PROCUREMENT AND INSTALLATION OF 11/0.415KV & 33/0.415KV KANO, KATSINA AND JIGAWA 80,000,000 TRANSFORMERS

REHABILITATION OF SUBSTANDARD AND VANDALISED PORTION OF 33KV KANO, KATSINA AND JIGAWA 70,000,000 FEEDER (KUMBOTSO TS- DAKATSALLE) ONGOING ELECTRIFICATION OF SABON GARIN (BAKURU/BARADA) IN KANO, KATSINA AND JIGAWA 25,000,000 KASTINA STATE CONSTRUCTION OF 33KV LINE TO EVACUATE POWER FROM DAKATA AND KANO, KATSINA AND JIGAWA 56,000,000 KATSINA TS COMMUNICATION EQUIPMENT KANO, KATSINA AND JIGAWA 17,000,000 EXT. OF 33KV LINE FROM GWARAM- DANGAYA JIGAWA 50,000,000 SUPPLY AND INSTALLATION OF PPM KANO, KATSINA AND JIGAWA 50,000,000 PROCUMENT AND INSTALLATION OF 2 X 500KVA TRANSFORMERS,2 X HADEJIA TOWN, HADEJIA LGA,KAFIN HAUSA TOWN AND AUYO TOWN AT 20,000,000 500NKVA TRNASFORMERS AND 1X500KVA TRANSFORMERS AUYO LGA RESPECTIVELY IN JIGAWA STATE COMPLETION OF RURAL ELECTRIFICATION PROJECTS DAN MADAI,HANNUN GIWA, MAAZU IN GUMEL,GAGORAWA,MAI GATARI 70,000,000 AND FEDERAL CONSTITUENCY JIGAWA STATE ELECTRIFICATION OF MANGA,DAN MAIGARI AND MASAKA TOWNS BABURA AND GARKI LGAS,JIGAWA STAT 30,000,000

CONSTRUCTION OF ELECTRIFICATION PROJECT DANDI, KAZAURE LGA 40,000,000 COMPLETION OF ELECTRIFICATION PROJECT (ONE UNIT) ZAUMAR GAURAYE, GWIWA LGA 30,000,000

2012 Federal Capital Project Pull Out for North West Page 4

MINISTRY OF SCIENCE AND TECHNOLOGY

NATIONAL OFFICE OF TECHNOLOGY IMPLEMENTATION OF THE PAN-AFRICAN TSETSE AND TRYPANOSOMIASIS JIGAWA & YOBE ACQUISITION AND PROMOTION ERADICATION CAMPAIGN (PATTEC) IN NIGERIA.

ENERGY COMMISSION OF NIGERIA CONSTRUCTION OF SOLAR POWERED ELECTRIFICATION BARMAGUWA VILLAGE IN KIRIKASAMMA LGA 15,000,000

CONSTRUCTION OF SOLAR POWERED BOREHOLE HADEJIA TOWN HADEJIA LGA 10,000,000 CONSTRUCTION OF SOLAR POWERED BOREHOLE GARIN ANDO VILLAGE IN KIRIKASAMMA LGA 10,000,000

CONSTRUCTION OF SOLAR POWERED BOREHOLE AYAMAS KUKA VILLAGE IN AUYO LGA 10,000,000 CONSTRUCTION OF SOLAR POWERED BOREHOLE GARIN GAMIN YAMASORI VILLAGE IN KAFIN HAUSA LGA 10,000,000

CONSTRUCTION OF SOLAR POWERED BOREHOLE KABEWA VILLAGE IN BIRNINWA LGA 10,000,000 CONSTRUCTION OF SOLAR STREET LIGHT JIGAWA SOUTHWEST 100,000,000 PROVISION OF SOLAR STREET LIGHTS JAHUN LGA OF JIGAWA 20,000,000 MINISTRY OF WORKS REHABILITATION OF HADEJIA-NGURU ROAD IN JIGAWA STATE PHASE II: JIGAWA 742,500,000 KIRIKASAMA- NGURU IN JIGAWA STATE C/NO. 6072

REHAB.OF HADEJIA - NGURU ROAD C/NO. 5927 990,000,000 REHABILITATION OF AJINGI - JAHUN - KAFIN HAUSA ROAD C/NO. 6041 198,000,000 CONSTRUCTION OF ROAD TO GALAMBI IN JIGAWA STATE 297,000,000 REHABILITATION OF KUNYA-KANYA-BABURA-BABBAN MUTUM 568,953,000 TSAKWARAM - GALAMBI ROAD 99,000,000 PILLAR CONSTRUCTION OF NIGERIA/NIGER INTERNATIONAL BOUNDARY KEBBI, SOKOTO, ZAMFARA, KATSINA, JIGAWA, YOBE, BORNO, 41,228,328

REHABILITATION OF WARJI-GWARAM ROAD BAUCHI AND JIGAWA STATES 39,600,000 GENERAL MAINTENANCE REPAIRS OF GUMEL – MALAM MADORI – HADEJIA JIGAWA 86,130,000 ROAD CREATION OF SETTLEMENT DATABASE FOR SETTLEMENTS ON NIGERIAN KEBBI, SOKOTO, ZAMFARA, KATSINA, JIGAWA, YOBE, BORNO 20,344,500 SIDE FOR MAPPING OF NIGERIAN/NIGER INTERNATIONAL BOUNDARY CORRIDOR CREATION OF SETTLEMENT DATABASE FOR SETTLEMENTS ON NIGERIAN KEBBI, SOKOTO, ZAMFARA, KATSINA, JIGAWA, YOBE, BORNO, 20,344,500 SIDE FOR MAPPING OF NIGERIAN/BENIN INTERNATIONAL BOUNDARY CORRIDOR CREATION OF SETTLEMENT DATABASE FOR SETTLEMENTS ON NIGERIAN KEBBI, SOKOTO, ZAMFARA, KATSINA, JIGAWA, YOBE, BORNO, 20,344,500 SIDE FOR MAPPING OF NIGERIAN/CHAD INTERNATIONAL BOUNDARY CORRIDOR

MINISTRY OF AVIATION ON GOING CONSTRUCTION OFDUTSE AIRPORT DUTSE 750,000,000

2012 Federal Capital Project Pull Out for North West Page 5

MINICTRY OF ENVIRONMENT ESTABLISHMENT OF WOODLOTS PLANTATION IN THE 11 FRONTLINE STATES KATSINA AND JIGAWA STATES 38,134,159

GREAT GREENWALL SAHARA NIGERIA PROGRAMME ADAMAWA, BORNO, YOBE, BAUCHI, GOMBE, JIGAWA, KANO, KATSINA, 13,335,530 ZAMFARA, SOKOTO AND KEBBI STATES SECOND PHASE OF THE GEF-ASSISTED INTEGRATED ECOSYSTEM BORNO, YOBE, KATSINA, KANO, JIGAWA AND SOKOTO STATES 57,500,000 MANAGEMENT PROJECT (IEM-P) THE TRANSBOUNDARY AREAS OF NIGERIA AND NIGER REPUBLIC

2012 Federal Capital Project Pull Out for North West Page 6