Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above

Details of work Name of the Cost of Project Sr.No. District Project/Work (in Rs.) Date of starting of work Date of completion of work

Construction of building of Old age Home and 1 Faridkot 17-02-2010 30-09-2012 10,00,000/- Hostel for deaf and Dumb Children Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above

Details of work Cost of Project Sr.No. District Name of the Project/Work Date of starting of Date of completion of (in Rs.) work work

1 Mansa Phirni village Raipur 19.9.2012 20.3.2013 15.00

2 Mansa Hall in Govt. Girls College, Mansa 29.9.2011 21.6.2013 100.00

3 Mansa For Govt. Girls College Mansa 22.12.2011 21.6.2013 25.00

4 Mansa For Bridge on kotla Branch 18.4.2013 29.8.2013 50.00

5 Mansa For Bridge on kotla Branch, kotli kalan 18.4.2013 29.8.2013 25.00

6 Mansa For Bridge on kotla Branch, Bhani Bagha 18.4.2013 29.8.2013 25.00

7 Mansa Road form Guru Nanak College Budhlada to Bus stand 7.3.2013 22.8.2013 50.00

8 Mansa Bridge on Canal water works Road 21.5.2010 26.3.2011 13.50

9 Mansa Construction fo Mahila Thana Mansa 8.2.2010 28.4.2010 10.00

10 Mansa Const. of Hall in Police Public School 6.11.2010 30.12.2010 10.00 Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above

Details of work Cost of Project Sr.No. District Name of the Project/Work Date of Date of starting (in Rs.) completion of of work work

1 Pathankot Purchasge Of Ambulance for ECHS Poly Clinic For 21 Sub Area Military Hospital 19-10-2011 15-02-2012 11,00,000

2 Pathankot Constrution of Swimming Pool 3/10/2012 Work Under Progress 40,00,000

3 Pathankot Instalation of Sewerage System 4/3/2013 Work Under Progress 10,00,000 Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above

Details of work Cost of Project Sr.No. District Name of the Project/Work Date of starting of Date of completion of (in Rs.) work work

w?Nbv ;VeK (fJBo o'v) dh T[;koh, ;[yBk n?Beb/t, 1 S.A.S. Nagar 28.3.12 - 10.00 eK;b fBnKrkT[A[

N?Agb nkc B"bi, ;?eNo^68 w'jkbh fty/ ukofdtkoh dh 2 S.A.S. Nagar 28.2.13 01.09.2013 10.00 T[;koh Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above

Details of work Cost of Project Sr.No. District Name of the Project/Work Date of starting of Date of completion of (in Rs.) work work

1 Bathinda Hotline conection for Water Works,Goniana 4/20/2011 20.03.2012 20.00

Const. of Drain for Dispojal water at jawher Nagar 2 Bathinda 11/15/2011 22.03.2012 19.8342 Block Rampura

3 Bathinda Hotline Electri citi conection for C.H.C Sagant 12/4/2012 18.06.2013 11.00

4 Bathinda Hotline Electri citi conection for C.H.C Goniana 12/4/2012 Work in Progress 13.97488

5 Bathinda Hotline Electri citi conection for C.H.C Raman 12/4/2012 10.07.2013 10.67600

Const. of Drain form Dispojal water Pond to Sam Drain 6 Bathinda 14.01.2013 24.05.2013 15.00 at Gill Kalan

7 Bathinda Const. of Village Phirni at Jethuke 14.01.2013 20.06.2013 15.00

8 Bathinda Const. of Floor in Grain Market (one Acre) at Chotia 14.01.2013 6/18/2013 10.00

Const. of inlet Channal for the Supply of Water from 9 Bathinda 17.01.2013 Work in Progress 12.00 Water Works at Ablu

10 Bathinda Const. of Water Works Tank at Pathrala 17.01.2013 Work in Progress 10.00

Total 137.49 Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above

Details of work Cost of Project Sr.No. District Name of the Project/Work Date of starting of Date of completion of (in Rs.) work work Const. of Balck top raod from sankar road to kashinagar 1 24 Soth, Pargans - 10.00 20.00 bazar PWD road

2 Leh Rehabilitation works in cludburst affected areas - 10.00 19.8342

3 Patiala Const of bathroom & toilets civil court nabha 16.12.2009 10.00 11.00

4 Patiala Const of community hall 01.08.2012 10.00 13.97488

5 Patiala Const of Lawyers chambers at distt court complex 15.02.2013 25.00 10.67600

6 Patiala Const of streets in sigligar basti W.No.1 - 10.92 15.00

7 Patiala Const of community center Ist floor - 10.00 15.00

Const. of coridoor parking area of new judiciala court 8 Patiala 16.03.2013 10.00 10.00 complex samana

9 Ajitgarh Const of river bridge at vill-Amralato karala(Ajitgarh) - 25.00 12.00 Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above. Sr.No. Name of M.P.'s District Name of the Project/ Works Details of work Cost. Of Projects (in Rs.)

Date of Date of starting of completion of work work

1 2 3 4 5 6 7 Dr. Rattan Singh Const. Of road from Kapurthala Ajnala, Hon'ble M.P. Fathudhinga Road upto 1 [Lok Sabha] Kapurthala Shahdullapur. 6/4/2010 9/21/2011 12,00,000/- Installation of Street Lights all 2 -do- -do- Wards in Kpt. (1-27) 3/29/2011 7/19/2013 20,00,000/- Const. Of road from Todarwal - 3 -do- -do- Dariewal, Sultanpur Lodhi. 6/8/2011 8/7/2012 22,95,000/- Ucha Boharwala to Paramjitpura 4 -do- -do- Link Rs. (Length 1.10K.M.) 6/21/2012 8/29/2013 26,68,000/-

Approach road to Kothe Isharwal 5 -do- -do- (length 0.50km) 10/30/2012 8/29/2013 10,48,000/-

Deputy Economic & Statistical Advisor,

Kapurthala. 8

Details of important projects done or being done in district Jalandhar under MPLAD Scheme costing Rs. 10 Lakh and above

Sr. Name of the Work Details of Work Cost of Project No. Date of starting Date of (in Rs.) work completion work

1 Const.of Library in Bar Council Jalandhar Jalandhar 8/22/2013 Work in Progress 10,00,000 2 Installation of Tubewell in Nimbu Shah Wali Gali Santokh Pura Jal-City 5/16/2013 Work in Progress 12,50,000 3 Installation of Tubewell in New Suraj Ganj Ward No. 51 Jal-City 5/16/2013 Work in Progress 13,50,000 4 Construction of building for deaf school (IInd floor) Ladhewali Road, Jal. Jalandhar 11/19/2009 3/29/2010 10,00,000 5 For construction of roads and streets in Moti Nagar, Ward No. 39, Jalandhar Ward No. 39 Moti Jal-City 4/16/2010 6/6/2010 9,92,564 Nagar,Jalandhar 6 For construction of road and Streets in Sheetal Nagar and New Sheetal Nagar Ward No. 39, Jalandhar Jal-City 7/28/2011 9/29/2011 10,00,000

7 For construction of road and Streets in New Janta Colony, Jalandhar Ward No. 1 Jal-City 12/5/2011 1/7/2012 10,00,000 8 For construction of road and drains on street No.1-A at New Guru Teg Bahadur New Guru Teg Bahadur Nagar, Jal-City 10/10/2011 1/2/2012 14,95,000 Nagar, Jal Jal. 9 For purchase of Cell Separator Model-TRIMA Civil Hospital, Jal. Jal-City 4/18/2011 3/22/2013 18,90,000 10 For purchase of Color Doppler System (Nemio XG (SSA-580A) Civil Hospital, Jal. Jal-City 9/21/2010 Work in Progress 15,50,000 11 For construction of street & drains W.o. 39, Jal. Jal-City 11/30/2010 2/5/2011 10,00,000 12 Construction of Hall and the toilets in the Wrestling Stadium Chougittee Jalandhar 7/15/2011 5/20/2012 10,00,000 13 Construction of Streets & Drains W.No.1 Angad Nagar Jal-City 12/5/2011 12/29/2011 10,00,000 14 Const.of road & streets Ravidas Nagar Ward No.1 Ravidas Nagar W.No 1 Jal-City 5/18/2012 6/23/2012 10,00,000 15 Const.of roads & Streets Guru Nanak Nagar W.No 1 Guru Nanak Nagar W.No 1 Jal-City 5/18/2012 8/8/2012 10,00,000 16 Const.of street from Main road to Canal W.No 45 street No.5 Dilbag Nagar Jal-City 5/2/2012 7/3/2012 15,00,000 Extension (Grover colony) 17 Const.of road for the Main street No 2 W.No 13 Street No 2 Moh. Baba Jal-City - 8/22/2013 16,81,000 Budha Ji Nagar

23 DETAIL OF IMPORTANT PROJECT DONE OR BEING DONE IN YOUR DISTT. UNDER MPLAD SCHEME COSTING RS. 10 LACS AND ABOVE SR.NO DISTT. NAME OF THE DATE OF DATE OF COST OF PROJECT PROJECT/WORK STARTING COMPLETION Rs. In Lacs OF WORK OF WORK 1 W.No.14 New Vishkarma Ngr 15.7.11 6.3.13 10.00 For New tubewell at new vishkarma ngr. (Submercible pump at residence old area w.no. 17

LUDHIANA Sant Vihar colony Balloke Rd 9.12.11 11.10.12 13.25 Const.of link road at Sant Vihar colony Balloke Rd ldh 2 LUDHIANA Const.of public toilets block at 20.12.11 30.4.12 10.00 police commissioner office 3 Ludhiana LUDHIANA Shashtri Ngr.Model town Ldh 11.3.13 10.6.13 10.00 Const.of operation theator at Guru Teg Bahadur © Hospital 4 ® LUDHIANA Jasdev Singh Ngr Ldh Const.of 16.55 road from Link rd to 5 malerkotla st.no 3 LUDHIANA Const.of 18.2.13 5.8.13 10.00 room and stairs at Grewal Sports stadium 6 LUDHIANA IMA B.R.S nagar ldh Const. of 14.2.13 26.7.13 10.00 audiotorium building at indian mendicl association BRS Ngr. 7 LUDHIANA Const.of bulding of Dukh 10.00 Niwaran Hospital chairitable 8 trust ludhiana LUDHIANA Instt. Of 25 HP Tubewell at H 15.50 block Shaheed Bhagat Singh ngr. Kabir colony 9 LUDHIANA Instt. Of 25 HP Tubewell at 15.50 Raghbir park st. no 4-1/2 w.no 10 31 LUDHIANA Instt. Of 25 HP Tubewell at 15.50 11 Kabir moh. W.no 22 LUDHIANA Instt. Of 25 HP Tubewell at 15.50 12 Baal Nagar w. no 22 LUDHIANA Instt. Of 25 HP Tubewell at 15.50 Santokh nagar st.no 6-1/2 13 w.no 23 LUDHIANA Instt. Of 25 HP Tubewell at 15.50 New Shivpuri nr. Dr. Ashwani 14 clinic LUDHIANA Instt. Of 25 HP Tubewell at 15.50 Jassowal colony w. no 3 15 LUDHIANA Instt. Of 25 HP Tubewell at 15.50 16 Santra Nagar w.no 7 LUDHIANA Instt. Of 25 HP Tubewell at 15.50 17 Prem Nagar w.no 74 LUDHIANA Const.of two computers room 13.75 at Ramgharia girls college 18 LUDHIANA Instt. Of 25 HP Tubewell at 15.50 Near hanuman mandir 19 HargobindNagar w. 41 LUDHIANA Instt. Of 25 HP Tubewell at 15.50 20 Grewal colony wn 2 LUDHIANA Instt. Of 25 HP Tubewell at 15.50 Hari Singh Ngr wn 27 21 LUDHIANA Instt. Of 25 HP Tubewell at 15.50 Ishmeet chowk Shashtary Ngr wno 48 22 LUDHIANA Instt. Of 25 HP Tubewell at 15.50 23 Murga market park wno. 50 LUDHIANA Instt. Of 25 HP Tubewell at 15.50 24 Basant nagar wno. 62 LUDHIANA Const.of sewrage at Chakkar 20.00 25 Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above

Details of work Cost of Project Sr.No. District Name of the Project/Work Date of starting of Date of completion of (in Rs.) work work

1 Fatehgarh Sahib Nil Nil Nil Nil Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above

Details of work Cost of Project Sr.No. District Name of the Project/Work Date of starting of Date of completion of (in Rs.) work work Ferozepur Const of Community Centre (Rai Sikh Bhawan) SC Area 29-03-10 15-07-10 15.00 1 Feroepur city.

Ferozepur Const.of Community Centre( Rai Sikh Bhawan) Firozpur City 7/9/2010 28-6-11 15.00 2 Muktsar Installation of R.O. Plant at Malout 20-04-10 25-11-10 21.93 3

Ferozepur Const.of Road from Malwal Road to Ishhe Wala road Dera 20/10/11 1/8/2013 10.00 4 Radha Swami Ferozepur

Fazilka Const. of Road Vill.Sukhera Bodla to Vill.Dhani Tek singh 16-5-12 5/8/2013 13.75 5

Fazilka Const of Road Malout Road Fazilka to Dhani Balveer singh 02-08-013 10.00 6 Fazilka Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above

Details of work Sr. Cost of Project District Name of the Project/Work Date of Remarks No. Date of starting (in Rs.) completion of of work work Construction of Community Hall in Ward No. 27, 1 Sangrur 10,00,000/- Work suspended due to court case Malerkotla Work sanctioned on 08/04/2013. Second Construction of Aggarwal Community Centre, 2 Sangrur 25,00,000/- & third installment of Rs. 10,00,000/- Patiala Road Sangrur pending Installation of exploratory Well bored by Central Ground Water for providing Drinking water at Work sanctioned on 01/08/2013. Second 3 Sangrur 40,00,000/- sangrur, cheema, lehra, khanuri, dhuri (Distt. of Rs. 10,00,000/- pending Sangrur) and Dahnulla and Tapa(Distt. Barnala)

Construction of Streets and drains in mehroom 4 Sangrur 10/2/2012 15/03/2012 10,00,000/- UC Received hadood, longowal

Provision of rain water harvesting system in village 5 Sangrur 20/04/2012 5/6/2012 10,00,000/- UC Received nagra, bijalpur, akbarpur, sangrehri for rain water Providing lift facility for public in lawyer chamber Work sanctioned on 07/08/2013. Second 6 Sangrur 11,00,000/- at district court complex, Sangrur of Rs. 2,87,000/- pending

7 Sangrur Construction of Community Centre at Vill. Sohian 1/4/2013 31/08/2013 15,00,000/- UC Received

Work sanctioned on 23/01/2013. Third Construction of Hall Room in building of S.D.P.P. 8 Sangrur Feb, 2013 17,00,000/- installment of Rs. 2,55,000/- pending high School at Malerkotla Work under progress Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above

Sr. Work Village / Block / District Name of the Project / Work Details of work No. Identity Place City No. Date of starting of Date of completion Cost of Project work of work (in Rs.) 1 2 3 4 5 6 7 8 9 Sh. Avinash Rai Khanna 1 2916 Jaijon Mahilpur Hoshiarpur Constn. of Govt. Community Centre. 26/02/2009 10/11/2009 1500000 Smt. Santosh Chowdhary 1 215 Dushehr Hoshiarp Hoshiarpur For Dushehra Ground (For Providing Steps 1/10/2011 30/06/2012 1000000 a ur City for the sitting of Public & to protect the Ground Dushehra ground from the floods)

2 813 Dussehr Hoshiarp Hoshiarpur Protection of Dushehra Ground from Floods 1/10/2011 30/06/2012 1137677 a ur City and Constn. of Stairs in Dushehra Ground Ground Total:- 2137677 Sh. Dharampal Sabharwal 1 1 KUNAIL GARHSHA HOSHIARPUR CONST. OF RETAINING WALLS , CAUSEWAY 20/03/2005 17/05/2005 1402000 NKAR 2 2 DAFFAR BHUNGA HOSHIARPUR CONST. OF NEW APPROACH ROAD 12/1/2005 16/11/2005 1000000 3 4 SHAHPUR DASUYA HOSHIARPUR CONST. OF NEW APPROACH ROAD 28/02/2005 14/12/2005 1000000

4 5 DHOOT BHUNGA HOSHIARPUR CONST. OF CAUSEWAY 24/01/2005 31/07/2005 1500000 KALAN 5 6 NANGAL TANDA HOSHIARPUR CONST. OF NEW APPROACH ROAD 12/1/2005 14/12/2005 1783700 JALALA 6 15 Jamshed BHUNGA HOSHIARPUR Constn. of new link road 23/02/2006 9/9/2006 1223720 Chthial 7 22 Toor BHUNGA HOSHIARPUR onstn. of road from Hsp. Dasuya road to vill. Toor 6/3/2006 9/9/2006 1365500 via vill. Raja Kalan 8 23 Bagol TANDA HOSHIARPUR Constn. of new link road from vill. Bagol Khurd to 5/4/2006 9/9/2006 1800000 Khurd vill. Khun khun Kalan 9 26 Garhdiwal BHUNGA HOSHIARPUR Const. of New link road Jhenda W/S Shamshan 6/6/2006 9/9/2006 1885200 a Ghat to Dholowal 10 27 Bajwara Hoshiarp HOSHIARPUR Const. of new Admn block in SBAC Sr Sse School 27/06/2006 29/06/2007 1254600 ur-2 11 28 Garhshank Garhshank HOSHIARPUR Const. of Admn. Block in D.A.V College for Girls 17/11/2006 31/12/2006 1000000 ar ar city 12 29 Hoshiarpu Hoshiarpu HOSHIARPUR Const. of Red Cross Vocational Traning Centre 28/07/2006 28/02/2007 1000000 r r City 13 31 Khurdan BHUNGA HOSHIARPUR Constn. of Mortuary in Santsar Charitable Hospital 12/12/2006 12/12/2007 1201900

14 33 Jamsher BHUNGA HOSHIARPUR Constn. of link road from Jamsher Chathial to 12/12/2006 12/7/2007 1080900 Chathial Shamshan Ghat 15 34 Panjaura Mahilpur HOSHIARPUR Constn. of Link Road from Panjaura Bridge to 3/2/2007 31/05/2007 1747100 Shamshan Ghat 16 62 Tanda Tanda City HOSHIARPUR Constn. of Community Centre 11/11/2008 8/8/2009 1165000

17 63 Old Tanda Hoshiarpu HOSHIARPUR Constn. of Community Centre at Balmik Ashram. 5/12/2008 15/07/2009 2956000 Road r City

18 69 Rajpur BHUNGA HOSHIARPUR Constn. of Link Road from Rajpur to Jujhar 1/1/2009 5/5/2009 2088200 19 77 Bassi Hoshiarp HOSHIARPUR Constn. of New Link Road from Bassi Mudda to 25/10/2008 23/06/2009 1425000 Mudda ur-1 Shamshanghat leading to Hoshiarpur to Dasuya Road. 20 80 Janauri BHUNGA HOSHIARPUR Constn. of Link Road from Hariana Dholbaha Road 1/3/2009 23/06/2009 2944000 to Bharthari Mandir Janauri. 21 101 Bodal DASUYA HOSHIARPUR Constn. of Link road from Bodal to Colony Gujjran. 2/2/2009 6/6/2009 1447100

22 108 Rara TANDA HOSHIARPUR Constn. of Road 2/3/2009 6/6/2009 1775700 23 110 Bhatolian BHUNGA HOSHIARPUR Constn. of New Pakka Road 14/04/2009 3/6/2009 1755000 24 126 BADIARAN TALWARA HOSHIARPUR CONSTN. OF NEW LINK ROAD FROM BADIARAN TO 4/12/2009 15/02/2010 1836800 TO BINDRAVAN BINDRAVA N 25 131 MUNAK TANDA HOSHIARPUR CONSTN. OF PHIRNI 9/12/2009 29/03/2010 1922200 KALAN 26 119 CHABBEW HOSHIARP HOSHIARPUR CONSTN. OF RCC OHSR OF G.H.R.S.COLLAGE FOR 3/6/2010 15/02/2011 1206400 27 135 PHADMA HOSHIARP HOSHIARPUR CONST. OF NEW LINK ROAD FROM PHADMA TO 1/1/2010 31/05/2010 3497600 UR-2 HUKRAN 28 139 Bassi HOSHIARP HOSHIARPUR Constn. of road 18/05/2010 30/09/2010 2713000 Kalan UR-2 29 144 CHABBEW HOSHIARP HOSHIARPUR Constn. of New Link road 18/05/2010 30/09/2010 1476900 AL UR-2 30 154 Mukerian Mukerian HOSHIARPUR Constn. of Community Centre 7/5/2010 21/10/2010 2840600 City

31 145 Marnaian HOSHIARP HOSHIARPUR Constn. of Link Road from Marnaian Kalan to 16/03/2010 21/10/2010 2353000 Kalan UR-2 Jathere 32 151 Saleran Hoshiarp HOSHIARPUR Constn. of Link Road Dera Peer Baba Mithe Shah to 6/9/2010 30/09/2011 1341000 ur-1 Chahal Road 33 153 Barian Mahilpur HOSHIARPUR Constn. of Link Road from Barian Kalan to Bilaspur 29/03/2010 25/06/2010 1997000 Kalan 34 157 Bham Mahilpur HOSHIARPUR Constn. of Street with Drain from Bham Mandir to 12/8/2010 10/11/2010 1947000 Talab 35 158 Mukhliana HOSHIARP HOSHIARPUR Constn. of Link Road from Mukhliana to Harta 10/10/2011 18/06/2011 2377900 UR-2 36 162 Kunail Garhshank HOSHIARPUR Constn. of Link road 22/10/2010 12/1/2012 2101000 ar Total:- 63411020 Sh. Varinder Singh Bajwa 1 636 Model Hoshiarp Hoshiarpur Constn. of Community Centre 2/1/2009 30/04/2009 1070000 Town ur city Smt. Ambika Soni 1 53 Binewal Garhshan Hoshiarpur Constn.of Pacca road leading Binewal to Sigha 23/11/2011 31/12/2005 2100000 to Sigha kar 2 54 Garhshan Garhshan Hoshiarpur Installation of Tube well for providing drinking 4/5/2006 31/07/2008 1600000 kar kar water 3 197 Jahan Hoshiarp Hoshiarpur Constn. of Hostel for Mentally Retarded 15/03/2009 26/06/2009 1000000 Khelan ur-2 Children run by Asha Deep Welfare Society Hoshiarpur(Regd.) 4 260 Mansowa Garhshan Hoshiarpur Constn. of Hall in M.B.B.G.R.C. BEd Girls College 26/02/2009 26/04/2009 1500000 l kar Total:- 6200000 Details of important projects done in your district under MPLAD scheme costing Rs 10 Lakh and above Sr.No District Name of the project/Work Details of work Cost of Project (in Rs)

Date of Starting of work Date of completion of work

1 Amritsar const. of various Parks 4-6-10 19-4-11 15.00

2 Amritsar const. of various Parks 18-2-11 26-1-12 11.00

3 Amritsar Const. of Comminity hall Ghaa 14-5-11 under progress 95% work 14.00 Mandi Raja sansi completed 4 Amritsar const. of Street of ward no 22 24-7-11 4-12-12 12.00

5 Amritsar Const. of Road Village Guruwali 12-1-12 21-9-12 18.00

6 Amritsar Installation of streets light 29-8-12 12-2-13 10.00

7 Amritsar Installation of dustbins Tender floated supply will be --- 10.00 made within this week

8 Amritsar Development of park near tarawala Not yet Started --- 40.00 pul along UBDC Canal

9 Amritsar Const. of Streets and drain in 25-9-13 --- 200.00 various wards of Amritsar east 10 Amritsar Const. of Streets and drain in 25-9-13 --- 40.00 various wards of Amritsar east

11 Amritsar Distribution of tricycles and 8-11-12 12-2-13 10.00 Artificallimbs Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above Details of work Cost of Project Sr.No. District Name of the Project/Work Date of starting of work Date of completion of work (in Rs.) Construction of Class Rooms at 1 Tarn Taran SGAD Government College Tarn 8/13/2004 1/17/2006 1000000 Taran Construction of Hostel at 2 Tarn Taran Govt.Sr.Sec. School (Girls) Tarn 9/16/2004 8/17/2007 2500000 Taran Construction of Hostel at SGAD 3 Tarn Taran Govt. (Girls)Sr.Sec.School 12/21/2005 6/20/2006 2755000 Construction of Hostel at SGAD 4 Tarn Taran Govt. (Girls)Sr.Sec.School 2/22/2008 6/19/2009 2000000

5 Tarn Taran Construction of 2nd Storey of Girls 7/29/2008 6/19/2009 2200000 Hostel at Govt. (Girls)Sr.Sec.School

6 Tarn Taran Construction of Drug-Deaadiction 8/4/2008 12/25/2008 1000000 Centre at Civil Hospital Tarn Taran Construction of Girls Hostel at 7 Tarn Taran SGAD College Khadur Sahib 8/4/2008 1/12/2009 2000000 Construction of Girls Hostel at 8 Tarn Taran SGAD College Khadur Sahib 1/21/2009 3/31/2010 1000000 construction of shed at Shri Guru 9 Tarn Taran Arjan Dev Sport stadium, Tarn 2/20/2009 3/31/2010 1000000 Taran Construction of ABC Blocks of Girls 10 Tarn Taran hostel at SGAD Govt Sr Sec School, 7/23/2009 3/31/2010 1200000 Tarn Taran CONSTRUCTION OF HOSTEL AT 11 Tarn Taran SGAD (G) SEN SEC SCHOOL, Tarn 11/21/2009 3/31/2010 2100000 Taran Construction of GIRLS AND STAFF 12 Ludhiana COMMON ROOM AT GOVT 3/25/2010 10/31/2010 1000000 COLLEGE, Ludhiana COMPLETION OF 2nd and 3rd 13 Tarn Taran STORY OF GIRLS HOSTEL AT SGAD 3/31/2010 10/31/2010 1500000 COLLEGE, Khadur Sahib construction of LPG based 14 Tarn Taran cremation 6/16/2011 12/16/2011 1600000 construction of women cell at bhai 15 Tarn Taran veer singh old age home 9/25/2012 3/25/2013 1500000

Dr. Rattan singh Ajnala Approach Road, Village Manochahal 1 Tarn Taran 7/27/2011 3/31/2012 1000000 Kalan STREET AND DRAINS, Village 2 Tarn Taran Kairon 11/11/2011 5/31/2012 1000000 STREET AND DRAINS, Village Algon 3 Tarn Taran Kalan 11/18/2011 5/31/2012 2000000 for street kale shah wali at Village 4 Tarn Taran khemkaran 9/21/2012 3/31/2013 1200000 STREET JAGTAR SINGH AND 5 Tarn Taran CHURCH WALI at Village 12/2/2011 6/1/2012 2000000 khemkaran Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above

Details of work Cost of Project Sr.No. District Name of the Project/Work Date of starting of Date of completion of (in Rs.) work work

1 Moga Nil Nil Nil Nil Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above

Details of work Cost of Project Sr.No. District Name of the Project/Work (in Rs.) Date of starting of work Date of completion of work Construction of Adarsh Senior Secondary School Khatkar 1 Shahid Bhagat Singh Nagar Kalan 20^07^2007 20^10^2007 50.00

Construction of Community 2 Shahid Bhagat Singh Nagar Hall Garlon Bet 16^06^2007 25^06^2008 12.50 Stadium in I.T.I,NSR 3 Shahid Bhagat Singh Nagar 26^03^2002 26^06^2002 10.00

Setting up of Pipe Lines for disposal of sullage Water, 4 Shahid Bhagat Singh Nagar Pharala, Banga 5^03^2007 11^12^2007 10.00 Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 10 Lakh and above

Sr. District Name of the Project/Work Details of work Cost of Project No. (in Rs.) Date of starting Date of of work completion of work 1 RUPNAGAR Purchase of 9 Ambulance Vans at First Aid Posts 11/5/2003 2/3/2004 23,40,000/-

2 RUPNAGAR Purchase of Five Ambulances 1/17/2004 2/3/2004 13,00,000/-

3 RUPNAGAR Const. of Stadium at Dashmesh Acadmy, Sri Anandpur 5/6/2006 12/31/2007 15,00,000/- Sahib 4 RUPNAGAR For Computer Project at Shri Dashmesh Acadmy, Sri 9/16/2005 4/27/2006 10,00,000/- Anandpur Sahib 5 now AJITGARH Constn. of Bridge on Shia-Teur Road, at Shami Pur 6/30/2006 7/31/2006 10,00,000/-

6 now AJITGARH Constn. of Room in Govt. Sr. Sec. School (Girls), Kurali 7/15/2006 10/31/2006 20,00,000/-

7 RUPNAGAR Const. of Bus Stand, Nurpur Bedi 4/18/2013 20,000,00/- ongoing

8 RUPNAGAR Approach Road to Bridge, Pati Tek Singh, Block Sri 4/18/2013 20,000,00/- ongoing Anandpur Sahib

9 RUPNAGAR For Construction of Parking on Both Sides of the Main 8/29/2013 20,000,00/- ongoing Road (Ropar Head Works to Garhshankar), Nurpur Bedi Town, Rupnagar

D:\Project\website material 10.12.13_received_on_18_12_13\MPLADS\Project work\Info Details of important projects done or being done in your district under MPLAD Scheme costing Rs. 5 Lakh

Details of work Cost of Project Sr.No. District Name of the Project/Work Date of starting of Date of completion of (in Rs.) work work

1 Barnala Const of Public Room at Red Cross Barnala 22.03.2012 16.04.2012 5.00

2 Barnala Const of Public Room at Red Cross Barnala 22.03.2012 11.04.2012 5.00

3 Barnala Const of Building for Red Cross Barnala 22.03.2013 25.03.2013 5.00