Search Results Recreational Program Project Database

Your search for projects in State: WV, Total Results : 333

State Project Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2014 S338-TEA/CR- S338-TEA/CR- Unspecified/Unidentifi $22,400 $5,600 $28,000

able

WV 2014 S309-NOR/TH- S309-NOR/TH- Unspecified/Unidentifi $49,653 $12,413 $62,066

able

WV 2014 U347-TRA/IL- U347-TRA/IL- Unspecified/Unidentifi $11,600 $2,900 $14,500

able

WV 2014 U306-MIL/TO- U306-MIL/TO- Unspecified/Unidentifi $8,000 $2,000 $10,000

able

WV 2014 U313-CRE/EK- U313-CRE/EK- Unspecified/Unidentifi $15,290 $4,000 $19,290

able

WV 2014 U353-SPO/RT- U353-SPO/RT- Unspecified/Unidentifi $25,600 $6,400 $32,000

able

WV 2014 U330-HAT/FI- U330-HAT/FI- Unspecified/Unidentifi $50,000 $12,500 $62,500

able

WV 2014 U333-NBR/T-1 U333-NBR/T-1 Unspecified/Unidentifi $50,000 $12,500 $62,500

able

WV 2014 X384-WVN/RT- X384-WVN/RT- Unspecified/Unidentifi $80,000 $20,000 $100,000

able

WV 2014 U334-FKM/TN- U334-FKM/TN- Unspecified/Unidentifi $14,100 $3,525 $17,625

able

WV 2014 U331-DEC/KE- U331-DEC/KE- Unspecified/Unidentifi $23,122 $5,781 $28,903

able

WV 2014 U313-LEW/IS- U313-LEW/IS- Unspecified/Unidentifi $19,200 $4,800 $24,000

able

WV 2014 U303-BOO/NE- U303-BOO/NE- Unspecified/Unidentifi $8,000 $2,000 $10,000

able

WV 2014 U333-NBR/T-1 U333-NBR/T-1 Unspecified/Unidentifi $32,000 $8,000 $40,000

able

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2014 U302-YAN/KA- U302-YAN/KA- Unspecified/Unidentifi $50,000 $12,500 $62,500

able

WV 2014 U313-CRE/EK- U313-CRE/EK- Unspecified/Unidentifi $710 Unknown $710

able

WV 2017 Tools and Equipment Asphalt Repair Trail Asphalt Repair Trail Equipment $14,400 $2,880 $17,280

Equipment

WV 2002 Fork Mountain Trail Maintenance Unspecified/Unidentifi $16,000 $4,000 $20,000

able

WV 2003 Mon River Trail Construct Trail Unspecified/Unidentifi $160,000 $40,000 $200,000

able

WV 2007 Trail Construction Trail Construction Construct Free Ride Bicycle trail in City Unspecified/Unidentifi $16,800 $4,200 $21,000

able

WV 2007 Rail-Trail Trail Maintenance Maintenance on rail-trail Unspecified/Unidentifi $18,862 $4,715 $23,577

able

WV 2007 Trail Construction Trail Construction Construct walking trail at school Unspecified/Unidentifi $20,000 $5,000 $25,000

able

WV 2007 Trail Construction Trail Construction Construct walking trail at elementary school Unspecified/Unidentifi $20,000 $5,000 $25,000

able

WV 2007 Trail Construction Trail Construction Construct Nature Trail Unspecified/Unidentifi $20,000 $5,000 $25,000

able

WV 2007 Upper Falls Public Information Facilities Develop Trail Brochure, install Kiosks and Unspecified/Unidentifi $24,800 $6,200 $31,000

signage and develop portage trail around able

Upper Falls

WV 2007 Trail Construction Trail Construction Construct rail-trail Unspecified/Unidentifi $44,000 $11,000 $55,000

able

WV 2007 Trail Construction Trail Construction and Sign Construct trail system, install signage, Unspecified/Unidentifi $66,650 $16,662 $83,312

Installation develop brochures able

WV 2007 Accessible Trail Construction Accessible Trail Construction Construct ADA Trail in Unspecified/Unidentifi $69,696 $17,424 $87,120

able

WV 2007 Various Trails Trail Maintenance Maintain multi-county motorized trail system. Unspecified/Unidentifi $137,101 $34,275 $171,376

able

WV 2007 Various Trails Trail Maintenance Maintain multi-county motorized trail system. Unspecified/Unidentifi $137,101 $34,275 $171,376

able

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2007 OHV Trail Construction OHV Trail Construction Construct ATV Trails and Trailhead Unspecified/Unidentifi $160,000 $40,000 $200,000

able

WV 2008 Various Trails Develop and Publish Map Develop and publish new map and trail guide Unspecified/Unidentifi $6,640 $1,660 $8,300

and Trail Guide for state park able

WV 2008 Public Information Develop and Publish Develop and publish rail-trail guide Unspecified/Unidentifi $14,400 $3,600 $18,000

Rail-Trail Guide able

WV 2008 Trail Construction Trail Construction Construct walking trail in community park Unspecified/Unidentifi $18,400 $4,600 $23,000

able

WV 2008 Trail Construction Trail Construction Construct extension to community trail at Unspecified/Unidentifi $18,400 $4,600 $23,000

housing project able

WV 2008 Rail-Trail Trail Improvements Resurface rail-trail Unspecified/Unidentifi $24,000 $6,000 $30,000

able

WV 2008 Trail Construction Trail Construction Pave walking trail in community park Unspecified/Unidentifi $24,858 $6,214 $31,072

able

WV 2008 Rail-Trail Trail Construction Pave Rail-Trail Unspecified/Unidentifi $26,000 $6,500 $32,500

able

WV 2008 Trail Construction Trail Construction Construct walking trail at elementary school Unspecified/Unidentifi $28,658 $7,164 $35,822

able

WV 2008 Trail Construction Trail Construction and Improve and extend trail in nature preserve Unspecified/Unidentifi $31,350 $7,837 $39,187

Improvements able

WV 2008 Trail Construction Trail Construction Purchase Equipment Unspecified/Unidentifi $40,000 $10,000 $50,000

able

WV 2008 Trail Construction Trail Construction Construct extension to community trail in Unspecified/Unidentifi $40,000 $10,000 $50,000

park. able

WV 2008 Water Trail Improvements Water Trail Development Develop water trail on Unspecified/Unidentifi $48,000 $12,000 $60,000

able

WV 2008 Trail Construction Trail Construction Construct paved walking trail in community Unspecified/Unidentifi $50,000 $12,500 $62,500

park able

WV 2008 Trail Construction Trail Construction for Develop equestrian trail system Unspecified/Unidentifi $75,000 $18,750 $93,750

Equestrians able

WV 2008 Rail-Trail Rail Bridge Reconstruction Convert railroad trestle to trail bridge Unspecified/Unidentifi $80,000 $20,000 $100,000

for Trail able

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2009 Unspecified/Unidentifiable Unspecified/Unidentifiable Unspecified/Unidentifi $4,800 $1,200 $6,000

able

WV 2009 Rail-Trail Maintenance On Rail-Trail Maintenance on rail-trail Unspecified/Unidentifi $12,000 $3,000 $15,000

able

WV 2009 Construct Bridge and Trail Construct Bridge and Trail Construct bridge and maintenance on trail Unspecified/Unidentifi $27,520 $6,880 $34,400

Maintenance Maintenance surface able

WV 2009 Construct Trail Construct Trail to Connect Construct trail to connect state park to Unspecified/Unidentifi $29,000 $7,250 $36,250

State Park to National National Scenic River able

Scenic River

WV 2009 Construct Construction Construct Connector Trail Construct connector trail. Unspecified/Unidentifi $32,800 $8,200 $41,000

able

WV 2009 Trail Construction Trail Construction Construct walking trail Unspecified/Unidentifi $40,000 $10,000 $50,000

able

WV 2009 Construct Nature Trail Construct Nature Trail Construct nature trail around Unspecified/Unidentifi $40,000 $10,000 $50,000

Around Pond Around Pond able

WV 2009 Construct Equestrian Trail Construct Equestrian Trail Construct equestrian trail. Unspecified/Unidentifi $40,000 $10,000 $50,000

able

WV 2009 Trail Construction Trail Construction In Develop and construct walking trail in Unspecified/Unidentifi $40,000 $10,000 $50,000

Community Park community park able

WV 2009 Rail-Trail Bridges Renovations to Rail-Trail Renovations to rail-trail bridges Unspecified/Unidentifi $40,000 $10,000 $50,000

Bridges able

WV 2009 Trail Construction Trail Construction Develop and construct walking trail in state Unspecified/Unidentifi $59,200 $14,800 $74,000

park able

WV 2009 State Park Trails Trail Rehabilitation Renovate walking trails in State Park Unspecified/Unidentifi $80,000 $20,000 $100,000

able

WV 2009 Construct ATV Trails and Construct ATV Trails and Construct ATV Trails and Trailhead Unspecified/Unidentifi $80,000 $20,000 $100,000

Trailhead Trailhead able

WV 2009 Acquisition Develop Acquire and Develop Acquire/develop-. Unspecified/Unidentifi $80,000 $20,000 $100,000

Rail-Trail Rail-Trail able

WV 2009 US Fish and Wildlife Service Trail Construction Develop and construct trail at US Fish and Unspecified/Unidentifi $80,000 $20,000 $100,000

Fish Hatchery Project Wildlife Service Fish Hatchery able

WV 2009 Trail Construction Trail Construction and Construct trail and trailhead. Unspecified/Unidentifi $220,000 $55,000 $275,000

Trailhead able

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 1996 Monongalia County Trails Trail Construction Construct Trails, Restoration of Trails 1 Monongalia $10,518 $10,518 $21,036

WV 1996 Cairo Trails Trailhead Construction Parking and Landscaping 1 Ritchie $10,814 $10,814 $21,628

WV 1996 Marion County Trails Trail Construction Develop Trail 1 Marion $12,500 $12,500 $25,000

WV 1996 Mon River Trail Bridge Improvements Bridge Decking 1 Preston $33,168 $33,168 $66,336

WV 1996 Mon River Trail Install Signs Install Signage and Barricades 1 Monongalia, Preston $10,518 $2,630 $13,148

WV 1997 Paden City Trail Trail Construction Construct Trail 1 Tyler $2,500 $2,500 $5,000

WV 1997 Little Kanawha River Install Signs Signage 1 Ritchie $4,795 $4,795 $9,590

WV 1997 Mon Valley Trails Trail Construction Construct Trail 1 Monongalia $6,304 $6,304 $12,608

WV 1997 Morgantown Trails Trail Construction Construct Trail 1 Monongalia $12,500 $12,500 $25,000

WV 1997 Philippi Trail Trail Construction Construct Connecting Trails Throughout City 1 Barbour $31,550 $31,550 $63,100

WV 1997 Various Equestrian Trails Trailhead Improvements for Construct Horse Trail 1 Harrison $12,415 $3,104 $15,519

Equestrians

WV 1998 Pleasants County School Trail Improvements Improvements to Trail 1 Pleasants $5,130 $5,130 $10,260

Trails

WV 1998 Various Trails Trail Construction Construct Trail 1 Hancock $6,250 $1,563 $7,813

WV 1998 Rail-Trail Development Rail-Trail Development Development of Rail-Trail 1 Monongalia, Preston $12,500 $3,125 $15,625

WV 2000 Rockwall Trail Construct Trail 1 Pleasants $2,000 $1,000 $3,000

WV 2000 Gobbler's Knob Club Trail Construction 1 Pleasants $2,000 $1,000 $3,000

WV 2000 Monongah River Trail, Ralph Trailhead 1 Marion $14,013 $3,504 $17,517

S. Larue Trail

WV 2000 Bridgeport City Park Trail Construct Trail 1 Harrison $17,147 $4,286 $21,433

WV 2000 Paden City Trail Trail Construction Construct Trail 1 Wetzel, Tyler $9,600 $4,800 $14,400

WV 2000 East Wetzel Trail Construct Trail 1 Wetzel $26,770 $6,800 $33,570

WV 2000 Sisterville River Trail Construct Trail 1 Tyler $42,710 $10,677 $53,387

WV 2000 Thomas Loop Trail Trail Construction Construct Trail 1 Tucker $9,845 $14,330 $24,175

WV 2000 Yankee Trail Construct Trail, Restrooms, Fountain, 1 Brooke $79,800 $19,995 $99,795

Parking, Pavilion

WV 2000 Mon River Trail Trail Construction Construct Trail 1 Monongalia $80,000 $40,000 $120,000

WV 2000 Little Kanawha Connector Trail Construction Construct Trail 1 Wood $80,000 $40,000 $120,000

Trail

WV 2000 Marion County Project Develop Off-Road Vehicle Trail 1 Marion $25,000 $6,250 $31,250

WV 2001 Gentle Trail Trail Renovations 1 Tucker $16,067 $4,017 $20,084

WV 2001 Pioneer Trail Bridge Renovation 1 Brooke $18,240 $4,560 $22,800

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2001 Mannington Rail-Trail Construct Trail 1 Marion $30,000 $7,500 $37,500

WV 2001 Little Kanoba Connector Construct Trail 1 Wood $30,000 $7,500 $37,500

WV 2001 West Fork River Trail Trailhead, Restroom 1 Marion $16,000 $8,000 $24,000

WV 2001 Caperton Trail Trailhead 1 Monongalia $80,000 $20,000 $100,000

WV 2002 Cooper's Rock Roadside Construct Trail 1 Monongalia, Preston $10,983 $2,745 $13,728

Trail

WV 2002 Lubeck Volunteer Fire Improvements 1 Wood $16,000 $4,000 $20,000

Department Community Park

Trail

WV 2002 Maintenance 1 Marion $17,246 $4,312 $21,558

WV 2002 Westover Trail Construct Trail 1 Monongalia $20,905 $5,227 $26,132

WV 2002 Swisher Nature Area Trail Construct Trail 1 Mineral $34,819 $8,704 $43,523

WV 2002 Yankee Connector Trail Construct Trail 1 Brooke $40,000 $10,000 $50,000

WV 2002 Lost Creek Trail Construct Trail 1 Harrison $40,000 $10,000 $50,000

WV 2002 Marion County and Maintenance 1 Marion $40,000 $10,000 $50,000

Recreation Commission Trail

WV 2002 West Botanic Construct Trail 1 Monongalia $55,480 $13,870 $69,350

Gardens

WV 2002 North Marion Rail-Trail Construct Trail 1 Marion $40,000 $50,000 $90,000

WV 2003 Bethany Trails Maintenance 1 Brooke $21,322 $5,331 $26,653

WV 2003 North Bend Lake Trail Construct Trail 1 Doddridge $80,000 $20,000 $100,000

WV 2003 Clarksburg-McWhorter Trail Construct Trail 1 Harrison $80,000 $20,000 $100,000

WV 2004 West Milford City Building Trailhead Construction Construct comfort station. 1 Harrison $8,094 $2,024 $10,118

WV 2004 Gobblers Knob Trail Bridge Installation and Trail Phase II Further development and swinging 1 Pleasants $11,390 $2,848 $14,238

Renovation bridge.

WV 2004 Mon River Trail, Caperton Install Signs Signage and Kiosks for rail-trail. 1 Monongalia $15,200 $3,800 $19,000

Trail

WV 2004 Grantsville Trails Trail Construction Paved walking trail. 1 Calhoun $28,000 $7,000 $35,000

WV 2004 Marion County Trail Trail Construction Pave Rail-Trail 1 Marion $40,000 $10,000 $50,000

(MCTrail)

WV 2004 Mon River Trail, Caperton Purchase Trail Maintenance Truck, trailer, attachments for mower. 1 Monongalia, Marion, $41,600 $10,400 $52,000

Trail, Deckers Creek Trail Equipment Preston

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2004 North Bend Rail-Trail State Purchase Trail Maintenance Purchase backhoe and attachments. 1 Ritchie $46,928 $11,732 $58,660

Park Equipment

WV 2004 Mon River Trail, Caperton Rail-Trail Development Develop rail-trail. (Combined with earlier 1 Monongalia $60,000 $15,000 $75,000

Trail, Deckers Creek Trail development project.)

WV 2004 Kingwood-Tunnelton Rail-Trail Development and Acquisition of right of way and development 1 Preston $80,000 $20,000 $100,000

Rail-Trail Acquisition of rail-trail.

WV 2005 Sistersville Trail Sistersville Trail Bridge Project merged into earlier project 1 Tyler $0 Unknown $0

WV 2005 Gilmer County Trail 1 Gilmer $4,158 $1,040 $5,198

WV 2005 Cheat Ranger District Trails Cheat Ranger District Repair trails in Dolly Sods vicinity 1 Multiple Counties $5,000 $1,250 $6,250

Maintenance

WV 2005 Blackwater Falls State Park Blackwater Falls Equipment Acquire equipment to patrol trails. 1 Tucker $10,000 $2,500 $12,500

WV 2005 Edison Arboretum Trail Construction Construct non-motorized trail and trailside 1 Wood $12,000 $3,000 $15,000

class room.

WV 2005 Canaan Valley Trails Trail Renovation Repair and maintain trail system in Tucker 1 Tucker $23,900 $5,975 $29,875

County

WV 2005 Homecrest Manor Trail Trail Construction Construct walking trail in housing project 1 Wood $32,000 $8,000 $40,000

WV 2005 Clarksburg City Park Trail Trail Construction Construct walking trail through city park. 1 Harrison $33,321 $8,330 $41,651

WV 2005 Deckers Creek Deckers Creek Repair trail surface and drainage where 1 Monongalia, Preston $47,160 $11,790 $58,950

Maintenance/Upgrade needed.

WV 2005 Bethlehem Community Park 1 Ohio $50,000 $12,500 $62,500

Trail

WV 2005 Philippi Trail Trail Construction Develop and construct extension to existing 1 Barbour $55,200 $13,800 $69,000

trail

WV 2005 Barnum Rail-Trail Barnum Rail-Trail Extension Acquire property and develop extension to 1 Mineral $58,380 $14,595 $72,975

existing rail-trail.

WV 2005 Barbour County Park Trail Trail Construction Design and construct walking trail in county 1 Barbour $72,800 $18,200 $91,000

park.

WV 2006 Mannington Rail-Trail Mannington Trail 1 Marion $4,000 $1,000 $5,000

Improvements

WV 2006 Follansbee Connector Trail Trail Construction Construct trail to connect Follansbee Nature 1 Brooke $18,840 $4,710 $23,550

Trail to nearby street and install trailside

amenities.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2006 Terra Alta Community Park Trail Construction Construct non-motorized trail connecting park 1 Preston $40,000 $10,000 $50,000

Trail and school.

WV 2006 Veteran's Memorial Park Trail Improvements Pave fitness trail 1 Harrison $52,000 $13,000 $65,000

Trail

WV 2006 Kingwood-Tunnelton Rail-Trail Development Project merged with 2004 project 1 Preston $80,000 $20,000 $100,000

Rail-Trail

WV 2007 Jody Hulka Memorial Trail Renovation Repair and maintain Jody Hulka Memorial 1 Hancock $12,600 $3,150 $15,750

Handicap Trail Handicap Trail

WV 2007 Williamston Trail Construction Construct trail around wetland in 1 Wood $40,000 $10,000 $50,000

Williamstown

WV 2008 South Wheeling Rail-Trail Rail-Trail Construction Construct rail-trail in South Wheeling 1 Ohio $32,000 $8,000 $40,000

WV 2009 Davis to Canaan Valley Trail Construction Construct trail to connect Davis to Canaan 1 Tucker $62,623 $15,655 $78,278

Wildlife Refuge Valley Wildlife Refuge

WV 2010 Rail-Trail Improvements Rail-Trail Improvements Improve surface of rail-trail 1 Wetzel $10,716 $536 $11,252

WV 2010 Monongah Trailhead Monongah Trailhead Shelter Construct shelter at trailhead. 1 Marion $8,000 $742 $8,742

WV 2010 Canaan Valley Wildlife Canaan Valley Wildlife Construct Pedestrian Trail 1 Tucker $36,767 $1,212 $37,979

Refuge Refuge

WV 2010 West Fork River Trail Coons Run Bridge Repair bridge and West Fork River Trail 1 Marion $40,000 $10,000 $50,000

surface

WV 2010 North Bend Rail-Trail North Bend Rail-Trail, Develop and construct an equestrian trail 1 Wood $32,800 $8,200 $41,000

Mountwood Park

WV 2011 Ferguson Memorial Park Ferguson Memorial Park Construct Trail 1 Harrison $8,000 $2,000 $10,000

WV 2011 Monongahela River Trails, Monongahela River Trails, Equipment purchase, trailhead improvements 1 Monongalia $78,400 $19,600 $98,000

Van Hoorhis Trailhead Van Hoorhis Trailhead

WV 2011 Fort Boreman Historic Park Fort Boreman Historic Park Repair and upgrade existing trail 1 Wood $78,682 $19,671 $98,353

WV 2012 West Fork River Trail West Fork River Trail Construct restroom facility 1 Harrison $29,856 $7,464 $37,320

WV 2012 Various Trails Construct new trails, maintain existing trails 1 Tucker $34,521 $9,630 $44,151

WV 2013 Brooke Pioneer Trail Brooke; for use on Brooke Pioneer Trail; 1 Brooke, Ohio $32,000 $8,000 $40,000

purchase of a tractor with attachments for

trail maintenance

WV 2013 Trails Ritchie; North Bend State Park; CN 8 miles of 1 Ritchie $40,000 $10,000 $50,000

multi-use trail designed to equestrian

standards

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2013 Coopers Rock State Forest Coopers Rock State Forest Monongalia and Preston; Coopers Rock 1 Monongalia, Preston $13,296 $3,324 $16,620

State Forest; develop media for kiosks and

interpretive signs; removal and install new

kiosks

WV 2015 Trail Relocation Trail Relocation 1 Harrison $24,200 $6,050 $30,250

WV 2015 Mon River Trail, Caperton Mon River/Caperton Trail 1 Monongalia $96,000 $24,000 $120,000

Trail Connector-Star City River

Landing

WV 2015 Mon River Trail Collins Ferry Road: Mon 1 Monongalia $60,000 $15,000 $75,000

River Trail Connector

WV 2015 Foundry Street Foundry Street 1 Monongalia $34,320 $8,580 $42,900

Linkage-Downtown to

Rail-Trail

WV 2015 Deckers Creek Trail Deckers Creek Trail Surface 1 Monongalia, Preston $101,376 $25,344 $126,720

Repair Project

WV 2015 Tucker County Trails Tucker County Rocks! 1 Tucker $120,000 $30,000 $150,000

WV 2016 Alum Cave Trail Phase 2 Alum Cave Trail Phase 2 Trail Construction 1 Barbour $96,000 $19,200 $115,200

WV 2016 Cheat River Rail-Trail Cheat River Rail-Trail Phase Rail-Trail Design and Construction 1 Preston $150,000 $30,000 $180,000

1

WV 2016 Corricks Ford Battlefield Corricks Ford Battlefield Park Development Project 1 Tucker $80,000 $16,000 $96,000

Park Park

WV 2016 North Bend Rail-Trail North Bend Rail-Trail Design and Construction 1 Doddridge, Harrison $80,000 $16,000 $96,000

WV 2016 North Fork Blackwater Trail North Fork Blackwater Trail Trail design and construction 1 Tucker $74,238 $14,848 $89,086

Development Project

WV 2016 Northern Rail-Trail Northern Rail-Trail Rail-trail Design and Construction 1 Preston $71,600 $14,320 $85,920

WV 2017 Cranberry Glades Botanical Cranberry Glades Boardwalk Cranberry Glades Boardwalk Trail 1 Nicholas $100,000 $20,000 $120,000

Area Trails Trail Replacement Replacement

WV 2017 Deckers Creek Deckers Creek Trail Landslide Repair 1 Monongalia, Preston $36,000 $7,200 $43,200

Landslide Repair

WV 2018 Mon River Trail, Caperton Caperton Rail-Trail Drainage Design and construction to repair and 1 Monongalia $58,000 $11,600 $69,600

Trail Upgrades & Repairs upgrade the drainage infrastructure of the

Caperton/Mon River Trail located within

Monongalia County, WV.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2018 Caperton Trail Caperton Trail Lighting Design and construction of lighting for the 1 Monongalia $150,000 $30,000 $180,000

Project half mile Caperton/Mon River Trail section

along the Morgantown Wharf District located

within Monongalia County, WV.

WV 2018 West Fork River Access West Fork River Access Construction of new trailhead and trail to 1 Harrison $5,000 $1,000 $6,000

provide access to the West Fork River

located in Shinnston, WV.

WV 2018 Northern Rail-Trail Northern Rail-Trail Design of approximately 10 linear miles of 1 Preston $100,000 $20,000 $120,000

new rail trail corridor for the WV Northern

Rail-Trail located within Preston County, WV.

WV 2001 Allegheny Trail Bridge, Trailhead, Signage, Shelter 1, 2, 3 Tucker, Randolph, $50,001 $12,500 $62,501

Pocahontas,

Greenbriar

WV 2005 Safety and Education Division of Motor Vehicles Purchase and distribute ATV safety literature 1, 2, 3 Statewide $91,315 $22,829 $114,144

(Dev.) ATV Safety Program and Public Service Announcements.

WV 2006 Safety and Education Division of Motor Vehicles Project merged with 2005 project 1, 2, 3 Statewide $0 Unknown $0

(DMV) ATV Safety Program

WV 2007 Various Trails Trail Marking Re Blaze trails in three state parks 1, 2, 3 Multiple Counties $8,000 $2,000 $10,000

WV 2007 Various Trails Trail Construction Construct fishing access trail 1, 2, 3 Multiple Counties $10,000 $2,500 $12,500

WV 2008 Various Trails Purchase GPS Equipment Purchase GPS Equipment for trail 1, 2, 3 Multiple Counties $4,000 $1,000 $5,000

maintenance

WV 2013 Acquire Equipment Acquire Equipment Statewide, acquire equipment 1, 2, 3 Statewide $127,113 $31,779 $158,892

WV 1997 Shepherdstown Men's Trail Trail Construction Construct Trails 2 Jefferson $3,305 $3,305 $6,610

WV 1997 Elk District Trails Trail Construction Construct Trail 2 Braxton $8,250 $8,250 $16,500

WV 1997 St. Albans Trails Trail Construction Construct, Improve Trails 2 Kanawha $9,700 $9,700 $19,400

WV 1997 Hurricane Trails 2 Putnam $10,893 $10,893 $21,786

WV 1998 Jackson County Trails 2 Jackson $12,500 $12,500 $25,000

WV 1998 Putnam County Trails Trail Construction Construct Trail 2 Putnam $12,500 $12,500 $25,000

WV 2000 River Trail Trail Construction Construct Trail 2 Upshur $22,504 $5,726 $28,230

WV 2000 Walk Memorial Handicapped Accessible Trail ADA 2 Kanawha $59,570 $32,920 $92,490

Trail Improvements

WV 2001 Nature Trail Trail Renovation 2 Jackson $22,400 $5,600 $28,000

WV 2001 Tuscarora Creek Linear Park Construct Trail 2 Berkeley $50,001 $12,500 $62,501

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2001 Tracer Fork Trail Bridges 2 Kanawha $55,000 $13,750 $68,750

WV 2001 Poorhouse Farm Park Trail Bridge 2 Berkeley $12,000 $30,000 $42,000

WV 2002 Paw Paw Town Park Trail Construct Trail 2 Morgan $6,000 $1,500 $7,500

WV 2002 Yankauer Nature Preserve Maintenance, Improvements 2 Berkeley $11,344 $2,836 $14,180

WV 2002 Warm Springs Middle School Construct Trail 2 Bath $16,000 $4,000 $20,000

Trail

WV 2002 Braxton County Nature Trail Improvements 2 Braxton $20,000 $5,000 $25,000

WV 2003 Rich Mountain Battlefield Construct Trail 2 Randolph $8,622 $2,155 $10,777

Trails

WV 2003 Randolph County Project Develop Model Sections 2 Randolph $25,000 $25,000 $50,000

WV 2004 Ravenswood Park Trail Construction Construct Trail 2 Jackson $17,434 $4,358 $21,792

WV 2004 Glendale Park Trail Extend previously constructed trail. 2 Mercer $29,600 $7,400 $37,000

WV 2004 Mathers Side Trail Trail Improvements Stone stairs on Mathers, improved signage 2 Jefferson $57,299 $14,325 $71,624

through town.

WV 2005 Middle Ridge Trail Construct new trail 2 Kanawha $36,524 $9,131 $45,655

WV 2005 Valley Park Trail Develop extension to existing trail system 2 Putnam $46,240 $11,560 $57,800

WV 2005 Buckhannon River Trail Construct .49 mile extension to Buckhannon 2 Upshur $49,949 $12,487 $62,436

trail system

WV 2005 Clay County Park Trail 2 Clay $74,751 $18,688 $93,439

WV 2006 Homestead School Walking Trail Construction Construct walking trail at elementary school 2 Randolph $7,832 $1,958 $9,790

Trail

WV 2006 Tuscarora Trail Bridge Installation Install bridge on Big Blue Trail as it goes 2 Morgan $14,200 $3,550 $17,750

through Morgan County

WV 2006 Paw Paw Trail Trailhead Construction Build Trailhead 2 Morgan $40,916 $10,229 $51,145

WV 2006 Jackson County Rail-Trail Rail-Trail Development Develop and construct rail-trail near Ripley 2 Jackson $80,000 $20,000 $100,000

WV 2007 Calhoun County Park Trail Construction Construct trail in Calhoun County Park 2 Calhoun $33,222 $8,305 $41,527

WV 2007 Wine Cellar Park Trail Renovation and Repair Resurface and extend trail to Laura 2 Kanawha $36,848 $9,212 $46,060

Construction Anderson Lake in Wine Cellar Park

WV 2007 Gauley Mountain Trail Trail Renovation Repair and maintain Gauley Mountain Trail in 2 Randolph $48,000 $12,000 $60,000

Mon National Forest

WV 2007 Bridge Installation Bridge Installation Construct three bridges on Kanawha Trace 2 Kanawha $80,000 $20,000 $100,000

WV 2008 Water Trail Improvements Water Trail Development Develop water trail on historic Mill Creek 2 Randolph $25,000 $6,250 $31,250

WV 2009 Tuscarora Trail Install Prefabricated Bridge Install prefab bridge on Tuscarora Trail 2 Morgan $17,200 $4,300 $21,500

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2010 Sleepy Creek Wildlife Sleepy Creek Wildlife Install Pedestrian Bridge 2 Morgan $17,139 $491 $17,630

Management Area Management Area

Pedestrian Bridge Pedestrian Bridge

WV 2010 Buckhannon Riverfront Buckhannon Riverfront Construct Pedestrian Trail 2 Upshur $40,000 $10,000 $50,000

WV 2011 Wardensville Trails Buy trail building tools, equipment, and 2 Hampshire $6,100 $1,525 $7,625

storage building

WV 2012 Flowing Springs Park Flowing Springs Park Construct non-motorized trail 2 Jefferson $64,000 $16,000 $80,000

WV 2012 Kanawha State Forest Construct non-motorized trail 2 Kanawha $80,000 $20,000 $100,000

WV 2013 East End Park Trail Charleston, Kanawha, East End Park/Dixie 2 Kanawha $15,250 $3,050 $18,300

St; const accessible trail loop around East

End Park

WV 2013 Wallace Hartman Nature Wallace Hartman Nature Kanawha; Wallace Hartman Nature Preserve; 2 Kanawha $10,000 $2,000 $12,000

Preserve Trail Preserve Trail construct non-motorized trail, trailhead,

facilities, improve existing trails

WV 2013 Reynolds Street Trail Spencer, Roane, Reynolds St, const of non 2 Roane $40,000 $10,000 $50,000

motor trails

WV 2015 Nature Trails Nature Trails-Phase II Trail 2 Kanawha $56,320 $14,080 $70,400

Maintenance Equipment

WV 2015 Kanawha County Trail Kanawha County Trail 2 Kanawha $80,000 $20,000 $100,000

System System

WV 2015 Kanawha County Trail Kanawha County Trailhead 2 Kanawha $40,000 $10,000 $50,000

System Facility

WV 2015 Golf Course Ridge Trail Golf Course Ridge Trail 2 Lewis $32,947 $8,237 $41,184

WV 2017 Hatfield-McCoy Trail System Kanawha County Trailhead Design and construction. 2 Kanawha $50,000 $10,000 $60,000

Facility

WV 2017 Hatfield-McCoy Trail System Logan County Trail System Design and construction. 2 Logan $50,000 $10,000 $60,000

Construction

WV 2017 Hatfield-McCoy Trail System Logan County Trailhead Design and construction. 2 Logan $50,000 $10,000 $60,000

Facility

WV 2017 Hatfield-McCoy Trail System McDowell County Trail Design and construction. 2 McDowell $50,000 $10,000 $60,000

System Construction

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2018 Appalachian National Scenic Loudoun Heights A.T. Construction of approximately 1,540 linear 2 Jefferson $50,000 $10,000 $60,000

Trail Relocation feet of new trail along the Appalachian

National Scenic Trail outside the town of

Harpers Ferry.

WV 2018 Glendale Park Nature Trail Glendale Park Nature Trail Design and construction to resurface 2 Randolph $31,419 $6,282 $37,701

equipment recreational trails and purchase of tractor with

attachments for maintenance of Glendale

Park in Elkins, WV.

WV 2018 Hatfield-McCoy Trail System Construction of Boone Purchase of 4 trucks for the construction and 2 Boone $150,000 $30,000 $180,000

County Trail System maintenance of the Hatfield McCoy

Recreation Area consisting of approximately

200 miles of trail located within Boone and

Wayne Counties, WV.

WV 2018 Hatfield-McCoy Trail System Equipment for Lincoln Purchase of a D5 dozer for maintenance of 2 Lincoln $150,000 $30,000 $180,000

County Trail System the Hatfield McCoy Recreation Area

consisting of approximately 100 miles of trail

located within Lincoln County, WV.

WV 2018 Hatfield-McCoy Trail System Equipment for Wayne Purchase of a D5 dozer for construction and 2 Wayne $150,000 $30,000 $180,000

County Trail System maintenance of the Hatfield McCoy

Recreation Area consisting of approximately

100 miles of trail within Wayne County, WV.

WV 2018 Hatfield-McCoy Trail System Maintenance Equipment for Purchase of 4 trucks for the construction and 2 Boone, Wayne $100,000 $20,000 $120,000

Boone and Wayne Counties maintenance of the Hatfield McCoy

Recreation Area consisting of approximately

200 miles of trail located within Boone and

Wayne Counties, WV.

WV 2006 Monongahela National Monongahela National Maintain trails in Monongahela National 2, 3 Multiple Counties $50,000 $12,500 $62,500

Forest Forest Trail Maintenance Forest.

WV 2015 Wayne County Trail System Wayne County Trail System 2, 3 Wayne, Kanawha, $80,000 $20,000 $100,000

McDowell, Mingo,

Wyoming

WV 1996 Trail Construction Trail Development 3 Pocahontas $10,000 $10,000 $20,000

WV 1996 Greenbrier River Trail Trail Improvements Improvements 3 Greenbrier $12,500 $12,500 $25,000

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 1996 Pocahontas County Rail Removal of R R Ties 3 Pocahontas $14,578 $14,578 $29,156

Trails

WV 1996 Richwood Trails Trail Construction Develop Trail 3 Nicholas $15,000 $15,000 $30,000

WV 1996 Hatfield-McCoy Trail System Design and Engineering Design and Engineer 3 Mingo, McDowell, $83,160 $20,790 $103,950

Wayne, Boone,

Lincoln, Wyoming,

Logan

WV 1997 Huntington Trails Trail Construction Construct/Improve Trails 3 Cabell $10,000 $10,000 $20,000

WV 1997 Princeton Trails Trail Construction Construct and Improve Trails 3 Mercer $10,000 $10,000 $20,000

WV 1997 Ritter Park Pathway Trail Construction Construct Underpass 3 Cabell $12,180 $12,180 $24,360

WV 1997 Hatfield-McCoy Trail System Trailhead Construction Construct Trail Head Facility 3 Mingo $64,750 $16,188 $80,938

WV 1998 Holly River Trails Trail Construction Construct Trail 3 Webster $2,656 $2,656 $5,312

WV 1998 McDowell County Trails Trail Construction Construct Trail 3 McDowell $3,080 $3,080 $6,160

WV 1998 Union Trails Trail Improvements Improvements 3 Monroe $12,500 $12,500 $25,000

WV 1998 Race Park Trailhead Improvements Construct and Improve Trail Head Facilities 3 Raleigh $22,500 $22,500 $45,000

Trails

WV 1998 Raleigh County Parks Trailhead Improvements Construct Trail Facilities 3 Raleigh $25,000 $6,250 $31,250

WV 2000 Mom's Mountain Trail and Trailhead Construct Info Building, Restroom 3 Raleigh $22,400 $11,200 $33,600

Construction

WV 2000 27th Street Park Trail Trail Construction Construct Trail 3 Cabell $80,000 $20,000 $100,000

WV 2000 Hatfield-McCoy Trail System Trail Construction Construct Trails 3 Logan $172,388 $43,097 $215,485

WV 2001 Potato Knob Trail Boardwalk, Improvements 3 Webster $13,426 $3,356 $16,782

WV 2001 Browning Fork Trail Construct Trail 3 Mingo, Logan $64,000 $16,000 $80,000

WV 2001 Ansted Rail-Trail Construct Trail 3 Fayette $34,000 $17,000 $51,000

WV 2001 Panther State Forest Trails Trail Renovations 3 McDowell $77,791 $19,448 $97,239

WV 2001 Matewan Connector Construct Trails, Trailhead 3 Mingo $80,000 $20,000 $100,000

WV 2001 Mom's Mountain Facility 3 Raleigh $11,000 $22,000 $33,000

WV 2002 West Fork Trail Construct Trail 3 Pocahontas $8,000 $2,000 $10,000

WV 2002 Props Run Trail Construct Trail 3 Pocahontas $11,500 $3,500 $15,000

WV 2002 Glenwood Park Walking Trail Construct Trail 3 Mercer $14,800 $3,700 $18,500

WV 2002 Kanawha Trace Trail Maintenance, Improvements 3 Cabell $50,560 $12,640 $63,200

WV 2002 West Virginia Tech Trails Maintenance, Improvements 3 Fayette $67,300 $16,825 $84,125

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2002 Hatfield-McCoy Trail System Construct Trail, Purchase Equipment 3 Unspecified/Unidentifi $197,681 $49,420 $247,101

able

WV 2003 Spruce Trails Construct Trail 3 Pocahontas $9,600 $2,400 $12,000

WV 2003 Fitzpatrick Park Trail Construct Trail 3 Raleigh $10,456 $2,614 $13,070

WV 2003 Hatfield-McCoy Trail System Construct Trail 3 Lincoln, Wyoming $205,339 $51,334 $256,673

WV 2004 Old Main Building Trail Renovation Restore trail system. 3 Nicholas $7,759 $1,940 $9,699

WV 2004 Trail Improvements Resurface trail. 3 Wayne $47,472 $11,868 $59,340

Nature Trail

WV 2004 Huntington Museum of Art Trail Renovation Rehabilitation of nature trail. 3 Cabell $67,711 $16,928 $84,639

Nature Trail

WV 2004 Lewisburg and Ronceverte Rail-Trail Development Develop rail-trail. 3 Greenbrier $80,000 $20,000 $100,000

Rail-Trail

WV 2004 Hatfield-McCoy Trail System OHV Area Development Design and develop multi-county motorized 3 Boone, Logan Mingo, $284,321 $71,080 $355,401

trail system and trailheads McDowell, Wyoming

WV 2005 Greenbrier River Trail Greenbrier River Trail Purchase dump bed trail for rail-trail 3 Greenbrier, $6,400 $1,600 $8,000

Equipment maintenance Pocahontas

WV 2005 Trail Construct new connection section for existing 3 Pocahontas $10,566 $2,642 $13,208

trail

WV 2005 Hatfield-McCoy Trail System Hatfield-McCoy Single Track Construct motorized trail for dirt bikes. 3 Boone, Mingo $40,000 $10,000 $50,000

WV 2005 Laurel Fork Trail Design and construct ADA accessible trail 3 Webster $41,480 $10,370 $51,850

and trailhead with accessible trailside

amenities.

WV 2005 Bluefield City Park Trail Bluefield City Park Tail Repair, construct and maintain trail system in 3 Mercer $56,000 $14,000 $70,000

System System city park.

WV 2005 White Oak Rail-Trail Develop and pave rail-trail inside of city 3 Fayette $56,800 $14,200 $71,000

WV 2005 Hatfield-McCoy Trail System Hatfield-McCoy Mercer Construct motorized trail in Mercer County 3 Mercer $60,000 $15,000 $75,000

County

WV 2005 Hatfield-McCoy Trail System Hatfield-McCoy Equipment Purchase maintenance and construction 3 Boone, Logan, Mingo, $493,681 $123,420 $617,101

equipment for motorized trail system. McDowell, Wyoming

WV 2006 Bluefield City Park Trail Bluefield City Park Trail, Project merged with 2005 project 3 Mercer $0 Unknown $0

System Phase II

WV 2006 Durbin-Frank Rail-Trail Rail-Trail Development Construct Rail-Trail between Durbin Depot 3 Pocahontas $24,000 $6,000 $30,000

and Whibney Park.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2006 Muddlety Trail Accessible Trail Construction Design and build ADA accessible nature trail 3 Nicholas $30,000 $7,500 $37,500

at school.

WV 2006 Glenwood Park Trail Trail Construction Develop and construct extension to lakeside 3 Mercer $38,088 $9,522 $47,610

trail in Glenwood Park.

WV 2006 Hawks Nest Rail-Trail Hawks Nest Rail-Trail Construct improvements to trailhead 3 Fayette $39,490 $9,872 $49,362

Trailhead

WV 2006 Hatfield-McCoy Trail System Trailhead Construction Build trailhead for motorized trail system. 3 Wayne $50,064 $12,516 $62,580

WV 2006 L & R Rail-Trail Construct Lewisburg end of L & R Rail-Trail 3 Greenbrier $50,418 $12,604 $63,022

WV 2006 Waterways Trail Trail Construction Construct non-motorized trail in county park. 3 Boone $60,000 $15,000 $75,000

WV 2006 Fork Mountain Trail Bridge Installation Construct bridge to connect Fork Mtn. Trail to 3 Nicholas $73,700 $18,425 $92,125

town

WV 2006 Hatfield-McCoy Trail System Trailhead Construction Build trailhead for motorized trail system. 3 Mercer $90,064 $22,516 $112,580

WV 2006 Hatfield-McCoy Trail System Trail Construction Build motorized trail system 3 Wayne $90,064 $22,516 $112,580

WV 2007 Alderson Elementary School Trail Construction and Sign Construct walking trail at Alderson 3 Greenbrier, Monroe $15,520 $3,880 $19,400

Installation Elementary School

WV 2007 Camp Arrowhead Accessible Trail Construction Construct ADA Trail at Camp Arrowhead 3 Cabell $700,007 $175,001 $875,008

WV 2008 Twin Branch Adventure Trail Construction Construct trail at Twin Branch Adventure 3 McDowell $11,625 $2,906 $14,531

Center center

WV 2008 Hawks Nest Trail Renovation Renovate historic overlook trail at Hawks 3 Fayette $29,000 $7,250 $36,250

Nest

WV 2010 Burning Rock ATV Park Burning Rock ATV Park Develop trails and trailheads in ATV Park 3 Raleigh $80,000 $3,631 $83,631

WV 2010 Rail-Trail Development Rail-Trail Development Develop Rail-Trail 3 Greenbrier $80,000 $20,000 $100,000

WV 2010 Various Water Trails Develop water trail 3 Pocahontas, $48,000 $12,000 $60,000

Greenbrier

WV 2010 Hatfield-McCoy Trail System Hatfield-McCoy Trail System Development of a motorized trail system and 3 Statewide $435,500 $108,875 $544,375

equipment purchase

WV 2010 Beech Fork State Park Trail Beech Fork State Park Repair and Rehabilitate Trail System 3 Wayne, Cabell $80,000 $20,000 $100,000

System

WV 2010 Cowen Trails Trail Development and Develop and Construct Pedestrian Trail 3 Webster $40,000 $10,000 $50,000

Construction

WV 2011 Waterways Park Waterways Park Construct Trail 3 Boone $50,000 $12,500 $62,500

WV 2011 Man Park Man Park Develop and construct 3,800 feet of trail and 3 Logan $40,000 $1,000 $41,000

rehabilitate 3,000 feet of existing trail

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2011 Summit Lake Summit Lake Renovate trail and rebuild pedestrian bridge 3 Nicholas $27,520 $6,880 $34,400

WV 2011 Camden Clinic Camden Clinic Construct non-motorized trail 3 Taylor $36,000 $9,000 $45,000

WV 2013 Rotary Park Trail Cabell, Huntington, Rotary Park, const new 3 Cabell, Wayne $12,000 $3,000 $15,000

trail.

WV 2013 Potts Valley Rail Trail Monroe, Potts Valley Rail Trail, preliminary 3 Monroe $3,213 $803 $4,016

engineering

WV 2013 Rainelle Recreation Trail Trail Construction Greenbrier; Rainelle; design and construct 3 Greenbrier $7,500 $1,875 $9,375

trail; installation of signage, clearing of brush

& downed trees

WV 2013 Mabscott Trails Purchase Equipment Mabscott, Raleigh, purchase trail building tool 3 Raleigh $27,440 $6,860 $34,300

equip.

WV 2015 Confederate Cemetery Confederate Cemetery 3 Greenbrier $80,000 $20,000 $100,000

Recreational Trail Recreational Trail

WV 2015 Rainelle Recreation Trail Rainelle Recreation Trail: 3 Greenbrier $48,000 $12,000 $60,000

Phase II

WV 2015 Wayne County Trail System Wayne County Trailhead 3 Logan, Mingo $40,000 $10,000 $50,000

Facility

WV 2015 Wellness Trails Wellness Trails 3 Mason $120,000 $30,000 $150,000

WV 2016 Babcock State Park Purchase Equipment 3 Fayette $37,700 $7,540 $45,240

WV 2017 Burning Rock Eastern Trails Burning Rock Eastern Trails Trail construction. 3 Raleigh $120,000 $24,000 $144,000

Project

WV 2016 Barboursville Park Barboursville Park Trail Design 3 Cabell $56,000 $11,200 $67,200

Equestrian Trail Equestrian Trail

WV 2016 Anthony Creek Boat Launch Anthony Creek Boat Launch Launch Design and Construction 3 Greenbrier $28,000 $5,600 $33,600

WV 2017 Hatfield-McCoy Trail System Boone County Trailhead Design and construct trailhead facility, 3 Boone $50,000 $10,000 $60,000

Facility

WV 2016 Guyandotte Water Trail Guyandotte Water Trail Design and construction 3 Lincoln, Logan, Mingo $125,000 $25,000 $150,000

WV 2016 Hatfield-McCoy Trail System Indian Ridge and Build motorized trail system 3 McDowell $80,000 $16,000 $96,000

Pocahontas Trail

WV 2016 Hatfield-McCoy Trail System Rockhouse and Pinnacle Build motorized trail system 3 Logan $80,000 $16,000 $96,000

Creek Trail

WV 2016 Hastfield-McCoy Trail Bearwallow and Buffalo Build motorized trail system 3 Logan $80,000 $16,000 $96,000

System Mountain Trail

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2016 Burning Rock ATV Park Burning Rock ATV Park Maintenance, Equipment and Trail Expansion 3 Raleigh $120,000 $24,000 $144,000

WV 2017 Greenbrier River Trail Greenbrier River Trail Resurface 50 miles of trail with gravel. 3 Greenbrier, $120,000 $24,000 $144,000

Resurfacing Pocahontas

WV 2017 Meadow River Trail Meadow River Trail Phase III Develop Rail-Trail 3 Greenbrier $150,000 $30,000 $180,000

WV 2017 Narrow Gauge Trail Narrow Gauge Rail Trail Restoration project. 3 Fayette $150,000 $30,000 $180,000

Restoration Project

WV 2017 Trail Park Trails and Park Trails and Improvements 3 Pocahontas $150,000 $30,000 $180,000

System Improvements

WV 2018 Athens Park Trail Athens Park Trail Design and construction of a walking trail 3 Mercer $60,157 $12,031 $72,188

within the Athens Town Park located in

Athens, WV.

WV 2018 Bluestone National Scenic Bluestone National Scenic Design and construction of drainage 3 Summers $10,000 $2,000 $12,000

River Trail Causeway River Trail Causeway infrastructure to prevent erosion of the

Bluestone National Scenic Trail Causeway

between Bluestone and Pipestem State

Parks.

WV 2018 Brush Creek River Access Bluestone River Water Trail Design of a hiking trail with river access along 3 Mercer $150,000 $30,000 $180,000

Group Brush Creek from the community of Gardner

to the Bluestone National Scenic River, on to

Pipestem State Park and along Camp Creek

to all within Mercer

County , WV.

WV 2018 Bridge Buttress Rock, Fayette County Climbing Design and construction to rehabiltate the 3 Fayette $100,000 $20,000 $120,000

Needleseye Park Access Stabilization and Bridge Buttress rock climbing and hiking

Development recreation area with erosion control as well

as creating new trails and staging areas for

hiking, rocking climbing and bouldering in

Needleseye Park located within...

WV 2018 Greenbrier River Trail Greenbrier River Trail Construction to replace the facilities of the 3 Greenbrier $53,000 $10,600 $63,600

Facilities Replacement and Greenbrier River Trail including the vault

Enhancement Project toilet, well with hand pump and Adirondack

shelter that were lost during the the 2016

flood.

State Project Trail Name Project Name Description Cong. District(s) County(s) RTP Funds Other Funds Total Funds

Year

WV 2018 Greenbrier River Trail - Marlinton Ranger District Design and construction of approximately 2.2 3 Pocahontas $25,000 $5,000 $30,000

Marlin Mountain Trail Forest and Community linear miles of trail along the abandoned

Connector Connections Halfway Run road bed to create a trail

connection between the Greenbrier River

Trail and the Marlin Mountain Trail within

Marlinton, WV.

Grand $16,797,099 $4,410,102 $21,207,201

Totals

(all results)