INNOVATIVE TRANSPORT SOLUTIONS Transport Impact Assessment Boulders Wind Farm Vredenburg, Western Cape November 2018 5th Floor, Imperial Terraces Carl Cronje Drive Tyger Waterfront Bellville, 7530 Tel: +27 (021) 914 6211 E-mail:
[email protected] Boulders Wind Farm ITS 3997 November 2018 (Rev1) Report Type Transport Impact Assessment Title Boulders Wind Farm Client Savannah Environmental (Pty) Ltd Location Vredenburg, Western Cape Project Team Pieter Arangie Theodore Neels Reviewed by: Christoff Krogscheepers, Pr. Eng Project Number ITS 3997 Date November 2018 Report Status Revision 1 File Name: G:\3997 TIS Boulders Wind Energy Facility, Vredenburg\12 Report\Issued\3997 Boulders Wind Energy Facility_Vredenburg - TIA_Revision1_PA_2018-11-22.docx This transport impact study was prepared in accordance with the South African Traffic Impact and Site Traffic Assessment Manual (TMH 26, COTO, Aug 2012), by a suitably qualified and registered professional traffic engineer. Details of any of the calculations on which the results in this report are based will be made available on request. i Boulders Wind Farm ITS 3997 November 2018 (Rev1) Table of Contents 1.0 INTRODUCTION ............................................................................................................ 1 2.0 LOCALITY ..................................................................................................................... 1 3.0 PROPOSED DEVELOPMENT ...................................................................................... 1 4.0 TRAFFIC