Site reference: SKH17022 Site name: Ash Hotel, 232 Manchester Road, Heaton Norris, ; . , ., STOCKPOIIT Ward: South / ~ ~-' ML'Tli;lrll!Jl'A.'OoJI\OUGll t'<.l•JNOl Committee Area: Heatons and Reddish Land Type: Brownfield Gross Site Size (ha) : 0.44 Key Site description: Former pub is now in use as tea rooms. It is adjacent to residential Q Detailed Site properties and a primary school. Estimated site capacity: 17 Notes: The estimated capacity is based on planning application reference DC/066706. Deliverable 2018-2023: 17 Developable 2023 - 2028: 0 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,285 Date: o?/U /2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and is in a sustainable location. The former Ash Hotel building is locally listed. Some of the site is a gas pipeline consultation zone, and this may affect the developable area.

Availability I Toe site is considered to be available within the next 5 years. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable.

Assessment Summary !Toe site is deliverable. After the baseline date of the study, an outline planning application was submitted on the site for a mix of conversion and demolition of the buildings to provide 17 dwelllngs, and was awaitlng determination, LJ

A~ - - -" (:;:) MANOR ROAD

7 ~r ..__; ~ ~f"'-

-._ --._ 17 -

oc ~ I - ,__ 0 --11_ .I [J [::] - ~ - J - :__J 1, r---

r--- I

r,, tN'W11 COl)'ttr'll'!l t>nd. dulo\Ju.1:11 f'lfl 1, (0•I Orl!lt-.-1« '~"IVf', WOOUt rTS

Site reference: SKH17029 Site name: 30 Manor Road, , Stockport, SK7 3LY STOCKPORT !'~ ! .J:jllOf+!.."\lJ 1',\..'i 6Jlf.Ol1l;.. f (JC,)• ~'01. Ward: Bramhall North Committee Area: Bramhall and South Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0.23 Key Site description: Large detached dwelling set in established residential area. D Detailed Site

Estimated site capacity: 7 Notes: The estimated capacity is based on planning application reference DC/067854. Deliverable 2018-2023: 7 Developable 2023 - 2028: 0 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale'. 1:856 Date, 0 7/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and is in a sustainable location. There may be some contamination issues which will need to be remediated or demonstrated to be safe, prior to any redevelopment for more intensive residential occupation of the land.

Availability I Toe site is considered to be available within the next 5 years. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies. There are no known legal or ownership issues.

Achievability lnie site is considered to be achievable.

Assessment Summary Inie .. s ite is deliverable. After the baseline date of the study, a planning application was submitted on the site far the demolition and the erection of a new build block of flats, and was awaitfng determination. 8 gross, 7 net Clifford Court

Site reference: SKH17065 Site name: Davenport Park Hotel, 175 Road, Stockport -. , ., STOCKPORT Ward: Manor / ~ ~-• ML'Tli.)rc>!Jl'A.'08UI\Ol.1Gll t'<.l•JNOl Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 0.19 Key Site description: Disused hotel with prominent frontage on A6, next to residential D Detailed Site dwellings. Estimated site capacity: 39 Notes: Yield is based on planning application that was approved after the baseline date ref DC/068899 Deliverable 2018-2023: 39 Developable 2023 - 2028: 0 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; l :843 Date, OJ/U /2018 Suitability I Toe site is accessible, and located dose to a train station (within 600m) and is in a sustainable location.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. The necessary infrastructure is considered to be available w1thin the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable.

Assessment Summary !Toe site is deliverable. This site is well served by local transport links. The existing building could potentially be remodelled or demolished to make way for residential development. Due to the sustainable location, there is potential for higher denslty than indicated in the estimate of yield. Site reference: SKH17135 Site name: Offerton Industrial Estate, Hempshaw Lane, Offerton, Stockport, SK2 5TJ ,~Ri1• Ward: Manor §!2S!5£S>~r Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 1.25 Key Site description: Former Battersby Hat works, now in a variety of commercial uses and D Detailed Site open storage, surrounded by dwellings. Estimated site capacity: 144 Notes: The estimated capacity is based on planning application reference DC/066807. Deliverable 2018-2023: 40 Developable. 2023 - 2028: 104 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:2,603 Da\e, 0 7/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and is in a sustainable location. The loss of employment uses must be justified and mitigated. There may be some contamination issues wtifch will need to be remedfated or demonstrated to be safe for residential uses, prior to any redevelopment.

Availability I Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies. Toe site might be subject to a number of leases that will need to be terminated to gain vacant ownership

Achievability !Toe site is considered to be achievable.

Assessment Summary IThe site is deliverable. After the baseline date of the study, a planning application was submitted on the site for a mix of demolition and conversion of the buildfngs to provide 149 dwellings, and was awaiting determination. Site reference: SKH17140 Site name: Roland Road, Reddish, St~ port, SK5 6TJ ; . '" STOCKPORT I ~ ~ :·1· Ml."TJ(l)rc>lJJ'AN 6ul\OU(;(1 N• :-or Ward: Reddish South Committee Area: Heatons and Reddish Land Type: Brownfield Gross Site Size (ha) : 1.25 Key Site description: Industrial buildings located in a residential area, adjacent to Reddish D Detailed Site South train station. Estimated site capacity: 35 Notes: The estimated capacity is based on planning application reference DC/064296. Deliverable 2018-2023: 35 Developable 2023 - 2028: 0 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:2,693 Date, 07/12/ 2018 Suitability I The site is accessible, located close to a train station (within 600m) and is in a sustainable location. Toe site may suffer from potential contamination that should be remediated prior to any redevelopment. A planning application was pending a decision at the baseline date of study.

Availability I Toe site is considered to be available within the next 5 years.Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies. There are no known legal or ownership issues.

Achievability !Toe site is considered to be achievable.

Assessment Summary ITh e site is deliverable. At the baseline date of the studY, a planning application was pending determination for the demolition of existing industrial buildings and erection of residential development comprising 35 dwellings with new access to Lambeth Road. River f.fr:rse)' - •l>f .I

Spnogmounl MIits.

Site reference: SKH17144 Site name: Springmount Mill, Northgate Road, Stockport Ward: and i-~1- §!2S!>£S)~I Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 0.77 Key Site description: Vacant mill In residential area, facing the . D Detailed Site

Estimated site capacity: 175 Notes: The estimated capacity is based on planning application reference DC/064893. Deliverable 2018-2023: 90 Developable 2023 - 2028: 85 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,411 Date: 07/12/ 2018 Suitability I The site is not located close to a train station, but is otherwise accessible, is in a sustainable location, and is close to Stockport town centre. The building is locally listed, and there may be some contamination issues which will need to be remediated or demonstrated to be safe for residential uses, prior to any redevelopment.

Availability I The site is considered to be available within the next 5 years. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies. There are no known legal or ownership issues.

Achievability !The site is considered to be achievable.

Assessment Summary IThe site is deliverable. At the baseline date of the studY, a planning application was in the process of being submitted for the redevelopment of the site and the provision of 175 apartments. War Memorial 0

0

St George's C of E Pdmary School

Site reference: SKH17003 Site name: St George's Vicarage, Buxton Road, cale Green, Stockport, SK2 6NU , .·•. STOCKPORT 1 ~ Mi..'Tlij)N)lJ li\..~ 81J~~1l~ll t:'<.)tJN01. Ward: Davenport and Cale Green if!'".! Committee Area: Stockport Central Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0,39 Key Site description: Vicarage associated with St George's church. Detailed Site

Estimated site capacity: 15 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 15 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,049 Date, 07/12/2018 Suitability I The site is not located close to a train station, but is otherwise accessible and is in a sustainable location. This vicarage is listed, located within a conservation area and there are some protected trees on the site,

Availability I The availability of this site needs to be confirmed, but is likely to be in single ownership. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !The site is considered to be achievable, at the point in tfme estimated for developmenL

Assessment Summary IThe site is developable. This substantial period building could potentially be suitable for a sensitive conversion into residential use. El Sub Sta

Site reference: SKH17004 Site name: Land at Hill, adjacent to Clarkethorn Terrace ;-~ . STOCKPORT ~ R1,:·__ • ML'TJ(l)rc>!Jl 'A.\' 6ul\OUGU N.l•JNOl Ward: and Central Committee Area: Stockport Central Land Type: Greenfield Gross Site Size (ha) : 0.16 Key Site description: Informal open space next to high-rise residential Detailed Site

Estimated site capacity: 6 Notes:

Deliverable 2018-2023: O Developable 2023 - 2028: 6 Developable 2028 - 2033: O Developable 2033 - 2037: O Scale; 1 :920 Da\e, 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. This is site next to tall residential units, any overshading by existing residential structures would have to be taken into account. There are some trees on the site, any loss of these would need to be mitigated.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered t o be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in t ime estimated for development.

Assessment Summary IThe site is developable. This site would lend itself to higher rise apartments to be in keeping with the nearby residential development, which could result in a higher density than indicated. Shelters

Site reference: SKH17005 Site name: car park and building on Road, opposite Greenbank Avenue :-~ .. STOCKPORT 1 I ~ Rjf--_ ML'T lij)N.llJl 'lu\1' 8U~l..1l~U l''(hJNCU. Ward: Heatons South Committee Area: Heatons and Reddish Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0.16 Key Site description: Car park and Scout Hut Detailed Site

Estimated site capacity: 6 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 6 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:713 Date: 07/U/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. It is in a conservation area. Facilities for the Scout hut/community use should be provided or mitgation for their loss provided.

Availability I Some land purchase and assembly may be required to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable, at the point in time estimated for development.

Assessment Summary lnie site is developable. There is potential for the provision of a mix of residential and community uses, if car parking provision and community use of the Scout hut can be addressed and included as part of the redevelopment this site. I

Shelter J

,--=-=-=-=-=---.:-.:::-.:::--=:-=i_r---~-~-- 1 ~ J Works 1------' n

__,..,._ __-, I \..___ ,./ :-- Cl ~ t.:...: ,--~~/,/~L~~~~~-~~h 'C ~-~,____.------~~~ - (½_ L r § I ::1 u,n I 1/ Site reference: SKH17006 Site name: 305-307 Gorton Road, , Stockport, SKS 6LN ,f-_i :• Ward: Reddish North §!2S!5f9]I Committee Area: Heatons and Reddish Land Type: Brownfield Gross Site Size (ha) : 0.15 Key Site description: A number of small structures in commercial use offering car repairs, Detailed Site surrounded by dwellings and recreational open space. Estimated site capacity: 6 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 6 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:798 Date: 07/12/ 2018 Suitability I The site is accessible, located close to a train station (within 600m) and is in a sustainable location. Some of the site is identified as local open space, any loss of this should be appropriately mitigated.

Availability I Some land purchase and assembly may be required to created a single development parcel, so the site is not likely to be available until years 6-10. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary IThe site is developable. This is a small site that is in use as vehicle hire and repairs and is very close to existing dwellings. The redevelopment of this site could offer a positive impact upon the amenity of the nearby properties. Site reference: SKH17007 Bank on corner of Woodford Road and Syddal Road ;-~ .. STOCKPORT Site name: f'/t ~ '- \ . ' .. ... ,._ ML'Tlij)N.llJ I)\.~ 6UR01..1l,ll~ l';.0UNC11. Ward: Bramhall South and Woodford Committee Area: Bramhall and Cheadle Hulme South Land Type: Brownfield Key Gross Site Size (ha) : 0.17 Site description: Bank and surface parking In the centre of Bramhall Detailed Site

Estimated site capacity: 6 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 6 Developable 2033 - 2037: 0 Scale: 1:588 Date: 07/U / 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. Toe loss of the site for employment uses would need to be j ustified and mitigated.

Availability I Toe site is not considered to be available yet, due to its active use. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable, at the point in time estimated for development.

Assessment Summary !Toe site is developable. Toe current use as a bank would have to cease before the site can come forward for residential use. Due to the sustainable location, there ls potential for higher density than indicated in the estimate of yleld. Site reference: SKH17008 Site name: Land near 265 Edgeley Road, Edgeley, Stockport - .· , J STOCKPORT Ward: Edgeley and Cheadle Heath I~~ ::.. ' ML1'Ji;>rc>!JJ)\.'16ul\OUGll C<.l•JNQ( Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 0.48 Key Site description: Former petrol station, garaging and open storage Detailed Site

Estimated site capacity: 17 Notes: Yield relflects presence of PP in supply,

Deliverable 2018-2023: 0 Developable 2023 - 2028: 17 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,373 Date: 07/U / 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I Toe availability and ownership of this site is unknown. Toe necessary infrastructure is consid.ered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary !Toe site is developable. This site is in a mix of uses. Potential redevelopment of the site offers an opportunity to improve biodiversity and green infrastructure on the site, and improve amenity for nearby dwellings. Site reference: SKH17010 Site name: Road/Siddington Avenue, Adswood Ward: Davenport and Cale Green ,iii(· §!2S!>£S~~I Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 1.95 Key Site description: Adswood Industrial Estate Detailed Site

Estimated site capacity: 70 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 70 Developable 2033 - 2037: 0 Scale; 1:2,275 Date: 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. Toe loss of the employment uses would need to be justified and mitigated. There may be some contamination issues on part of the site which will neecj to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I Some land purchase and assembly may be require to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary !Toe site is developable. This site is currently identified as a housing allocation in the UDP but has not come forward for residential development, therefore it has been re-assessed. Toe site is In a variety of active employment uses, and these would need to cease and the site cleared before residential development can take place. NO @,.. Mast communication)

Site reference: SKH17012 Site name: 167 Buxton Road, Heaviley, Stockport, SK2 6EQ ~ . , J STOCKPOJIT /~Ri ::.. ' ML'TJ,;>rll!Jl'A.\!6 ul\OUGll N.l•JNOl Ward: Manor Committee Area: Stockport Central Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0.18 Key Site description: Substantial dwelling with large grounds. Detailed Site

Estimated site capacity: 7 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 7 Developable 2033 - 2037: 0 Scale; 1:783 Date: 07/12/ 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. Toe building is locally listed, set within a conservation area and there are some protected trees on the site.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary lnie site is developable. Toe conversion of the existing building and some sensitive development on the remainder of this site could potentially be suitable in this predomlonantly residential area. Hatherlow Heights

Hatherlow Farm

Site reference: SKH17013 Site name: Hatherlow House, 10 Hatherlow, , Stockport, SK6 3DY Sl ' ' J STOCKPOJIT •1~ }qf':...' ML'Tlll)rc>!J l'A.\! 6ul\OUGll t'

Estimated site capacity: 7 Notes: Estimated yield assumes conversion of existing building into apartments.

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 7 Developable 2033 - 2037: 0 Scale; l:698 Date: 07/12/ 2018 Suitability I Toe site is within 1000 metres of a train station, is accessible and is in a sustainable location. Toe building is listed, located within a conservation area, and there are some protected trees on the site.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable, at the point in tfme estimated for development .

Assessment Summary lnie site is developable. This substantial period building is current in commercial use but could potentially be suitable for a sensitive conversion into residential use. Car Park

Rose Hill Marple (Station) ---Posts ·

Site reference: SKH17014 Site name: Site at Railway Road, Marple, Stockport, SK6 6HU ; .•~ ., STOCKPORT /~Rjf ':..' Ml.1'J(l)rc>!J l'A.\I 6,JJ\01.IGll l"<.l•JNO( Ward: Marple North Committee Area: Marple Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0.18 Key Site description: Builders yard next to car park for Rose Hill Marple Station, Detailed Site

Estimated site capacity: 7 Notes: May be potential for higher density, subject to more detailed assessment.

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 7 Developable 2033 - 2037: 0 Scale; 1:790 Date: 07/U / 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I Toe availability and ownership of this site is unknown. Toe necessary infrastructure is consid.ered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development_

Assessment Summary lnie site is developable. Proximity to train station offers good access to public transport. Site reference: SKH1701S Site name: Reddish Community Centre, 132-138 Gorton Rd, Reddish SKS 6UG ;-~ .. STOCKPOIIT "I~ pJ!--_, ML'Tlij)NJlJli\.\"8U~l..1l~ll r..OUNOl. Ward: Reddish North Committee Area: Heatons and Reddish Land Type: Brownfield Gross Site Size (ha) : 0.19 Key Site description: Library, community centre and former swimming baths. Detailed Site

Estimated site capacity: 16 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 16 Developable 2033 - 2037: 0 Scale: 1:759 Date; 07/12/ 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. Toe group of buildings are locally listed, and is used as a community centre.

Availability I Toe site is in single ownership and considered to be available within the next S years. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary !Toe site is developable. Toe swimming baths have been closed since 2005. Any redevelopment or conversion of the site would have to be undertaken in a way that is sensitive to its status as a locally listed building, and to ensure appropriate provision of community facilities. Site reference: SKH17017 Site name: car Park on Banks Lane, Little Moor, Stockport, SK1 4JT ~. ·~ .; STOCKPOIIT "J ~ PS{--_, ML'Tlij)N.llJ1i\..\!6U~l..1l~ll l';.0UN01. Ward: Manor Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 0.19 Key Site description: Car parking and soft landscaplng in residential area. Detailed Site

Estimated site capacity: 7 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 7 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:617 Date: 07/U /2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and is in a sustainable location. There are some protected trees on the site.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary lnie site is developable. This surface car parking may be suitable for redevelopment subject to assessment of parking needs in the area and potential mitigation. Site reference: SKH17020 Site name: Adswood Road/Stockholm Road (north of), Stockport, SK3 9QT ,. . • .. STOCKPOJIT 1 Ward: Davenport and Cale Green ~ ~ ':_ Mi..'TlWf+'-">.Uli\..\76U~l..1l~ll N •-~01. Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 0.99 Key Site description: Single storey industrial units set between two railway lines. Detailed Site

Estimated site capacity: 35 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 35 Developable 2033 - 2037: 0 Scale; l :2;305 Date, 07/12/ 2018 Suitability I The site is accessible and is in a sustainable location, and is located 1.5km from Stockport Railway Station. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I The site is not considered to be available yet, due to its active use. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary IThe site is developable. This site is currently identified as a housing allocation in the UDP but has not come forward for residential development, therefore it has been re-assessed. The site is in a variety of active employment uses, and these would need to cease and the site cleared before residential development can take place. L

158 163

BLAZEMOSS BANK

Site reference: SKH17021 Site name: castle Shaw Road, Offerton, Stockport !--i ~- Ward: Offerton ~2S!5£S>]I Committee Area: Stepping Hill Land Type: Greenfield Gross Site Size (ha) : 0.22 Key Site description: Open space in residential area Detailed Site

Estimated site capacity: 8 Notes: Assumed 100% houses

Deliverable 2018- 2023: 0 Developable 2023 - 2028: 8 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:783 Da\e, 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. Toe site is not formally designated as Local Open Space,

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. The necessary infrastructure is considered to be available withil'l the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary IThe site is developable. This is a small area of open space in housing estate, loss of the green space would have to be mitigated or compensated for. The Meeting Room

Filling Station

Site reference: SKH17023 Site name: Site off Harwood Road , .·• ., STOCKPORT ~ R)i,.':__· ML T1..irc>1JJ'AN 6\JI\OU(;:1 N• :-or Ward: Heatons South Committee Area: Heatons and Reddish Land Type: Brownfield Gross Site Size (ha) : 0.21 Key Site description: Single storey garages and units, facing residential units, adjacent to pub. Detailed Site

Estimated site capacity: 8 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 8 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale'. 1:l,049 Date, 07/12/2018 Suitability I Toe site is not located close to a train station, but it it close to East Didsbury Tram stop, is accessible and is in a sustainable location. Due to the adjacent uses, any residential development would have to protect the amenity of future occupiers. Toe loss of the .site for employment uses would need to be justified and mitigated.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership_The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development_

Assessment Summary IThe site is developable. Toe site is currently occupied by a mix of employment uses. Broadstone House

Site reference: SKH17024 ; . , .J STOCKPORT Site name: Broadstone Mill, Broadstone Road, Reddish, SKS 7DL 1 Ward: Reddish South l~ Ri!'-_ ML"Tlij)N.llJl'A.\"61J~l..1l~ll t"

Estimated site capacity: 90 Notes: Estimated yield is based on 90 units split across the top 3 floors.

Deliverable 2018-2023: 0 Developable 2023 - 2028: 45 Developable 2028 - 2033: 45 Developable 2033 - 2037: 0 Scale; 1:1,664 Date: o?/U /2018 Suitability I The site. is accessible, located close to a train station (within 600m) and is in a sustainable location, but the nearest train station, Reddish South, operates a ghost service. The building is listed, in a conservation area and within a designated employment area; any loss of employment uses would need to be justified and mitigated. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I The availability of this site needs to be confirmed, but is likely to be in single ownership. The necessary infrastructure is considered to be available w1thin the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary IThe site is developable. The lower floors are in a variety of commercial uses. There is potential for the top floors to be converted into residential uses to create a mixed-use scheme. Site reference: SKH17026 Site name: Torkington Lodge, Torkinton Road, Stockport, SK7 4RQ , . , .J STOCKPORT Ward: Hazel Grove / ~ ~ ':...' ML'Tli.>rc>!J l'A.\! 6ul\OUGll t'<.l•JNOI Committee Area: Stepping Hill Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0.2 Key Site description: Detached buildlng set within an area of local open space, Detailed Site

Estimated site capacity: 8 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 8 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,475 Date: o?/U /2018 Suitability I The site is not located close to a train station, but is otherwise accessible and is in a sustainable location. It is"a Grade Il listed building dating from 1820s/30s, set inside a designated area of local open space and Green Chain, Any redevelopment of the site would have to be undertaken in a way that does not detract from the wildlife or recreation value of the Green Chain.

Availability I The site is considered to be available within the next 5 years. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable.

Assessment Summary !Toe site is developable. Substantial Grade II listed mansion building, set within Torkington Park, formerly used as offices. This building has the potential for a senstive conversion into a number of apartments. A

Filling Station

pg

Site reference: SKH17028 , . , J STOCKPORT Site name: car park at the Griffin Hotel, 600 Didsbury Road, SK4 3AJ 1 I ~ Ri!"_ ML'Tlij.)N)lJl'A.\1'6VfU1~1l~ll t:'

Estimated site capacity: 8 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 8 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:714 Date, 07/U/2018 Suitability I Toe site is not located close to a train station, but it it close to East Didsbury Tram stop, is accessible and is in a sustainable location. Due to the adjacent uses, any residential development would have to protect the amenity of future occupiers.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered t o be available w1thin the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development_

Assessment Summary IThe site is developable. Toe estimated yield is based on parking being provided on the site for both the pub and new residential uses. Site reference: SKH17030 Site name: carringtons Hat Works, Lytham St and Meyer St SK3 8JE , . , .J STOCKPORT / ~ ~ '.._' ML'TJ,;>rc>lJl'A.\>6,JI\OUGll N.l•JNO( Ward: Davenport and Cale Green Committee Area: Stockport Central Land Type: Brownfield Key Gross Site Size (ha) : 0.23 Site description: Historic industrial buildings and hardstanding in a variety of commercial Detailed Site uses, in predominantly residential area. Estimated site capacity: 9 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 9 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; l:877 Date: 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. Toe site is located within a conservation area. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I Toe current uses of the site mean that it is not likely to be available until years 6-10. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary !Toe site is developable. Conversion of existing buildings and some development on the remainder of this site would be suitable in this predominantly residential area. Holly Cottage - C7

Site reference: SKH17032 Site name: Holly Cottage / Bramhall Manor, Holly Road, Bramhall, Stockport, SK? lHH , . , ., STOCKPORT Ward: Bramhall South and Woodford /~~ ::.. ' ML'TJ(l)rc>!Jt'A.\!6ul\01.1Gll t'<.l•JNO( Committee Area: Bramhall and Cheadle Hulme South Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0.24 Key Site description: listed building set within large plot Detailed Site

Estimated site capacity: 8 Notes: Assumes apartments ~om conversion of existing dwelling

Deliverable 2018-2023: 0 Developable 2023 - 2028: 8 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; l :611 Date: 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. Toe site is located within a conservation area, and the building is listed,

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered t o be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development_

Assessment Summary !Toe site is developable. This listed building could potentially be sensitively converted into a number of apartments. Site reference: SKH17033 _.• ,. J Site name: Land adjacent and to rear of 39 Meadows Rd, SK4 SON 1 STOCKPORT ,~RJ!'-_ Mi..'Tlij)ftl"l1Jl'A.\!8UfU1Ul~ll t:'<.)1JNC:.:J1. Ward: Heatons North Committee Area: Heatons and Reddish Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0.24 Key Site description: Vacant land surrounded by residential, commerical and vacant former Detailed Site pub. Estimated site capacity: 9 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 9 Developable 2033 - 2037: 0 Scale; 1:936 Date: 07/U / 2018 Suitability I Toe site is located dose to a train station {within 600m) and is in a sustainable location. Access to this parcel may be subject to a ransom strip.

Availability I Some land purchase and assembly may be require to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable, at the point in time estimated for development.

Assessment Summary lnie site is developable. Sites SKH17033, SKH17038 and SKH17090 could be brought forward in conjunction to form a larger site for redevelopment for residential uses. Access to this parcel may be subject to a ransom strip. Site reference: SKH17034 Site name: Tarvin Footpath, Tarvin Avenue, Heaton Chapel, Stockport ;, ., .. STOCKPOIIT "I~ PJ!_':_1 ML'Tlij)N.lllli\.~8U~l..1l~U r..OUNCl1. Ward: Heatons North Committee Area: Heatons and Reddish Land Type: Greenfield Gross Site Size (ha) : 0.23 Key Site description: Fenced-off informal open space surrounded by residential. Detailed Site

Estimated site capacity: 9 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 9 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale: l :857 Date: 07/12/ 2018 Suitability I The site is not located close to a train station, but is otherwise accessible and in a sustainable location. It is open space but is not formally designated and is fenced off and not publically accessible. The site is located within a conservation area.

Availability I The availability of this site needs to be confirmed, but is likely to be in single ownership. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !The site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary lnie site is developable. This small parcel of green space is in an establised residential area. The developable area may be reduced by slightly awkward access. 1- w w a:: I­ (/) ~ <( I 0 ...J 0

Site reference: SKH17036 Site name: Fire Queen Site, Broadstone Road, Reddish ;-~ .. STOCKPOJIT "I~~ ':!' ML'Tlij)N.llJ li\..\! 6 U~l..1l~ll N.ltJNCU. Ward: Reddish South Committee Area: Heatons and Reddish Land Type: Brownfield Gross Site Size (ha) : 0.24 Key Site description: Commercial premises and yard close to Reddish District Centre. Detailed Site

Estimated site capacity: 9 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 9 Developable 2033 - 2037: 0 Scale; 1:1,031 Date: 07/12/ 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location, but the nearest train station, Reddish South, operates a ghost service. The loss of the site for employment uses would need to be justified and mitigated.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary lnie site is developable. Relocation of existing uses would be required, and the site cleared, prior to any redevelopment for residential purposes. Site reference: SKH17037 ; .· , J STOCKPORT Site name: Kwik Fit, Buxton Road, Stockport 1 1! Ri!':_ Mi..'Tlij)N.llJl'A.\"61J~l..1l~ll t'(ltJNC:.:.11. Ward: Stepping Hill Committee Area: Stepping Hill Land Type: Brownfield Gross Site Size (ha) : 0.23 Key Site description: Car repairs garage Detailed Site

Estimated site capacity: 25 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 25 Developable 2033 - 2037: 0 Scale; 1:846 Date: 07/12/ 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. Toe loss of the employment uses would need to be justified and mitigated.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary !Toe site is developable. This site is in active use by Kwik Fit, and surrounded by private educational facilities. It is on the A6 and is well served by bus services. The current use would have to cease and the site cleared prior to redevelopment for residential purposes. HEATON CHAPEL

Garage

Site reference: SKH17038 ;.;% .. STOCKPOIIT Site name: 10 Howard Avenue, Heaton Chapel, Stockport, SK4 SAF 1 "J~ P$!'-_ ML'Tlij)N.llJli\..~81J~l..1l~U t:'t.ltJNC.:11. Ward: Heatons North Committee Area: Heatons and Reddish Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0.23 Key Site description: Residential dwelling set within large garden, adjacent to Tesla garage. Detailed Site

Estimated site capacity: 9 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 9 Developable 2033 - 2037: 0 Scale; 1:1,040 Date: 07/12/ 2018 Suitability I The site is located close to a train station {within 600m) and is in a sustainable location. Although there is currently a dwelling on this site, it is set in a large plot, which offers the potential for additional dwellings to be brought forward within the curtilage, or clearance and redevelopment.

Availability I Some land purchase and assembly may be require to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !The site is considered to be achievable, at the point in time estimated for development.

Assessment Summary lnie site is developable. Sites SKH17033, SKH17038 and SKH17090 could be brought forward in conjunction to form a larger site for redevelopment for residential uses. Bus Depot

Site reference: SKH17039 Site name: car wash and adjacent land on King Street West ,rj :i, Ward: Edgeley and Cheadle Heath ~!2S!>£S~fil Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 0.27 Key Site description: Mix of car wash, sales and parking, located close to Stockport town D Town Centre Living Area centre. Estimated site capacity: 10 Detailed Site Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 10 Developable 2033 - 2037: 0 Scale; 1:1,094 Date: 07/12/ 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I Some land purchase and assembly may be required to create a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary !Toe site is developable. This site is located close to Stockport rail st,ation and the town centre, it has the potential to be developed at a higher density than estimated, subject to the amenity of future and surrounding residential occupiers being protected. Site reference: SKH17040 Site name: Site of 56-72 Wellington Road North, Heaton Norris SK4 1HF 1iRj{:• Ward: Brinnington and Central §!2S!>£S~tq Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 0.25 Key Site description: Mix of hand car wash and car parking. Detailed Site

Estimated site capacity: 40 Notes: Yield assumes apartments

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 40 Developable 2033 - 2037: 0 Scale; 1:771 Date: 07/U/ 2018 Suitability I The site is not located close to a train station, but is otherwise accessible and is in a sustainable location. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I Some land purchase and assembly may be require to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !The site is considered to be achievable, at the point in time estimated for development.

Assessment Summary ITh e site is developable. The redevelopment of this site offers an opportunity to improve amenity for nearby houses, enhance the setting of the listed Wycliffe Congregational Church and introduce green infrastructure. Site reference: SKH17041 Site name: Works buildings on Commercial Rd and Peter St, Hazel Grove SK7 4BG ;-~ .. STOCKPOJIT .. ... ,._ \ ML'TlWN.llJ t,\,\" 81JROl..1l,ll.. l';.0UN0' 1. Ward: Hazel Grove "'• ~" . Committee Area: Stepping Hill Land Type: Brownfield Gross Site Size (ha) : 0.27 Key Site description: 2-storey works buildings, set between residential and retailing uses. Detailed Site

Estimated site capacity: 10 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 10 Developable 2033 - 2037: 0 Scale: l:899 Date: 07/12/ 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land. Toe loss of the site for employment uses would need to be justified and mitigated.

Availability I Some land purchase and assembly may be require to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary lnie site is developable. This site is comprised of a mix of buildings in a variety of commercial uses. The redevelopment for residential uses provides an opportunlty to improve the built and natural environment in this sustainable location. (/) (/) 1 to 116W Norris Towers

Site reference: SKH17042 Site name: Land off Florence Street, Heaton Norris !Rjf1• Ward: Brinnington and Central §!QS!>£S>~I Committee Area: Stockport Central Land Type: Greenfield Gross Site Size (ha) : 0.16 Key Site description: Open land with highways crossing parcel of land, adjacent to a row of Detailed Site terraced houses. Estimated site capacity: 10 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 10 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:909 Date: 07/12/ 2018 Suitability I The site is not located close to a train station, but is otherwise accessible and in a sustainable location. The site is located on the edge of a Conservation Area. The loss of informal open space should be assessed and mitigated if required.

Availability I Some land purchase and assembly may be require to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !The site is considered to be achievable, at the point in time estimated for developmenL

Assessment Summary !The site is developable. This site has potential to deliver a small block of apartments or a row of terraced housing. Site reference: SKH17045 Site name: Land at at Abney Road and School Lane, Heaton Chapel <: ·~ ., STOCKPORT 1 Ward: Heatons North I~ RJ!':! ML'Tlij)N.llJ l'fu\)' 61J~l..1l~ll ~.ltJNCU. Committee Area: Heatons and Reddish Land Type: Brownfield Gross Site Size (ha) : 0.26 Key Site description: Former petrol filling station and second hand car sales Detailed Site

Estimated site capacity: 10 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 10 Developable 2033 - 2037: 0 Scale; 1:953 Date: 07/12/ 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. Toe loss of the employment uses would need to be justified and mitigated. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I Some land purchase and assembly may be required to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable, at the point in time estimated for development.

Assessment Summary lnie site is developable. Toe site is in a prominent location on the A6, has good transport links, and is close to local services. It is currently used for second hand car sales, and this use would have to cease and the site cleared prior to any redevelopment for residential purposes. Site reference: SKH17046 Site name: 67 Chester Road, Stockport, SK? SPA Ward: Hazel Grove ,,ifi::. ~!2S!>£S~~I Committee Area: Stepping Hill Land Type: Brownfield Key Gross Site Size (ha) : 0.27 Site description: Period buildlng used as offices, set in large grounds Detailed Site

Estimated site capacity: 10 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 10 Developable 2033 - 2037: 0 Scale: 1:892 Date: 07/12/ 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. Toe loss of the site for employment uses would need to be j ustified and mitigated.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary !Toe site is developable. This building is in active use as offices,. providing support for people with disabilities. The use of this building would have to cease and relocate prior to any conversion or redevelopment of the site. Site reference: SKH17048 Site name: Land to the south of Old Croft Mews, Hempshaw Lane 5K1 4NT , .·, .1 STOCKPORT /~lqi,::__ • ML'TIIJ.lr<>LJl)\.\!6v l\UU(;ll t'<.l•JNOL Ward: Manor Committee Area: Stockport Central Land Type: Greenfield Gross Site Size (ha) : 0.29 Key Site description: Believed to be former terraced housing that was cleared a long t ime ago Detailed Site and has now reverted to the appearance of green field. Estimated site capacity: 11 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 11 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,030 Date, 07/12/2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. There may be some contamination issues on the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land. Toe mature trees on the site should be retained.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary IThe site is developable. This is well located site in a sustainable location, which currently provides some visual amenity, and efforts should be made to improve biodiversity as part of any new scheme. Site reference: SKH17049 Site name: Land at Marsland Terrace, Stockport, SKl 4PZ ~ .•~ ., STOCKPORT 1! R}!--_, Mi..'TlWt+~.llJli\.\l'61J~I.K;l1 t'<.)tJNC:.:.U. Ward: Manor Committee Area: Stockport Central Land Type: Greenfield Gross Site Size (ha) : 0.27 Key Site description: Believed to be former terraced housing that was cleared a long time ago Detailed Site and has now reverted to the appearance of green field. Estimated site capacity: 12 Notes: Highway through site will reduce developable area

Deliverable 2018-2023: 0 Developable 2023 - 2028: 12 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:987 Date: 07/12/ 2018 Suitability I The site is not located close to a train station, but is otherwise accessible and in a sustainable location. The mature trees should be retained.

Availability I The availability of this site needs to be confirmed, but is likely to be in single ownership. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary !Toe site is developable. This is a well located site in a sustainable location, which currently provides some visual amenity, therefore efforts should be made to Improve biodiversity as part of any new scheme. Site reference: SKH17050 ;-~ .. STOCKPORT Site name: Parkside Social Club, Midland Road, Bramhall 1 Ward: Bramhall North "I~ ~ :_ ML'Tlij)N..'>1Jl'lu~8UfU1Ul~U ~OUNOJ. Committee Area: Bramhall and Cheadle Hulme South Land Type: Brownfield Gross Site Size (ha) : 0.31 Key Site description: Social club surrounded by dwellings and a railway line. Detailed Site

Estimated site capacity: 12 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 12 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale: 1:1,003 Date: 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and is in a sustainable location. There are some protected trees on the site.

Availability I Toe site is not considered to be available yet, due to its active use. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable, at the point in time estimated for development.

Assessment Summary lnie site is developable. Toe current use as social club would have to cease or be relocated before site can come forward as residential use. Residential development ls currently taking place on the land to the west of this site. Site reference: SKH17051 Site name: caretakers' House, Hazel Grove High School, Jacksons lane "" , .J STOCKPOITT "J~ PS!':_1 ML"Tlij)N.llJli\..\"6U~I.K;U C'{ltJNOl. Ward: Stepping Hill Committee Area: Stepping Hill Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0.32 Key Site description: Caretakers house and associated land Detailed Site

Estimated site capacity: 12 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 12 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale: 1:1,0Sl Date: 07/U /2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. It is a small parcel of designated Local Open Space, set wfthin the wider Local Open Space grounds for Hazel Grove High School. Subject to suitable mitigation, this site could potentially be acceptable for housing. Mature trees should be retained where possible.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development_

Assessment Summary !Toe site is developable. Any loss of Local Open Space on this site would need to be robustly justified and mitigated. Site reference: SKH17053 Site name: Land at Wellington Road South and Andrew Street ~ ·,. STOCKPOIIT l~_iq{'.._' Ml:TJi.>rc>lJl'A.\!8\JI\OUGll t'

Estimated site capacity: 18 Detailed Site Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 18 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,298 Date: 07/12/2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. There are some mature trees on the periphery of the slte.

Availability I Some land purchase and assembly may be require to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability jToe site is considered to be achievable, at the point in t ime estimated for development.

Assessment Summary IThe site is developable. Part of the site may be required for the new Tiviot Way bypass road, but the northern part of the site has potential for apartments. Toe mature trees should be retained as they provide valuable visual amenity along the A6, Site reference: SKH17054 ; .• , J Site name: Land at Woodbank Community Centre, Edwin Road, Stockport, SK1 4HW 1 STOCKPOIIT 1! Ri!'",.!_ ML'Tlij)N)1Jl'A.\!thJ~~1l~ll t:'<.)1JNC.:J1. Ward: Manor Committee Area: Stockport Central Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0,77 Key Site description: Community centre and adjoining land Detailed Site

Estimated site capacity: 12 Notes: The southern part of the site is being developed fOr housing, this is reflected in the estimated yield . Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 12 Developable 2033 - 2037: 0 Scale; 1:1,632 Date: 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. Toe site is used as a community centre and this service should be retained or relocated as part of any redevelopment of the site.

Availability I Some land purchase and assembly may be require to created a single development parcel, so the site iS not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary !Toe site is developable. This site could potentially be redeveloped with a new community centre occuying the ground floor, with apartments on the upper floors. 56 52 58 54

so

Site reference: SKH17055 ~ .· , .J STOCKPORT Site name: The Adswood, Former Pub, Adswood Road, Adswood 1 1! ~ '",.!_ Mi..'Tlij)N)lJ li\..~ 8U~~1l~ll C'

Estimated site capacity: 12 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 12 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:811 Date, 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and is in a sustainable location. This building is locally listed and the wider site is set within a conservation area.

Availability I Toe site is considered to be available within the next 5 years. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable.

Assessment Summary IThe site is developable. This site has a locally listed pub which has the potential for a sensitive conversion, together with some new build dwellings. Site reference: SKH170S6 Site name: Cecil Court , Kent Road, Edgeley, Stockport, SK3 OJD Ward: Edgeley and Cheadle Heath ,,ii::-~!QS!>£S~~I Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 0.21 Key Site description: Site includes existing apartment block and car parking, set adjacent to a Detailed Site park and close to existing dwellings. Estimated site capacity: 5 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 5 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:735 Date: 0 7/U / 2018 Suitability I The site is not located close to a train station, but is otherwise accessible and is in a sustainable location. There is an existing apartment block that should be retained.

Availability I The site is considered to be available within the next 5 years. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !The site is considered to be achievable.

Assessment Summary !Toe site is developable. There is an existing apartment block on this site that should be retained, but there is potential for further apartments on the site, provided that amenity for current and future occupants is not negatively impacted. Site reference: SKH17057 Site name: Cow And Calf Hotel, School Brow , Bredbury, Stockport SK6 3AT • •', ,A STOCKPORT ~ ~ ,'...- ' ML'Tli.)fCllJ l'A.~ 6ul\OUGll t-.i• MJ( Ward: Bredbury Green and Romiley Committee Area: Wemeth Land Type: Brownfield Gross Site Size (ha) : 0.22 Key Site description: Former pub and surrounding land, on a prominent junction in a Detailed Site residential location. Estimated site capacity: 8 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 8 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,078 Date: 07/12/2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and is in a sustainable location. There are no other known constraints.

Availability I Toe site is considered to be available within the next S years. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable.

Assessment Summary IThe site is developable. This former pub is now vacant, a full redevelopment of the site would make the most efficient use of the land across the site and potentially offer a higher density than is indicated in the estimated capacltY. Site reference: SKH170S8 Site name: Library and land at Queens Road, Hazel Grove, Stockport, SK7 4QP ,,, ·~ J STOCKPORT 1 Ward: Hazel Grove "J~ PJ!':! ML'Tlij)N.llJl'A.\!6U~Ul~ll N ..h JNCU. Committee Area: Stepping Hill Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0.33 Key Site description: Library and associated land, and Beech Avenue Car Park Detailed Site

Estimated site capacity: 22 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 22 Developable 2033 - 2037: 0 Scale: 1:923 Date: 07/12/ 2018 Suitability I Toe site is accessible, and located close to a train station (within 600m) and is in a sustainable location. The library and community facilities would need to be assessed as part of the redevelopment of this land for relocation or inclusion within a new mixed use scheme.

Availability I Some land purchase and assembly may be require to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable, at the point in time estimated for development.

Assessment Summary lnie site is developable. All of this land could potentially be redeveloped, but the loss of library and car parking would need to be addressed, incorporated into the scheme, or mitigated elsewhere. Site reference: SKH17059 Site name: Werneth Young Peoples Centre, George Lane, Bredbury , . , .J STOCKPORT I~ R}f'-_1 Mi..'Tlij)f+o_">.llli\..~6U~l..1l~ll C'.'(.)1JNCJ1. Ward: Bredbury Green and Romiley Committee Area: Wemeth Land Type: Brownfield Gross Site Size (ha) : 0.34 Key Site description: Youth club and surface parking, next to railway line anct dwellings. Detailed Site

Estimated site capacity: 13 Notes: Apartments to allow for rebuild of community facilities on same site

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 13 Developable 2033 - 2037: 0 Scale; 1:1,150 Date, 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. Toe mature trees on the site should be protected, and green Infrastructure should be included within the scheme to offset any losses. Toe provision of community facilities should be assessed, prior to any potential redevelopment, and retained within the area or at this location if required.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary IThe site is developable. This site could potentially be redeveloped to provide youth and community facilities on the lower floors with apartments above, creating a mixed-use scheme. Site reference: SKH17060 Site name: Hampstead Mill, Lake Street, Great Moor, Stockport, SK2 7NU ; . , .1 STOCKPOIIT ~ R1,.'__' ML'Tli.)rc>!J l'A.\! 8Ul\OI.IGU (:'

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary !Toe site is developable. This works site is in a residential area. It is likely that the existing building would have to be demolished to enable redevelopment for residential purposes. Site reference: SKH17061 ; , .J STOCKPORT Site name: Shaw Heath Health Centre, Gilmore Street SK3 8DN 1 Ward: Brinnington and Central 'J~ 2'!! ML'Tlij)N.llJ l'A.\! 8 U~Ul~ll N.)tJNt:.11. Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 0,37 Key Site description: Single storey health centre and associated surface car parkfng D Town Centre Living Area

Estimated site capacity: 14 Detailed Site Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 14 Developable 2033 - 2037: 0 Scale; 1:1,140 Date: 07/U/ 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary !Toe site is developable. Toe current use as a health centre precludes residential development over the near and mid-term future, but there is potential fur redevelopment at higher density and a mix of uses to Include residential accomodation on the site. Site reference: SKH17062 Site name: Petrol filling Station and offices at Ack Lane East, Bramhall ~ ·~ .l STOCKPOJIT ' 1~ P$f':..' ML'Tlll)rc>!J r,...., 8,JJ\OU(;ll t:OUN01 Ward: Bramhall South and Woodford Committee Area: Bramhall and Cheadle Hulme South Land Type: Brownfield Gross Site Size (ha) : 0.35 Key Site description: Petrol station and adjacent offices in the centre of Bramhall. Detailed Site

Estimated site capacity: 14 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 14 Developable 2033 - 2037: 0 Scale; 1:908 Date: 07/12/ 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land. Toe loss of the site for employment uses would need to be justified and mitigated, but offices could potentially be converted under the prior approval process

Availability I Some land purchase and assembly may be required to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary !Toe site is developable. Toe current use as a petrol filling station would have to cease before the site can come forward fur residential use. Due to the sustainable .location, there is potential for higher density than indicated in the estimate of yield. Site reference: SKH17063 Site name: 92-94 Church Lane, Marple SK6 ?AR ;~# STOCKPOJIT 1 "I~ P$!':_ ML'Tlij)N.llJ1i\..\"6U~Ul~ll ~.ltJNCU. Ward: Marple South Committee Area: Marple Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0.35 Key Site description: Mix of buildings in commercial uses, car wash and surface parking, close Detailed Site to the centre of Marple. Estimated site capacity: 18 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 18 Developable 2033 - 2037: 0 Scale; 1:1,132 Date.:07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location.

Availability I Some land purchase and assembly may be required to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary !Toe site is developable. It is likely that land assembly would be required to bring this site forward, but it is in a good location to access local amenities. Some site clearance will be required, but some of the buildings could potentially be converted into residential use. Site reference: SKH17064 ;.•~. , STOCKPORT Site name: Gordon Street/Nicholson Street, Lancashire Hill 1 ~ ~ ':_ Mi..'TlWt+'-llJ 1'11..\1' 6U~l..1l~ll Oj,_:'11,Q1. Ward: Brinnington and Central Committee Area: Stockport Central Land Type: Mix of greenfield and brownfield Gross Site Size (ha} : 0,37 Key Site description: Open land with highways crossing parcel of land Detailed Site

Estimated site capacity: 14 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 14 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,248 Da\e, 0 7/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. Toe developable area will be reduced due to presence of mature trees on the site that should be retained where possible.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership_The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary IToe site is developable. The highways located on this small site are used for informal parking, any impact of this loss of parking may need to be considered prior to any redevelopment of the site. Green infrastructure should be incorporated into any new scheme where possible, to help offset any losses due to development on the site. Site reference: SKH17066 Site name: Site at Rupert Street and Broadstone Road, Reddish ,iit_. Ward: Reddish South §!2S!5£S>~I Committee Area: Heatons and Reddish Land Type: Brownfield Gross Site Size (ha) : 0,37 Key Site description: Public house, club, and surface parking, close to Reddish centre Detailed Site

Estimated site capacity: 14 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 14 Developable 2033 - 2037: 0 Scale'. 1:l ,520 Date, 0 7/12/ 2018 Suitability I The site is accessible, and located close to <1 train station (within 600m) and is in a sustainable location) but the nearest train station, Reddish South, operates a ghost service. The pub is locally listed and located within a conservation area. There are some mature trees that should be retained.

Availability I Some land purchase and assembly may be required to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be av9ilable within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary IThe site is developable. Toe estimated yield for this site is based on retention of the pub, and redevelopment of the club to potentially provide community llses on the ground floor and apartments above. Site reference: SKH17067 Site name: Factories at Compstall Village, Andrew Street, Romiley "" , .J STOCKPOIIT 'J~ PS!':_1 ML'Tlij)N.llJl'lu'1'8U~l..1l~ll t:'tJ,JNCl1. Ward: Marple North Committee Area: Marple Land Type: 3.33 Gross Site Size (ha) : Traditional mill buildfngs in a variety of uses, located in Compstall vlllage, Key Site description: !eObetween the River Etherow, Compstall Road and a reservoir. Detailed Site

Estimated site capacity: Custom Notes: Mills and associated land

Deliverable 2018-2023: 0 Developable 2023 - 2028: 60 Developable 2028 - 2033: 100 Developable 2033 - 2037: 0 Scale; 1:3,665 Date: 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible. Toe site is identified as a Major Existing Developed Site in the Green Belt. Around a quarter of the site is located within flood zones 2 and 3. There are several locally listed buildings within the site, and it is entirely within a conservation area. There may be some contamination issues which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I Toe site is considered to be available within the next 5 years. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies. Land may need to be purchased to assemble the eastern and western parts of the site into a single development parcel, and some site clearance and remediation may be required.

Achievability !Toe site is considered to be achievable.

Assessment Summary !Toe site is developable. This site has previously benefitted from planning permission for 121 units on the eastern side of the site, comprised of 90 flats and 31 houses, which was granted in 22 May 2013, but expired before being implemented, gl l £ A .,, -~ iii ~ "' "' .., C;; g, 0 .. u .... 0, "'.,

Site reference: SKH17068 Site name: Land at Northumberland Road, Lenham towers ; .• ~., STOCKPOIIT l ~ R1,::.. ' ML'TJ,;>rc>!Jt'A.'"6ul\OUGll N.l•JNO( Ward: Brinnington and Central Committee Area: Stockport Central Land Type: Greenfield Gross Site Size (ha) : 0.38 Key Site description: Area of open space next to estate housing and high rise residential Detailed Site development and adjacent to Green Belt. Estimated site capacity: 15 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 15 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,214 Date: 07/12/2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. Toe site is identified as local open space, any loss of this should be appropriately mitigated, but it has not been assessed in the Open Space Assessment, as the series of spaces around the apartments were below the threshold for consideration.

Availability I Toe site is considered to be available within the next 5 years. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary ITh e site is developable. This site has been subject to some anti-social behaviour. This site would benefit from being sensitively developed for residential development, subject to suitable mitigation and some of the land being preserved as amenity space for the residents of the existing flats. Site reference: SKH17070 , .·,.1 STOCKPOIIT Site name: Mile End Meadow off Dialstone and Mile End Lane 1 Ward: Manor ~Ri!'-_ ML'TlWt+~)lll'A.~6lJ~~1l;l1 t'

Estimated site capacity: 15 Notes: Mix of dwellings weighted towards apartments due to site shape and access Deliverable 2018-2023: 0 Developable 2023 - 2028: 15 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,502 Date: 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise in a sustainable location. The site is identified as local open space, any loss of this should be appropriately mitigated. There may be some contamination issues which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land. The site is currently land locked, but it may be possible to create an access through the eastern boundary of the site, through the car park associated wlth the residential/apartment development on the eastern edge. Availability I Some land purchase and assembly may be require to created a suitable access point prior to development, so the site is not likely to be available until years 6-10. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary !Toe site is developable. Subject to land assembly and appropriate mitigation, the location provides a sustainable location for residential development. Site reference: SKH17072 Site name: Land at Stanbank Street, Heaton Norris ;-;>? .. STOCKPOIIT I~ ~ '...' ML'Tli.>rc>!Jt'A.'Oul\OUGll (:'

Estimated site capacity: 15 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 15 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; l:896 Date: 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. Toe site is in a designated employment allocation, and any loss of employment use should be assessed, justified and mitigated.

Availability I Some land purchase and assembly may be required to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary !Toe site is developable. This site is a small part of a wider employment allocation, but this parcel is surrounded on three sides by residential terraces. Half of the slte has an expired permission for 7 residential units, see planning reference DC/052050. Marple Dale

L )',UL' trJM~ 1018 Ordtre-ntit SJJrvf-V 100019S71

Site reference: SKH17074 Site name: Buildings and land at Marple Dale Hall Nursing Home, Dale Road "·~ .; STOCKPOIIT 'I~ P${':._• ML'Tlllll'Cl!J !'A.~ 6UI\Ol.1Gll t:OUN01 Ward: Marple North Committee Area: Marple Land Type: Brownfield Gross Site Size (ha) : 2.15 Key Site description: Vacant care buildings. Detailed Site

Estimated site capacity: 21 Notes: Estimated yield is based on conversion/remodelling of existing structures.

Deliverable 2018-2023: 0 Developable 2023 - 2028: 21 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:2,707 Date: 07/12/ 2018 Suitability I Toe site is accessible, but is not located close to a train station and is not in a sustainable location. It is located within the Green Belt. There may be some contamination issues on the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability jn,e site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary lnie site is developable. This is an existing developed site in the Green Belt. A sensitively prepared scheme may be acceptable, but the estimated yield should not be used as an indication of the likely number of acceptable units. Site reference: SKH1707S Site name: 168 Belmont House, Schools Hill, Cheadle, Stockport, SK8 1JE ~ .•~., STOCKPOJIT Ward: Cheadle and I ~ Ri:·__ • ML'TJ(l)rc>!J l'A.~ 8ul\01.1Gll t'<1•JN01 Committee Area: Cheadle Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0.46 Key Site description: Substantial building and grounds In use as care home. Detailed Site

Estimated site capacity: 16 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 16 Developable 2033 - 2037: 0 Scale; 1:1,2.94 Date: 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and is in a sustainable location. The building is locally listed and there are some protected trees on the site.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary !The site is developable. If the use of this building ceases as a care home, there is potential for conversion into apartments. Alternatively the site could potentially be remodelled and extended to create a mix of apartments and dedicated onsite care uses. @Q

Site reference: SKH17076 Site name: Sunnyfield Road, , next to St Winfred's Church ,! ~~-- Ward: Heatons South §!QS!SES!I> Committee Area: Heatons and Reddish Land Type: Greenfield Gross Site Size (ha) : 0.47 Key Site description: former education playing fields for education uses. Detailed Site

Estimated site capacity: 16 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 16 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale'. 1:1,271 Date, 0 7/12/ 2018 Suitability I The site is not located close to a train station, but is otherwiseacc.essible and is in a sustainable location. The site is identified as local open space, any loss of this should be appropriately mitigated. 30% of site is within a conservation area. This area of open space has scored low for both quality and value in the open space assessment.

Availability I Disposal or change of use of playing field and school land is subject to legislation, and following the prescribed process can take some time, so the site is not likely to be available until years 6-10. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confinned with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary IThe site is developable. This overgrown former playing fields is a designated area of local open space that has scored low for both quality and value in the open space assessment, and could be potentially suitable for residentral, subject to appropriate mitlgation. Apartments may make best use of the land whilst still allowing sufficient amenity space for future occupiers. Site reference: SKH17077 Site name: Shepley House, Eyam Road, Hazel Grove, Stockport, SK7 6HP, ;" , ., STOCKPORT "J~ PS!'-_1 ML'Tlij)N)1J1i\..\)'6 U~Ul~U ~OUNCIJ. Ward: Hazel Grove Committee Area: Stepping Hill Land Type: Brownfield Gross Site Size (ha) : 0.47 Key Site description: Care home in residential area. Detailed Site

Estimated site capacity: 16 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 0 Developable 2033 - 2037: 16 Scale: 1:1,168 Date: 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. Any loss of the care facilities should be assessed and mitigated or provided elsewhere if requlred,

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary !Toe site is developable. Its current use as a Shepley House Care Home precludes it from coming forward for residential development over the medium term, but the site has potential to be redeveloped at a hfgher density with a mix of uses, over the longer term, War Memorial 0

St George's Church

Site reference: SKH17078 Site name: Former ATS site, 35 Buxton Rd, Stockport, SK2 6LU ;~ .. STOCKPOJIT .., .~ ,., \ . ~ ' Ward: Manor • • ~- ML'Tlll)fll!J! )\.\> 6UI\Ol.ll,ll t:OVN01 Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 0,36 Key Site description: Site is comprised of a mix of uses and buildings including a former car Detailed Site repairs garage, located on the A6 and next to the cemetery. Estimated site capacity: 14 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 14 Developable 2033 - 2037: 0 Scale: 1:1,045 Date: 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and is in a sustainable location. The site is entirely within a conservation area, and some of the buildings are locally listed. There may be some contamination issues which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I Toe site is considered to be available within the next 5 years. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies. Land may need to be purchased to assemble this site into a single development parcel, and some site clearance will be required.

Achievability lnie site is considered to be achievable.

Assessment Summary lnie site is developable. This site has a prominent frontage along the A6 and has been vacant for some time. It represents an opportuntity to regenerate the site and create a high quality development within the setting of St George's Church. GROSVENOR

D c::=J D Cl D 0 D D •D 0 •

•ooao

Works

Q Depot

CJ t,owr1 eopyr111)i\ i1nd d.,tilOO.sl, n,t,u ~01s Ordr,,;intit s1,1rvt-v 1ooorns11

Site reference: SKH17079 Site name: Former Cheadle Brickwork Site, Adswood Road , Cheadle Hulme ;~ * STOCKPOIIT '1~ ~ :.!' Mt:TllUJ1(lL11'AN BQROUtar ~OUN~Jl. Ward: Bramhall North Committee Area: Bramhall and Cheadle Hulme South Land Type: Brownfield Gross Site Size (ha) : 9.33 Key Site description: Former brickworks Detailed Site

Estimated site capacity: 160 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 120 Developable 2028 - 2033: 40 Developable 2033 - 2037: 0 Scale: 1:4,291 Date: 0 7/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. There may be some contamination issues on the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land. The site is a designated employment allocation, and any loss of the site for employment uses would need to be justified and mitigated.

Availability I Toe availability and ownership of this site is unknown. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability jToe site is considered to be achievable, at the point in t ime estimated for development.

Assessment Summary lnie site is developable. Half of the site is historic landfill, which is not considered to be suitable for residential development unless it can be proved to be made safe. Subject to assessment of ground contamination and remediation, there may be a possiblity of this slte being redeveloped over the longer term in conjunction with the site to the east SKH17134; the estimated yield has been adjusted to reflect this. Site reference: SKH17080 Site name: Former Ford Dealership, 60 Buxton Road, Hazel Grove ; .•~ ., STOCKPOIIT ~ R1,.':._' ML'Tli;lfD!J l'A.\! 8Ul\Ol.1Gll N.l•JNQ( Ward: Hazel Grove Committee Area: Stepping Hill Land Type: Brownfield Gross Site Size (ha) : 0.2 Key Site description: Former car dealership in established residential area, Detailed Site

Estimated site capacity: 8 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 8 Developable 2033 - 2037: 0 Scale; 1:1,035 Date: o?/U/2018 Suitability I Toe site. is not located close to a train station, but is otherwise accessible and in a sustainable location. It is located within a designated employment area, but on the peripherery and at the mouth of a residential estate, so the change of use could potentially improve the amenity of nearby residents, subject to appropriate justification and mitigation of the loss of employment use.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for developmenL

Assessment Summary IThe site is developable. Vacant commercial premises on the A6, surrounded by residential dwellings. Site reference: SKH17081 Site name: Westwood House, Cross Lane, Marple SK6 7PZ • I. STOCKPOIIT ~ R1,:·__ • ML'Tli.>rc>!J l'A.\! 6vl\01.1Gll C<.l•JNQ( Ward: Marple North Committee Area: Marple Land Type: Brownfield Key Gross Site Size (ha) : 0.51 Site description: Large area ofhardstandlng and some industrial uses, set between Detailed Site residential and employment uses Estimated site capacity: 18 Notes: Yield is influenced by surrounding housing, but potential for a higher density. Deliverable 2018-2023: 0 Developable 2023 - 2028: 18 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,757 Date: o?/U / 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. Toe loss of the site for employment uses would need to be justified and mitigated.

Availability I Toe availability and ownership of this site is unknown. Toe necessary infrastructure is consid.ered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary IThe site is developable. This site is in an established residential location. Toe clearance and redevelopment of this site offers an opportunity to improve the built and natural environment In this location. Site reference: SKH17082 Site name: Eden Point, Eden Park Road, Cheadle Hulme ; . , J STOCKPOJIT 1! ~ •:.t ML'Tlij)N.. llJli\..\l'6U~l..1l~U t:'t ..hJNCll. Ward: Cheadle Hulme South Committee Area: Bramhall and Cheadle Hulme South Land Type: Brownfield Gross Site Size (ha) : 0.52 Key Site description: Modern offices adjacent to recent housing development. Detailed Site

Estimated site capacity: 25 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 25 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,472 Date: 07/U / 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible. Toe building is in an employment allocation but may be able to be converted into residential use through the prior approval process.

Availability I Toe site is considered to be available within the next 5 years. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable.

Assessment Summary lnie site is developable. This is an office block which could potentially be converted to residential through the prior approval process. !t has on-site parking. AN i

Site reference: SKH17083 Site name: Land to rear of 170 Bruntwood lane, , Cheadle, SK8 3AS Ward: Cheadle Hulme South !i 1· §!QS!>£l9!I Committee Area: Bramhall and Cheadle Hulme South Land Type: Greenfield Gross Site Size (ha) : 0.85 Key Site description: Small wedge of open space, bounded by A34, dwellings and further open Detailed Site space. Estimated site capacity: 18 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 18 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,983 Date: o?/U /2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and is in a sustainable location. The land is identifed as Green Chain, so any redevelopment of the site would have to be undertaken in a way that does not detract from the wildlife or recreation value of the Green Chain. There are a number of mature trees on the site. Toe site is located at the southern tip of a much wider area of designated Strateglc Open Space, but this parcel has not be assessed as amenity space in the Open Space Assessment as it does not function as amenity space; any loss would have to be appropriately mitigated. Availability I Toe site is considered to be available within the next 5 years. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies. There are no known legal or ownership issues.

Achievability !Toe site is considered to be achievable.

Assessment Summary IThe site is developable. This small site is located at the southern tip of a much larger area of Strategic Open Space, and is adjacent to existing residential development. It could potentially be appropriate for housing, subject to suitable mitigation and improvements made to the quality and accessibility of the wider area of Strategic Open Space. Site reference: SKH17085 Site name: Land at John Street and London Road, Hazel Grove, Stockport, SK7 4AH ,ti {· Ward: Hazel Grove §IQS!>£S>~I Committee Area: Stepping Hill Land Type: Brownfield Gross Site Size (ha) : 0.56 Key Site description: Buildings in a mix of commercial uses, including a pub and depot Detailed Site

Estimated site capacity: 31 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 31 Developable 2033 - 2037: 0 Scale; 1:1,4.97 Date: 07/U/ 2018 Suitability I Toe site. is within 800 metres of a train station, is accessible and is in a sustainable location. Toe amenity of future occupiers should be protected from any negative impacts due to the proximity of the A6.

Availability I Some land purchase and assembly may be required to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be av9ilable within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary IToe site is developable. This site has a prominent frontage on the A6 in Hazel Grove, and is well served by public transport. Comprehensive redevelopment across the site could potentially deliver hfgher density due to location, but site assembly is likely to be required. !SHERWOOD DRIVE

Site reference: SKH17086 Site name: Former Rose Hill Primary school, Walton Drive ~ ·' ' J STOCKPORT I~ ~ '.!' MLT1i.>rc>1JJ'AN6ul\OUG(I N• :-or Ward: Marple North Committee Area: Marple Land Type: Greenfield Gross Site Size (ha) : 0.73 Key Site description: Playing fields associated with a primary school that It no longer sited at Detailed Site that location. Estimated site capacity: 20 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 20 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale '. 1:1,377 Date: 07/12/ 2018 Suitability I The site is accessible, located close to a train station (within 600m) and is in a sustainable location. Toe site is identified as local open space, any loss of this should be appropriately mitigated.

Availability I Toe site is considered to be available within the next 5 years. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies. There are no known legal or ownership issues.

Achievability !Toe site is considered to be achievable.

Assessment Summary IThe site is developable. Toe site is playing fields associated with former primary school buildings which have since been demolished and rebuflt as housing. The sTte is surrounded by resfdentlal development. Toe Local Authority may need to ask the Secretary of State for consent to dispose of the land. Site reference: SKH17087 Site name: Sandfold Piggeries, Sandfold, North Reddish, Stockport, SKS 6LU , .·' ,A STOCKPORT 1 Ward: Reddish North ~Rif'-_ Mi..'Tlij.)N)1Jli\.~8U~~1l~ll N.)tJNCU. Committee Area: Heatons and Reddish Land Type: Brownfield Key Gross Site Size (ha) : 0,95 Site description: Mix of semi derelict buildings and open storage. Detailed Site

Estimated site capacity: 20 Notes: The eastern wedge of site is indentified as former landfill, this may affect the developable area, and this has been. reflected in the estimated yield. Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 20 Developable 2033 - 2037: 0 Scale; 1:1,974 Date: 07/12/ 2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I Toe availability and ownership of this site is unknown. Toe necessary infrastructure is consid.ered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development_

Assessment Summary IThe site is developable. This site is in a residential area and next to North Reddish Park. Playing Field

Site reference: SKH17089 Site name: Land off Harrogate Road 1ti 1- Ward: Reddish North §!QS!>£S)~I Committee Area: Heatons and Reddish Land Type: Greenfield Gross Site Size (ha} : 0.61 Key Site description: Playing field set between Victoria Mill, residential dwellings and strategic Detailed Site open space. Estimated site capacity: 21 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 21 Developable 2033 - 2037: 0 Scale; 1:1,004 Date, 0 7/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land. Any loss of playing fields would need to be assessed and mitigated for.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership_The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for developmenL

Assessment Summary IToe site is developable. Toe playing fields are not designated as local open space, and are not considered to be publically accessible. HEATON CHA PEL

Site reference: SKH17090 Site name: Land at Howard Avenue and Meadows Road Heaton Chapel ~:~J STOCKPORT 1 "J ~ PJ!"_ ML'Tlij)N.llJli\..\l'6lJ~l..1l~U r..OUN01. Ward: Heatons North Committee Area: Heatons and Reddish Land Type: Brownfield Gross Site Size (ha) : 0,59 Key Site description: Tesla garage and vacant pub Detailed Site

Estimated site capacity: 36 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 36 Developable 2033 - 2037: 0 Scale; 1:1,591 Date: 07/12/ 2018 Suitability I The site is located close to a train station {within 600m) and is in a sustainable location. Part of this site is in employrnent use and the loss of this will need to be justified and mitigated

Availability I Some land purchase and assembly may be require to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable, at the point in time estimated for development.

Assessment Summary lnie site is developable. Sites SKH17033, SKH17038 and SKH17090 could be brought forward in conjunction to form a larger site for redevelopment for residential uses. BIRD HALLAVENUE;

Site reference: SKH17092 Site name: Bird Hall lane Open Space ; .•~ ., STOCKPORT Ward: Davenport and Cale Green ~ ~ '!' ML'TJi.>rc>lJJi\N 6uf\OU(;ll t'U•JNO( Committee Area: Stockport Central Land Type: Greenfield Gross Site Size (ha) : 0.62 Key Site description: Area of open space bounded by a railway line, residential dwellings and a Detailed Site church. Estimated site capacity: 22 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 22 Developable 2033 - 2037: 0 Scale; 1:1,079 Date: o?/U /2018 Suitability I Toe site. is not located close to a train station, but is otherwise accessible and is in a sustainable location. The land is identifed as Green Chain, so any redevelopment of the site would have to be undertaken in a way that does not detract from the wildlife or recreation value of the Green Chain. There are a number of mature trees on the site. This site is designated as open space and has scored low for both quality and value in the Open Space Assessment, any foss of this should be appropriately mitigated, The design of the site would have to be done in such a way that protects the amenity of future occupiers from any negative impacts of the adjacent railway line. Availability I This site is considered to be available now. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary IThe site is developable. This area of open space has been assessed as low quality and value in the open space assessment. Over the longer term, and subject to policy review, the site could potentially come forward for sensitive residential development, subject to suitable mitigation being made. Avondale Recreation Centre

Site reference: SKH17093 ; . , .J STOCKPOJIT Site name: Avondale Industrial Estate, Avondale Road, Cheadle Heath 1 1! Ri!':_ ML'Tlij.)N.llJl'lu~61J~l..1l~ll C'{l,JNC.:.11. Ward: Edgeley and Cheadle Heath Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 0.65 Key Site description: Small industrial estate in active use, surrounded by residential dwellings. Detailed Site

Estimated site capacity: 23 Notes: Yield is influenced by surrounding housing, but potential for a higher density. Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 0 Developable 2033 - 2037: 23 Scale; 1:1,446 Date: 07/12/2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and is in a sustainable location. There may be contamination issues on the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land . The loss of the site for employment uses would need to be justified and mitigated.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary lnie site is developable. This site is in an established residential location. Toe clearance and redevelopment of this site offers an opportunity to improve the built and natural environment in this sustainable location. Site reference: SKH17094 Site name: Bank and Alexander House, Station Road, Cheadle Hulme - · '.1 STOCKPORT l ~ R1,::.. ' ML'TJ(l)rc>!J l'A.\! 6ul\01.IGU C<.l•JNQ( Ward: Cheadle Hulme South Committee Area: Bramhall and Cheadle Hulme South Land Type: Brownfield Gross Site Size (ha) : 0.51 Key Site description: Two buildings with prominent frontages w ithin Cheadle Hulme, adjacent Detailed Site to residential properties on the west. Estimated site capacity: 25 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 25 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale: 1:1,646 Date: o?/U /2018 Suitability I The site is aa:essible, located close to a train station (within 600m) and is in a sustainable location. The loss of the site for employment uses would need to be justified and mitigated.

Availability I The site is not considered to be available yet, due to its active use. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !The site is considered to be achievable, at the point in time estimated for development.

Assessment Summary IThe site is developable. It is likely that the bank / estate agents building would need to be demolished prior to redevelopment fur residential purposes. Alexander house could potentlally be converted to residential under the prior approval process. Site reference: SKH17095 Site name: Former SAAB garage, 31 Buxton Road, Hazel Grove Ward: Hazel Grove iif~- ~r2s~is~!£ Committee Area: Stepping Hill Land Type: Brownfield Gross Site Size (ha) : 0.3 Key Site description: Car garage & sales, surrounded by a mix of uses Detailed Site

Estimated site capacity: 25 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 25 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:836 Date: 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible, is in a sustainable location, and is very close to the Hazel Grove Park and Ride facility, Most of the site is covered by flood risk zone 2, so a flood risk assessment will need to be undertaken prior to any development taking place. The site is currently used for second hand car sales and this would need to cease prior to redevelopment.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary !Toe site is developable. This site has a prominent frontage on the A6. The redevelopment for residential uses provides an opportunity to improve the built and natural environment, and create a sense of arrival into the Hazel Grove area when travelling from the south of the borough. HEATON CIYAPEL

Site reference: SKH17097 Site name: Land off Meadows Road, Heaton Chapel, 1 Ward: Heatons North ii ::- ~!QS!>£S)~I Committee Area: Heatons and Reddish Land Type: Greenfield Gross Site Size (ha) : 0.74 Key Site description: Local Open Space Detailed Site

Estimated site capacity: 26 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 26 Developable 2033 - 2037: 0 Scale; 1:1,640 Oa\e: 07/12/2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. It is part of a larger area of designated Local Open Space, and any loss should be assessed and mitigated. A new access road would need to be created. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary IThe site is developable. This site is small parcel within a wider area of Local Open Space. It was partially included within the curtilage of the application for the adjacent Adllngton House which has since been completed. Site reference: SKH17098 Site name: Moreton Lane Sports ground ~.·,., STOCKPORT 1~ Rjf',.!' ML,-1i.,rc>1JJ'Al• 6ul\OU(;(I N• :-or Ward: Offerton Committee Area: Stepping Hill Land Type: Greenfield Gross Site Size (ha) : 0.73 Key Site description: Playing fields surrounded by residential development. Detailed Site

Estimated site capacity: 26 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 26 Developable 2033 - 2037: 0 Scale'. l :1,773 Date: 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and is in a sustainable location. This designated area of open space has scored low for both quality and value in the open space assessment, any loss of this should be appropriately mitigated.

Availability I Toe availability and ownership of this site is unknown. Toe necessary infrastructure is consid.ered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in t ime estimated for development.

Assessment Summary IThe site is developable. This area of open space has been assessed as low quality and value in the open space assessment. Over the longer term, and subject to policy review, the site could potentially come forward for sensitive residential development, subject to suitable mitigation being made. A

Site reference: SKH17099 Site name: Land between Overton Crescent and Farndon Avenue SK7 4LF • • .A STOCKPORT 1~ ~ :-__• ML'Tli;>rc>!Jl'A.'"6ul\01.IG(I (.()• MJL Ward: Hazel Grove Committee Area: Stepping Hill Land Type: Greenfield Gross Site Size (ha) : 0.77 Key Site description: Green field land surrounded by dwellings on three sides Detailed Site

Estimated site capacity: 27 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 27 Developable 2033 - 2037: 0 Scale; 1:2,335 Date, 07/12/ 2018 Suitability I The site is not located close to a train station, but is otherwise in a sustainable location, Access to the site may need to be established, and could potentially be made via Meadow Cro~.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership_The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary IThe site is developable. This is unallocated open land in a residential area. Land assembly may be required to enable a wide enough access point, or potentially taken through a small amount of Green Belt to the north of the site. Site reference: SKH17100 Site name: Green Lane, Romiley, Stockport SK6 3JQ 1 Ward: Bredbury Green and Romiley !R1l · §!2S!>£l9]I Committee Area: Wemeth Land Type: Brownfield Gross Site Size (ha) : 0,76 Key Site description: Commerical buildings adjacent to housing. Detailed Site

Estimated site capacity: 27 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 27 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,812 Date: 07/12/ 2018 Suitability I Toe site is accessible, and located close to a train station (within 600m) and is in a sustainable location. Toe loss of the site for employment uses would need to be justified and mitigated.

Availability I Some land purchase and assembly may be require to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary IThe site is developable. This site is close to the centre of Romiley. Permission has been granted for housing on an adjacent site (Gralan House) Site reference: SKH17101 Site name: Mercedes-Benz, Wellington Road North SK4 2QH !Rjf1• Ward: Heatons South §!QS!5£S>Jq Committee Area: Heatons and Reddish Land Type: Brownfield Gross Site Size (ha) : 0.83 Key Site description: Car sales and repairs, adjacent to railway line and A6, Detailed Site

Estimated site capacity: 42 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 42 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:2,2-99 Datec 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. It is adjacent to the A6 which is served by the number 192 bus route. The loss of the site for employment uses would need to be justified and mitigated.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership_The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary IToe site is developable. This site is currently used by Mercedes-Benz which is relocating to a purpose built unit on Brighton Road industrial estate in the near future. Once the current use ceases, there is potentlal for this site to deliver dwellings in a sustainable location. Site reference: SKH17102 Site name: Off Bramley Close, Bramhall, Stockport, SK7 2DT ; . '.1 STOCKPOIIT Ward: Bramhall South and Woodford ~ ~ .':.. ' Ml.'TJ,;>rc>!J l'A.\> 8Ul\Ol.1Gll t'<.l•JNO( Committee Area: Bramhall and Cheadle Hulme South Land Type: Brownfield Gross Site Size (ha) : 0.32 Key Site description: Surface car parking and low-level buildl11g Detailed Site

Estimated site capacity: 22 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 22 Developable 2033 - 2037: 0 Scale; 1:1,001 Date: 07/U /2018 Suitability I Toe site is accessible, and located close to a train station (within 600m) and is in a sustainable location. Toe loss of the site for car parking uses would need to be assessed and mitigated If required.

Availability I The availability of this site needs to be confirmed, but is likely to be in single ownership. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability jToe site is considered to be achievable, at the point in tfme estimated for development_

Assessment Summary !Toe site is developable. Comprehensive redevelopment of site could yield a mixed scheme of parking and high density apartments. Site reference: SKH17103 , .·, ,A STOCKPORT Site name: Land and buildings to west of Oakwood Mills, off Crossmoor Crescent 1 ~ Rif'",_! ML'TlWt+t'ilJ l'fu\)' 61.JROUl~ll t:'

Estimated site capacity: 30 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 30 Developable 2033 - 2037: 0 Scale; 1:2,052 Date: o?/U /2018 Suitability I Toe site is accessible, located close to a train station (within 600m) and is in a sustainable location. Toe site is within a conservation area, there is a large area of protected trees on the south of the site which is also designated as a Site of Biological Importance (5B1 ).

Availability I Some land purchase and assembly may be required to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be av9ilable within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for developmenL

Assessment Summary IThe site is developable. This site is in a residential area. Due to the senstive nature of the site, the potential yield has been reduced. Site reference: SKH17104 ~. •... STOCKPORT Site name: Land at Old Road and Belmont Way, Heaton Norris 1 1! ~ "_ ML"tlij)t+t.llJl'A.\1'6V~l..1l';~I ~•-:'\01. Ward: Brinnington and Central Committee Area: Stockport Central Land Type: Mix of greenfield and brownfield Gross Site Size (ha) : 0.89 Key Site description: Mix of informal open space and employment uses Detailed Site

Estimated site capacity: 32 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 32 Developable 2033 - 2037: 0 Scale'. 1:l,823 Date, 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. Toe loss of the employment uses would need to be justified and mitigated. There may be some contamination issues on part of the site which will nee(! to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land. Any future residential occupiers should have their amenity protected,

Availability I Some land purchase and assembly may be require to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary IToe site is developable. This parcel of the employment allocation is identified as being in poor condition in the Employment Land Review (ELR), and under­ occupied, The site could potentially be developed for residential uses over the longer term. -I C z (J) -I J> r r (J) -i ;;u m ~L------7m

z (") )> (/) :::c rn :::c

Site reference: SKH17105 Site name: Lancashire Hill, Penny Lane , .•~ ., STOCKPORT lc1,.':...' ML'Tli.>rc>!J l'A.\! 6ul\OUGll t'<.l•JNOI Ward: Brinnington and Central ~ Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 0.17 Key Site description: Former vacant pub now µsed as small convenience store. Detailed Site

Estimated site capacity: 6 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 6 Developable 2033 - 2037: 0 Scale; 1:755 Date: 07/U / 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. A gas pipeline runs through part of the site and this wil reduce the amount of land that can be built upon,

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development_

Assessment Summary !Toe site is developable. This two storey building has the potential to be demolished and the site redeveloped at a higher density. A

Site reference: SKH17106 Site name: Land to rear of Buckingham Road, SK4 4RA • .•• J STOCKPORT Ward: Heatons North I~ ~ ::.. ' ML'TJ(l)rc>!Jt'A.'Oul\01.IGll (:'

Estimated site capacity: 35 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 35 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:2,008 Date: 07/12/2018 Suitability I The site is accessible, located close to a train station (within 600m) and is in a sustainable location. The site is designated as local open space, any loss of this should be assessed and mitigated. The land is identifed as Green Chain, so any redevelopment of the site would have to be undertaken in a way that does not detract from the wildlife or recreation value of the Green Chain.

Availability I The availability of this site needs to be confirmed, but is likely to be in single ownership. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary IThe site is developable. This is a games court that is no longer publically accessible, the estimated yield has been reduced to allow for the potential relocation or improvement of leisure or games facilities upon the site. Site reference: SKH17107 Site name: Land off Stitch Lane, Heaton Norris, Stockport, SK4 1HS ~ ·~ .; STOCKPORT 1 "I~ PSf-:_ ML'Tlij)N.llJl'fu\)'61J~l..1l~ll r..OUNCll. Ward: Reddish South Committee Area: Heatons and Reddish Land Type: Brownfield Gross Site Size (ha) : 0.34 Key Site description: Cleared site, next to railway line and A6 Detailed Site

Estimated site capacity: 13 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 13 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale: 1:916 Date: 07/U /2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land.

Availability I Toe site is considered to be available within the next 5 years. Toe necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary !Toe site is developable. Estimated yield assumes apartments due to presence of A6 and railway lines, to ensure greater separation distances to protect amenity. Apartment blocks have been developed nearby within the past 10 years on similar sites to this. A

CALE GREEN

Site reference: SKH17109 Site name: Hallam Mill, Hallam Street, Davenport 1 Ward: Davenport and Cale Green i"i::-~!QS!>£S~~I Committee Area: Stockport Central Land Type: Brownfield Gross Site Size (ha) : 1.11 Key Site description: Mill and industrial buildings Detailed Site

Estimated site capacity: 70 Notes: Estimated capacity is based on potential for conversions

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 0 Developable 2033 - 2037: 70 Scale; 1:2,041 Date: 0 7/U / 2018 Suitability I Toe site is aa:essible, located close to a train station (within 600m) and is in a sustainable location. Toe site is within a conservation area, and the buildings are locally llsted. There may be some contamination issues on part of the site which will need to be remediated or demonstrated to be safe, prior to redevelopment for residential occupation of the land. Toe loss of employment use would have to be justified and mitigated prior to any change of use or redevelopment.

Availability I Some land purchase and assembly may be required to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary !Toe site is developable. Toese buildings are in a variety of employment uses. Some of the buildings may lend themselves to partial conversion to residential to provide a mixed-use development. Site reference: SKH17110 Site name: Land and buildings at Chadwick Street, Marple, Stockport, SK6 7/\t. •.•~ ., STOCKPOITT Ward: Marple South l ~,!c1,.':..' ML'Tli.>rc>!JJ)\.'Oul\01.IGU N.l•JNO( Committee Area: Marple Land Type: Brownfield Gross Site Size (ha) : 1.09 Key Site description: Sorting office, surface car parking, chapel, residential and other buildings. Detailed Site

Estimated site capacity: 39 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 0 Developable 2028 - 2033: 39 Developable 2033 - 2037: 0 Scale; 1:2,168 Date, 0 7/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and in a sustainable location. Toe loss of the site for employment uses would need to be justified and mitigated.

Availability I Some land purchase and assembly may be required to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in time estimated for development.

Assessment Summary !Toe site is developable. This location is in a mix of active uses including a sorting office, these would have to cease and cleared to allow comprehensive redevelopment and intensification of residential uses across the site, this could be considered over the longer term, Goyt MUI

Site reference: SKH17111 Site name: Goyt Mill Ward: Marple South ,ii!t· ~!2S!>£S)~I Committee Area: Marple Land Type: Brownfield Gross Site Size (ha) : 0,73 Key Site description: Mill building in a variety of uses Detailed Site

Estimated site capacity: 40 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 40 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:l.,645 Date: 07/U/ 2018 Suitability I Toe site is not located close to a train station, nor is it considered to be in a sustinable location in terms of accessibility to public transport and local facilities. The site is accessible from the highways network. The building is locally listed, within a conservation area and and an employment area. Any loss of employment uses would need to be justified and mitigated.

Availability I Toe availability of this site needs to be confirmed, but is likely to be in single ownership. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability !Toe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary ITo e site is developable. This mill is well used, and has the potential to be converted on the upper 3 floors into residential use or a vertical split, retaining employment uses and creating a full mix of uses throughout the building. Site reference: SKH17113 Site name: Orishmere Primary school, Cheadle Hulme ~ .•~ ., STOCKPOIIT 1 Ward: Cheadle Hulme North ~ ~ '....' ML'Tli.)fcl!Jl)\.'Oul\OUGU Nj1JNO( Committee Area: Cheadle Land Type: Greenfield Gross Site Size (ha) : 1.2 Key Site description: Playing fields of a former primary school, surrounded by residential Detailed Site development. Estimated site capacity: 43 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 43 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:1,670 Date, 07/12/ 2018 Suitability I Toe site is not located close to a train station, but is otherwise accessible and is in a sustainable location. The site is identified as local open space, any loss of this should be appropriately mitigated.

Availability I Disposal or change of use of playing field and school land is subject to legiSlation, and following the prescribed process can take some time, so the site is not likely to be available until years 6-10. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability jToe site is considered to be achievable, at the point in tfme estimated for development.

Assessment Summary !Toe site is developable. This designated area of local open space is the playing fields for a former primary school Which has shut and merged with the former Queens Road primary, and been renamed as Oak Tree Primary school, on Buckingham Road.The space is not considered to be publically accessible, so there is scope for the site to redeveloped for residential use, subject to appropriate mitigation. The Local Authority may need to ask the Secretary of State for consent to dispose of the land, Site reference: SKH17114 , . , .J STOCKPORT Site name: Hurstfield Industrial Estate, Hurst Street, Reddish 1 I ~ Ri!"_ Mi..'Tlij)N.lllli\.~8 U~l..1l~l l C'<.)1JNCJ1. Ward: Reddish South Committee Area: Heatons and Reddish Land Type: Brownfield Gross Site Size (ha) : L22 Key Site description: Small industrial estate, set between railway line and residential dwellrngs Detailed Site

Estimated site capacity: 43 Notes:

Deliverable 2018-2023: 0 Developable 2023 - 2028: 43 Developable 2028 - 2033: 0 Developable 2033 - 2037: 0 Scale; 1:2,113 Date: 07/11/ 2018 Suitability I Toe site. is ac.cessible, located close to a train station (within 600m) and is in a sustainable location, but the nearest train station, Reddish South, operates a ghost service. There may be some contamination issues on the site which will need to be remediated or demonstrated to be .safe, prior to redevelopment for residential occupation of the land. The loss of the site for employment uses would need to be justified and mitigated.

Availability I Some land purchase and assembly may be required to created a single development parcel, so the site is not considered to be available yet. The necessary infrastructure is considered to be available within the locality, but provision to the site will need to be confirmed with the relevant utility companies.

Achievability lnie site is considered to be achievable, at the point in time estimated for development.

Assessment Summary lnie site is developable. This site is in employment use, but is not formally designated as an employment allocation, and in recent years the estate has had high vacancy levels. Toe only access to this site is through a residential area. If this site were to come forward for residential, the site would need to be cleared first to allow new development to take place.