Customer Stories Discover the Power of Digital Across Th
Total Page:16
File Type:pdf, Size:1020Kb
Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories GE Power Digital Solutions © 2017 General Electric Company. All rights reserved. Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories Power Digital Outcomes “I am continuously inspired by the digital strategies employed Reliability by our customers as they uncover new business opportunities while “fundamentals of the energy market shift. These customers deserve our Productivity recognition for their bold actions to embrace the power of data and analytics to drive optimization from individual assets all the way through Profitability delivery networks.” Security Steven Martin, Chief Digital Officer,” GE Power 2 GE Power Digital Solutions © 2017 General Electric Company. All rights reserved. Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories RELIABILITY Challenge Additionally, Bord Gáis Energy is leveraging GE’s Operations CUSTOMER SUCCESS STORY: POWER GENERATION The 445-megawatt Whitegate gas combined-cycle power Optimization solution to provide enhanced performance plant, owned by Bord Gáis Energy, is located 25 miles east of capabilities for their fleet of GE turbines. The solution is the city of Cork, and provides power to 10% of Ireland. powered by GE’s enterprise platform Predix*, which uses the cloud to unify the data flow across all plant and fleet assets, With European government regulations demanding more delivering the enterprise visibility and insights needed to help renewable energy production, in turn creating a greater need improve power plant, fleet and business operations. for reliable, on-demand generation capacity, Bord Gáis Energy understood it needed to prepare the Whitegate station for Results future grid challenges. The Whitegate implementation of GE’s APM, Advanced €1.2MM cost avoidance Controls and GE’s Predix platform reduced plant downtimes in the first year Solution and balance of plant operations costs. With APM, early Bord Gáis Energy required a solution for condition-based warnings of failure mechanisms using 300 algorithms detect monitoring at the Whitegate plant to ensure continuous when plant components are about to fail, allowing for more Potential avoidance of an additional operation toward no unplanned downtime. They chose GE’s efficient outage management. Asset Performance Management (APM) solution featuring 141 €1.2MM total sensors throughout the plant. These sensors allow for The integrated solution has created a €2,28M positive 24/7 monitoring of the plant’s hardware, offering Whitegate’s financial impact from cost savings and cost avoidance engineers operational recommendations while still providing without any plant unavailability due to covered equipment a single, consolidated view of plant performance. and 21 additional “catches” by the system. *Predix is a trademark of General Electric Company. 3 GE Power Digital Solutions © 2017 General Electric Company. All rights reserved. Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories RELIABILITY Challenge staff. SSE created an Equipment Performance Center (EPC) CUSTOMER SUCCESS STORY: POWER GENERATION Scottish and Southern Energy (SSE) with a £14.95BN to continuously monitor asset health for over 11 different market cap and 20,000 employees is UK’s broadest-based locations. The system tracks factors such as combustion energy company. It’s capabilities include power generation, dynamics, turbine vibration analysis, boiler temperatures, transmission, distribution, supply and services. It is also creep analysis and safety case management. Ireland’s fastest growing energy company. Predictive analytics drive model-based condition monitoring, The outturn availability of the thermal generation fleet was allowing SSE to understand pending issues before they an area of improvement focus due to a number of specific become production problems, allowing proactive action to technical failures over the last several years. SSE identified avoid unplanned outages. Early detection failures > £3MM per year the following objectives to help improve the maintenance Results profile: Saved a generator from running into a fail state, SSE has experienced a significant reduction in plant failures • Early detection of potential failure and prevent past since the introduction of GE’s APM solution, resulting in saving £100K in repair costs failures from reoccurring increased plant availability and production. Early failure • Increase availability of plant detection has resulted in savings of approximately £3MM Significant reduction in insurance cost ~ • Manage and control CAPEX per year. • Reduce insurance cost The EPC is now armed to monitor multiple site operations £6MM per year • Condition-based maintenance efficiently with confidence to understand pending failures. Solution Overall insurance costs have been reduced (£7.5MM per Total monitored assets year) and with improved maintenance, a greater control over 1026 With GE’s Asset Performance Management solution, SSE was CAPEX is expected. able to turn data into actionable knowledge for the operating 4 GE Power Digital Solutions © 2017 General Electric Company. All rights reserved. Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories RELIABILITY Challenge GE’s APM solution empowers RasGas with asset anomaly CUSTOMER SUCCESS STORY: POWER GENERATION RasGas is one of the worlds’ premier integrated liquefied detection through a unified user experience covering both natural gas (LNG) enterprises that transformed a regional GE and non-GE assets, providing alerts, alarms, historical resource into a key component of the global energy mix. analysis with the visibility into asset performance and health. RasGas is a Qatari joint stock company with more than 3,000 The intention of RasGas’s APM analytic solution was to reduce employees, owned by Qatar Petroleum (70%) and ExxonMobil unplanned downtime, improve productivity and reliability,and (30%). Qatar remains the largest LNG exporter, providing 77 MTA to move from reactive to predictive maintenance for rapid to the market, which is roughly one-third of global supply. recovery. Results The LNG production at RasGas in Ras Laffan, Qatar, consists 2,300+ monitored assets of seven LNG production trains with an approximate capacity The GE team worked closely with the RasGas team to develop of 37MM Tons a year. RasGas is focused on cost and value and identify opportunities for a pilot project to detect early optimization to reduce overall expenditures and enhance failures and production optimization initiatives by leveraging a The Predix cloud solution is projected efficiency by improving plant reliability and availability without consolidated store of collected machine sensor data, analytic to extend the life of RasGas assets, as well as compromising safety, health and the environment. software and a platform that provides a plant-wide view. lower operating costs through greater Solution By mid 2015, the pilot project had demonstrated intially that “ efficiencies. This ‘Software Defined Operations’ The initiative at RasGas began in late 2014 with a pilot for early early failures and process optimization opportunities can be detection of equipment or system failures and production detected with the use of analytics with the ability to identify provides RasGas with deeper insights into areas to optimize and reduce waste. optimization for selected units of three (3) LNG trains. This their plant operations to enable more forward covered GE & non-GE equipment with GE’s Asset Performance Way Forward Management (APM) solution, built on the Predix cloud platform, looking decisions, in turn providing inputs for GE’s APM solution is expected to cover the entire plant by using machine data sensors, predictive analytics and process monitoring and connecting 2,300+ assets with over 65,000 GE how to manage their business. optimization. and non-GE devices. 5 GE Power Digital Solutions © 2017 General Electric Company.” All rights reserved. Discover the Power of Digital Across the Electricity Value Network (EVN) Customer Stories RELIABILITY Challenge Solution CUSTOMER SUCCESS STORY: POWER GENERATION Salt River Project (SRP) provides generation, transmission and SRP chose GE’s Asset Performance Management (APM) distribution services, as well as metering and billing services solution to consolidate machine sensor data across 11 of their to over 1 million customers in the Phoenix metro area. They 12 plant locations and over 500 assets. The solution uses operate 12 power plants, including coal, nuclear, natural gas and advanced modeling, protected by over 40 patents, to put into renewable sources (hydroelectric, solar, wind, and geothermal). context the normal operating relationships among all relevant parameters, such as load, temperatures, pressures, vibration SRP was looking for a solution that would allow them to readings and ambient conditions. In real time, the software 7 fossil sites monitored integrate data across multiple plants for outage management, compares actual sensor readings to that particular machine’s to optimize maintenance strategies and to understand where normal, predicted values. production issues might occur next. They also wanted to identify opportunities to extend monitoring across their Results 4 hydro sites monitored transmission and distribution-critical assets. By consolidating SRP’s data and applying GE’s robust With today’s complex