Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

______

State of Palestinian Water Authority

Project: Data Bank Enhancement funded by United Nations Children's Fund

Data gathering and validation

Main Water Service Providers

September, 2014 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

LIST OF CONTENT

1. Governorate ...... 1 1.1. WSP: Silat Ad Dahr/ ...... 2 1.2. WSP: Ya’bad Municipality/Jenin Governorate ...... 4 1.3. WSP: Al Zababdeh Municipality/Jenin Governorate...... 6 1.4. WSP: Kufur Ra’ie Municipality/Jenin Governorate ...... 8 1.5. WSP: Birqin Municipality/Jenin Governorate ...... 10 1.6. WSP: Jaba’ Municipality/Jenin Governorate...... 12 1.7. WSP: Municipality/Jenin Governorate...... 14 1.8. WSP: Arraba Municipality/Jenin Governorate ...... 16 1.9. WSP: Marj Ibn Amer/Jenin Governorate...... 18 1.10. WSP: JSC for DW & WW for towns & Villages of North West of Jenin/Jenin Governorate..... 20 1.11. WSP: Jenin Municipality/Jenin Governorate...... 22 1.12. WSP: Maythaloun MWSSC/Jenin Governorate...... 24 2. Governorate ...... 26 2.1. WSP: JSC for Water & Wastewater –Tubas District/Tubas Governorate...... 27 3. Governorate...... 29 3.1. WSP: Zeita Municipality/Tulkarm Governorate ...... 30 3.2. WSP: Beit Leed Municipality/Tulkarm Governorate ...... 32 3.3. WSP: Al Kafriyyat Municipality/Tulkarem Governorate...... 34 3.4. WSP: Kafr Allabad Municipality/Tulkarm Governorate...... 36 3.5. WSP: Deir Al Ghosoon Municipality/Tulkarm Governorate...... 38 3.6. WSP: QaffIn Municipality/Tullkarm Governorate ...... 40 3.7. WSP: Bala'a Municipality/Tulkarm Governorate ...... 42 3.8. WSP: Illar Municipality/Tulkarm Governorate ...... 44 3.9. WSP: Attil Municipality/Tulkarm Governorate ...... 46 3.10. WSP: Baqa Al Sharqiya W Al Nazlat Municipalit/Tulkarm Governorate ...... 48 3.11. WSP: Tulkarm Municipality/Tulkarm Governorate...... 50 3.12. WSP: Anabta Municipality/Tulkarm Governorate...... 52 4. Governorate...... 54 4.1. WSP: Sabastia Municibality /Nablus Governorate...... 55 4.2. WSP: Asira ash Shamaliya Municipality/Nablus Governorate ...... 57 4.3. WSP: Nablus Municipality/Nablus Governorate ...... 59 4.4. WSP: Beit Furik Municipality/Nablus Governorate...... 61 4.5. WSP: Howwara Municipality/Nablus Governorate...... 63

Main Water Service Providers Page II Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

4.6. WSP: Beita Municipality/Nablus Governorate...... 65 4.7. WSP: Jammain Municipality/Nablus Governorate...... 67 4.8. WSP: Qabalan Municipality/Nablus Governorate...... 69 5. Qalqilia Governorate ...... 71 5.1. WSP: Municipality/Qalqilia Governorate...... 72 5.2. WSP: Qalqilia Municipality/Governorate: Qalqilia...... 74 5.3. WSP: Azzoun Municipality/Qalqilia Governorate ...... 76 5.4. WSP: Municipality/Qalqilia Governorate...... 78 5.5. WSP: Kufur Thulth Municipality/Governorate: Qalqilia...... 80 6. Salfit Governorate ...... 82 6.1. WSP: Deir Istya Municipality/Salfeet Governorate ...... 83 6.2. WSP: Qarawa Bani Hassan Municipality/Salfeet Governorate ...... 85 6.3. WSP: Kifel Haris Municipality/Salfeet Governorate...... 87 6.4. WSP: Municipality/Salfeet Governorate ...... 89 6.5. WSP: Al-Zawya Municipality/Salfeet Governorate...... 91 6.6. WSP: SalfIt Municipality/Salfeet Governorate ...... 93 6.7. WSP: Bruqin Municipality/Salfeet Governorate ...... 95 6.8. WSP: Kafr Al-Deek Municipality/Salfeet Governorate ...... 97 6.9. WSP: Deir Ballout Municipality/Salfeet Governorate ...... 99 7. and Al Bireh Governorate ...... 101 7.1. WSP: Ni’lin Municipality/Ramallah Governorate ...... 102 7.2. WSP: Beituniya Municipality/Ramallah Governorate ...... 104 7.3. WSP: Beit Liqia Municipality/Ramallah Governorate...... 106 7.4. WSP: Bani Zaid Al-Gharbiya Municipality/Ramallah Governorate...... 108 7.5. WSP: Al-Ittihad Municipality/Ramallah Governorate ...... 110 7.6. JWU/Ramallah Governorate ...... 112 8. Jerusalem Governorate...... 113 8.1. WSP: Jerusalem Water Undertaking (JWU)/Jerusalem & Ramallah Governorates ...... 114 8.2. WSP: JSC for W & WW for the area of North West of Jeusalem/Jerusalem Governorate .... 119 9. Governorate ...... 121 9.1. WSP: Al-Auja Municipality/Jericho Governorate ...... 122 9.2. WSP: Jericho Municipality/Jericho Governorate...... 124 10. Bethlehem Governorate ...... 126 10.1. WSP: Janata (beit Falouh + Al Asakra) Municipality/Bethlehem Governorate...... 127 10.2. WSP: Tuqu' Municipality/Bethlehem Governorate...... 129 10.3. WSP: Al-UbEidiya Municipality/Bethlehem Governorate...... 131 10.4. WSP: Za'tara Municipality/Bethlehem Governorate ...... 133

Main Water Service Providers Page III Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

10.5. WSP: Beit Fajjar Municipality/Bethlehem Governorate ...... 135 10.6. WSP: WSSA/Bethlehem Governorate ...... 137 11. Hebron Governorate...... 140 11.1. WSP: Dura Municipality/Hebron Governorate ...... 141 11.2. WSP: Ash Shuyukh Municipality/Hebron Governorate...... 143 11.3. WSP: Beit Ummar Municipality/Hebron Governorate...... 145 11.4. WSP: Al Yassriya Municipality/Hebron Governorate ...... 147 11.5. WSP: Taffuh Municipality/Hebron Governorate...... 149 11.6. WSP: As Samu’ Municipality/Hebron Governorate...... 151 11.7. WSP: Halhul Municipality/Hebron Governorate...... 153 11.8. WSP: Ad-Dahiriya Municipality/Hebron Governorate ...... 155 11.9. WSP: Idhna Municipality/Hebron Governorate ...... 157 11.10. WSP: Tarqumiya Municipality/Hebron Governorate...... 159 11.11. WSP: Beit Ula Municipality/Hebron Governorate...... 161 11.12. WSP: Nuba Municipality/Hebron Governorate...... 163 11.13. WSP: Kharas Municipality/Hebron Governorate ...... 165 11.14. WSP: Yatta Municipality/Hebron Governorate...... 167 11.15. WSP: Sa’ir Municipality/Hebron Governorate ...... 169 11.16. WSP: Bani Naim Municipality/Hebron Governorate...... 171 11.17. WSP: Hebron Municipality/Hebron Governorate ...... 173 11.18. WSP: Surif Municipality/Hebron Governorate...... 175 11.19. WSP: JSC for Reef Dura/Hebron Governorate ...... 177

Main Water Service Providers Page IV Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

LIST 1 OF FIGURES

Fig 1: Jenin Governorate ...... 1 Fig 2: Tubas Governorate ...... 26 Fig 3: Tulkarm Governorate ...... 29 Fig 4: Nablus Governorate...... 54 Fig 5: Qalqilia Governorate ...... 71 Fig 6: Salfit Governorate...... 82 Fig 7: Ramallah and Al Bireh Governorate ...... 101 Fig 8: Jerusalem Governorate ...... 113 Fig 9: Jericho Governorate ...... 121 Fig 10: Bethlehem Governorate...... 126 Fig 11: Hebron Governorate ...... 140

LIST 2 OF FIGURES

Figure 1-1: Silat Ad Dahr...... 2 Figure 1-2: Ya'bad...... 4 Figure 1-3: Az Zababdeh...... 6 Figure 1-4: Kafr Ra'i ...... 8 Figure 1-5: Birqin...... 10 Figure 1-6: Jaba' ...... 12 Figure 1-7: Qabatiya...... 14 Figure 1-8: Arraba ...... 16 Figure 1-9: Marj Ibn Amer...... 18 Figure 1-10: NWVSC ...... 20 Figure 1-11: Jenin ...... 22 Figure 1-12: MWSSC...... 24 Figure 2-1: Tubas Cluster...... 27 Figure 3-1: Zeita ...... 30 Figure 3-2: Beit Leed ...... 32 Figure 3-3: Al Kafryyat...... 34 Figure 3-4: Kafr Al Labbad ...... 36 Figure 3-5: Deir Al Ghosoon ...... 38 Figure 3-6: Qaffin ...... 40 Figure 3-7: Bala'a...... 42 Figure 3-8: Illar ...... 44 Figure 3-9: Attil...... 46 Figure 3-10: Baqa Al Sharqiya and Al Nazlat ...... 48 Figure 3-11: Tulkarm ...... 50 Figure 3-12: Anabta...... 52 Figure 4-1: Sabastiya ...... 55 Figure 4-2: Asira ash Shamaliya...... 57 Figure 4-3: Nablus ...... 59 Figure 4-4: Beit Furik ...... 61 Figure 4-5: Howwara...... 63 Figure 4-6: Beita ...... 65 Figure 4-7: Jammain...... 67 Figure 4-8: Qabalan...... 69 Figure 5-1: Jayyous...... 72

Main Water Service Providers Page V Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

Figure 5-2: Qalqiliya ...... 74 Figure 5-3: Azzoun...... 76 Figure 5-4: Habla ...... 78 Figure 5-5: ...... 80 Figure 6-1: ...... 83 Figure 6-2: Qarawa Bani Hassan ...... 85 Figure 6-3: Kifl Haris ...... 87 Figure 6-4: Biddya ...... 89 Figure 6-5: Al Zawya...... 91 Figure 6-6: Salfit ...... 93 Figure 6-7: Bruqin...... 95 Figure 6-8: KAFR AL DEEK...... 97 Figure 6-9: Deir Ballout ...... 99 Figure 7-1: Ni'lin ...... 102 Figure 7-2: Betunia...... 104 Figure 7-3: Beit Liqia...... 106 Figure 7-4: Bani Zied Al Gharbiya...... 108 Figure 7-5: Al Ittihad...... 110 Figure 8-1: Jerusalem Water Undertaiking_JWU...... 114 Figure 8-2: North West Jerusalem Villages (NWJSC)...... 119 Figure 9-1: Al Auja ...... 122 Figure 9-2: Jericho...... 124 Figure 10-1: Janata (Beit Falouh + Al Asakra)...... 127 Figure 10-2: Tuqu' ...... 129 Figure 10-3: Al 'Ubeidiya ...... 131 Figure 10-4: Za'tara ...... 133 Figure 10-5: Beit Fajjar ...... 135 Figure 10-6: WSSA...... 137 Figure 11-1: Dura...... 141 Figure 11-2: Ash Shuyukh...... 143 Figure 11-3: Beit Ummar...... 145 Figure 11-4: Al Yassiryah ...... 147 Figure 11-5: Taffuh...... 149 Figure 11-6: As Samu'...... 151 Figure 11-7: Halhul...... 153 Figure 11-8: Ad Dahririya ...... 155 Figure 11-9: Idhna ...... 157 Figure 11-10: Tarqumiya ...... 159 Figure 11-11: Beit Ula...... 161 Figure 11-12: Nuba...... 163 Figure 11-13: Kharas...... 165 Figure 11-14: Yatta...... 167 Figure 11-15: Sa'ir...... 169 Figure 11-16: Bani Naim...... 171 Figure 11-17: Hebron ...... 173 Figure 11-18: Surif...... 175 Figure 11-19: Reef Dura (DRSC) ...... 177

Main Water Service Providers Page VI Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

List of Abbreviations

Abbreviation Definition DRSC Dura Rural Service Council JSC Joint Service Council JWU Jerusalem Water Undertaken km Kilometre M Municipality m Metre m² Square meter m³ Cubic metre mm Millimetre MWSSC Maythalun Water & sanitation Service Council NIS New Israeli Shekel NWJSC North West Jerusalem Service Council NWVSC North West Jenin Service Council PCBS Palestinian Central Bureau of Statistics PWA Palestinian Water Authority R Rural W Water WW Wastewater WBWD Water Department WSP Water Service Provider WSSA Water Supply and Sewerage Authority YRSC Yatta Rural Service Council

Main Water Service Providers Page VII Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

______

1. JENIN GOVERNORATE

Fig 1: Jenin Governorate

Main Water Service Providers in Jenin Governorate in year 2013 are 12 main WSPs:

. Nine (9) individual Municipalities . The new Marj Ibn Amer Municipality which consists of five (5) jointed localities . Jenin North West Villages Cluster/ NWVSC that includes eleven (11) localities . Maythalun Cluster/MWSSC which includes six (6) localities

General, technical, wastewater and tariff information in addition to map location for each Main Water Service Provider are provided in the following pages, more details, analysis, findings and conclusions are illustrated in the final report.

Page 1 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

1.1. WSP: SILAT AD DAHR/JENIN GOVERNORATE

Figure 1-1: Silat Ad Dahr

Main Water Service Providers Page 2 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 10625 Head of water department/section: Imad Omar Hantouli Accountant: Abdel Al Raheem Basheer Ghanem Telephone: 04-2505997 Cell phone: 0598-931851 E-mail: [email protected]

Water is being supplied by a 60 km distribution network where the total population served is 7000 persons through 1200 water meters. There is 1 storage tank of volume 192 m3. The total number of employees in the water section is 2 without females.

The total amount of water produced is 36480 m3 and comes from Al Hawd spring and Beit Iba well. In addition, the total purchased amount of water from WBWD is 130157 m3. The total billed amount of water is 113009 m3. This gives a 32% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 3m3 it is 20NIS From 4m3 to 25m3 it is 5 NIS Greater than 25m3 it is 19 NIS/m3 The minimum limit is 20NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 12 per year at a cost of 70-100 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of water system.

Main Water Service Providers Page 3 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

1.2. WSP: YA’BAD MUNICIPALITY/JENIN GOVERNORATE

Figure 1-2: Ya'bad

Main Water Service Providers Page 4 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 10265 Head of water department/section: Eng. Bassam Ghanem Accountant: Sa’ied Badaeneh Telephone: 04-2461111 Cell phone: 0599-136644, 0599-673793 E-mail: [email protected]

Water is being supplied by a 32 km distribution network where the total population served is 20000 persons through 2299 water meters. There are 2 storage tanks of total volume 1175m3. The total number of employees in the water section is 7 without females.

The total amount of water produced is 437430 m3 and comes from Municipality wells. In addition, the total purchased amount of water from WBWD is 9174 m3. The total billed amount of water is390587 m3. This gives a 13% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Zabda, Al Khuljan, Um Dar and Um Riha.

For the tariff system, it can be summarized as follows:

The price of water is uniform at 4.7 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not available) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of water system.

Main Water Service Providers Page 5 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

1.3. WSP: AL ZABABDEH MUNICIPALITY/JENIN GOVERNORATE

Figure 1-3: Az Zababdeh

Main Water Service Providers Page 6 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 10435 Head of water department/section: Not available Accountant: Sami Majeed Ibrahim Telephone: 04-2510203 Cell phone: 0592-924255 E-mail: samiibrahim [email protected]

Water is being supplied by a 12.87 km distribution network where the total population served is 4800 persons through 685 water meters. There is 1 storage tank of volume 500m3. The total number of employees in the water section is 5 including 2 females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water is 123455 m3. The total billed amount of water is 112285 m3. This gives a 9% overall loss percentage of water from the system.

This WSP does not supply any communities by water.

For the tariff system, it can be summarized as follows:

Less than 15m3 it is 4.5 NIS/m3 From 16 m3 to 30 m3 it is 5.5 NIS/m3 Greater than 31m3 it is 9 NIS/m3 The minimum limit is 10 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 6-9 times per year at a cost of 50 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 7 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

1.4. WSP: KUFUR RA’IE MUNICIPALITY/JENIN GOVERNORATE

Figure 1-4: Kafr Ra'i

Main Water Service Providers Page 8 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 10465 Head of water department/section: Not available Accountant: Iyad Hirzallah Telephone: 04-2466481 Cell phone: 0595-991130 E-mail: [email protected]

Water is being supplied by a 21km distribution network where the total population served is 7500 persons through 1066 water meters. There is 1 storage tank of volume 500m3. The total number of employees in the water section is 3 without females

The total amount of water produced is zero m3. In addition, the total purchased amount of water is 288885 m3. The total billed amount of water is 136369 m3. This gives a 52.8% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Fahmeh.

For the tariff system, it can be summarized as follows:

Less than 15m3 it is 4.5 NIS/m3 From 16m3 to 20m3 it is 6 NIS/m3 Greater than 20m3 it is 7 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 14-15 per year at a cost of 70 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a book-record system for the administrative records of water systems.

Main Water Service Providers Page 9 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

1.5. WSP: BIRQIN MUNICIPALITY/JENIN GOVERNORATE

Figure 1-5: Birqin

Main Water Service Providers Page 10 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 10220 Head of water department/section: Not available Accountant: Ayman Shalameesh Telephone: 04-2505137 Cell phone: 0569-7600190 E-mail: Not available

Water is being supplied by a 155 km distribution network where the total population served is 6500 persons through 1058 water meters. There is 1 storage tank of volume 1000 m3. The total number of employees in the water section is 2 without females.

The total amount of water produced is 36845 m3 and comes from the Municipality well. In addition, the total purchased amount of water is 207467 m3. The total billed amount of water is 142182 m3. This gives a 41.8% overall loss percentage of water from the system.

This WSP does not supply any other communities by water.

For the tariff system, it can be summarized as follows:

Less than 3 m3 it is 5 NIS/m3 From 4 m3 to 10 m3 it is 5 NIS/m3 From 11 m3 to 30 m3 it is 6 NIS/m3 Greater than 31m3 it is 10 NIS/m3 The minimum limit is 15 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 24 per year at a cost of 80 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 11 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

1.6. WSP: JABA’ MUNICIPALITY/JENIN GOVERNORATE

Figure 1-6: Jaba'

Main Water Service Providers Page 12 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 10605 Head of water department/section: Not available Accountant: Mahmoud Irsan Telephone: 04-2450222 Cell phone: 0599-312658 E-mail: Not available

Water is being supplied by a 27-km distribution network where the total population served is 10500 persons through 1470 water meters. There are 2 storage tanks of volume 700m3. The total number of employees in the water section is 3 where they are no females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water is 251567m3. The total billed amount of water is 174975 m3. This gives a 30.5% overall loss percentage of water from the system.

This WSP supplies the following communities by water: El Asa’aseh

For the tariff system, it can be summarized as follows:

Less than 3m3 it is 21 NIS/m3 From 4 m3 to 15 m3 it is 5 NIS/m3 Greater than 16m3 it is 7 NIS/m3 The minimum limit is 21 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 12 per year at a cost of 60 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 13 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

1.7. WSP: QABATIYA MUNICIPALITY/JENIN GOVERNORATE

Figure 1-7: Qabatiya

Main Water Service Providers Page 14 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 10340 Head of water department/section: Eng Ahmad Assaf Accountant: Feras Zakarneh Telephone: 04-2511606 Cell phone: 0599-675327 E-mail: Not Available

Water is being supplied by a 15 km distribution network where the total population served is 21000 persons through 3700 water meters. There are 3 storage tanks of total volume 2100m3 (1500+500+100). The total number of employees in the water section is 7 where without females.

The total amount of water produced and purchased is 900009 m3 and comes from private wells and WBWD. The total billed amount of water is 542113 m3. This gives a 40% overall loss percentage of water from the system.

This WSP does not supply any communities by water.

For the tariff system, it can be summarized as follows:

Less than 4 m3 it is 16 NIS (Minimum limit) From 4m3 to 20m3 it is 5.0 NIS/m3 Greater than 20m3 it is 5.5 NIS/m3 The minimum limit is 16 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 10-11times per year at a cost of 70 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 15 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

1.8. WSP: ARRABA MUNICIPALITY/JENIN GOVERNORATE

Figure 1-8: Arraba

Main Water Service Providers Page 16 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 10370 Head of water department/section: Burhan Mohammad Shalabi Accountant: Sa’ed Eldeen Abdel Azeez Telephone: 04-2468929 Cell phone: 0599-296303 E-mail: Not available

Water is being supplied by a 12 km distribution network where the total population served is 11000 persons through 1850 water meters. There is 1 storage tank of volume 500m3. The total number of employees in the water section is 4 without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water is 573875 m3. The total billed amount of water is 412080 m3. This gives a 38% overall loss percentage of water from the system.

This WSP supplies the following communities by water:

For the tariff system, it can be summarized as follows:

Less than 4m3 it is 4.5 NIS/m3 From 4 m3 to 20 m3 it is 4.5 NIS/m3 From 21 m3 to 50 m3 it is 5.5 NIS/m3 Greater than 50m3 it is 9 NIS/m3 The minimum limit is 18 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 12 per year at a cost of 50 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 17 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

1.9. WSP: MARJ IBN AMER/JENIN GOVERNORATE

Figure 1-9: Marj Ibn Amer

Main Water Service Providers Page 18 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: (Aarraneh: 10050, Arabouneh: 10025, Jalboun: 10190, : 10140 and Beit Qad Project: 10110) Head of water department/section: Huseen Zakarneh Accountant: Waleed Oudeh Telephone: 04-2411665 Cell phone: 0599-411351 E-mail: [email protected] Additional Information: Water is being supplied by a 10 km distribution network where the total population served is 2000 persons through 353water meters. There are 2 storage tanks of volume 300m3. The total number of employees in the water section is 4 without females.

The total amount of water produced is 34590 m3. In addition, the total purchased amount of water is 145321 m3. The total billed amount of water is 94475 m3. This gives a 47.5% overall loss percentage of water from the system.

This WSP supplies the following communities by water:

For the tariff system, it can be summarized as follows:

The price of water is uniform at 4.25 NIS/m3 The minimum limit is 0 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of not provided but not the number per year is very limited at a cost of 100-150 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 19 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

1.10. WSP: JSC FOR DW & WW FOR TOWNS & VILLAGES OF NORTH WEST OF JENIN/JENIN GOVERNORATE

Figure 1-10: NWVSC

Main Water Service Providers Page 20 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code:

10095 Kufur Dan 10080 Al Yamoun 10035 Al Sileh Al Hathiyeh 10010 Rummaneh 10045 Aneen 10020 Al 10155 Al Hasmiyeh 10210 Kufur Qoud 10005 Zbubaba 10015 Te’inik 10125 Al Araqeh

Head of water department/section: Eng Muneer Jaradat Accountant: Mahmoud Abu Na’eem Telephone: 04-2431604 Cell phone: 0598-916005 E-mail: [email protected]

Water is being supplied by a 142 km distribution network (12 localities listed below) where the total population served is 70000 persons through 5793 water meters. There are 9 storage tanks of total volume 8000m3. The total number of employees in the water section is 30 including 2 females.

The total amount of water produced is 1008389 m3 comes from wells of Al Yamoun, Abu Arab and Kefert m3. In addition, the total purchased amount of water from WBWD (Mekorot) is 761080 m3. The total billed amount of water is 1226566 m3. This gives a 30.6% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Kufur Dan, Al Yamoun, Al Sileh Al Hathiyeh, Rummaneh, Aneen, Al Taybeh, Al Hasmiyeh, Kufur Qoud, Zbubaba, Te’inik and Al Araqeh.

For the tariff system, it can be summarized as follows:

Less than 25m3 it is 6 NIS/m3 From 26m3 to 50m3 it is 7 NIS/m3 Greater than 50m3 it is 10 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 12 per year at a cost of 100-150 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of water system.

Main Water Service Providers Page 21 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

1.11. WSP: JENIN MUNICIPALITY/JENIN GOVERNORATE

Figure 1-11: Jenin

Main Water Service Providers Page 22 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 10180 Head of water department/section: Eng Ragheb Malhees Accountant: Rida Abu Saif Telephone: 04-2501036 Cell phone: 0599-133379 E-mail: [email protected]

Water is being supplied by a 187 km distribution network where the total population served is 50000 persons through 8500 water meters. There are 2 storage tanks of total volume 2000 m3. The total number of employees in the water section is 77 including 2 females.

The total amount of water produced is 567690 m3 and comes from wells of Al Sa’adeh and other private wells. In addition, the total purchased amounts of water from WBWD (Mekkorot) are 1745960 m3. The total billed amount of water is 1246850 m3. This gives a 46% overall loss percentage of water from the system.

This WSP supplies the following communities by water: , Aba Al Gharbiya, (Arab Al Swaitat and Dahiat Sabah Al Khair which are part of Jenin)

For the tariff system, it can be summarized as follows:

Less than 5m3 it is 23.56 NIS From 5 m3 to 50 m3 it is 4.34 NIS/m3 Greater than 51m3 it is 6.2 NIS/m3 The minimum limit is 23.56 NIS

There is a wastewater collection networks with a total length of 120 km where the total population served by this network is 50000 with a percentage of coverage of 80-85%. There is wastewater treatment plant. The remainder of the population (none served) uses cesspits for wastewater disposal.

We noticed that the WSP uses both the computerized and book record systems for the administrative records of the water system.

Main Water Service Providers Page 23 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

1.12. WSP: MAYTHALOUN MWSSC/JENIN GOVERNORATE

Figure 1-12: MWSSC

Main Water Service Providers Page 24 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code:

10520 Maythaloun 10565 Al Jdaydeh 10600 Sirees 10415 Misilyeh 10495 Seer 10430 Al

Head of water department/section: Eng Isa Dababat Accountant: Ahmad Abdullah Marie Telephone: 04-2519109 Cell phone: 0599-525639 E-mail: [email protected] Additional Information: Maythaloun JWSSC includes Maythaloun, Sirees, Al Jdaydeh, Seer, Misilyeh and Al Jarba.

Water is being supplied by a 169.7 km distribution network (6 localities listed below) where the total population served is 21068 persons through 3773 water meters. There are 6 storage tanks of total volume 2515 m3. The total number of employees in the water section is 5 without females.

The total amount of water produced is 0 m3. In addition, the total purchased amount of water is 477800 m3. The total billed amount of water is 416298 m3. This gives a 12.9% overall loss percentage of water from the system.

This WSP supplies the following communities by water:

For the tariff system, it can be summarized as follows:

Less than 11m3 it is 4 NIS/m3 From 11m3 to 20 m3 it is 5 NIS/m3 From 21m3 to 30 m3 it is 7 NIS/m3 Greater than 30m3 it is 10 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 12 per year at a cost of 100 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a book record system for the administrative records of water system.

Main Water Service Providers Page 25 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

2. TUBAS GOVERNORATE

Fig 2: Tubas Governorate

Main Water Service Provider in Tubas Governorate in year 2013 is one main WSP:

. The JSC for Water & Wastewater –Tubas District which includes Tubas, Aqqaba and Tammun municipalities in addition to Tayasir village council.

General, technical, wastewater and tariff information in addition to map location for the above Main Water Service Provider is provided in the following pages, more details, findings, analysis and conclusions are illustrated in the final report.

Main Water Service Providers Page 26 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

2.1. WSP: JSC FOR WATER & WASTEWATER –TUBAS DISTRICT/TUBAS GOVERNORATE

Figure 2-1: Tubas Cluster

Main Water Service Providers Page 27 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code:

50610 Tubas 50755 Tammoun 50535 Aqqaba 50550 Taysir 50560 Al Aqabeh

Head of water department/section: Eng. Isa Dababat Accountant: Ahmad Draghmeh Telephone: 09-2571973 Cell phone: 0592-951984 E-mail: [email protected]

Additional information: The JSC started its services during May/2013; therefore, the information provided in the questionnaire and profile is covering part of year 2013 from the start of the work of the JSC and not all of year 2013.

Water is being supplied by a 55 km WDN for Tubas, 19 WDN km for Aqqaba while there is no accurate length for Tammoun WDN where the total population served in WSP area is 45000 persons through 6200 water meters. There are 6 storage tanks of total volume 4000 m3 and one filling point in the service area. The total number of employees in the water section is 17 without females.

The total amount of water produced is not provided. In addition, the total purchased amount of water from in the period between June/2013-nd of December/2013 from WBWD (from Wells of Tubas-Tubas, Tammoun-Tubas and Tammoun-Tammoun) is 705640 m3. The total billed amount of water for the same period (June/2013-December/2013) is 512110 m3. This gives a 27% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Tubas, Aqqaba, Tammoun, Tayasir and Al Aqabeh)

For the tariff system, it can be summarized as follows:

Less than 10m3 it is 4 NIS/m3 From 11 m3 to 20 m3 it is 5 NIS/m3 From 21 m3 to 30 m3 it is 7 NIS/m3 Greater than 31 m3 it is 10 NIS/m3 The minimum limit is 10 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not available) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses the book-record system for the administrative records of the water system.

Main Water Service Providers Page 28 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

3. TULKARM GOVERNORATE

Fig 3: Tulkarm Governorate

Main Water Service Providers in Tulkarm Governorate in year 2013 are 12 main WSPs:

. Ten (10) individual Municipalities . One (1) new municipality consists of seven jointed villages (Al Kafrriyat) . In addition to Baqa Al Sharqiya and Nazlat after four village were jointed to Baqa Al Sharqiya

General, technical, wastewater and tariff information in addition to map location for each Main Water Service Provider are provided in the following pages, more findings, analysis, details and conclusions are illustrated in the final report.

Main Water Service Providers Page 29 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

3.1. WSP: ZEITA MUNICIPALITY/TULKARM GOVERNORATE

Figure 3-1: Zeita

Main Water Service Providers Page 30 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 100425 Head of water department/section: Not available Accountant: Husni Zaghloul Telephone: 09-2660221 Cell phone: 0598-945220 E-mail: [email protected]

Water is being supplied by a 13 km distribution network where the total population served is 3700 persons through 690 water meters. There is 1 storage tank of volume 500m3. The total number of employees in the water section is 1 where there are no females.

The total amount of water produced is 335060m3 and comes from Municipality wells. In addition, the total purchased amount of water is zero. The total billed amount of water is 292203m3. This gives a 13% overall loss percentage of water from the system.

This provider supplies the following communities by water: Ellar & Seida

For the tariff system, it can be summarized as follows:

Less than 4m3 it is 12 NIS/m3 (Minimum limit) From 4 m3 to 50 m3 it is 1.5 NIS/m3 Greater than 50m3 it is 1.3 NIS/m3

There is a wastewater collection networks with a total length of 10 km where the total population served by this network is 2700 with a percentage of coverage of about 80%. There is a wastewater treatment plant established in 2009 and serves 24% of total population. The remainder of the population (none served) and use cesspits for wastewater disposal. For the parts where there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 12 times per year at a cost of 150 NIS each time.

We noticed that the WSP use a book-record system for the related water administrative records.

Main Water Service Providers Page 31 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

3.2. WSP: BEIT LEED MUNICIPALITY/TULKARM GOVERNORATE

Figure 3-2: Beit Leed

Main Water Service Providers Page 32 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 100800 Head of water department/section: Not Available Accountant: Husen Hatem Juma’h Telephone: 09-2680697 Cell phone: ---- E-mail: [email protected]

Water is being supplied by a 15 km distribution network where the total population served is 6800 persons through 1010 water meters. There is 1 storage tank of volume 205 m3. The total number of employees in the water section is 3 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water from WBWD is Not Available. The total billed amount of water is 124819 m3. This gives a Not Available % overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

The price of water is uniform at 5 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 6 per year at a cost of 70 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use book-records for his administrative records.

Main Water Service Providers Page 33 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

3.3. WSP: AL KAFRIYYAT MUNICIPALITY/TULKAREM GOVERNORATE

Figure 3-3: Al Kafryyat

Main Water Service Providers Page 34 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code:

100815 Al Ras 100870 Kour 100915 Kufur Abboush 100845 Kufur Sour 100895 Kufur Ziebad 100900 Kufur Jammal 100780 Khirbet Jbara

Head of water department/section: Not Available Accountant: Mohannad Nofal Telephone: 09-2683718 Cell phone: 0599-731696 E-mail: [email protected]

Water is being supplied by a 20km distribution network where the total population served is 8000 persons through 1900 water meters. There is 5 storage tanks of total volume 1500 m3. The total number of employees in the water section is 2 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 388921m3. The total billed amount of water is 235011m3. This gives a 40% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 31m3 it is 3.5 NIS/m3 From 31 m3 to 60 m3 it is 4.0 NIS/m3 More than 60 m3 it is 5 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of NA per month at a cost of 50 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use book-records for his water administration records.

Main Water Service Providers Page 35 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

3.4. WSP: KAFR ALLABAD MUNICIPALITY/TULKARM GOVERNORATE

Figure 3-4: Kafr Al Labbad

Main Water Service Providers Page 36 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 100690 Head of water department/section: Eng. Osama Basyouni Accountant: Abdel Rahman Asa’ad Telephone: 09-2673646 Cell phone: 0599-241475 E-mail: [email protected]

Water is being supplied by a 18 km distribution network where the total population served is 5500 persons through 752 water meters. There is 1 storage tank of total volume 342m3. The total number of employees in the water section is 4 where there are no females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 154981m3. The total billed amount of water is 135260m3. This gives a 13% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Al Hafasi, Izbet Alekhlal and Izbet Abu Khmaish

For the tariff system, it can be summarized as follows:

Less than 15m3 it is 3.0 NIS/m3 From 16 m3 to 30 m3 it is 3.5 NIS/m3 More than 30 m3 it is 4 NIS/m3

There is a wastewater collection networks which is under construction with a total length of 11.1 km where the total population served by this network is 4000 with a percentage of coverage of about 75%. There is no wastewater treatment plant. The remainder of the population (none served) and use cesspits for wastewater disposal. For the parts where there is no wastewater collection network. The wastewater is being disposed of by using cesspits at a rate of 2 per month at a cost of 100NIS each time.

We noticed that the WSP use a book-record system for the administrative records of water systems.

Main Water Service Providers Page 37 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

3.5. WSP: DEIR AL GHOSOON MUNICIPALITY/TULKARM GOVERNORATE

Figure 3-5: Deir Al Ghosoon

Main Water Service Providers Page 38 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 100530 Head of water department/section: Hani Ghanem Accountant: Rami Barakat Telephone: 09-2663912 Cell phone: 0599-889852 E-mail: [email protected]

Water is being supplied by a 50km distribution network where the total population served is 9444 persons through 1950 water meters. There is 3 storage tanks of total volume of 500 m3. The total number of employees in the water section is 4 without females.

The total amount of water produced is 322679m3 and comes from Municipality Well of Dier Al Ghosoon. In addition, the total purchased amount of water is zero. The total billed amount of water is 258143m3. This gives a 20% overall loss percentage of water from the system.

This WSP supplies the following communities by water:

Less than 1m3 to 8 m3 it is 20 NIS/m3 From 1 m3 to 50 m3 it is 2.5 NIS/m3 Greater than 50 m3 it is 4NIS/m3 The minimum limit is 23 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of NA per year at a cost of 100 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses a computerized system for all related administrative records.

Main Water Service Providers Page 39 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

3.6. WSP: QAFFIN MUNICIPALITY/TULLKARM GOVERNORATE

Figure 3-6: Qaffin

Main Water Service Providers Page 40 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 100290 Head of water department/section: Mo'ath khaseeb Accountant: Ruba Badran Telephone: 09-2665166 Cell phone: 0598-909018 E-mail: [email protected]

Water is being supplied by a 23-km distribution network where the total population served is 10200 persons through 1520 water meters. There is 2 storage tanks of volumes 300m3 & 500m3. The total number of employees in the water section is 2 where there are no females.

The total amount of water produced is 490150m3 and comes from well of Qiffeen Municipality. In addition, the total purchased amount of water is 56850m3 comes from Awni Well. The total billed amount of water is 347436m3. This gives a 36% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Akkaba and Dahr Al Abed

For the tariff system, it can be summarized as follows:

Less than 6m3 it is 2 NIS/m3 Greater than 7m3 it is 2 NIS/m3 The minimum limit is 12 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (Not available) per year at a cost of (Not available) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use book-records system for all water administrative records

Main Water Service Providers Page 41 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

3.7. WSP: BALA'A MUNICIPALITY/TULKARM GOVERNORATE

Figure 3-7: Bala'a

Main Water Service Providers Page 42 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 100570 Head of water department/section: Not Available Accountant: Ali Abu Yunes Telephone: 09-2693221 Cell phone: 0599-371926 E-mail: [email protected]

Water is being supplied by a 45km distribution network where the total population served is 8000 persons through 1417 water meters. There is 3 storage tanks volume of each: (1 x 100m3 + 1x200m3 + 1x 500m3 but the 500m3 ST is not working). The total number of employees in the water section is 4 without females.

The total amount of water produced is 381840m3 and comes from Bala'a old Well. In addition, the total purchased amount of water is zero. The total billed amount of water is 221798m3. This gives a 42% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 5m3 it is 18 NIS/m3 From 6 m3 to 20 m3 it is 3 NIS/m3 From 21 m3 to 50 m3 it is 4 NIS/m3 Greater than 51m3 it is 5 NIS/m3 The minimum limit is 18 NIS

There is a wastewater collection networks with a total length of 12 km where the total population served by this network is 5000 with a percentage of coverage of 60%. There is no wastewater treatment plant. The remainder of the population (none served) use cesspits for wastewater disposal.

For the non served part of the town by a wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 2 times per month at a cost of 100 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records for all the components of the water system

Main Water Service Providers Page 43 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

3.8. WSP: ILLAR MUNICIPALITY/TULKARM GOVERNORATE

Figure 3-8: Illar

Main Water Service Providers Page 44 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 100475 Head of water department/section: Manal Qashoo Accountant: Mohammad Asawra Telephone: 09-2666166 Cell phone: 0599-817272 E-mail: [email protected]

Water is being supplied by a 5.09 km distribution network where the total population served is 7200 persons through 1310 water meters. There are 2 storages tank of volumes 500 m3 and 200m3. The total number of employees in the water section is 8 where 1 is female.

The total amount of water produced and/or purchased is 541910 m3 out of it 218959 m3 for Illar Municipality, the remained quantity (322971 m3) is sold to Kufur Raie and Sayda. The total billed amount of water for residents in Ellar is 190126 m3. This gives an 13.2% overall loss percentage of water considering that the purchased and billed quantities in Ellar are 218959 m3 and 190126 m3 respectively.

This provider supplies the following communities by water: Seida and Kufur-Ra’ai

For the tariff system, it can be summarized as follows:

The price of water is uniform at 3 NIS/m3 The minimum limit: None

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed off using cesspits at a rate of 5 per year at a cost of 70 each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use book-records system for all water administrative records

Main Water Service Providers Page 45 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

3.9. WSP: ATTIL MUNICIPALITY/TULKARM GOVERNORATE

Figure 3-9: Attil

Main Water Service Providers Page 46 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 100480 Head of water department/section: Mohammad Abu Madi Accountant: Jalal Yaseen Telephone: 09-2661120 Cell phone: 0599-477593 E-mail: [email protected]

Water is being supplied by a 60km distribution network where the total population served is 11000 persons through 1835 water meters. There is 1 storage tank of volume 200m3. The total number of employees in the water section is 2 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 503030m3 from Mahmoud Abdel Razzaq Well and his partners. The total billed amount of water is 317704m3. This gives a 37% overall loss percentage of water from the system.

This provider supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

From 5 m3 to 30 m3 it is 2 NIS/m3 From 31 m3 to 50 m3 it is 3 NIS/m3 Greater than 50m3 it is 4 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed off using cesspits at a rate of 10 times per year at a cost of 50 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses computerized system for his administration records

Main Water Service Providers Page 47 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

3.10. WSP: BAQA AL SHARQIYA W AL NAZLAT MUNICIPALIT/TULKARM GOVERNORATE

Figure 3-10: Baqa Al Sharqiya and Al Nazlat

Main Water Service Providers Page 48 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code:

100350 Baqa Al Sharqiya 100355 Al Nazleh Al Wusta 100380 Al Nazleh Al Gharbiyeh 100330 Nazket Issa 100360 Nazlet Abu Al Nar

Head of water department/section: Eng. Ammar Khamees Accountant: Naser Taher Jaber Telephone: 09-2664318 Cell phone: 0599-030810 E-mail: [email protected]

Water is being supplied by a 38 km distribution network where the total population served is 9000 persons through 1560 water meters. There is 4 storage tanks and one balance tank of total volume 1100m3. The total number of employees in the water section is 5 where there are no females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 356133m3. The total billed amount of water is 301938m3. This gives a 15.2% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Nazalat Isa, Al Nazla Al Gharbiya and Al Nazla Al Wusta which are now part of the municipality

For the tariff system, it can be summarized as follows:

From 1 m3 to 999 m3 it is 2 NIS/m3 Minimum limit is 20 NIS

There is a wastewater collection networks with a total length of 17 km where the total population served by this network is 3600 with a percentage of coverage of about 40%. There is no wastewater treatment plant. The remainder of the population (none served) and use cesspits for wastewater disposal. For the parts where there is no wastewater collection network. The wastewater is being disposed of by using cesspits at a rate of Not provided per year at a cost of Not provided for each time.

We noticed that the WSP use a book-record system for the related water administrative records.

Main Water Service Providers Page 49 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

3.11. WSP: TULKARM MUNICIPALITY/TULKARM GOVERNORATE

Figure 3-11: Tulkarm

Main Water Service Providers Page 50 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 100645 Head of water department/section: Eng. Bassam Al Naji Accountant: Ahmad Ya’qoub Telephone: 09-2671015 Cell phone: 0597-151999 E-mail: [email protected]

Water is being supplied by a 385 km distribution network where the total population served is 77000 persons through 13922 water meters. There are 6 storage tanks of total volume 4000 m3. The total number of employees in the water section is 127 including 2 females.

The total amount of water produced is 6851068 m3 and comes from Municipality wells No.1, No. 2, No.3, Al Misnawi, No. 5 and No. 6. In addition, the total purchased amount of water is zero. The total billed amount of water is 3815871 m3. This gives a 44% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Al Masqoufeh, Al Jaroushiy, Camp, , Kafa and Dinnabeh

For the tariff system, it can be summarized as follows:

Less than 5m3 it is 3.4 NIS/m3 From 6 m3 to 30 m3 it is 2.5 NIS/m3 Greater than 30m3 it is 3.5 NIS/m3 Minimum Limit is 17 NIS

There is a wastewater collection networks with a total length of about 100 km where the total population served by this network is 70000. There is no a wastewater treatment plant. The remainder of the population (none served) and use cesspits for wastewater disposal. For the parts where there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 5-6 times per year at a cost of 70 NIS each time.

We noticed that the WSP use a computerized system for the related water administrative records.

Main Water Service Providers Page 51 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

3.12. WSP: ANABTA MUNICIPALITY/TULKARM GOVERNORATE

Figure 3-12: Anabta

Main Water Service Providers Page 52 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 100665 Head of water department/section: Not Available Accountant: Amer Barakat Telephone: 09-2673401 Cell phone: 0599-777641 E-mail: Not provided

Water is being supplied by a 43 km distribution network where the total population served is 8141 persons through 1892 water meters. There is 1 storage tank of total volume 600m3. The total number of employees in the water section is 7 where there are no females.

The total amount of water produced is 604044m3 comes from well No.2 & well No.3. In addition, the total purchased amount of water is zero m3. The total billed amount of water is 326978m3. This gives a 46% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Village council of Rameen and Kufur Rumman

For the tariff system, it can be summarized as follows:

Less than 5m3 it is 3.3 NIS/m3 From 6 m3 to 25 m3 it is 3.0 NIS/m3 From 26 m3 to 50 m3 it is 3.13NIS/m3 More than 50 m3 it is 6.2 NIS/m3

There is a wastewater collection networks which is under construction but without information. All information can be provided after completion of the project which is funded by kfw.

We noticed that the WSP use a computerized system for the related water administrative records.

Main Water Service Providers Page 53 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

4. NABLUS GOVERNORATE

Fig 4: Nablus Governorate

Main Water Service Providers in Nablus Governorate in 2013 are 8 main WSPs:

. Eight (8) individual Municipalities

General, technical, wastewater and tariff information in addition to map location for each Main Water Service Provider are provided in the following pages, more details, findings, analysis and conclusions are illustrated in the final report.

Main Water Service Providers Page 54 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

4.1. WSP: SABASTIA MUNICIBALITY /NABLUS GOVERNORATE

Figure 4-1: Sabastiya

Main Water Service Providers Page 55 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 150765 Head of water department/section: Not available Accountant: Osama Mkhemer Telephone: 09-2532244 Cell phone: 0599-360832 E-mail: [email protected]

Water is being supplied by a 14 km distribution network where the total population served is 3200 persons through 670 water meters. There are 3 storage tanks of volume total 4000 m3. The total number of employees in the water section is 1 without females.

The total amount of water produced is 42050 m3 and comes from Haroon Spring. In addition, the total purchased amount of water is 52800 m3 comes from Water Authority Well. The total billed amount of water is 77777 m3. This gives a 18% overall loss percentage of water from the system.

This provider supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 20m3 it is 3.5 NIS/m3 From 21 m3 to 50 m3 it is 5 NIS/m3 From 51 m3 to 100 m3 it is 10 NIS/m3 Greater than 101m3 it is 15 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (NA) per year at a cost of (NA) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses a computerized system for the administrative records for all related components of the water system

Main Water Service Providers Page 56 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

4.2. WSP: ASIRA ASH SHAMALIYA MUNICIPALITY/NABLUS GOVERNORATE

Figure 4-2: Asira ash Shamaliya

Main Water Service Providers Page 57 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 150820 Head of water department/section: Not Available Accountant: Mohammad Taher Musa Sawalmeh Telephone: 09-2396079/80 Cell phone: 0597-545915 E-mail: [email protected]

Water is being supplied by a 17.6 km distribution network where the total population served is 9000 persons through 1507 water meters. There is 1 storage tank of volume 300 m3. The total number of employees in the water section is 4 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 178790 m3. The total billed amount of water is 131410m3. This gives a 26.5% overall loss percentage of water from the system.

This WSP supplies the following communities by water:

For the tariff system, it can be summarized as follows:

Less than 20m3 it is 6.40 NIS/m3 Greater than 20m3 it is 10 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at average rate of 4 times per month at a cost of not provided each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses a computerized system for the administrative records for all related components of the water system

Main Water Service Providers Page 58 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

4.3. WSP: NABLUS MUNICIPALITY/NABLUS GOVERNORATE

Figure 4-3: Nablus

Main Water Service Providers Page 59 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 150920 Head of water department: Engineer Emad Al-Masri Accountant: Leeda Abu Al-Huda Telephone: 09-2390000 Cell phone: 0599-268082 E-mail: [email protected]

Water is being supplied by a 428 km distribution network where the total population served is 231021 persons through 38416 water meters. The total volume of storage tanks is 22422 m3. The total number of employees in the water section is 272 males and 22 females.

The total amount of water produced is 9420143 m3 and comes from the wells and springs of Sabastia, Odala, Al-Badan, Al-far'aa, Deir Sharaf, Al-karyon, Ras al-'Ein, 'Ein beit alma', 'Ein Al-asal, 'Ein dafna, Rujeeb, Beitt eba, al-qwaren springs, Aljuned Provide point. In addition, the total purchased amount of water is 775040m3. The total billed amount of water is 6615997m3. This gives a 35% overall loss percentage of water from the system.

This WSP supplies the following communities by water:(Zawata, Al-Badan), (Talloza, Asera Al- shamalia, Kofor Kallel, Dair Sharaf, Burin, Part of Albadan, Assera alkbali, Joint Services Council(Sabastia village)

For the tariff system, it can be summarized as follows:

From 0 m3 to 5 m3 it is 3:98 NIS/m3 From 5.1 m3 to 10 m3 it is 3:98 NIS/m3 From 10.1 m3 to 15 m3 it is 6:70 NIS/m3 From 15.1 m3 to 20 m3 it is 8:70 NIS/m3 From 20.1 m3 to 30 m3 it is 8:70 NIS/m3 From 30.1 m3 to 40 m3 it is 11:50 NIS/m3 Greater than 40m3 it is 11:50 NIS/m3

There is a wastewater collection networks with a total length of 202km where the total population served by this network is 187000 with a percentage of coverage of 97%. There is no wastewater treatment plant. The remainder of the population (none served) use cesspits for wastewater disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 60 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

4.4. WSP: BEIT FURIK MUNICIPALITY/NABLUS GOVERNORATE

Figure 4-4: Beit Furik

Main Water Service Providers Page 61 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 151090 Head of water department/section: Not Available Accountant: Huda Kamel Hamed Hanani Telephone: 09-2500001/2 Cell phone: 0597-032032 E-mail: [email protected]

Water is being supplied by a 31km distribution network where the total population served is 13000 persons through 2300 water meters. There is 1 storage tank of volume 1000 m3. The total number of employees in the water section is 5 without females.

The total amount of water produced is 348455m3 and comes from Municipality. In addition, the total purchased amount of water is zero. The total billed amount of water is 240511. This gives a 31% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 10m3 it is 4 NIS/m3 From 11 m3 to 20 m3 it is 5 NIS/m3 From 21 m3 to 30 m3 it is 6 NIS/m3 Greater than 31m3 it is 8 or 10 NIS/m3 The minimum limit is 13 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at average rate of 2 times per month at a cost of 90 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses a computerized system for the administrative records for all related components of the water system

Main Water Service Providers Page 62 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

4.5. WSP: HOWWARA MUNICIPALITY/NABLUS GOVERNORATE

Figure 4-5: Howwara

Main Water Service Providers Page 63 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 151185 Head of water department/section: As'ad Hasan Sha'aweet Accountant: Basel Jameel Salman Sha'aweet Telephone: 09-2590470 Cell phone: 0599-700877 E-mail: [email protected]

Water is being supplied by a 32 km distribution network where the total population served is 6350 persons through 1179 water meters. There is 1 storage tank of volume 60 m3. The total number of employees in the water section is 5 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 514964 m3. The total billed amount of water is 288902 m3. This gives a 44% overall loss percentage of water from the system.

This provider supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 30m3 it is 6 NIS/m3 Greater than 31m3 it is 7 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at average rate of 24 per year at a cost of 90 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses a computerized system for the administrative records for all related components of the water system

Main Water Service Providers Page 64 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

4.6. WSP: BEITA MUNICIPALITY/NABLUS GOVERNORATE

Figure 4-6: Beita

Main Water Service Providers Page 65 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 151215 Head of water department/section: Eng Awad Fahd Abu Amer Accountant: Nabeel Sadeq Abu Mazen Telephone: 09-2593203 Cell phone: 0597-417726 E-mail: [email protected]

Water is being supplied by a 62 km distribution network where the total population served is 11550 persons through 1806 water meters. There is 1 storage tank of volume 500 m3. The total number of employees in the water section is 2 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 376306m3. The total billed amount of water is 267111m3. This gives a 29% overall loss percentage of water from the system.

This provider supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 10m3 it is 4 NIS/m3 From 11 m3 to 31 m3 it is 5 NIS/m3 Greater than 31 m3 it is 5.5 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 6 times per year at a cost of 50 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses a book record system for the administrative records of the water system.

Main Water Service Providers Page 66 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

4.7. WSP: JAMMAIN MUNICIPALITY/NABLUS GOVERNORATE

Figure 4-7: Jammain

Main Water Service Providers Page 67 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 151245 Head of water department/section: Not available Accountant: Hamdalla Alhaj Ali Telephone: 09-2596001 Cell phone: 0598-941959 E-mail: [email protected]

Water is being supplied by a 15 km distribution network where the total population served is 8000 persons through 1200 water meters. There is 1 storage tank of volume 280 m3. The total number of employees in the water section is 2 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 260504m3. The total billed amount of water is 174132 m3. This gives a 33% overall loss percentage of water from the system.

This provider supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

The price of water is uniform for domestic use at 4 NIS/m3 The price of water is uniform for industrial use at 5.5 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 12 per year at a cost of 30-80 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses a computerized system for the administrative records for all related components of the water system

Main Water Service Providers Page 68 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

4.8. WSP: QABALAN MUNICIPALITY/NABLUS GOVERNORATE

Figure 4-8: Qabalan

Main Water Service Providers Page 69 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 151335 Head of water department/section: Municipal Engineer Fathi Muna Accountant: Ali Kasem Az'ar Telephone: 09-2520131 Cell phone: 0599-672474 E-mail: [email protected]

Water is being supplied by a 20.35 km distribution network where the total population served is 7329 persons through 1500 water meters. There are 2 storage tanks of volume 200 m3. The total number of employees in the water section is 2 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 165,705 m3. The total billed amount of water is 146640 m3. This gives a 12% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 20m3 it is 6 NIS/m3 Greater than 21m3 it is 8 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed off using cesspits at a rate of (NA) per year at a cost of (NA) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses a computerized system for the administrative records for all related components of the water system

Main Water Service Providers Page 70 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

5. QALQILIA GOVERNORATE

Fig 5: Qalqilia Governorate Main Water Service Providers in Qalqilia Governorate in 2013 are 5 main WSPs:

. Five (5) individual Municipalities

General, technical, wastewater and tariff information in addition to map location for each Main Water Service Provider are provided in the following pages, more details, findings, analysis and conclusions are illustrated in the final report.

Main Water Service Providers Page 71 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

5.1. WSP: JAYYOUS MUNICIPALITY/QALQILIA GOVERNORATE

Figure 5-1: Jayyous

Main Water Service Providers Page 72 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 200985 Head of water department/section: Muna Bassam Radwan Accountant: Majed Abdel Raheem Telephone: 09-2900033 Cell phone: 0569-364003 E-mail: [email protected]

Water is being supplied by a 21.5km distribution network where the total population served is 4500 persons through 729 water meters. There is one storage tank of volume 250m3. The total number of employees in the water section is two including one female.

The total amount of water produced is zero m3. In addition, the total purchased amount of water is 135490m3 which comes from Azzoun Municipality. The total billed amount of water is 111695 m3. This gives 18% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

The price of water is uniform at 4 NIS/m3 No minimum limit

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not provided) per year at a cost of (not provided) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses book-records for the administrative records of the water system.

Main Water Service Providers Page 73 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

5.2. WSP: QALQILIA MUNICIPALITY/GOVERNORATE: QALQILIA

Figure 5-2: Qalqiliya

Main Water Service Providers Page 74 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 201040 Head of water department/section: Engineer Abdel Mo’men Afaneh Accountant: Hisham Abu Khader Telephone: 09-2940014 Cell phone: 0597-916527 E-mail: [email protected]

Water is being supplied by a 138 km distribution network where the total population served is 50106 persons through 8427 water meters. There is 5 storage tanks of total volume equals 5300 m3. The total number of employees in the water section is 24 where there are no females.

The total amount of water produced is 4,334,207m3 and comes from the wells: 1) Al- Wakaleh, 2) Ghayyatheh, 3) Al Maslekh, 4) Soufeen and 5) Khibet Sofeen . In addition, the total purchased amount of water is zero. The total billed amount of water is 3074222m3. This gives a 29% overall loss percentage of water from the system.

The WSP supplies the following communities by water: none

For the tariff system, it can be summarized as follows:

Less than 5m3 it is 20 NIS/m3 From 6m3 to 39m3 it is 0.75 NIS/m3 From 40m3 to 69m3 it is 1.0 NIS/m3 From 70m3 to 99m3 it is 1.8 NIS/m3 Greater than 100m3 it is 2.8 NIS/m3 Minimum limit is 20 NIS/m3 (Less than 5m3)

There is a wastewater collection networks with a total length of 106.5 km where the total population served by this network is 48000 with a percentage of coverage of 95.8%. There is no wastewater treatment plant. The remainder of the population (non served) use cesspits for wastewater disposal.

We noticed that the WSP use for his administration records both the computerized system and the book record system

Main Water Service Providers Page 75 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

5.3. WSP: AZZOUN MUNICIPALITY/QALQILIA GOVERNORATE

Figure 5-3: Azzoun

Main Water Service Providers Page 76 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 201100 Head of water department/section: Eng. Mohammad Khirfan Accountant: Abdallah Saleem Telephone: 09-2901930 Cell phone: 599250445 E-mail: [email protected]

Water is being supplied by a 31km distribution network where the total population served is 9397 persons through 1606 water meters. There are 2 storage tanks of volume 500 m3 each. The total number of employees in the water section is 5 all of them are males.

The total amount of water produced is 592580 m3 and comes from North Azzoun Well. In addition, the total purchased amount of water is 370 m3 from Al Odwan Well. The total billed amount of water is 493900 m3. This gives a 17% overall loss percentage of water from the system.

This WSP supplies the following communities by water:  Branch Meters: Industrial Area.  Main Meters (Bulk Sales): Jayyous Municipality & Seer Village Council

For the tariff system, it can be summarized as follows:

From 1m3 to 20m3 it is 2.5 NIS/m3 From 21m3 to 50m3 it is 2.75 NIS/m3 Greater than 51m3 it is 5 NIS/m3 There is no minimum limit

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of NA per year per house at a cost of NA each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses book-records system in the administrative records of the water system.

Main Water Service Providers Page 77 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

5.4. WSP: HABLEH MUNICIPALITY/QALQILIA GOVERNORATE

Figure 5-4: Habla

Main Water Service Providers Page 78 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 201125 Head of water department/section: Not Available Accountant: Ahmad Mohammad Atrees Telephone: 09-2940491 Cell phone: 0598-910355 E-mail: [email protected]

Water is being supplied by a 30 km distribution network where the total population served is 6700 persons through 1267 water meters. There is one storage tank of 300m3 volume. The total number of employees in the water section is 2 without females

The total amount of water produced is 459450m3 and comes from Municipality well. In addition, the total purchased amount of water is zero. The total billed amount of water is 347455m3. This gives a 24% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 2m3 it is 10 NIS/m3 From 3m3 to 50m3 it is 1.50 NIS/m3 From 51m3 to 200m3 it is 2.20 NIS/m3

There is a wastewater collection networks with a total length of 1.5 km where the total population served by this network is 100 with a percentage of coverage of 1.5%. There is experimental station wastewater treatment plant. The remainder of the population (non served) use cesspits for wastewater disposal.

As for the wastewater collection and sanitation, there is a small wastewater collection network as mentioned above. The wastewater is being disposed of using cesspits at a rate of 3-4 per month at a cost of 50 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use both the computerized system and the book record system in his administrative records.

Main Water Service Providers Page 79 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

5.5. WSP: KUFUR THULTH MUNICIPALITY/GOVERNORATE: QALQILIA

Figure 5-5: Kafr Thulth

Main Water Service Providers Page 80 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 201175 Head of water department/section: Abed Ellateef Mustafa Odeh Accountant: Ra'ed Thaher Telephone: 09-2901127 Cell phone: 0597-582200/0595-910960 E-mail: [email protected]

Water is being supplied by a 25924km distribution network where the total population served is 4700 persons through 793 water meters. There is (1) storage tank of volume (500m3). The total number of employees in the water section is 1 where there are no females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 140670m3 and comes from the Well of Al-Hamra Al Zera’i . The total billed amount of water is 129416m3. This gives an 8% overall loss percentage of water from the system.

This provider supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 15m3 it is 4 NIS/m3 From 16 m3 to 30 m3 it is 4.5 NIS/m3 From 31 m3 to 60 m3 it is 5 NIS/m3 Greater than 60 m3 it is 6.5 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The rate of disposal of wastewater from cesspits per year is variable and not consistent at a cost of 40-50 NIS/ each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed also that the WSP use book-records system for the administrative records of water system.

Main Water Service Providers Page 81 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

6. SALFIT GOVERNORATE

Fig 6: Salfit Governorate

Main Water Service Providers in Salfit Governorate in 2013 are 9 main WSPs:

. Eight (9) individual Municipalities

General, technical, wastewater and tariff information in addition to map location for each Main Water Service Provider are provided in the following pages, more details, findings, analysis and conclusions are illustrated in the final report.

Main Water Service Providers Page 82 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

6.1. WSP: DEIR ISTYA MUNICIPALITY/SALFEET GOVERNORATE

Figure 6-1: Deir Istiya

Main Water Service Providers Page 83 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 251250 Head of water department/section: Not available Accountant: Mohammad Sa'ed Abu Hijleh Telephone: 09-2514226 Cell phone: 0595-552950 E-mail: [email protected]

Water is being supplied by a 15 km distribution network where the total population served is 4000 persons through 670 water meters. There is 1 storage tank of volume 200 m3. The total number of employees in the water section is 2 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 126995m3. The total billed amount of water is 106904m3. This gives a 16% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

The price of water is uniform at 4 NIS/m3

There is a small wastewater collection networks with a total length of 0.4 km where the total population served by this network is only about 100 persons. The remainder of the population (none served) uses cesspits for wastewater disposal. The wastewater is being disposed of using cesspits at average rate of 12 per year at a cost of 40 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses a book record system for the administrative records of the water system.

Main Water Service Providers Page 84 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

6.2. WSP: QARAWA BANI HASSAN MUNICIPALITY/SALFEET GOVERNORATE

Figure 6-2: Qarawa Bani Hassan

Main Water Service Providers Page 85 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 251275 Head of water department/section: Jalal Rayyan Accountant: Ziyad Rayyan. Telephone: 09-2990666 Cell phone: 0599-652964 E-mail: [email protected]

Water is being supplied by a 22.9 km distribution network where the total population served is 4000 persons through 1178 water meters. There is 1 storage tank of 500m3 volume. The total number of employees in the water section is 2 without females.

The total amount of water produced is 21900. In addition, the total purchased amount of water is 121725 m3. The total billed amount of water is 138049m3. This gives a xx% overall loss percentage of water from the system. According to municipality the total purchased amount of water is an estimated quantity because the main water meter is not working properly and WBWD for the last 8 months of 2013 was giving estimated readings and the water meter is not repaired yet.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

The price of water is uniform at 4 NIS/m3 The minimum Limit is 14 NIS (From 1m3 up to 4m3)

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 2 times per month at a cost of 50 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 86 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

6.3. WSP: KIFEL HARIS MUNICIPALITY/SALFEET GOVERNORATE

Figure 6-3: Kifl Haris

Main Water Service Providers Page 87 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 251295 Head of water department/section: Eng Mohammad Abdel Hameed Accountant: Saleh Mohammad Amen Saleh Telephone: 09-2513731 Cell phone: 0599-259828 E-mail: [email protected]

Water is being supplied by a 14.5 km distribution network where the total population served is 3688 persons through 769 water meters. There is 1 storage tank of volume 200 m3. The total number of employees in the water section is 2 where there are no females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 136678m3. The total billed amount of water is 91591m3. This gives a 33% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 2m3 it is 4 NIS/m3 From 3 m3 to 15 m3 it is 4 NIS/m3 From 16 m3 to 25 m3 it is 4.5 NIS/m3 Greater than 25m3 it is 5 NIS/m3 The minimum limit is 8 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 8 per year at a cost of 60 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 88 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

6.4. WSP: BIDDYA MUNICIPALITY/SALFEET GOVERNORATE

Figure 6-4: Biddya

Main Water Service Providers Page 89 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 251305 Head of water department/section: Jamal Abdela’al Accountant: As'ad Sa'ed Al-deen Telephone: 09-2995219 Cell phone: 0595-940143 E-mail: [email protected]

Water is being supplied by a 24 km distribution network where the total population served is 9157 persons through 2100 water meters. There is 1 storage tank of volume 500 m3. The total number of employees in the water section is 3 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 403944m3. The total billed amount of water is 316915m3. This gives a 22% overall loss percentage of water from the system.

This provider supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

The price of water is uniform at 4 NIS/m3

There is a wastewater collection networks with a total length of 1.5 km where the total population served by this network is 100 houses. There is experimental wastewater treatment plant. The remainder of the population (none served) uses cesspits for wastewater disposal. The wastewater is being disposed of using cesspits at a rate of NA per year at a cost of not provided each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses a computerized system for the administrative records of the water system.

Main Water Service Providers Page 90 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

6.5. WSP: AL-ZAWYA MUNICIPALITY/SALFEET GOVERNORATE

Figure 6-5: Al Zawya

Main Water Service Providers Page 91 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 251360 Head of water department/section: Khader Salem/Yaser Abu Qahha Accountant: Musa Abu Zer. Telephone: 09-2990904 Cell phone: 0598-301285 E-mail: [email protected]

Water is being supplied by a16 km distribution network where the total population served is 6000 persons through 1100 water meters. There is no storage tank. The total number of employees in the water section is 3 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 230210 m3. The total billed amount of water is 149736m3. This gives a 35% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

The price of water is uniform at 3.5 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 8 per year at a cost of 60 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 92 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

6.6. WSP: SALFIT MUNICIPALITY/SALFEET GOVERNORATE

Figure 6-6: Salfit

Main Water Service Providers Page 93 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 251370 Head of water department/section: Eng Saleh Affaneh Accountant: Mohammad Najeh Odeh. Telephone: 09-2515704 Cell phone: 0599-672763 E-mail: [email protected]

Water is being supplied by a 55 km distribution network where the total population served is 15000 persons through 2426 water meters. There are 5 storage tanks of total volume 2200. The total number of employees in the water section is 7 where there are no females.

The total amount of water produced is 94291m3 and comes from wells Ein al-seka and Ein al-matwi. In addition, the total purchased amount of water is 504410m3. The total billed amount of water is 415194m3. This gives a 31% overall loss percentage of water from the system.

This provider supplies the following communities by water: Farkha For the tariff system, it can be summarized as follows:

Less than 10m3 it is 35 NIS/m3 From 11 m3 to 30 m3 it is 3.5 NIS/m3 From 31 m3 to 60 m3 it is 4 NIS/m3 From 61 m3 to 100 m3 it is 4.5 NIS/m3 Greater than 100m3 it is 5 NIS/m3 The minimum limit is 35 NIS

There is a wastewater collection networks with a total length of 46 km where the total population served by this network is 6600 with a percentage of coverage of 65%. There is no wastewater treatment plant. The remainder of the population (none served) where there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 1-2 times per month at a cost of 200 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 94 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

6.7. WSP: BRUQIN MUNICIPALITY/SALFEET GOVERNORATE

Figure 6-7: Bruqin

Main Water Service Providers Page 95 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 251400 Head of water department/section: Not Available Accountant: Ameen Faheem Sabra Telephone: 09-2512020 Cell phone: 0598-905644 E-mail: Not provided

Water is being supplied by a 14 km distribution network where the total population served is 3500 persons through 550 water meters. There is 1 storage tank of volume 500 m3. The total number of employees in the water section is 2 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 76708 m3. The total billed amount of water is 70457m3. This gives an 8% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 3 m3 it is 5 NIS From 4 m3 to 10 m3 it is 5 NIS/m3 From 11 m3 to 30 m3 it is 6 NIS/m3 Greater than 30m3 it is 10 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at average rate of 12 per year at a cost of 70 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use book-records for the administrative records for all records for the water system

Main Water Service Providers Page 96 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

6.8. WSP: KAFR AL-DEEK MUNICIPALITY/SALFEET GOVERNORATE

Figure 6-8: KAFR AL DEEK

Main Water Service Providers Page 97 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 251425 Head of water department/section: Eng. Mohammad Zeyad Hamad. Accountant: Jehad Huseen Abdel Jawad Telephone: 09-2511444 Cell phone: 0598-211497 E-mail: [email protected]

Water is being supplied by a 22 km distribution network where the total population served is 5000 persons through 713 water meters. There is 1 storage tank of volume 470 m3. The total number of employees in the water section is 1 where there are no females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 139500m3. The total billed amount of water is 101815m3. This gives a 27% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 20m3 it is 4NIS/m3 From 21 m3 to 30 m3 it is 5 NIS/m3 Greater than 31m3 it is 7 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at average rate of 12 per year at a cost of 90 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 98 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

6.9. WSP: DEIR BALLOUT MUNICIPALITY/SALFEET GOVERNORATE

Figure 6-9: Deir Ballout

Main Water Service Providers Page 99 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 251430 Head of water department/section: Amer Khaleel Abdellah Accountant: Ayyoub Abdellateef Abdallah Telephone: 09-2995939 Cell phone: ---- E-mail: [email protected]

Water is being supplied by a 37.4 km distribution network where the total population served is 3850 persons through 704 water meters. There is 1 storage tank of volume 200 m3. The total number of employees in the water section is 1 where there are no females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 126510m3. The total billed amount of water is 96903m3. This gives a 23% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

The price of water is uniform at 3.5 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 8 per year at a cost of 50 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 100 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

7. RAMALLAH AND AL BIREH GOVERNORATE

Fig 7: Ramallah and Al Bireh Governorate

Main Water Service Providers in Ramallah and Al Bireh Governorate in year 2013 are 3 categories of main WSPs:

. Four (4) individual Municipalities (after the Main individual WSP of Bir Zeit Municipality has moved to JWU) . The new Al Ittihad Municipality which consists of three jointed localities . Jerusalem Water Undertaking (JWU) which serves more than 45 localities/communities (municipalities, villages and others areas in Ramallah & Al Bireh Governorate)

General, technical, wastewater and tariff information in addition to map location for each Main Water Service Provider are provided in the following pages, more details, findings, analysis and conclusions are illustrated in the final report.

Main Water Service Providers Page 101 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

7.1. WSP: NI’LIN MUNICIPALITY/RAMALLAH GOVERNORATE

Figure 7-1: Ni'lin

Main Water Service Providers Page 102 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 301715 Head of water department/section: Husni Abu Isa Accountant: Diya’ Mohammad Nafe’ Telephone: 02-2482222 Cell phone: 0592-2482222 E-mail: [email protected]

Water is being supplied by a 13.8 km distribution network where the total population served is 5500 persons through 850 water meters. There are no storage tanks. The total number of employees in the water section is 3 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 243179 m3. The total billed amount of water is 195896 m3. This gives a 19.4% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 31m3 it is 4 NIS/m3 Greater than 31m3 it is 5 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not available) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses the computerized and book record system for the administrative records of the water system.

Main Water Service Providers Page 103 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

7.2. WSP: BEITUNIYA MUNICIPALITY/RAMALLAH GOVERNORATE

Figure 7-2: Betunia

Main Water Service Providers Page 104 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 301825 Head of water department/section: Eng Medhat Abboor Accountant: Shaher Taleb Al-Reimawi Telephone: 02-2900533, 02-2900748 Cell phone: 0599-939980 E-mail: administration@.ps

Water is being supplied by a 54.8 km distribution network where the total population served is 27630 persons through 5526 water meters. There is 1 storage tank of volume 500 m3. The total number of employees in the water section is 11 including 1 female.

The total amount of water produced is zero. In addition, the total purchased amount of water from JWU is 965760 m3. The total billed amount of water is 722694 m3. This gives a 25% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

The minimum limit is 40 NIS Less than 5m3 it is 40 NIS/m3 From 5 m3 to 50 m3 it is 5.5 NIS/m3 (Domestic use) From 5 m3 to 60 m3 it is 7 NIS/m3 (Commercial & Industrial use) Greater than 50m3 it is 7 NIS/m3 (Domestic use)

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not available) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed also that the WSP use book-records system for the administrative records of water system.

Main Water Service Providers Page 105 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

7.3. WSP: BEIT LIQIA MUNICIPALITY/RAMALLAH GOVERNORATE

Figure 7-3: Beit Liqia

Main Water Service Providers Page 106 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 301895 Head of water department/section: Not available Accountant: Waheed Fadel Musa Telephone: 02-2484353 Cell phone: Not provided E-mail: [email protected]

Water is being supplied by a 20.6 km distribution network where the total population served is 9400 persons through 1400 water meters. There are no storage tanks. The total number of employees in the water section is 5 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 426288 m3. The total billed amount of water is 343179 m3. This gives a 20% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

The price of water is uniform at 5 NIS/m3 There is no minimum limit

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not available) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses the computerized system for the administrative records of the water system.

Main Water Service Providers Page 107 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

7.4. WSP: BANI ZAID AL-GHARBIYA MUNICIPALITY/RAMALLAH GOVERNORATE

Figure 7-4: Bani Zied Al Gharbiya

Main Water Service Providers Page 108 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 301460 Head of water department/section: Fadi Ahmad Al Haj Accountant: Mayyadeh Sa’ed Al Asmar Telephone: 02-2860110/1 Cell phone: 0597-940417 E-mail: Not provided

Water is being supplied by a 50 km distribution network where the total population served is 13000 persons through 1822 water meters. There is 1 storage tank of 200m3 volume. The total number of employees in the water section is 5 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water from WBWD is 359817 m3. The total billed amount of water is 246247 m3. This gives a 32% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Qarawa Bani Zeid, Kufur Ein and Al Nabi Saleh

For the tariff system, it can be summarized as follows:

The minimum limit is 48 NIS (Less than 10m3) From 11m3 to 20m3 it is 4NIS/m3 Other tariff is not provided

Only 49 houses are connected to 2.5 km wastewater collection system which covers 2.7% of Bani Zeid housing units use the wastewater collection network as a means for wastewater disposal, while the rest of housing units (97.3%) use cesspits.

We noticed that the WSP uses the computerized system for the administrative records of the water system.

Main Water Service Providers Page 109 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

7.5. WSP: AL-ITTIHAD MUNICIPALITY/RAMALLAH GOVERNORATE

Figure 7-5: Al Ittihad

Main Water Service Providers Page 110 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 301620 Head of water department/section: Feda' Bazzar Accountant: Feda' Mohammad Bazzar Telephone: 02-2486726 Cell phone: 0592-383237 E-mail: [email protected]

Water is being supplied by a 35 km distribution network where the total population served is 8264 persons through 1050 water meters. There is no storage tank. The total number of employees in the water section is 4 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water is 268611 m3. The total billed amount of water is 164066 m3. This gives a 39% overall loss percentage of water from the system.

This WSP supplies the following communities by water: The three joint localities of Al Ittihad Municipality (Beitillo, Deir Ammar and )

For the tariff system, it can be summarized as follows:

The price of water is uniform at 6 NIS/m3 The minimum limit is 24 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not available) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses the book record system for the administrative records of the water system.

Main Water Service Providers Page 111 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

7.6. JWU/RAMALLAH GOVERNORATE

Please refer to Jerusalem Govenorate section 8.1.

Main Water Service Providers Page 112 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

8. JERUSALEM GOVERNORATE

Fig 8: Jerusalem Governorate

Main Water Service Providers in Jerusalem Governorate in year 2013 are 3 main WSPs:

. Jerusalem Water Undertaking (JWU) which serves about (35) localities/communities and areas in Jerusalem Governorate . JSC for W & WW for the area of North West of Jeusalem which serves nine (9) commnities in the area . Jehoun Water Israeli Company which serves about nineteen (19) Palestinian communities/areas in Jerusalem Governorate

General, technical, wastewater and tariff information in addition to map location for each Main Water Service Provider are provided in the following pages, more details, analysis, findings and conclusions are illustrated in the final report.

Main Water Service Providers Page 113 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

8.1. WSP: JERUSALEM WATER UNDERTAKING (JWU)/JERUSALEM & RAMALLAH GOVERNORATES

Figure 8-1: Jerusalem Water Undertaiking_JWU

Main Water Service Providers Page 114 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: For Ramallah communities served by JWU

301485 301490 Turmus Ayyeh 301500 Sinjel 301505 Deir Al Sudan 301520 Jiljya 301525 Ajjoul 301530 Al Mghayer 301545 301550 Um Safa 301555 Al Mazra'a Al Sharqiyeh 301565 Attara 301575 Jibybeh 301585 Burham 301590 Kufur Malek 301600 Kouber 301610 301615 Yabroud 301620 Al Ittihad 301640 Ein Sinya 301645 301650 Deir Jareer 301670 Al Zaytouneh 301675 301680 Dura Al Qare' 301685 Al Tabeh 301695 Al Mazraa Al Qibliyeh 301700 Jalazoun Camp 301705 301735 301740 Al Janyeh 301750 Rammoun 301755 Kufur Ni'meh 301765 Bitteen 301770 Ein Qinya 301780 Deir Ibzeegh 301785 301790 Al Bireh 301800 Ein Areek 301810 Ramallah 301815 Burqa 301460 Mazare' Al Nubani 301475 Arourah 301825 Betunia (Bulk) 301830 Ama'ari Camp 301835 Qaddourah Camp

PCBS Code: For Jerusalem communities served by JWU 401870 Rafat 401875 Kufur Aqab

Main Water Service Providers Page 115 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

401885 Mikhmas 401900 Qalandya Camp 401915 Qalanya 401935 Jaba'a 401940 Al Judayreh 401945 Al Ram And Dahyet Al Bareed 401960 Bier Nabala 401990 Beit Haneena 402005 Hizma 402010 Beit Haneena Al Balad

Head of water department: Bassam Al Sawalhi Accountant: Suha Al Barghouthi (Head of Financial Department Telephone: 02-2969191 Cell phone: 0599-282600 E-mail: [email protected]

Water is being supplied by a 1200 km distribution network (79 localities listed on following page) where the total population served is 350000 persons through 55703 water meters. There are 8 storage tanks of total volume 22300m3. The total number of employees in the sections of water department section is 80 including xx females.

The total amount of water produced is 2,218,555 m3. In addition, the total purchased amount of water from WBWD is 11,636,944 m3 and the total purchased amount of water from other sources is 2,102,237 m3. The total billed amount of water is 11,733,402 m3. This gives a 26.5% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Please refer to next page

For the tariff system, it can be summarized as follows:

Bulk 60+ 40.1-60 20.1-40 10.1-20 0-10 Consumption (Whole type/Category Sale) 9 6.8 5.6 4.5 4.5 Domestic 9.9 8.1 6.8 5.6 5.6 Industrial 10.8 8.1 6.8 5.6 5.6 Tourist 9 8.1 6.8 5.6 5.6 Commercial 9 6.8 5.6 4.5 4.5 Public Institutions 4.2 Bulk (Whole Sale)

This WSP does not provide and sanitation and wastewater services, therefore no information about the existing situation for wastewater collection and management systems for the localities served by JWU has provided.

Main Water Service Providers Page 116 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

We noticed that the WSP use the computerized system for the administrative records of water system.

Number of consumers and total consumption for all the area for year 2013

Consumption Number of Total Area/community name Area code Subscribers Population 368,196 2236 31167 Ramallah 1 86,353 533 Deir Dibwan 2 128,022 720 43359 Al Bireh 4 1,488,427 165 Local bodies 5 395,942 665 Governorate 7 17,384 100 1371 Qaddoura Camp 8 8,786 36 434 Silwad Camp 9 137,918 858 Al Bireh 10 294,548 1759 Ramallah 11 170,590 1077 Ramallah 12 613,338 3685 Ramallah/Al Bireh 13 169,689 1266 Al Bireh 14 312,176 1877 Al Bireh 15 348,165 2110 Ramallah/Al Bireh 16 697,847 2454 Ramallah 17 211,329 775 9705 Camp 18 443,114 2212 36000 Beit Hanina 19 425,432 2162 Beit Hanina 20 138,991 573 5691 Ama'ari Camp 21 117,048 644 5961 Deir Dibwan 22 74,311 431 2432 Bitteen 23 84,097 456 4524 Deir Jareer 24 79,723 351 1648 Al Taybeh 25 77,399 354 2981 Rammoun 26 144,143 935 6950 Silwad 27 171,045 1024 5834 Bier Nabala 28 85,607 379 3163 Kufur Malek 29 111,914 599 3404 30 85,463 452 1948 Jifna 31 475,127 3047 Al Bireh/Um Al Sharayet 32 13,813 76 731 Yabroud 33 30,121 116 807 Ein Sinya 34 102,842 490 Al Bireh/She'ab Kassab 35 307,181 1549 9254 Sameeramees/Almatar 36 143,379 205 1225 Sameeramees/Almatar 37

Main Water Service Providers Page 117 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

383,368 1962 11721 Kufur Aqab 38 370745 2353 329 Atarout/Behind Airport 39 76413 519 22374 Al Ram 40 127394 721 Al Ram 41 1503849 174 Al Ram 42 0 0 Al Ram 43 422234 643 Al Ram 44 21421 100 Al Ram 45 8375 36 2576 Atara 46 130029 886 1428 Qalandiya Town 47 280026 1837 1170 Surda 48 170057 1082 2501 Al Jadeereh 49 638708 3855 3498 Jaba' 50 164843 1287 699 Burham 51 319472 1902 6892 Hizma 52 341417 2121 1594 Abu Qash 53 702785 2575 168 Jbybeh 54 216992 770 5102 Al Mazra'a As shrqiyeh 55 436993 2267 8868 Jalazoun Camp 56 409924 2189 2609 Rafat 57 143816 575 3288 Dura Al qari' 58 110142 646 5943 Sinjel 59 72425 436 4240 Turmus Ayyeh 60 80948 475 4535 Abu Falah 61 81052 363 695 Um Safa 62 73667 366 1752 Mikhmas 63 137263 961 2372 Burqa 64 161575 1039 841 Jilijya 65 82140 387 3540 Abwein 66 96090 599 5769 Arourah 67 86945 469 Mazare' Al Noubani 68 475567 3163 7026 Al Mazraa Al Gharbiyeh 69 11925 78 Abu Shkheidem 70 31734 123 4173 Kouber 71 102501 511 1779 Ein Areek 72 317648 1814 2348 Dier Ibzeegh 73 132367 202 4256 Kufur Ni'meh 74 387980 2258 2260 Deir Al Sudan 75 18437 58 1404 Ajjoul 76 162555 1013 1303 Al Mghayyer 77 123689 643 922 Ein Qinya 78 154120 802 1177 Beit Haneena Village 79

Main Water Service Providers Page 118 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

8.2. WSP: JSC FOR W & WW FOR THE AREA OF NORTH WEST OF JEUSALEM/JERUSALEM GOVERNORATE

Figure 8-2: North West Jerusalem Villages (NWJSC)

Main Water Service Providers Page 119 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: For communities served by JSC for W & WW for the area of North West of Jeusalem

Biddo 401995 Beit Anan 401950 Qattaneh 402015 Beit Sureek 402020 Beit Iksa 402025 Beit Doqqo 401930 Beit Ijza 401965 Al Qbybeh 401980 Khirbet Um Allhem 401985

Head of water department/section: Eng Mohammad Musleh Accountant: Murad Mohammad Ja’as Telephone: 02-2476234 Cell phone: 0597-315171 E-mail: [email protected]

Water is being supplied by a 100 km distribution network (9 localities listed below) where the total population served is 40000 persons through 4430 water meters. There are 3 storage tanks of total volume 2000m3 (500 m3 in Biddo+1500 m3 in Al Qbybeh+200 m3 in Beit Anan). The total number of employees in the water section is 15 including 1 female.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD is 757559 m3. The total billed amount of water is 668035 m3. This gives a 11.8% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Biddo, Beit Anan, Qattaneh, Beit Sureek, Beit Iksa, Beit Doqqo, Beit Ijza, Al Qbybeh and Khirbet Um Allhem.

For the tariff system, it can be summarized as follows:

Less than 30m3 it is 5 NIS/m3 Greater than 30m3 it is 5.5 NIS/m3 The minimum limit is 3m3 or (15 NIS)

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not provided) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use the book record system for the administrative records of water system.

Main Water Service Providers Page 120 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

9. JERICHO GOVERNORATE

Fig 9: Jericho Governorate

Main Water Service Providers in Jericho Governorate in 2013 are two (2) main WSPs:

. Two (2) individual Municipalities

General, technical, wastewater and tariff information in addition to map location for each Main Water Service Provider are provided in the following pages, more details, analysis and conclusions are illustrated in the final report.

Main Water Service Providers Page 121 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

9.1. WSP: AL-AUJA MUNICIPALITY/JERICHO GOVERNORATE

Figure 9-1: Al Auja

Main Water Service Providers Page 122 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 351690 Head of water department/section: Not Available Accountant: Ahmad Drei'at Telephone: 02-2325555 Cell phone: 0598-311603 E-mail: ----

Water is being supplied by a 30 km distribution network where the total population served is 5600 persons through 750 water meters. There is 1 storage tank of volume 500 m3. The total number of employees in the water section is 2 without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water 561029 m3. The total billed amount of water is 485325. This gives a 13.5 % overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

Less than 60m3 it is 3.5 NIS/m3 From 60 m3 to 100 m3 it is 4 NIS/m3 Greater than 100m3 it is 5 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 3 per year at a cost of 100 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses a computerized record system for the administrative records of the water system.

Main Water Service Providers Page 123 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

9.2. WSP: JERICHO MUNICIPALITY/JERICHO GOVERNORATE

Figure 9-2: Jericho

Main Water Service Providers Page 124 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 351920 Head of water department/section: Ghazi Al Naji Accountant: Nada Awatleh Telephone: 02-2322418 Cell phone: 0599-201351 E-mail: [email protected]

Water is being supplied by a 95 km distribution network where the total population served is 22000 persons through 6000 water meters. There is 4 storage tank of total volume 4000 m3 (2000+1000+500+500). The total number of employees in the water section is 9 including 1 female.

The total amount of water produced is 3106300 m3 and comes from Ein Al-Sultan spring. In addition, the total purchased amount of water is zero. The total billed amount of water is 2184395 m3. This gives a 30% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Ein Al-Sultan camp

For the tariff system, it can be summarized as follows:

Less than 100m3 it is 1 NIS/m3 From 101m3 to 150 m3 it is 2 NIS/m3 From 151 m3 to 250 m3 it is 4 NIS/m3 Greater than 251m3 it is 5 NIS/m3 The minimum limit is 30 NIS

There is a wastewater collection networks with a total length of 30 km where the total population served by this network is 5500 persons with a percentage of coverage of 25%. There is a new wastewater treatment plant which was opened in June 2014. The remainder of the population (none served) by wastewater collection and sanitation use cesspits for wastewater disposal.

We noticed that the WSP use a computerized system for the administrative records for all the components of the water system

Main Water Service Providers Page 125 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

10. BETHLEHEM GOVERNORATE

Fig 10: Bethlehem Governorate

Main Water Water Service Providers in Bethlehem Governorate in year 2013 are 6 main WSPs:

. Five (5) individual Municipalities . WSSA (Bethlehem Water Supply and Sewerage Authority) which serves 14 localities/communities (municipalities and villages Bethlehem Governorate)

General, technical, wastewater and tariff information in addition to map location for each Main Water Service Provider are provided in the following pages, more details, findings, analysis and conclusions are illustrated in the final report.

Main Water Service Providers Page 126 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

10.1. WSP: JANATA (BEIT FALOUH + AL ASAKRA) MUNICIPALITY/BETHLEHEM GOVERNORATE

Figure 10-1: Janata (Beit Falouh + Al Asakra)

Main Water Service Providers Page 127 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 452385 Head of water department/section: Mohammad Ibraheem Accountant: Mohammad Zawahreh Telephone: 02-2742380 Cell phone: 0598-964243 E-mail: [email protected]

Water is being supplied by a 16 km distribution network where the total population served is 6000 persons through 520 water meters. There are no storage tanks. The total number of employees in the water section is 2 without females.

The total amount of water produced is zero and comes from wells Batn al-ghoul. In addition, the total purchased amount of water is 226808 m3. The total billed amount of water is 159112 m3. This gives a 30% overall loss percentage of water from the system.

This WSP supplies the following communities by water: (Beit Falouh + Al Asakra)

For the tariff system, it can be summarized as follows:

The price of water is uniform at 4 NIS/m3 There is no minimum limit

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not available) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses both computerized and book record systems for the administrative records of the water system.

Main Water Service Providers Page 128 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

10.2. WSP: TUQU' MUNICIPALITY/BETHLEHEM GOVERNORATE

Figure 10-2: Tuqu'

Main Water Service Providers Page 129 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 452495 Head of water department/section: Tayseer Abu Mffreh Accountant: Sameer As-Sha'er Telephone: 02-2763142 Cell phone: 0599-819071 E-mail: [email protected]

Water is being supplied by a 30-km distribution network where the total population served is 14000 persons through 1205 water meters. There is 1 storage tank of volume 1000m3. The total number of employees in the water section is 4 where are no females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water is 569034m3. The total billed amount of water is 304087m3. This gives a 46% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Al-Minya

For the tariff system, it can be summarized as follows:

The price of water is uniform at 4 NIS/m3 The minimum limit is 16 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not available) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses the book record system for the administrative records of the water system.

Main Water Service Providers Page 130 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

10.3. WSP: AL-UBEIDIYA MUNICIPALITY/BETHLEHEM GOVERNORATE

Figure 10-3: Al 'Ubeidiya

Main Water Service Providers Page 131 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 452180 Head of water department/section: Not available Accountant: Na'el Ali Mahmoud Al-Asa Telephone: 02-2761011 Cell phone: 0597-888562 E-mail: [email protected]

Water is being supplied by a 40 km distribution network where the total population served is 13700 persons through 1332 water meters. There is 1 storage tank of volume 1500 m3 that serves also Dar Salah, Al Khas and An Nu’man. The total number of employees in the water section is 10 including 1 female.

The total amount of water produced is zero. In addition, the total purchased amount of water from WBWD is 260255 m3. The total billed amount of water is 191948m3. This gives a 26% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

The price of water is uniform at 5 NIS/m3 The minimum limit is 25 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not available) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses the computerized system for the administrative records of the water system.

Main Water Service Providers Page 132 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

10.4. WSP: ZA'TARA MUNICIPALITY/BETHLEHEM GOVERNORATE

Figure 10-4: Za'tara

Main Water Service Providers Page 133 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 452360 Head of water department/section: Not available Accountant: Taher Ahmad Mohsen Telephone: 02-2775257 Cell phone: 0569-808034 E-mail: [email protected]

Water is being supplied by a 50 km distribution network where the total population served is 7900 persons through 1170 water meters. There is no storage tank. The total number of employees in the water section is 4 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water from WBWD is 262994 m3. The total billed amount of water is 162757m3. This gives a 38% overall loss percentage of water from the system.

This provider supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

The price of water is uniform at 4 NIS/m3 There is no minimum limit

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not available) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses a computerized system for the administrative records of the water system.

Main Water Service Providers Page 134 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

10.5. WSP: BEIT FAJJAR MUNICIPALITY/BETHLEHEM GOVERNORATE

Figure 10-5: Beit Fajjar

Main Water Service Providers Page 135 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 452525 Head of water department/section: Nayef Taqatqeh Accountant: Yousef Hmeid Telephone: 02-2769490 Cell phone: 0599-255989 E-mail: ----

Water is being supplied by a 10.8 km distribution network where the total population served is 14480 persons through 1364 water meters. There is 1 storage tank of volume 500 m3. The total number of employees in the water section is 5 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water from WBWD is 471704 m3. The total billed amount of water is 348122 m3. This gives a 26% overall loss percentage of water from the system.

This WSP supplies the following communities by water: None

For the tariff system, it can be summarized as follows:

The price of water is uniform at 5 NIS/m3 (domestic) and The price of water is uniform at 7 NIS/m3 (industrial & commercial) The minimum limit: No minimum limit

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not available) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses both computerized and book record systems for the administrative records of the water system.

Main Water Service Providers Page 136 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

10.6. WSP: WSSA/BETHLEHEM GOVERNORATE

Figure 10-6: WSSA

Main Water Service Providers Page 137 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 452240 Bethlehem 452255 Beit Sahour 452255 Beit Jala 452210 Hindaza 452280 Aydeh Camp 452185 Al Azza Camp 452195 Al Dheisha Camp 452275 Al Douha 452265 Al Khader 452270 Artas 452300 Rakhma 452350 Al Freidees 452375 Harmala 452420 Al Wljeh

Head of water department/section: Akram Ramadan Accountant: Hasan Al Oruj Telephone: 02-2742685 Cell phone: 0599-255989 E-mail: [email protected]

Water is being supplied by a not provided km distribution network where the total population served is 120,000 persons through water meters as distributed in the following table. There is 5 storage tanks of volume 18000 m3. The total number of employees in the water section is 30 without females.

Community No. of Water Community No. of Water Meters Meters Al Khader 1017 Aydeh Camp 242 Bethlehem 4230 Al 1231 Camp Beit Sahour 2191 Al Azzeh 121 Camp Beit Jala 2131 Al Wljeh 345 Artas 305 Al Douha 1183 Al Freidees 221

The total amount of water produced is 1,317,100 m3 from Beit Fajjar Well. In addition, the total purchased amount of water from WBWD is 4,436,513 m3. The total billed amount of water is not provided m3. This gives a NA% overall loss percentage of water from the system.

This WSP supplies the following communities by water: As listed above.

For the tariff system, it can be summarized as follows:

The price of water between 5-10 m3 is 4.5 NIS/m3 The price of water between 11-20 m3 is 5.5 NIS/m3

Main Water Service Providers Page 138 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

The price of water between 21-30 m3 is 6.5 NIS/m3 Greater than 30 m3 is 7.5 NIS/m3 The minimum limit: 27.5 NIS for less than 5m3

There is a wastewater collection networks with a total length of 250 km where the total population served by this network is 70000 with a percentage of coverage of 74%. There is no wastewater treatment plant but there is two sewage pump stations. The remainder of the population (none served) use cesspits for wastewater disposal.

We noticed that the WSP uses both computerized and book record systems for the administrative records of the water system.

Main Water Service Providers Page 139 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11. HEBRON GOVERNORATE

Fig 11: Hebron Governorate

Main Water Service Providers in Hebron Governorate in year 2013 are 19 main WSPs:

. Seventeen (17) individual Municipalities . The new Al Yassriya Municipality which consists of six (6) jointed localities . Dura Rural Service Council that includes 36 localities/communities

General, technical, wastewater and tariff information in addition to map location for each Main Water Service Provider are provided in the following pages, more details, findings, analysis and conclusions are illustrated in the main report.

Main Water Service Providers Page 140 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.1. WSP: DURA MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-1: Dura

Main Water Service Providers Page 141 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502840 Head of water department/section: Eng Maher Qazzaz Accountant: Aqel Abu Frendel Telephone: 02-2280355 Cell phone: 0599-999638 E-mail: [email protected]

Water is being supplied by a 84 km distribution network where the total population served is 38000 persons through 3500 water meters. There are 3 storage tanks of total volume 3000m3 (500+500+2000). The total number of employees in the water section is 8 without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD is 451200 m3. The total billed amount of water is 403200 m3. This gives a 10.6% overall loss percentage of water from the system.

The following communities are served by this WSP: 502655 Kureiseh 502665 Rafada 502675 Wadeh 502680 Al Tabaqah

For the tariff system, it can be summarized as follows:

Less than 15m3 it is 5 NIS/m3 From 16m3 to 30m3 it is 7.5 NIS/m3 Greater than 30m3 it is 12 NIS/m3 There is no minimum limit

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not provided) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 142 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.2. WSP: ASH SHUYUKH MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-2: Ash Shuyukh

Main Water Service Providers Page 143 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502635 Head of water department/section: Abdel Hameed Eweidat Accountant: Fayzeh Ayaydeh Telephone: 02-2561002 Cell phone: 0599-292645 E-mail: [email protected]

Water is being supplied by a 44.3 km distribution network where the total population served is 10750 persons through 1378 water meters. There are 2 storage tanks of volume 600 m3. The total number of employees in the water section is 5 without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD is 400700 m3 and from other sources is 1000 m3 .The total billed amount of water is 307049 m3. This gives a 23.6% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Khalet Al Eis, Aqabet Sa’eer ansd Abu Shawer and Qafan Al Khamees follow Al Shuyukh Municipality

For the tariff system, it can be summarized as follows:

Less than 50m3 it is 5 NIS/m3 Greater than 50m3 it is 6 NIS/m3 The minimum limit is 20 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not provided) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 144 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.3. WSP: BEIT UMMAR MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-3: Beit Ummar

Main Water Service Providers Page 145 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502540 Head of water department/section: Hammoudeh Al Housani Accountant: Hasan Allameh Telephone: 02-2520035 Cell phone: 0598-990529 E-mail: Not available

Water is being supplied by a 7 km distribution network where the total population served is 17000 persons through 2500 water meters. There is no storage tank. The total number of employees in the water section is 3 where without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD is 639352 m3. The total billed amount of water is 526791 m3. This gives a 17.6% overall loss percentage of water from the system.

This WSP supplies the following communities by water:

502750 Safa 502765 Khirbet Al Manatreh 502770 Jala 502780 Al Bqar

For the tariff system, it can be summarized as follows:

The price of water is uniform at 5 NIS/m3 The minimum limit is 15 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not known) per year at a cost of (not available) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 146 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.4. WSP: AL YASSRIYA MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-4: Al Yassiryah

Main Water Service Providers Page 147 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code:

502645 502485 Deir Samet 502645 Beit Maqdoum 502645 Al Kome 502645 Hamseh 502645 Al Mwaraq

Head of water department/section: Eng Ashraf Abu Hlayel Accountant: Munther Al Hroub Telephone: 02-2200005 Cell phone: 0592-887004 E-mail: [email protected] Additional Information: This municipality includes: Deir Samet, Beit Awwa, Beit Maqdoum, Al Koum, Hamsa and Almwareq.

Water is being supplied by a 33 km distribution network where the total population served is 18000 persons through 2835 water meters. There is 1 storage tank of volume 2000m3. The total number of employees in the water section is 10 where without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD is 311027 m3. The total billed amount of water is 300140 m3. This gives a 3.5% overall loss percentage of water from the system. (The total billed quantity of water is based on Municipality estimations which are not documented therefore, the loss percentage is not very accurate).

This WSP supplies the following communities by water: 502725 Soba 502730 Trusa 502905 Al Simya

For the tariff system, it can be summarized as follows:

The price of water is uniform at 5 NIS/m3 There is no minimum limit.

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not provided) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 148 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.5. WSP: TAFFUH MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-5: Taffuh

Main Water Service Providers Page 149 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502750 Head of water department/section: Eng Khaled So’oud Al Tardeh Accountant: Nabeel Mahmoud Irzeiqat Telephone: 02-2222093 Cell phone: 0599-524487 E-mail: [email protected]

Water is being supplied by a 40.5 km distribution network where the total population served is 11000 persons through 1146 water meters. There is 1 storage tank of volume 300m3. The total number of employees in the water section is 4 without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD is 237348 m3. The total billed amount of water is197956 m3. This gives a 16.6% overall loss percentage of water from the system.

This WSP supplies the following communities by water : 502800 Al Khamajat

For the tariff system, it can be summarized as follows:

The price of water is uniform at 4.5 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not provided) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 150 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.6. WSP: AS SAMU’ MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-6: As Samu'

Main Water Service Providers Page 151 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502610 Head of water department/section: Eng Aa’ed Al Salamin Accountant: Aref Al Rwashdeh Telephone: 02-2268001 Cell phone: Not provided E-mail: [email protected]

Water is being supplied by a 101km distribution network where the total population served is 24000 persons through 2590 water meters. There is 1 storage tank of volume 2000m3. The total number of employees in the water section is 5 without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD is 450340 m3 and from other sources is 84397 m3 .The total billed amount of water is 405227 m3. This gives a 24.2% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Khirbet A’ounein.

For the tariff system, it can be summarized as follows:

Less than 15m3 it is 5 NIS/m3 From 16m3 to 30 it is 7 NIS/m3 Greater than 30 m3 it is 20NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not provided) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 152 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.7. WSP: HALHUL MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-7: Halhul

Main Water Service Providers Page 153 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code:502630 Head of water department/section: Eng Mahmoud Alewhoush Accountant: Feras Abu Rayyan Telephone: 02-2228167 Cell phone: 0599-200620 E-mail: [email protected] or [email protected]

Water is being supplied by a 64 km distribution network where the total population served is 29000 persons through 3495 water meters. There are 2 storage tanks of total volume 2500 m3 (500+2000). The total number of employees in the water section is 7 without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD is 355882 m3 and the total amount of water purchased from other sources is 169970 m3. The total billed amount of water is 420801 m3. This gives a 20% overall loss percentage of water from the system.

This WSP supplies the following communities by water:

502805 Khirbet Al Hasakeh

For the tariff system, it can be summarized as follows:

From 5m3 to 50m3 it is 5 NIS/m3 Greater than 50m3 it is 6 NIS/m3 The minimum limit is 25 NIS (Less than 5m3)

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of 5 time/day in the town at a cost of 100 NIS each time.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 154 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.8. WSP: AD-DAHIRIYA MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-8: Ad Dahririya

Main Water Service Providers Page 155 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 503245 Head of water department/section: Ahmad Qaiseia Accountant: Iyad Abu Sharkh Telephone: 02-2267601 Cell phone: 0599-662807 E-mail: [email protected]

Water is being supplied by a (not provided) km distribution network where the total population served is 38000 persons through 2180 water meters. There are 2 storage tanks of total volume 2130 m3 (130 m3+ 2000 m3). The total number of employees in the water section is 4 without females.

The total amount of water produced is zero. In addition, the total purchased amount of water from WBWD is 236502 m3. The total billed amount of water is 218977 m3 .This gives a 7.4% overall loss percentage of water from the system.

This WSPr supplies the following communities by water:

502720 Jwai & Kufur Joul 502890 Soumara 502895 Khirbet Deir Shams 502900 Khirbet Deir Shams

For the tariff system, it can be summarized as follows:

The price of water is uniform at 5 NIS/m3 The minimum limit is 37 NIS

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not provided) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use both book record and a computerized system for the administrative records of the water system.

Main Water Service Providers Page 156 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.9. WSP: IDHNA MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-9: Idhna

Main Water Service Providers Page 157 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502685 Head of water department/section: Waleed Abu Jahsheh Accountant: Khaleel Tumaizeh Telephone: 02-2256002 Cell phone0599-256291 or 0599-661737 E-mail: [email protected]

Water is being supplied by a 84 km distribution network where the total population served is 21600 persons through 3133 water meters. There are 2 storage tanks of total volume 2000m3 (500+1500). The total number of employees in the water section is 4 where without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water is 480966 m3. The total billed amount of water is 453980 m3. This gives a 5.6% overall loss percentage of water from the system.

This WSP supplies the following communities by water: 502685 Beer Msallam

For the tariff system, it can be summarized as follows:

The price of water is uniform at 4 NIS/m3 without minimum limit.

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not provided) NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 158 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.10. WSP: TARQUMIYA MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-10: Tarqumiya

Main Water Service Providers Page 159 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502640 Head of water department/section: Eng Mohammad Ahmed Qabaja Accountant: Mu’taz Ramadan Shalalfeh Telephone: 02-2584863 Cell phone: 0597-222290 E-mail: [email protected]

Water is being supplied by an 80 km distribution network where the total population served is13870 persons through 2181 water meters. There is 1 storage tank of volume 1000m3. The total number of employees in the water section is 5 without females.

The total amount of water produced is 0 m3. In addition, the total purchased amount of water is 395000m3. The total billed amount of water is 353884 m3. This gives 10.4% overall loss percentage of water from the system.

This WSP supplies the following communities by water: 502795 Khirbet Jamroura

For the tariff system, it can be summarized as follows:

The price of water is uniform at 5 NIS/m3 without minimum limit.

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not provided) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 160 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.11. WSP: BEIT ULA MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-11: Beit Ula

Main Water Service Providers Page 161 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502615 Head of water department/section: Eng Areej Al Amleh Accountant: Mohammad Ismail Telephone: 02-2281004 Cell phone: 0599-816455 E-mail: [email protected]

Water is being supplied by a 16 km distribution network where the total population served is 7000 persons through 1180 water meters. There is 1 storage tank of volume 1000m3. The total number of employees in the water section is 2 without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD is 320075m3. The total billed amount of water is 237244 m3. This gives 25.9% overall loss percentage of water from the system.

This WSP supplies the following communities by water: 502785 Qieleh

For the tariff system, it can be summarized as follows:

The price of water is uniform at 5 NIS/m3 There is no minimum limit.

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not known) per year at a cost of 125 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses both the computerized and the book record system for the administrative records of the water system.

Main Water Service Providers Page 162 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.12. WSP: NUBA MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-12: Nuba

Main Water Service Providers Page 163 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502585 Head of water department/section: Eng Ranya Abu Ayyash Accountant: Ishaq Al Dabbas Telephone: 02-2585001 Cell phone: 0592-500252 E-mail: [email protected]

Water is being supplied by a 12-km distribution network where the total population served is 6000 persons through 750 water meters. There is 1 storage tank of volume 500m3. The total number of employees in the water section is 4 where they are no females.

The total amount of water produced is 0 m3. In addition, the total purchased amount of water is 161290m3. The total billed amount of water is 129719m3. This gives 19.6% overall loss percentage of water from the system.

This provider does not supply any communities by water.

For the tariff system, it can be summarized as follows:

The price of water is uniform at 4 NIS/m3 The minimum limit is 16 NIS

There is a wastewater collection networks with a total length of not less than 8 km where the total population served by this network is 1950 with a percentage of coverage of 30%. There is a wastewater treatment plant established in 2002. The remainder of the population (none served) uses cesspits for wastewater disposal at average rate of 12 per year for each house at a cost of 100 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 164 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.13. WSP: KHARAS MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-13: Kharas

Main Water Service Providers Page 165 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502560 Head of water department/section: Yousef Mohmmad Atwan Accountant: Ra’ed Ibraheem Hajjaj Telephone: 02-2586111 Cell phone: 0599-258616 E-mail: [email protected]

Water is being supplied by a 16 km distribution network where the total population served is 8000 persons through 1400 water meters. There is 1 storage tank of volume 1000m3 (not used). The total number of employees in the water section is 3 without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD is 277635m3. The total billed amount of water is 199202m3. This gives 28.3% overall loss percentage of water from the system.

This WSP supplies the following communities by water:

502810 Khirbet Mishref

For the tariff system, it can be summarized as follows:

The price of water is uniform at 5 NIS/m3 without minimum limit.

There is a wastewater collection networks with a total length of 16 km where the total population served by this network is 1600 with a percentage of coverage of 20%. There is wastewater treatment plant. The remainder of the population (none served) uses cesspits for wastewater disposal at a cost of 60 NIS for each time of disposal.

We noticed that the WSP uses the book record system for the administrative records of the water system.

Main Water Service Providers Page 166 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.14. WSP: YATTA MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-14: Yatta

Main Water Service Providers Page 167 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 503120 Head of water department/section: Mohammad Abu Elayyan Accountant: Dr. Yaser Abu Tuhfeh Telephone: 02-2279394, 02-2279502 Cell phone: 0599-111962 E-mail: [email protected]

Water is being supplied by a 150 km distribution network where the total population served is 65000 persons through 4013 water meters. There are 4 storage tanks of volume 3600m3. The total number of employees in the water section is 18 without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD is 872261m3. The total billed amount of water is 530225m3. This gives 39.2% overall loss percentage of water from the system.

This WSP supplies the following communities by water:

502875 Baiar Al Arous 502880 Al Mintar 502885 Azeez 502910 Al Hieleh 502915 Al Dawawier

For the tariff system, it can be summarized as follows:

Less than 15m3 it is 4NIS/m3 Greater than 15m3 it is 5 NIS/m3 There is no minimum limit

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not provided) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 168 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.15. WSP: SA’IR MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-15: Sa'ir

Main Water Service Providers Page 169 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502620 Head of water department/section: Not available Accountant: Ajwad Al Mtawwar Telephone: 02-256002 Cell phone: 0599-232509 E-mail: [email protected]

Water is being supplied by a 44 km distribution network where the total population served is 23500 persons through 2864 water meters. There is 1 storage tank of volume 1000m3. The total number of employees in the water section is 6 without females.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD is 589352m3 and from other sources is 88766 m3. The total billed amount of water is 542393m3. This gives 20% overall loss percentage of water from the system.

This WSP supplies the following communities by water:

502815 Um Al Batem 502820 Irqan Tourad 502830 Kzeibeh 502835 Shamlyat Al Hawa 502840 Ras Taweel 502845 Beit Einoun 502850 Al Dawawreh 502855 Jorn Allouz 502860 Al Edeiseh 502865 Wadi Al Ram 502870 Qienan Al Nimer

For the tariff system, it can be summarized as follows:

Less than 3 m3 it is 14 NIS From 3 m3 to 15 m3 it is 5.4 NIS/m3 Greater than 25 m3 it is 6 NIS/m3 The minimum limit is 14 NIS

As for the wastewater collection and sanitation, there is no a wastewater collection network. The wastewater is being disposed of using cesspits at a not known rate per year at a cost of 150 NIS each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use the book record system for the administrative records of the water system.

Main Water Service Providers Page 170 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.16. WSP: BANI NAIM MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-16: Bani Naim

Main Water Service Providers Page 171 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502815 Head of water department/section: Not available Accountant: Zayed Sawalha Telephone: 02-2229157 Cell phone: 0599-259918 E-mail: [email protected]

Water is being supplied by a 40 km distribution network where the total population served is 24000 persons through 2402 water meters. There are 3 storage tanks of volume 500 m3. The total number of employees in the water section is 2without females.

The total amount of water produced is zero. In addition, the total purchased amount of water from WBWD is 463684m3. The total billed amount of water is 353137 m3. This gives a 24% overall loss percentage of water from the system.

This WSP supplies the following communities by water: 502830 Masafer Bani Naim

For the tariff system, it can be summarized as follows:

Less than 100m3 it is 5 NIS/m3 Greater than 100 m3 it is 15 NIS/m3

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not provided) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 172 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.17. WSP: HEBRON MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-17: Hebron

Main Water Service Providers Page 173 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502780 Head of water department/section: Eng Imad Al Zier Accountant: Hashem al Hammouri Telephone: 02-2228121/2/3 Cell phone: 0598-901926 E-mail: [email protected]

Water is being supplied by a 26 km distribution network where the total population served is 240000 persons through 18000 water meters. There are 5 storage tanks of volume 15000m3. The total number of employees in the water section is 50 including 1 female.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD 5,355,056m3. The total billed amount of water is approximately 4,780,000m3 (according to the value of billed amount and tariff values in 2013). This gives about 11% overall loss percentage of water from the system.

This WSP supplies the following communities by water: Al Fawwar, Al Hadab, Alsair and Alhajra.

For the tariff system, it can be summarized as follows:

Less than 20m3 it is 4NIS/m3 Greater than 20m3 it is 5NIS/m3 There is no minimum limit

There is a wastewater collection networks with a total length of 185 km where the total population served by this network is 150000 with a percentage of coverage is about 54%. There is no wastewater treatment plant. The remainder of the population (none served) uses cesspits for wastewater disposal. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP use a computerized system for the administrative records of the water system.

Main Water Service Providers Page 174 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.18. WSP: SURIF MUNICIPALITY/HEBRON GOVERNORATE

Figure 11-18: Surif

Main Water Service Providers Page 175 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Code: 502450 Head of water department/section: Eng Feda’ Al Qadi Accountant: Ahmad Sha’ban Telephone: 02-2523001 Cell phone: 0599-888259 E-mail: [email protected] and [email protected]

Water is being supplied by a 68.5 km distribution network where the total population served is 14500 persons through 2696 water meters. There are 2 storage tanks of volume 1140m3. The total number of employees in the water section is 3 including 1 female.

The total amount of water produced is zero m3. In addition, the total purchased amount of water is 558307 m3. The total billed amount of water is 391530 m3. This gives % 29.9 overall loss percentage of water from the system.

This WSP does not supply any communities by water.

For the tariff system, it can be summarized as follows:

Less than 30m3 it is 4NIS/m3 Greater than 30m3 it is 5NIS/m3 There is no minimum limit

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not provided) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses both the book record and the computerized system for the administrative records of the water system.

Main Water Service Providers Page 176 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

11.19. WSP: JSC FOR REEF DURA/HEBRON GOVERNORATE

Figure 11-19: Reef Dura (DRSC)

Main Water Service Providers Page 177 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

PCBS Locality 503095 Sikkeh 503100 Khirbet Salameh 503105 Wadi Ebied 503110 Fqieqes 503115 Tuwas 503120 Kharsa 503125 Trameh 503130 Al Majd 503135 Mrah Al Bqar 503145 Hdab Al Fawwar 503150 Deir Al Asal Al Tahta 503155 Wadi Al Shahneh 503160 Al Surra 503165 Deir Razeh 503170 Deir Al Asal Al Fuqa 503175 Khalet Al Iqed 503185 Imraish 503190 Abdeh 503195 Beit Al Roosh Al Tahta 503205 Khirbet Basem 503215 Al Alaqeh Al Fuqa 503220 Hadab Al Alaqeh 503225 Al Alaqeh Al Tahta 503230 Beit Mersem 503235 Beit Al Roosh Al Fuqa 503245 Karmeh 503255 Wadi Al Klab 503260 Karzeh 503265 Rabood 503270 Abu Al Asjeh 503280 Abu Al Ghuzlan 503285 Al Bireh 503290 Al Burj 503295 Abu Al Irqan 503300 Al Ramadeen 502960 Athab Al Kabeer 502965 Khirbet Zanouneh 502970 Khirbet Al Rahweh 502975 Gharb Al Freijat 502990 Al Hajra 502995 Abu Sehweil 502920 Khirbet Abu-Hmaid 502925 Iskaik

Main Water Service Providers Page 178 Data Bank Enhancement funded by United Nations Children's Fund _ Data gathering and validation

Head of water department/section: Eng Rasmyeh Swaiti Accountant: Ayser Al Nammourah (Financial Manager) Telephone: 02-2283776 Cell phone: 0595-311112 E-mail: info-jcspd-dura.org

Water is being supplied by a 245 km distribution network where the total population served is 30183 persons through 4161 water meters. There are three storage tanks of volume 1500m3. The total number of employees in the water section is 13 including 1female.

The total amount of water produced is zero m3. In addition, the total purchased amount of water from WBWD in the last 3 months of 2013 is 102371 m3. The total billed amount of water for the same period is 85226 m3. This gives a 16.7% overall loss percentage of water from the system.

This WSP supply the following communities by water: 36 communities as listed in the table on next page

For the tariff system, it can be summarized as follows:

Less than 20m3 it is. 4.5 NIS/m3 From 20m3 to 40m3 it is 6 NIS/m3 Greater than 40m3 it is 10 NIS/m3 There is no minimum limit

As for the wastewater collection and sanitation, there is no wastewater collection network. The wastewater is being disposed of using cesspits at a rate of (not available) per year at a cost of (not provided) each time. The water provider has no supervision on the cesspits construction or wastewater evacuation and disposal.

We noticed that the WSP uses the book record system for the administrative records of the water system.

Main Water Service Providers Page 179