World Bank Document
Total Page:16
File Type:pdf, Size:1020Kb
PROCUREMENT PLAN (Textual Part) Project information: India- PMGSY Additional financing (P124639) Project Implementation agency: NRIDA and SRRDAs Public Disclosure Authorized Date of the Procurement Plan: 15th May 2018 Period covered by this Procurement Plan: ist 18 months Preamble In accordance with paragraph 5.9 of the “World Bank Procurement Regulations for IPF Borrowers” (July 2016) (“Procurement Regulations”) the Bank’s Systematic Tracking and Exchanges in Procurement (STEP) system will be used to prepare, clear and update Procurement Plans and conduct all procurement transactions for the Project. This textual part along with the Procurement Plan tables in STEP constitute the Procurement Plan Public Disclosure Authorized for the Project. The following conditions apply to all procurement activities in the Procurement Plan. The other elements of the Procurement Plan as required under paragraph 4.4 of the Procurement Regulations are set forth in STEP. The Bank’s Standard Procurement Documents: shall be used for all contracts subject to international competitive procurement and those contracts as specified in the Procurement Plan tables in STEP. National Procurement Arrangements: In accordance with paragraph 5.3 of the Procurement Regulations, when approaching the national market (as specified in the Procurement Plan tables in STEP), the country’s own procurement procedures may be used. Public Disclosure Authorized When the Borrower uses its own national open competitive procurement arrangements as set forth in NCP conditions, such arrangements shall be subject to paragraph 5.4 of the Procurement Regulations and the following conditions. List only the applicable conditions required to ensure consistency with paragraph 5.4 of the Procurement Regulations. If no conditions apply, delete the phrase “and the following conditions”. When other national procurement arrangements other than national open competitive procurement arrangements are applied by the Borrower, such arrangements shall be subject to paragraph 5.5 of the Procurement Regulations. Public Disclosure Authorized Leased Assets as specified under paragraph 5.10 of the Procurement Regulations: Leasing may be used for those contracts identified in the Procurement Plan tables. Otherwise state “Not Applicable” Not Applicable Procurement of Second Hand Goods as specified under paragraph 5.11 of the Procurement Regulations – is allowed for those contracts identified in the Procurement Plan tables Otherwise state “Not Applicable” Not Applicable Domestic preference as specified under paragraph 5.51 of the Procurement Regulations (Goods and Works). Specify for each Not Applicable Goods: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables]; Works: [is not applicable/is applicable for those contracts identified in the Procurement Plan tables] Hands-on Expanded Implementation Support (HEIS) as specified under paragraphs 3.10 and 3.11 of the Procurement Regulations is Applicable. [Include this sentence only if the Bank has formally agreed to provide the Borrower with HEIS. Otherwise delete] Not Applicable Other Relevant Procurement Information. Proposed Procedures for CDD Components: NA 4. Reference to (if any) Project Operational/Procurement Manual: Project will use a procurement manua named PCMMl, which will be agreed with World Bank 5. Any Other Special Procurement Arrangements: Retroactive financing is applicable 6. Summary of the Procurement Packages planned during the first 18 months after project effectiveness ( including those that are subject to retroactive financing and advanced procurement) [List the Packages which require Bank’s prior review first and then the other packages] 1 2 3 4 5 6 7 Ref. Description Estimate Packages Domes Review Comment No. d tic s Prefer by Bank Cost ence (Prior / US$ (yes/n Post) million o) Summary of 0 0 NA NA the ICB (Works) Summary of Nil Nil NA NA Nil the ICB (Goods) Summary of 41.2 No NA post the NCB (Works) Summary of Nil the NCB (Goods) Summary of Nil the ICB (Non- Consultant Services) III. Selection of Consultants 1. Prior Review Threshold: As agreed in Procurement Plan Selection Method Prior Review Threshold Comments 1. Competitive Methods (Firms) Above US$ 1,000,000 2. Single Source (Firms) Do 3. Individual Above US$ 300,000 2. Any Other Special Selection Arrangements: Retroactive financing applicable 3. Consultancy Assignments with Selection Methods and Time Schedule 1 2 3 4 5 6 Ref. No. Description Estimate Packages Review Comments of d Assignment by Bank Cost US$ (Prior / million Post) Summary of Nil Nil NA Nil number of contracts that will be let under QCBS Summary of 0.25 4 Post Nil number of review contracts that will be let under other methods PROCUREMENT India : PMGSY Rural Roads Project PLAN General Information Country: India Bank’s Approval Date of the Original Procurement Plan: 2019-12-16 Revised Plan Date(s): (comma delineated, leave blank if none)2020-03-12 Project ID: P124639 GPN Date: Project Name: PMGSY Rural Roads Project Loan / Credit No: IBRD / 88640 Executing Agency(ies): Bihar Rural Roads Development Agency WORKS Bid Evaluation Activity Reference No. Estimated Actual Draft Pre- Draft Bidding Loan / Credit Market Procurement Prequalificatio Process Prequalification Specific Procurement Bidding Documents Proposal Submission Report and / Description Component Review Type Method Amount Amount qualification Document / Signed Contract Contract Completion No. Approach Process n (Y/N) Status Evaluation Report Notice / Invitation as Issued / Opening / Minutes Recommendation for (US$) (US$) Documents Justification Award Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual Planned Actual BR02P2R-01 / MRL04- Under PMGSY Program Request for Single Stage - KATEYA To MAKHRA IBRD / 88640 Post Open - National 194,718.26 0.00 Implementa 2019-12-26 2020-01-10 2019-12-31 2020-02-04 2020-02-04 2020-03-15 2020-04-03 2021-04-03 Financing Bids Two Envelope (Aurangabad) tion BR38P2R001 / L058- Under PMGSY Program Request for Single Stage - Patna Aurangabad to IBRD / 88640 Post Open - National 233,964.13 0.00 Implementa 2019-12-26 2020-01-10 2019-12-31 2020-02-04 2020-02-04 2020-03-15 2020-04-03 2021-04-03 Financing Bids Two Envelope Bahadurapur (Arwal) tion BR02P2R-02 / L036-GOH Under PMGSY Program Request for Single Stage - GAYA ROAD T02 TO IBRD / 88640 Post Open - National 591,597.23 0.00 Implementa 2019-12-26 2020-01-10 2019-12-31 2020-02-04 2020-02-04 2020-03-15 2020-04-03 2021-04-03 Financing Bids Two Envelope DAUDPUR (Daudnagar) tion BR37P2R-02 / L027- Under PMGSY Program Request for Single Stage - R.E.O. Road to Nuniapatti IBRD / 88640 Post Open - National 126,338.09 0.00 Implementa 2019-12-26 2020-01-10 2019-12-31 2020-02-04 2020-02-04 2020-03-15 2020-04-03 2021-04-03 Financing Bids Two Envelope (Bagaha-1) tion BR37P2R-03 / L066- Under Parsauni Dih PMGSY PMGSY Program Request for Single Stage - IBRD / 88640 Post Open - National 190,651.04 0.00 Implementa 2019-12-26 2020-01-10 2019-12-31 2020-02-04 2020-02-04 2020-03-15 2020-04-03 2021-04-03 Road to Deurwaa via Financing Bids Two Envelope tion Pandey patti (Bagaha-1) BR37P2R-06 / T01- Under PMGSY Program Request for Single Stage - Chamainia To Gonauli IBRD / 88640 Post Open - National 431,902.27 0.00 Implementa 2019-12-26 2020-01-10 2019-12-31 2020-02-04 2020-02-04 2020-03-15 2020-04-03 2021-04-03 Financing Bids Two Envelope Path (Bagaha-1) tion BR02P2R-03 / ML02- Under PMGSY Program Request for Single Stage - L027 TO CHARAN IBRD / 88640 Post Open - National 1,214,277.64 0.00 Implementa 2019-12-26 2020-01-10 2019-12-31 2020-02-04 2020-02-04 2020-03-15 2020-04-03 2021-04-03 Financing Bids Two Envelope KALAN (Aurangabad) tion BR02P2R-04 / L047-T04 Under PMGSY Program Request for Single Stage - TO KADIAHI KHURD IBRD / 88640 Post Open - National 393,814.43 0.00 Implementa 2019-12-26 2020-01-10 2019-12-31 2020-02-04 2020-02-04 2020-03-15 2020-04-03 2021-04-03 Financing Bids Two Envelope (Daudnagar) tion BR36P2R-01 / T03- Under KHALSA CHOWK TO PMGSY Program Request for Single Stage - IBRD / 88640 Post Open - National 137,876.01 0.00 Implementa 2019-12-26 2020-01-10 2019-12-31 2020-02-04 2020-03-15 2020-04-03 2021-04-03 KHALSA GHAT Financing Bids Two Envelope tion (HAJIPUR MAHNAR ROAD) (Mahnar) BR36P2R-02 / T01- Under PHULPURA TO PMGSY Program Request for Single Stage - IBRD / 88640 Post Open - National 208,656.97 0.00 Implementa 2019-12-26 2020-01-10 2019-12-31 2020-02-04 2020-02-04 2020-03-15 2020-04-03 2021-04-03 CHAKSIKANDAR BAZAR Financing Bids Two Envelope tion (Mahnar) BR03P2R-01 / MRL01- Under Mahadeopur to Kashba PMGSY Program Request for Single Stage - IBRD / 88640 Post Open - National 614,899.03 0.00 Implementa 2019-12-26 2020-01-10 2019-12-31 2020-02-04 2020-02-04 2020-03-15 2020-04-03 2021-04-03 via Ranikitta to Financing Bids Two Envelope tion Pranathpur (Banka-1) BR36P2R-03 / T01- Under PMGSY Program Request for Single Stage - Baksama se Bakhari Doaa IBRD / 88640 Post Open - National 486,951.00 0.00 Implementa 2019-12-26 2020-01-10 2019-12-31 2020-02-04 2020-02-04 2020-03-15 2020-04-03 2021-04-03 Financing Bids Two Envelope via Sumerganj (Mahua) tion BR03P2R-02 / MRL01- Under PMGSY Program Request for Single Stage - Bgp -dumka rd to bhurna IBRD / 88640 Post Open - National 417,695.24 0.00 Implementa 2019-12-26 2020-01-10 2019-12-31 2020-02-04 2020-02-04 2020-03-15 2020-04-03 2021-04-03 Financing Bids Two Envelope (Banka-2) tion BR36P2R-04 / T01-L040 Under PMGSY