9Rl and RESIDENTIAL BUILDING PROJECT "ORBITO
Total Page:16
File Type:pdf, Size:1020Kb
STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, BIHAR Rer. No. f :f 9rl Patna-23, dated: Zl"< n /sn +f f From, Prof. R. C. Sinha Chairman, SEIAA. Bihar To, Shri Samrendra Singh, (Managing Director) M/s MUNDESHWARI MULTICON PVT" LTD.. 1" Floor, Amitabh Kunj, Main Road, Buddha Colony, District:- Patna (BIHAR) Pin - 800 001. Sub: Environmental Clearance for the proponent "COMMERCIAL AND RESIDENTIAL BUILDING PROJECT "ORBITO PROJECT" at Thana No.:- 36, Khata No.:- 167, 188, 197, Plot No.- 13, 15, 16, I7 & 18, Village:- Mustafapur, Tehsil:- Danapur Block, Near Saguna More, District:- Patna, State:- Bihar." Sir, This has reference to your application submitted vide letter No. MMPL/2O1 7lPATll53, dated l4th |une,2017 (project received in SEIAA on l6th June, 2017) in this regard seel<ing. environmental clearance, your application rvas appraised bv SEAC in its ruuul.irrg lrcld uu 17"' &18"'Jurru, 2017 as pur l-lA f.lutifiuatiun, 2006 and its atricudurcut thcrcoi. Un the recommendation of SHAU, SBIAA in il.s meeting held on 29''' Junc,2017 auuurds Environmental Clearance with the followine conditions. The silent features are as follows. r\ STATE ENVIRONMENT IMPACT ASSESMENT AUTORITY (SEIAA). BIHAR li . The salient feature of project is given in table given below:- COMMERCIAL AND RESIDENTIAL BUILDING Name of Project PROJECT "ORBITO PROJECT" Shri Samrendra Singh, Name of applicant (Managing Director) lWs MUNDESHWARI MULTICON PVT. LTD.. Type of Proiect Buildine & Construction Proiect Catesorv of the Proiect 8(a)-B, At Thana No.:- 36, Khata No.:- 167, 188, 197, Plot No.- 13, 15, 16, 17 & 18, Village:- Mustafapur, Project Location Tehsil:- Danapur Block, Near Saguna More, District:- Patna, State:- Bihar Latitude Longitude I Corner - I 25" 36'27.27" N 85'02'26.70" E I Latitude & Longitude Comer - II 25" 36'29.55" N 85' 02' 27.59" E I Corner - III 25" 36'28.79" N 95" 02' 31.40" E I Comer - IV 25" 36'25.89" N 85'02'31.60" E I Total Plot Area 2.61 acres) 10,581 .94M" Total Built-up Area 36.719.24M'z 3703.67 M" (35 % of site area) Permissible Ground Coverage 3.280.40M" (31 % of site area) Prooosed Road / Paved Area 3.148.13M'Q9.75% of plot area) 3,204.21V" Q0.29% of plot area for tree plantation) Green Belt Area 949.20M'(8.960 of plot area forpark area) Total : 4,153.41V12 (Sq.ZS oh of sitelplot area) Commercial Buildins BUA (M, Lower Ground Floor 8o.ol(M2) B/UP Area Ground Floor B/UP 889.s8 (M2) Area 1" Floor B/UP Area 889.58 rM 2no Floor B/UP Area 889.58 (M',) 3'" Floor B/UP Area 889.58 (M Block wise built-up area 4th Floor B/UP Area 889.58 (M', 5th Floor BruP Area 889.58 rM 6' Floor B/UP Area 889.58 rM 7'' Floor BfuP Area 889.58 (M',) Itn Flnor tt/t-TP Aran 8fi9 5fi il\4" Total BUA (A) 8086.23 (M',) Residential Buildine BUA (M,) Lower ground floor 165.3 BUA area 0w) Shastri Nagar, Patna. Pin:- 800 023 ( STATE ENVIRONMENT IMPACT ASSESMENT AUTORITY (SEIAA). BIXEN : Ground floor BUA area 505.89 (M') lst floor BUA area 1302.88 (M', 2nd floor BUA area 2423.54 (M" 3rd floor BUA area 2423.s4 (M 4th floor BUA area 2423.54 (M 5th floor BUA area 2423.54 (M 6th floor BUA area 2423.54 (M" 7th floor BUA area 2423.54 (M 8th floor BUA area 2423.54 (M'\ 9th floor BUA area 2423.54 (M" lOth floor BUA area 2423.54 (}/4'\ l lth floor BUA area 2423.54 (};4'\ 12th floor BUA area 2423.54 (M' Total BUA area (B) 28633.01 (M TOTAL BUA (A + B) 36.719.24 (M' 04 Nos. of Building Blocks. Building Blocks Details Commercial Building:- 0 I Residential Buildins:- 03 New/ Exoansion / Modernization New Project Patliputra Junction:- 3.08 Km towards NE. Nearest Railway Station Danapur Railway Station:- 2.86 Km towards South" Patna Junction:- 9.64 Km towards East. Jay Prakash Narayan International Airport:- 5.23 Nearest Airport Km towards East. Khagaul - Shiwal- Bihta Road - 2.84Km. Khagaul - Phulwari - Sharif Road - 2.80 Km. Danapur- Naubatpur Road 2.17 Km. Nearest Highway/Roads - Rukunpura - Khagaul Road - 1.93 Km. NH - 30 at 1.38 Km. NH - 98 at 4.15 Km. Buddha Dental College & Hospital (Patna) at I.071 Km towards North East. Danapur Hospital (Patna) at 3.071 Km towards Nearest Hospital North - East. AIIMS (Patna) at 5.15 Km towards South. Apollo Hospital at 5.2 Km towards South - West. IGIMS. Patna at4.82 Km towards East. Nearest 'l'own/City Patna Nearest River/Water Bodles Rlver Gansa:- 5.15 Km North. Proposed Capacity/area/ lengthltonnage 10,581.94 M' to be handledi Command areal Lease Total Plot Area areal number of wells to be drilled Total Built-up Area 36,719.24M' Green-Belt & Landscape Area Total : 4,153.41M" (39.25 Yo of sitelplot area Shastri Nagar, Patna. Pin:- 800 023 ( STATE ENVIRONMENT IMPACT ASSESMENT AUTORITY (SEIAA). BISNN Total Parkins Area Available 16.041.89 M' As per Bihar Bye Law Area ( M' Total Commercial BUA 8086.23 M2 Area Commercial Parking Required 30% of BUA 2425.869M" atea Residential BUA Area 28633.01M" Residential Parking Required 25%OF BUA 7158.2525 M' Parking Area Requirement afea TOTAL PARKING 9,584ly'r2 AREA REOUIRED Parking Area Provided 7473.55M2 In Basement Parking area provided 2tt7.65 M2 in lower sround floor Total Parking area 9,591M2 orovided Maximum Heisht of the Buildins 49.50 Meters Total Nos. of Residential Flats 198 Nos. Proposed Occupancy residential of 836 persons Buildins (E 5 oersons each flats Construction Phase:- I I KLD (drinking purpose) Operational Phase:- 149 KLD Total Freshwater Requirement Source:- The fresh water will be sourced throueh sround water. Total Waste Water Generated I19 KLD Total Water Consumption Construction Phase:- 44 KLD Operational Phase:- 207 KLD No. of Rain Water Harvestins Pits 03 No. 809 KW Power Requirement (Source:- Bihar State Electricitv Board) Power Backup 2 DG sets of total capacity of 830 KVA (1 X630KVA+1X2OOKVA) Solid Waste to be Generated 0.6 TPD No. of Over head tanks 08 I otal [jost of the Proiect ? 80,00,00,000/- Shastri Nagar, Patna. Pin:- 800 023 4 ( STATE ENVIRONMENT IMPACT ASSESMENT AUTORITY (SEIAA). BIHAN PART A - GENERAL CONDITIONS I. Pre- Construction Phase i. Provision shall be made for the housing of construction labour within the site with all necessary infrastructure and facilities such as fuel (kerosene/gas) for cooking, safe drinking water, medical health care, etc. The housing may be in the form of temporary structures to be removed after completion of the project. ii. Provision of drinking water, waste water disposal, solid wastes management and primary health facilities shall be ensured for labour force. Proper sanitation facilities shall be provided at the construction site to prevent health related problems. Domestic as'well as sanitary wastes from construction camps shall be cleared regularly. iii. Adequate safety measures shall be adopted for the construction workers. iv. All the labourers to be engaged for construction works shall be screened for health and adequately treated before issue of work permits. The contractor shall ensure periodic health check-up of construction workers. v. Fencing of the project boundary before start of construction activities. vi. Use of energy efficient construction materials shall be ensured to achieve the desired thermalcomfort. vii. Use of fly ash based bricks/blocks/tiles/products shall be explored to the maximum extent possible. viii. Lay out of proposed buildings and roads within premises etc. shall be made in such a way that it shall cause minimum disturbance to existing flora and fauna. Appropriate green belt shall developed to compensate the {rabitat loss of tree cutting (if any) from competent authority as per prevailing ActlRules. The exotic species existing within the existing premises, if any, shall be protected. The greening programme shall include plantation of both exotic and indigenous species. ix. Dedicated pedestrian paths shall be provided along the proposed Buildings. Appropriate aecess shall be provided for physically challenged people in the Putlustrian Fuths. x. The design of service roads and the entry and exit from the buildings shall conform to the norrns & standards prescribed by the State Public Works Department. Shastri Nagar, Patna. Pin:- 800 023 ( STATE ENVIRONMENT IMPACT ASSESMENT AUTORITY (SEIAA). BIXIN xi. The road system shall have the road cross sections for general traffic, exclusive ways for public mass transport (bus) system, pedestrian paths and ways, utility corridors and green strip. xii. Topsoil excavated during construction activities should be stored for use in horticulture / landscape development within the project site. Balance top soil should be disposed at in planned manner for use elsewhere adequate erosion and sedirnent control measures to be adopted before ensuing construction activities. xiii. Prior permission should be obtained from the competent authority for demolition of the existing structure, if any. Waste recycling plans including top soil should be developed prior to beginning of demolition and construction activity. The plans should identify wastes to be generated and designate handling, recycling and disposal method to be followed. xiv. Disposal of muck including excavated material during construction phase should not create any adverse effects in the neighborhood and the same shall be disposed of taking the necessary precautions for general safety and health aspects. xv. The project proponent should advertise in at least two local newspapers widely circulated in the region, one of which should in the vernacular language, inforrning that the project has been accorded Environmental Clearance and copies of clearance letters are available with the State Environment Impact Assessment Authority, Bihar, and the same matter also be sent to Bihar State Pollution Control Board (B.S.P.C.B.), Patna.