Mathbaria Cyclone Shelter Subproject Initial Environmental Examination

Total Page:16

File Type:pdf, Size:1020Kb

Mathbaria Cyclone Shelter Subproject Initial Environmental Examination Initial Environmental Examination Document Stage: Final Project Number: 44212 ADB Loan/Grant Number: 3133/8284/0394/0395 September 2014 BAN: Coastal Towns Environmental Infrastructure Project – Mathbaria Cyclone Shelter Subproject Prepared by the Local Government Engineering Department for the Asian Development Bank. This is a revised version of the draft originally posted in August 2014 available on http://www.adb.org/projects/44212-013/documents. This initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Section 6: Subsection 3: Particular Specifications: Appendix A: Initial Environmental Examination APPENDIX A Coastal Towns Environmental Infrastructure Project (CTEIP) (ADB Loan No.______________) Local Government Engineering Department (Ministry of Local Government, Rural Development and Cooperatives) INITIAL ENVIRONMENTAL EXAMINATION (IEE) Batch 1: Stage I CTEIP Programme Contract Package No.: MAT/CS/01: Construction of Multipurpose Cyclone Shelter at Momenia Dakhil Madrassa (Ward 1), Mathbaria Pourashava, District: Pirojpur August 2014 Package:MAT/CS/01:IEE Section 6: Subsection 3: Particular Specifications: Appendix A: Initial Environmental Examination Package:MAT/CS/01:IEE Section 6: Subsection 3: Particular Specifications: Appendix A: Initial Environmental Examination Table of Contents Local Government Engineering Department ....................................................................................... i Executive Summary ................................................................................................................................ vi 1 Introduction ...................................................................................................................................... 1 1.1 Overview .................................................................................................................................. 1 1.2 Purpose of IEE ........................................................................................................................ 1 1.3 Scope of Services .................................................................................................................... 2 1.4 Approach and Methodology ..................................................................................................... 3 1.5 The Format of the Report ........................................................................................................ 5 2. Policy, Legal Framework and Institutional Capacity ........................................................................ 5 2.1 National Relevant Policies and Strategy ................................................................................. 5 2.1.1 National Environmental Policy ......................................................................................... 5 2.1.2 National Water Policy (NWP) .......................................................................................... 6 2.1.3 National Forest Policy ...................................................................................................... 6 2.1.4 Bangladesh Climate Change Strategy and Action Plan .................................................. 6 2.2 Legal Instruments .................................................................................................................... 7 2.3 Institutional Arrangements / Framework .................................................................................. 8 2.3.1Environmental Clearance Procedure .......................................................................................... 9 2.4.1 Environmental Category: Bangladesh ........................................................................... 10 2.4.2 Environmental Category: ADB ....................................................................................... 10 2.4.3 Bangladesh Environmental Standards .......................................................................... 11 2.4.4 Institutional Capacity ..................................................................................................... 11 3. Project Description ........................................................................................................................ 11 3.1 Overview ................................................................................................................................ 11 3.2 Selection and Siting of Cyclone Shelter ................................................................................ 12 3.3 Environmental Categorization ............................................................................................... 12 3.4 Existing Condition and Need for the Project ...................................................................... 12 4. Description of Baseline Environment ....................................................................................... 16 4.1 Mathbaria Pourashava and Environment .......................................................................... 16 4.1.1 Rainfall and Temperature .............................................................................................. 16 4.1.2 Hydrology ....................................................................................................................... 16 4.1.3 Drainage and Flood Control .......................................................................................... 17 4.1.4 Ambient Air Quality ........................................................................................................ 17 4.1.5 Ambient Noise ............................................................................................................... 17 4.1.6 Surface Water Quality ................................................................................................... 17 4.1.7 Groundwater Quality and Availability............................................................................. 17 4.1.8 Biological Environment .................................................................................................. 17 4.1.9 Economic Development ................................................................................................. 17 4.1.10 Socio-economic Characteristics .................................................................................... 18 5. Assessment of Environmental Impacts and Safeguards ............................................................... 19 5.1 Environmental Screening Considerations ............................................................................. 19 5.2 Anticipated Impacts and Mitigation Measures – Pre-construction Phase ............................. 20 5.3 Anticipated Impacts and Mitigation Measures – Construction Phase .................................... 20 5.4 Anticipated Impacts / Mitigation Measures – O&M Phase .................................................... 21 6. Grievance Redress Mechanism .................................................................................................... 22 6.1 Procedures ............................................................................................................................ 22 6.2 Grievance Registration .......................................................................................................... 22 6.3 Grievance Redress Process .................................................................................................. 22 6.4 Records ................................................................................................................................. 23 6.5 Grievance Redress Costs ...................................................................................................... 23 7. Public Consultation ........................................................................................................................ 24 7.1 Public Consultations and Participation .................................................................................. 24 7.2 Stakeholders .......................................................................................................................... 24 7.3 Public Participation – Methods and Process ......................................................................... 24 7.4 Findings from Public Consultation Meeting ........................................................................... 25 7.4.1 Focus Groups Discussions (FGD) ................................................................................. 25 7.4.2 Future Consultation and Disclosure ............................................................................... 27 8. Conclusion and Recommendations ............................................................................................... 27 8.1 Conclusions ........................................................................................................................... 27 8.2 Recommendations ................................................................................................................. 28 8.3 Disclosure
Recommended publications
  • Oral Hygiene Awareness and Practices Among a Sample of Primary School Children in Rural Bangladesh
    dentistry journal Article Oral Hygiene Awareness and Practices among a Sample of Primary School Children in Rural Bangladesh Md. Al-Amin Bhuiyan 1,*, Humayra Binte Anwar 2, Rezwana Binte Anwar 3, Mir Nowazesh Ali 3 and Priyanka Agrawal 4 1 Centre for Injury Prevention and Research, Bangladesh (CIPRB), House B162, Road 23, New DOHS, Mohakhali, Dhaka 1206, Bangladesh 2 BRAC James P Grant School of Public Health, BRAC University, 68 Shahid Tajuddin Ahmed Sharani, Mohakhali, Dhaka 1212, Bangladesh; [email protected] 3 Bangabandhu Sheikh Mujib Medical University (BSMMU) Shahbag, Dhaka 1000, Bangladesh; [email protected] (R.B.A.); [email protected] (M.N.A.) 4 Department of International Health, Johns Hopkins Bloomberg School of Public Health, 615 N. Wolfe Street, Baltimore, MD 21205, USA; [email protected] * Correspondence: [email protected] or [email protected]; Tel.: +880-2-58814988; Fax: +880-2-58814964 Received: 27 February 2020; Accepted: 14 April 2020; Published: 16 April 2020 Abstract: Inadequate oral health knowledge and awareness is more likely to cause oral diseases among all age groups, including children. Reports about the oral health awareness and oral hygiene practices of children in Bangladesh are insufficient. Therefore, the objective of this study was to evaluate the oral health awareness and practices of junior school children in Mathbaria upazila of Pirojpur District, Bangladesh. The study covered 150 children aged 5 to 12 years of age from three primary schools. The study reveals that the students have limited awareness about oral health and poor knowledge of oral hygiene habits. Oral health awareness and hygiene practices amongst the school going children was found to be very poor and create a much-needed niche for implementing school-based oral health awareness and education projects/programs.
    [Show full text]
  • World Bank Document
    Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Table of Contents Table of Contents ....................................................................................................................... i List of Tables .............................................................................................................................. v List of Figures .......................................................................................................................... vii Abbreviation and Acronyms ................................................................................................ ix Executive Summary .............................................................................................................. xiii 1. Introduction ....................................................................................................................... 1 1.1. Background .......................................................................................................... 1 1.2. Rationale ............................................................................................................... 1 1.3. Objectives ............................................................................................................. 3 1.4. Past initiatives of Greenbelt .............................................................................. 3 1.5. Overall Approach ................................................................................................
    [Show full text]
  • BAN: Coastal Towns Infrastructure Improvement Project – Mathbaria Water Supply
    Draft Initial Environmental Examination October 2013 BAN: Coastal Towns Infrastructure Improvement Project – Mathbaria Water Supply Prepared by the Local Government Engineering Department and Department of Public Health Engineering, Government of Bangladesh for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 10 October 2013) Currency unit – Taka (Tk) BDT.1.00 = $.01287 $1.00 = Tk 77.69 ABRREVIATIONS ADB – Asian Development Bank AP – affected person DoE – Department of Environment DPHE – Department of Public Health Engineering EARF – environmental assessment and review framework ECA – Environmental Conservation Act ECC – environmental clearance certificate ECR – Environmental Conservation Rules EIA – environmental impact assessment EMP – environmental management plan ETP – effluent treatment plant GRC – grievance redressal committee GRM – grievance redress Mechanism IEE – initial environmental examination LCC – location clearance certificate LGED – Local Government Engineering Department MLGRDC – Ministry of Local Government, Rural Development, and Cooperatives O&M – operations and maintenance PMU – project management unit PPTA – project preparatory technical assistance REA – rapid environmental assessment RP – resettlement plan SPS – Safeguard Policy Statement ToR – terms of reference GLOSSARY OF BANGLADESHI TERMS crore – 10 million (= 100 lakh) ghat – boat landing station khal – drainage ditch/canal khas, khash – belongs to government (e.g. land) katcha – poor quality, poorly built lakh, lac – 100,000 madrasha – Islamic college mahalla – community area mouza – government-recognized land area parashad – authority (pourashava) pourashava – municipality pucca – good quality, well built, solid thana – police station upazila – subdistrict WEIGHTS AND MEASURES ha – hectare km – kilometer m – meter mm – millimeter NOTES (i) In this report, "$" refers to US dollars. (ii) ―BDT. refers to Bangladeshi Taka This initial environmental examination is a document of the borrower.
    [Show full text]
  • Situation Report 2010
    MAY 12, SITUATION REPORT 2010 Situation Report No.164 Hazard Title: Pure Water Crisis in Aila Affected Area Location: Mathbaria upazila of Pirojpur district Event Details: Thousands of people in Mathbaria upazila of Pirojpur district of Bangladesh have been suffering from pure water as it is one of the massive Aila affected seashore. Moreover, Excess of salinity intrusion and continuous dropping down of layer of mineral water make it difficult to set up new tube-well. Area Municipality Union Population Reserve Shallow Deep PSF Surface pond tube-well tube-well water treatment plant 353.25 1 11 About 3 lac 4 2920 927 450 3000 liter Sq km. water per day Table- Mathbaria upazila of Pirojpur district Causes of Water Crisis: Natural causes : Climate change causes lake of rain, and Arsenic and Salinity intrusion Man made causes: Lake of long term plan, implementation and monitoring mechanisms of GO and NGO has been damaged and polluted man made and natural source of water. A short snap of present situation of water source in Mothbaria Upazila: Reserve Pond: In Mathbaria there are 4 reserve ponds under the local municipality to ensure pure water ponds. At present, the reserve ponds water becomes polluted with garbage as there is no way to drink that water. Shallow Tube-well: Most of the Shallow tube-well’s water becomes unhygienic with arsenic and salinity intrusion. Deep Tube-well: Local municipality has set up only 4 deep tube-wells to reduce water crisis. But mineral water layer is going down day by day and as it is therefore those deep tube-wells are not supplying water properly.
    [Show full text]
  • Sarankhola Upazila Profile
    SARANKHOLA UPAZILA PROFILE District: Bagerhat December 2014 Local Capacity Building and Community Empowerment (LCBCE) Programme. Supported by: UNICEF 1 | P a g e Table of Content Sl # Content Page # 1. Union Map 03 2. Background 04 3. Socio-economic condition 04 4. Geography 04 5. Disaster/ Vulnérabilités 05 6. Hard-to-Reach Areas. 05 7. Population in general 05 8. Child Population 06 9. Snapshot of situation of children and women in the union 06 10. Health and Nutrition 07 11. Situation of Birth Registration, Disability and Child Marriage 08 12. Child Labour 08 13. Education: Pre Primary, Primary and Secondary level 09 14. Water and Sanitation 10 15. Service by NGOs 10 16. Table 1.1: Union wise Sex disaggregated population data 12 17. Table 1.2: Age specific child population 12 18. Table 2.1: Union wise number of Children fully immunized or left out 13 19. Table 2.2: Union wise number of pregnant women with status of IFA intake 13 20. Table 2.3: Infrastructure and facilities/ Health & FP 14 21. Table 2.4 and 2.5: HR status of Health and FP 14 22. Table 3.1: Situation of birth registration child labour, disability 15 23. Table 4.1: Pre-primary Education coverage 15 24. Table 4.2: Primary Education coverage 16 25. Table 4.3: Secondary education coverage 16 26. Table 4.4: Infrastructure and facilities of Educational institution 17 27. Table 4.5: HR status of Institution 17 28. Table 5.1: Source of safe water and water Coverage 18 29. Table 5.2: Sanitation Coverage 18 30.
    [Show full text]
  • List of Upazilas of Bangladesh
    List Of Upazilas of Bangladesh : Division District Upazila Rajshahi Division Joypurhat District Akkelpur Upazila Rajshahi Division Joypurhat District Joypurhat Sadar Upazila Rajshahi Division Joypurhat District Kalai Upazila Rajshahi Division Joypurhat District Khetlal Upazila Rajshahi Division Joypurhat District Panchbibi Upazila Rajshahi Division Bogra District Adamdighi Upazila Rajshahi Division Bogra District Bogra Sadar Upazila Rajshahi Division Bogra District Dhunat Upazila Rajshahi Division Bogra District Dhupchanchia Upazila Rajshahi Division Bogra District Gabtali Upazila Rajshahi Division Bogra District Kahaloo Upazila Rajshahi Division Bogra District Nandigram Upazila Rajshahi Division Bogra District Sariakandi Upazila Rajshahi Division Bogra District Shajahanpur Upazila Rajshahi Division Bogra District Sherpur Upazila Rajshahi Division Bogra District Shibganj Upazila Rajshahi Division Bogra District Sonatola Upazila Rajshahi Division Naogaon District Atrai Upazila Rajshahi Division Naogaon District Badalgachhi Upazila Rajshahi Division Naogaon District Manda Upazila Rajshahi Division Naogaon District Dhamoirhat Upazila Rajshahi Division Naogaon District Mohadevpur Upazila Rajshahi Division Naogaon District Naogaon Sadar Upazila Rajshahi Division Naogaon District Niamatpur Upazila Rajshahi Division Naogaon District Patnitala Upazila Rajshahi Division Naogaon District Porsha Upazila Rajshahi Division Naogaon District Raninagar Upazila Rajshahi Division Naogaon District Sapahar Upazila Rajshahi Division Natore District Bagatipara
    [Show full text]
  • Coastal Towns Environmental Infrastructure Project – Mathbaria Cyclone Shelter Subproject
    Initial Environmental Examination Document Stage: Final Project Number: 44212 ADB Loan/Grant Number: 3133/8284/0394/0395 May 2014 Bangladesh: Coastal Towns Environmental Infrastructure Project – Mathbaria Cyclone Shelter Subproject Prepared by the Local Government Engineering Department The initial environmental examination is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. Coastal Towns Environmental Infrastructure Project (CTEIP) (ADB Loan No.______________) Local Government Engineering Department (Ministry of Local Government, Rural Development and Cooperatives) INITIAL ENVIRONMENTAL EXAMINATION (IEE) (FINAL REPORT) Batch 1: Stage I CTEIP Programme Contract Package No.: MAT/CS/01: Construction of Multipurpose Cyclone Shelter at Momenia Dakhil Madrassa (Ward 1), Mathbaria Pourashava, District: Pirojpur May 2014 Table of Contents Local Government Engineering Department ....................................................................................... i Executive Summary ........................................................................................................................... viii 1. Introduction .................................................................................................................................... 1 1.1 Overview .................................................................................................................................. 1 1.2 Purpose of IEE
    [Show full text]
  • List of 50 Bed Hospital
    List of 50 Bed UHC No. of Sl. No. Organization Name Division Name District Name Upazila Name Bed 1 Amtali Upazila Health Complex, Barguna Barisal Barguna Amtali 50 2 Betagi Upazila Health Complex, Barguna Barisal Barguna Betagi 50 3 Patharghata Upazila Health Complex, Barguna Barisal Barguna Patharghata 50 4 Agailjhara Upazila Health Complex, Barishal Barisal Barishal Agailjhara 50 5 Gournadi Upazila Health Complex, Barishal Barisal Barishal Gaurnadi 50 6 Muladi Upazila Health Complex, Barishal Barisal Barishal Muladi 50 7 Borhanuddin Upazila Health Complex, Bhola Barisal Bhola Burhanuddin 50 8 Charfession Upazila Health Complex, Bhola Barisal Bhola Charfession 50 9 Daulatkhan Upazila Health Complex, Bhola Barisal Bhola Daulatkhan 50 10 Lalmohan Upazila Health Complex, Bhola Barisal Bhola Lalmohan 50 11 Nalchithi Upazila Health Complex, Jhalokati Barisal Jhalokati Nalchity 50 12 Galachipa Upazila Health Complex, Patuakhali Barisal Patuakhali Galachipa 50 13 Kalapara Upazila Health Complex, Patuakhali Barisal Patuakhali Kalapara 50 14 Mathbaria Upazila Health Complex, Pirojpur Barisal Pirojpur Mathbaria 50 15 Nesarabad Upazila Health Complex, Pirojpur Barisal Pirojpur Nesarabad 50 16 Nasirnagar Upazila Health Complex, Brahmanbaria Chittagong Brahmanbaria Nasirnagar 50 17 Sarail Upazila Health Complex, Brahmanbaria Chittagong Brahmanbaria Sarail 50 18 Haziganj Upazila Health Complex, Chandpur Chittagong Chandpur Hajiganj 50 19 Kachua Upazila Health Complex, Chandpur Chittagong Chandpur Kachua 50 20 Matlab(daxin) Upazila Health Complex,
    [Show full text]
  • Cylindrocystis Menegh. (Chlorophyta): a New Record for Bangladesh
    Bangladesh J. Bot. 37(2): 189-191, 2008 (December) - Short communication CYLINDROCYSTIS MENEGH. (CHLOROPHYTA): A NEW RECORD FOR BANGLADESH 1 MONIRUZZAMAN KHONDKER , MD. ALMUJADDADE ALFASANE AND RAUF AHMED BHUIYAN Department of Botany, University of Dhaka, Dhaka-1000, Bangladesh Key words: Phytoplankton, Cylindrocystis brebissonii, Cylindrocystis crassa var. elliptica, Saccoderm desmid, New record, Bangladesh Abstract Cylindrocyctis brebissonii Menegh. and C. crassa var. elliptica West and West have been illustrated and discribed in this paper as new report for Bangladesh. In Bangladesh, saccoderm desmids are poorly represented compared to its counterpart placoderms. Of the six genera of saccoderm desmids (Smith 1950) only two such as Netrium and Gonatozygon have so far been reported from Bangladesh. The genus Netrium is represented by four species (Islam 1970, Islam and Akter 1999). On the other hand the genus Gonatozygon is represented by six species (Islam 1970, Islam and Chowdhury 1979, Islam and Haroon 1980, Islam et al. 1980, Islam and Irfanullah 1999 and Aziz and Tanbir 2003). The present authors, while working on some plankton samples collected from a domestic pond of Mathbaria Upazila Sadar of Pirojpur district (southern part of Bangladesh) came across the occurrence of Cylindrocystis brebissonii Menegh. and C. crassa var. elliptica West and West hitherto unreported. Details of the study site and sampling procedure have been presented in Khondker et al. (2006). Division: Chlorophyta, Class: Chlorophyceae, Order: Desmidiales, Family: Mesotaeniaceae 1. Cylindrocystis brebissonii Menegh. (Fig. 1) (Croasdale and Grönblad 1964, 148, 1: 10; Ling and Tyler 2000, 129, 56:1) Cells short cylindrical, slightly reniform, poles broadly rounded, cell wall prominent, fully filled up with protoplasm, chloroplasts 2, one in each semicell, stellate.
    [Show full text]
  • Eco-Village Development Feasibility Study Bangladesh
    Feasibility Study of Eco-Village Development concept in the coastal region of Bangladesh DRAFT July 2020 1 Table of content 1. Introduction 3 1.1. Background 3 1.2. Executive Summary 4 2. Objective 5 3. Scope of Work 5 4. Methodology 5 4.1. Parameters of area selection 5 4.2. Questionnaire 7 4.3. key informant interview (KII) or Focus Group Discussion (FGD) 7 4.4. Data collection and analysis 7 4.5. Validation 8 5. Context of the area 13 5.1. Geographic location 13 5.2. Demography 13 5.3. Major Challenges: 13 5.4. Existing projects, development activities: 15 6. Feasibility Study 16 6.1. Current Scenario 16 6.2. Feasibility Study Summary 23 7. National Policy review and National Priority 26 8. National programs 30 9. Finance 32 10. Vulnerability in the Coastal region 39 11. Recommendation 41 12. Conclusion 42 13. Annex 43 2 1. Introduction 1.1. Background Eco-Village Development In South Asia, more than half the population lives in villages and the development of the subcontinent is linked to the development of the villages. The Eco-Village Development (EVD) in South Asia is based on promoting local and affordable climate friendly technologies and practices, as a means to create sustainable local development and climate mitigation and adaptation actions in existing rural villages and communities. The EVD involves the implementation of inexpensive, renewable energy solutions, food security interventions, and livelihood enhancing solutions, mainly via capacity building and with aims of climate change adaptation and mitigation. EVD is an integrated approach of creating development-focused, low-carbon communities of practice in pre-existing villages.
    [Show full text]
  • Health Bulletin 2007
    Board of Publication Chief Advisor: Dr. Md. Shahjahan Biswas, Director General, Directorate General of Health Services (DGHS), Mohakhali, Dhaka. Advisors: 1. Dr. Md. Muzaffar Hossain, Director, Administration, DGHS, Mohakhali, Dhaka. 2. Dr. Saleh Muhammad Rafique, Director, Primary Health Care, DGHS, Mohakhali, Dhaka. 3. Dr. Md. Nazrul Islam, Director, Planning & Research, DGHS, Mohakhali, Dhaka. 4. Dr. Md. Akhtar Hossain Bhuiyan, Director, Hospital, DGHS, Mohakhali, Dhaka. 5. Prof. Dr. Moazzem Hossain , Director, Disease Control, DGHS, Mohakhali, Dhaka. 6. Dr. Md. Moazzam Hossain, Ex Director, MIS, DGHS, Mohakhali, Dhaka. 7. Dr. Ranjit Kumar Dey, N.P.O., WHO. Chief Editor: Dr. Md. Abdul Jalil PK, Line Director, Management Information System (MIS), DGHS, Mohakhali, Dhaka. Editors: 1. Dr. Md. Ansar Ali, Chief (HIU), MIS, DGHS, Mohakhali, Dhaka. 2. Dr. Abu Zamil Hussain Imam, Deputy Director, MIS, DGHS, Mohakhali, Dhaka. 3. Dr. AFM Nowsher Ali, Deputy Chief (Medical), MIS, DGHS, Mohakhali, Dhaka. 4. Dr. Md. Nazrul Islam, Asstt. Director, MIS, DGHS, Mohakhali, Dhaka. 5. Dr. Wahidul Mowla, Deputy Program Manager (DPM), MIS, DGHS, Mohakhali, Dhaka. 6. Dr. Munir Ahmed, Asstt. Chief (Medical), MIS, DGHS, Mohakhali, Dhaka. 7. Mr. Moinuddin Ahmad Bhuiyan, System Analyst, MIS, DGHS, Mohakhali, Dhaka. 8. Engr. Sukhendu Shekhor Roy, Programmer, MIS, DGHS, Mohakhali, Dhaka. Compiled and Analyzed by: Mr. Md. Ashraful Islam Babul, Deputy Chief (Non-Medical), MIS, DGHS, Mohakhali, Dhaka. Associate Editors: 1. Mr. Burhan uddin Ahmad, Asstt. Programmer, MIS, DGHS, Mohakhali, Dhaka. 2. Mr. Fakhrul Islam Khan, Statistician, MIS, DGHS, Mohakhali, Dhaka. Assisted Person: Mr. Md. Mahfuzur Rahman, Data Entry Operator, DGHS, Mohakhali, Dhaka. Implemented by: Management Information System (MIS), Directorate General of Health Services (DGHS), Mohakhali, Dhaka.
    [Show full text]
  • Indigenous Peoples Impact Categorization Report Coastal
    Indigenous Peoples Impact Categorization Report Project No. 45084-002 Semiannual Report December 2018 Coastal Climate-Resilient Infrastructure Project Prepared by Local Government Engineering Department for the People’s Republic of Bangladesh and the Asian Development Bank. This Indigenous Peoples Impact Categorization Report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH Local Government Engineering Department (LGED) COASTAL CLIMATE RESILIENT INFRASTRUCTURE PROJECT (CCRIP) ADB Project No. 45084-002 INDIGENOUS PEOPLES IMPACT CATEGORIZATION REPORT Reporting Period: July to December 2018 Project Management Office Project Director, CCRIP RDEC Bhaban (3rd Floor), LGED HQ Agargaon, Dhaka 1207 Table of Contents 1 Executive Summery ........................................................................................... 2 2 Introduction ........................................................................................................ 3 3 Background of Coastal Climate Resilient Infrastructure Project ......................... 4 4 ADB’s Safeguard Policy Statement
    [Show full text]