Planning and Development Committee Meeting - 13Th July 2006

Total Page:16

File Type:pdf, Size:1020Kb

Planning and Development Committee Meeting - 13Th July 2006 PLANNING AND DEVELOPMENT COMMITTEE MEETING - 13TH JULY 2006 P/06/249/FUL LADBROKES LTD., PER CORSER WEST LTD., UNIT 6, TOP BARN FARM BUS CTR. HOLT HEATH, WORCESTER WR6 6NH 2 COMMERCIAL STREET MAESTEG CF34 9DF NEW SHOP FRONT ~ AMENDED PLANS R'CD 08-05-06 Application Received : 24th February 2006 Site Inspected: 2 March 2006 Town Council Observations: Object on the grounds that the proposal would create an undue concentration of non-retail uses within the Established Commercial Centre of Maesteg, dilute the continuity of the primary shopping frontage and have a detrimental impact on the regeneration strategy of the town centre and contrary to Policies R3 and Reg 2 of the Bridgend Unitary Development Plan. Report: DESCRIPTION OF DEVELOPMENT The application proposes the installation of a new shop front at this currently vacant shop premises within Maesteg Town Centre. RELEVANT HISTORY 86/841 - Buttressing retaining wall to rear of premises - unconditional consent 14/8/1986 92/467 - Rear fire escape - unconditional consent - 11/06/92 06/294 - Change of Use vacant shop to betting office - Refused 12/05/2006 06/A07 - Internally illuminated signs - Not Yet Decided PUBLICITY The application has been advertised on site and in the local press as a development lying within the Maesteg Town Centre Conservation Area and adjoining properties have been individually notified. The period for consultation response expired on 5 April 2006. NEGOTIATIONS On 9 March 2006 the applicant's agent was advised that the design of the proposed shop front did not comply with the Authority's design guidance for shop fronts. Revised plans were submitted on 6 April 2006 which whilst they reflected a more traditional style did not fully comply with design guidance. Further amendments were received on 8 May 2006 and reconsultations were undertaken on these final revisions. PAGE 1 PLANNING AND DEVELOPMENT COMMITTEE - 13 JULY 2006 P/05/1442/FUL PARC DERWEN NORTH OF HEOL WEST PLAS & WEST OF HEOL SPENCER COITY, BRIDGEND PRIMARY ROAD, ACCESS AND DRAINAGE INFRASTRUCTURE (AMENDED ROAD LAYOUT RECEIVED 26-06-2006) This application was considered by the Planning and Development Committee on 16 February 2006 when Members resolved that the Executive Director - Environment be granted plenary powers to issue a decision notice granting consent once the Section 106 Agreement for the Parc Derwen Development had been signed. This has not happened to date and the outline application remains undetermined. Application P/05/1442/FUL sought consent for the northern section of primary infrastructure works to serve Parc Derwen and included a section of the loop road which was to serve the “Upper Village and School Square”. In the previous report to Members it was recommended that a condition be imposed requiring the submission and agreement of a detailed scheme for the ‘School Square’ including full engineering details and a programme of works. The developer’s submission proposes a predominantly hard surface, unified by the use of materials incorporating open space, landscaping and car parking. Whilst the scheme reflected the advice contained within the approved Parc Derwen Design Guide it raised serious highway safety concerns, the most fundamental being the position of the ‘School Square’ on the route of the primary estate road. The potential for conflict between pedestrian and vehicle movements existed. Negotiation has resulted in the submission of revised road designs which now remove the primary loop road from the ‘school square’ with the new route now continuing due west from the northern junction of the Upper Village and School Square. Junction priorities and alignment will be amended as will the widths of the respective sections of the highways. In agreeing to submit the amended drawings the developers have also requested a variation to the wording of a condition. The condition currently requires details of the School Square to be submitted and agreed by the Authority prior to commencement. The developers maintain that as the primary road infrastructure no longer passes through the School Square the condition could be amended to require the detailed submission at a later stage possibly following the commencement of works on site. The amended plans have been the subject of consultation with the Community Council, Local Members and the Transportation and Engineering Section. The period allowed for responses to the consultations expires on 11 July 2006. A copy of my original report to Members on the application is reproduced as APPENDIX E to the main report. APPRAISAL The changes proposed by the revised plans are relatively minor in the context of the overall infrastructure to serve the Parc Derwen development. Whilst they represent a PAGE: 105 PLANNING AND DEVELOPMENT COMMITTEE - 13 JULY 2006 technical departure from the approved development brief they are in the interests of highway safety and will allow the design concepts of the brief to be incorporated in the future design of the School Square. Whilst the observations of the Transportation and Engineering Section are awaited they are likely to be provided prior to the Committee meeting and will be brought to the attention of Members on the amendment sheet. The applicant’s request to vary condition (13) is also reasonable in the circumstances and subject to appropriate wording will allow the Authority to retain effective control over the future design of the School Square. Recommendation: (A) That the Executive Director - Environment be granted plenary powers to issue a decision notice granting consent P/05/1442/FUL - Primary Road Access and Drainage Infrastructure - Amended Road Layout (received on 26 June 2006) once a Section 106 Agreement for the Parc Derwen development has been signed and a decision notice issued granting planning permission to P/00/288/OUT. (B) That this application will be subject to the following conditions:- 1. The drainage infrastructure scheme including off-site works to the Main Avenue Sewer shall be completed in accordance with a programme to be submitted to and approved by the Local Planning Authority in writing prior to the commencement of works on site. Reason : To ensure safe drainage of the site and prevent flooding. (Policy EV17- Unitary Development Plan) 2. The flows from the approved drainage infrastructure shall discharge at a maximum rate of 19 litres per second per hectare to the River Ewenny catchment. Reason : To ensure safe drainage of the site and prevent flooding. (Policy EV17- Unitary Development Plan) 3. No development shall commence until detailed plans showing the design of the new channels for diverted watercourses, including engineering details and a programme for the completion of the works have been submitted to and agreed in writing by the Local Planning Authority. The water course diversions shall be carried out in accordance with the agreed details. Reason : To ensure safe drainage of the site and prevent flooding. (Policy EV17- Unitary Development Plan) 4. Notwithstanding the submitted drawings, no works shall commence on site until full engineering details in respect of the proposed infrastructure roads and pedestrian link footpaths have been submitted to and approved in writing by the Local Planning Authority. The roads shall be implemented in accordance with the approved engineering details. PAGE: 106 PLANNING AND DEVELOPMENT COMMITTEE - 13 JULY 2006 Reason : To ensure safe and satisfactory vehicular and pedestrian in the interests of public and highway safety. (Policy T2- Unitary Development Plan) 5. The access roads and cycleway footpaths leading from the public highway to the boundary of the Primary School site shall be completed to an adoptable standard within twelve months of the practical completion of the Primary School unless an extended period of not more than twenty four months is agreed in writing by the Local Planning Authority if such an extended period is agreed, and up to base course level before the beneficial use of the Primary School commences. Reason: To ensure safe and satisfactory vehicular and pedestrian access to the Primary School and Community Centre in the interests of public and highway safety. (Policy T2- Unitary Development Plan) 6. All access roads, apart from those covered by condition 5 that are the subject of this planning permission shall be completed to an adoptable standard prior to occupation of all of the dwellings served by the sections of access roads that are contained within individual 'Development Cells' to be developed in accordance with the 'Phasing Plan' to be agreed in accordance with the terms and conditions of the Section 106 Agreement in respect of planning permission P/00/288/OUT and up to base course level prior to the occupation of the first dwelling contained within the development cell served by the road concerned. Reason: To ensure safe and satisfactory vehicular and pedestrian access to the Primary School, and dwellings in the interests of public and highway safety. (Policy T2- Unitary Development Plan) 7. Notwithstanding the submitted drawings, no works whatsoever shall commence on site until such time as a comprehensive traffic calming scheme, including full engineering details, has been submitted to and agreed in writing by the Local Planning Authority for traffic calming restricting 85 percentile traffic speeds to 20 mph in relation to the infrastructure estate roads proposed and 30 mph in respect of the access loop road. The traffic calming facilities shall be implemented in accordance with the approved engineering details and completed within the same timescale identified for the associated roads by condition 5. Reason: In the interests of highway safety. (Policy T2- Unitary Development Plan) 8. No development shall commence until a scheme and method statement detailing the construction access location(s), site delivery vehicle and haulage routes, location of site compound(s), parking for construction workers and details of temporary turning facilities have been submitted to and approved in writing by the Local Planning Authority for each phase of the development.
Recommended publications
  • 233 08 SD69 Variation Notice, Single Permit Consolidation
    Notice of variation and consolidation with introductory note The Environmental Permitting (England & Wales) Regulations 2010 Northwood & Wepa Limited Bridgend Paper Mill Llangynwyd Bridgend CF34 9RS Variation application number EPR/EP3738NG/V003 Permit number EPR/EP3738NG Variation and consolidation Page i application number EPR/EP3738NG/V003 Bridgend Paper Mill Permit number EPR/EP3738NG Introductory note This introductory note does not form a part of the notice. The following notice gives notice of the variation and consolidation of an environmental permit. The Industrial Emissions Directive (IED) came into force on 7th January 2014 with the requirement to implement all relevant BAT conclusions as described in the Commission Implementing Decision. The production of paper, pulp and board BAT conclusions were published on 30th September 2014 in the Official Journal of the European Union following a European Union wide review of BAT. This variation incorporates the changes required by the Industrial Emissions Directive following a statutory review of permits in the paper, pulp and board sector. This includes the amendment of the wording of several permit conditions relating to notifications and also includes the addition of a condition relating to a requirement for monitoring of groundwater and soil. At the same time the permit has been converted into the current EPR Permit format. The schedules specify the changes made to the permit. The status log of a permit sets out the permitting history, including any changes to the permit reference number. Variation and consolidation Page ii application number EPR/EP3738NG/V003 Status log of the permit Description Date Comments Application EPR/BJ5805IX received 27/02/01 Response to request for Request Response dated 25/06/01.
    [Show full text]
  • SD148 Accessible Natural Greenspace Study 2009
    BRIDGEND COUNTY BOROUGH COUNCIL ACCESSIBLE NATURAL GREENSPACE STUDY FINAL REPORT MARCH 2012 Integrity, Innovation, Inspiration 1-2 Frecheville Court off Knowsley Street Bury BL9 0UF T 0161 764 7040 F 0161 764 7490 E [email protected] www.kkp.co.uk BRIDGEND COUNTY BOROUGH COUNCIL ACCESSIBLE NATURAL GREENSPACE STUDY CONTENTS Section Page Part 1: Introduction 1 Context 3 Part 2: Methodology 5 Part 3: Inception 7 Part 4: Assessment 9 Inventory of candidate sites 9 Inventory of natural sites 12 Inventory of accessible sites 12 Inventory of natural and accessible greenspace 14 Part 5: Analysis 16 Catchment zone mapping 17 Quality assessments 23 Part 6: Response 25 Meeting deficiencies 26 Improving quality 42 BRIDGEND COUNTY BOROUGH COUNCIL ACCESSIBLE NATURAL GREENSPACE STUDY PART 1: INTRODUCTION This is the draft Natural Greenspace study for Bridgend County Borough Council (BCBC). It presents and illustrates the findings of: A comprehensive assessment of the current level of provision of accessible natural greenspace across Bridgend County Borough. Data analysis and GIS mapping work. Recommendations for improving provision. This report incorporates the results of extensive research conducted in accordance with the Countryside Council for Wales (CCW) ‘Providing Accessible Natural Greenspace in Towns and Cities’ toolkit. The results of the project will be used to provide part of the evidence base for emerging local development plans (LDP) and in setting appropriate local targets for the provision of natural greenspace in accordance with Planning Policy Wales and Draft Technical Advice Note 16 ‘Sport, Recreation and Open Spaces’. The analysis provides an overall picture for Bridgend and also a more localised examination of issues by splitting the Borough into smaller areas (see overleaf for a map of the area covered and analysis areas used).
    [Show full text]
  • Special Conditions of 5 Church Place, Maesteg, CF34 9PD Sale by Auction
    Special Conditions of 5 Church Place, Maesteg, CF34 9PD Sale by Auction 1 Seller James Edward Blower Sellers Solicitor West Coast Conveyancing, 9 Kings Road, Canton, Cardiff, CF11 9BZ, reference WCC/AK/BLO001/001 2 Description of property All that freehold property known as 5 Church Place Maesteg CF34 9PD registered title number CYM602887. 3 The property is sold subject to all matters capable of registration whether registered or not before the date of the auction, all notices served and orders, grants, proposals or requirements made by local or public authority before or after these special conditions. 4 The seller sells with full title guarantee. 5 The deposit payable at auction shall be held by the auctioneers as agents for the seller. 6 If the buyer does not complete this contract on the completion date, the amount payable shall be increased by £250.00 if applicable for the costs of preparation of service of notice to complete by the seller. 7 If the buyer requests a change to the parties to the contract or their conveyancers following the exchange of contracts the amount payable shall be increased by £50.00. 8 The Transfer shall be prepared by the buyer. 9 Upon completion, the buyer shall pay the seller …‐1 Search fees of £311.80, 2 £780 (inc. VAT) being the seller’s legal fees, 3 Office Copies £9.00. 10 The Property Shall be at the risk of the Buyer from the date hereof and General Condition G3 shall not apply. 11 In all other respects, the General and Common Auction Conditions shall apply to this sale.
    [Show full text]
  • Llynfi Afan Renewable Energy Park (REP)
    Llynfi Afan Renewable Energy Park (REP) Design & Access Statement on behalf of Gamesa Energy UK Limited (GEUK) Prepared by: November 2010 RPS Planning & Development, Oxford RPS Planning & Development 18 Milton Park Abingdon Oxford OX14 4RP Tel 01235 838 200 Fax 01235 838 225 Email [email protected] Llynfi Afan Renewable Energy Park Design and Access Statement Contents Page no. Part 1 Introduction 1 Part 2 Context 4 Part 3 Response 10 Part 4 Summary 20 Figures Figure 1 Three Local Planning Authorities and Llynfi Afan REP Figure 2 The Site Location Plan and the Proposed Llynfi Afan REP Appendices 1 Schedule of the Split of Proposed Development Across the Three Local Planning Authorities Llynfi Afan Renewable Energy Park Design and Access Statement 1 Part 1: Introduction Outline of the Proposal 1.1 This Design and Access Statement (DAS) has been prepared by RPS Planning & Development on behalf of Gamesa Energy UK Limited (GEUK) to support a planning application for the construction and operation of a wind farm on land in Neath Port Talbot (NPTCBC), Bridgend (BCBC) and Rhondda Cynon Taff (RCTCBC) County Borough Councils. The wind farm is to be known as Llynfi Afan Renewable Energy Park (REP). 1.2 Full planning permission is sought for the following: • 15 wind turbines with a blade tip of 118m and a hub height of 78m; • a 78m high permanent wind monitoring mast, referred to as an anemometry mast or met mast; • widening of existing forestry tracks at pinch points to allow access for the vehicles delivering the wind turbine components; • upgrading and widening of existing on-site agricultural tracks and construction of new on-site access tracks, some of which would require watercourse crossings; • new access off A4107 • crane hardstandings for each turbine, referred to as crane pads; • up to four areas of stone extraction referred to as borrow pits; • underground cabling parallel to access tracks, where practical; • an electricity substation within a compound containing a control building; and • two construction compounds.
    [Show full text]
  • G'i'eat Western Railway Act,1895, [58
    ~.: ..". " CHAPTER ciriii.· -AnAct.forconferring further powers upon the Great Western A.D. J~~5. Railway Company in .reapect of their own Undertaking ahdupon that Company and the London and North Western. Railway Company in respect of undertakings in which they are jointly interested and upon the Great '. Western .Railway Company and the Lambourn Valley Railway Companyin respect of the undertaking of that Company and for otherpurposes. [6th July 1895.J "lX7HEREAS it is expedient thnt the Great Western Railway '" Company (in' this Act called "the Company ttl should be empowered to execute make and maintain the railway widenings of railways and other .works and to exercise the powers by this Act respectively authorised and conferred upon them and to acquire for the purposes of this Act and for the general purposes of'. their undertaking and works connected therewith and for providing ,. increased accommodation certain lands in this Act described or i'eferred to: ' ,And whereas it is expedient that the Company and the London and'North Western Railway Company (in this Aot called. "the North Western Company") should be empowered to execute the works .andex:ercisetho powers,.and acquire the lands in this Act respectively mentioned or referred -to : ' And whereas plans and sections showing the lines and levels of the railway and other works by this Act authorised to be constructed and plans showing the lands by this Act authorised to be acquired and also books of reference containing the names of the owners and lessees or reputed owners and lessees and of the occupiers of those lands were duly deposited with the clerks of the peace for the several counties within which such railway and other works will.
    [Show full text]
  • Reference Code: GB 214 UDM
    GLAMORGAN RECORD OFFICE/ARCHIFDY MORGANNWG TEMPORARY LIST Reference code: GB 214 UDM Title: MAESTEG URBAN DISTRICT COUNCIL Date(s) 1895-1974 Level of Fonds (level 2) description: Extent: 1.68 cubic metres Name of creator(s) SOME OF THE RECORDS ARE STORED IN AN OUTSIDE REPOSITORY. THESE RECORDS SHOULD BE ORDERED AT LEAST A WEEK IN ADVANCE OF AN INTENDED VISIT SO THAT THEY CAN BE BROUGHT INTO THE RECORD OFFICE FOR CONSULTATION IN THE SEARCH ROOM Administrative/Biographical history Scope and content Maesteg Urban District Council was formed in 1894 following the Local Government England and Wales Act. It took over the functions of Maesteg (Cwmdu) Local Board of Health. The Council’s area of responsibility was the parishes of Cwmdu and Higher Llangynwyd. The Urban District Council ceased to exist on 31 March 1974 and was merged with the Urban Districts of Bridgend, Porthcawl, Ogmore and Garw and Penybont Rural District to form Vale of Glamorgan Borough Council. Archival history Immediate source of acquisition Mid Glamorgan County Council Scope and content Appraisal, destruction and scheduling information All records which meet the collection policy of the Glamorgan Record Office have been retained. Accruals Accruals are not expected. System of arrangement Conditions governing access © Glamorgan Record Office MAESTEG URBAN DISTRICT COUNCIL UDM No restrictions. Conditions governing reproduction Normal Glamorgan Record Office conditions apply. Language/scripts of material English Physical characteristics and technical requirements Good to poor
    [Show full text]
  • River Ogmore – Ogmore Fishing Association
    River Ogmore – Ogmore Fishing Association An advisory visit carried out by the Wild Trout Trust – July 2012 1 1. Introduction This report is the output of a Wild Trout Trust advisory visit undertaken on selected sections of the River Ogmore on waters controlled by the Ogmore Angling Association. The request for the visit was made by Mr. Ian Finylas, the club’s Chairman and Mr. Colin Chapman, the clubs Conservation Officer. Fish migration and habitat quality is heavily influenced by a large number of weirs on the main river Ogmore. Many of these structures were introduced as angling mitigation measures following the construction of the Bridgend flood alleviation scheme. In addition to the numerous large block stone weirs, the Environment Agency also maintain two flow gauging weirs on club waters. The visit was focussed on inspecting a selection of these weirs with a view to carrying out an assessment of fish passage and the impact that these impoundments might be having on in- channel habitat quality. Comments in this report are based on observations on the day of the site visit and discussions with Mr. Finylas, Mr. Chapman and Ms. Ida Tavner of the Environment Agency Wales. Throughout the report, normal convention is followed with respect to bank identification i.e. banks are designated Left Bank (LB) or Right Bank (RB) whilst looking downstream. 2. Catchment overview The River Ogmore rises at Craig Ogwr as the Ogwr Fawr, meeting with the Ogwr Fach at Blackmill, the River Garw at Brynmenyn, and the River Llynfi at Aberkenfig. The headwaters flow over a mixture of coal measures, and sedimentary bedrock with the middle reaches consisting of limestone and sandstone with overlays of glacial debris and gravels.
    [Show full text]
  • Garw Valley Landscape Action Plan December 2010
    Western Valleys Strategic Regeneration Area – Garw Valley Landscape Action Plan December 2010 GARW VALLEY LANDSCAPE ACTION PLAN 0 Western Valleys Strategic Regeneration Area – Garw Valley Landscape Action Plan December 2010 GARW VALLEY The Garw Valley is one of nine across the Western Valley Strategic Regeneration Area. Also refer to the WVSRA Landscape Improvement Strategy for context and SRA-wide generic projects. 1.0 LANDSCAPE OVERVIEW Steep valley sides with conifer plantations, unattractive valley floor settlements often merged, but views to upland/alpine character valley sides. Dead end valley, elevated to +200m with a distinctive microclimate. - Community First areas at: - Bettws – population 2,327 - Llangeinor – population 1,161 - Settlements along valley floor, the key settlements Pontycymer and Blaengarw have merged. - Outlier settlement at Bettws, detached from the valley floor and set in open countryside, includes social housing area owned and managed by Valleys to Coast (V2C). - Long runs of poor condition roadside railing. - Empty shops, steel shutters at Pontycymer, lifted by townscape improvements (including street tree planting, seating). - Occasional poor building design but usually at key locations eg. gateway at Pantygog, adjacent to Blaengarw village square, Richard Price Centre Llangeinor (a replacement building & upgraded environs are programmed). - Hub for residents is Pontycymer, providing supermarket, leisure centre. - Hub for visitors is Bryngarw Country Park (run down, outdated visitor facilities, not easy to find but is near Sustrans route, is the start of the Garw Valley community route and links to Sustrans route 4). - No gateway role as the valley is a dead end. - Community route for cycling, follows river – management is complicated by ownership/tenancy split, capital investment is needed to upgrade boundaries & key detractors such as poor environment around Pontycymer leisure centre.
    [Show full text]
  • Old Industries and New Parks Circular Walk
    Once in the woods go four country parks. Go west on the over a wooden stile, Ridgeway for Margam Country Park and and follow the foot- Afan Forest Park, east for Bryngarw B4282 path until you see a Country Park and north from Llangenid Nantymoel To Swansea MAESTEG track on your right to Dare Valley Country Park. Pontycymer hand side. Ignore this Turn right along the Ridgeway and Llangynwyd A4063 and stay on the lower follow the waymarked path across the Bettws Llangeinor path next to the river fields. When you go over the stile near A48 to a point where the City Farm follow the access track to the Tondu Heol y Cyw A4061 path moves away right to the junction with Pyle B4281 36 Elephant Hawk moth from the river. Cross Bettws Road. At this point Kenfig Photo Courtesy of Paul Chesterfield over another wooden turn left and walk for a 37 A473 BRIDGEND 35 stile then cross a small bridge over a A48 short distance then A4106 To Cardiff stream and out of the wood. Continue cross over the road A4229 Newton Coychurch straight ahead towards the stone foun- Merthyr opposite the junction Mawr A48 PORTHCAWL B4524 Ewenny dations of an old farm building then to Tudor Drive. St Brides Major Ogmore by Sea with the stone wall on your right hand Continue to follow the B4265 side continue until you see a field gate signs along a rough track, with a wooden stile along side it. Go over which is a registered Rosehips Acknowledgements the stile.
    [Show full text]
  • Strategic Flood Consequence Assessment of Bridgend County Borough
    Strategic Flood Consequence Assessment of Bridgend County Borough VOLUME II Technical Report Final October 2010 Contents Foreword .................................................................................................................... i 1 Introduction................................................................................................... 1-1 2 Strategic assessment................................................................................... 2-1 3 Environment and planning context............................................................. 3-1 4 Flood defences and assets.......................................................................... 4-1 5 Flood warning and emergency planning .................................................... 5-1 6 Flooding from rivers..................................................................................... 6-1 7 Flooding from the sea .................................................................................. 7-1 8 Flooding from land (surface water)............................................................. 8-1 9 Flooding from groundwater......................................................................... 9-1 10 Flooding from sewers ................................................................................ 10-9 11 Flooding from artificial sources ................................................................ 11-1 12 Glossary and notation................................................................................ 12-1 Annex A - Maps Overview maps
    [Show full text]
  • Tawe to Cadoxtoncmanagement Catchment Summary
    Tawe to Cadoxton Management Catchment Summary Date Contents 1. Background to the management catchment summary ..................................................... 3 2. The Tawe to Cadoxton Management Catchment ............................................................ 4 3. Current Status of the water environment ......................................................................... 7 4. The main challenges ........................................................................................................ 9 5. Objectives and measures .............................................................................................. 12 6. Water Watch Wales ....................................................................................................... 21 Page 2 of 22 www.naturalresourceswales.gov.uk 1. Background to the management catchment summary This management catchment summary supports the 2015 updated Western Wales River Basin Management Plan (RBMP). Along with detailed information on the Water Watch Wales (WWW) website, this summary will help to inform and support delivery of local environmental improvements to our groundwater, rivers, lakes, estuaries and coasts. Information on WWW can be found in Section 6. Natural Resources Wales has adopted the ecosystem approach from catchment to coast. This means being more joined up in how we manage the environment and its natural resources to deliver economic, social and environmental benefits for a healthier, more resilient Wales. It means considering the environment as a whole,
    [Show full text]
  • From Tondu Station
    Once in the woods go four country parks. Go west on the over a wooden stile, Ridgeway for Margam Country Park and and follow the foot- Afan Forest Park, east for Bryngarw B4282 path until you see a Country Park and north from Llangenid Nantymoel To Swansea MAESTEG track on your right to Dare Valley Country Park. Pontycymer hand side. Ignore this Turn right along the Ridgeway and Llangynwyd A4063 and stay on the lower follow the waymarked path across the Bettws Llangeinor path next to the river fields. When you go over the stile near A48 to a point where the City Farm follow the access track to the Tondu Heol y Cyw A4061 path moves away right to the junction with Pyle B4281 36 Elephant Hawk moth from the river. Cross Bettws Road. At this point Kenfig Photo Courtesy of Paul Chesterfield over another wooden turn left and walk for a 37 A473 BRIDGEND 35 stile then cross a small bridge over a A48 short distance then A4106 To Cardiff stream and out of the wood. Continue cross over the road A4229 Newton Coychurch straight ahead towards the stone foun- Merthyr opposite the junction Mawr A48 PORTHCAWL B4524 Ewenny dations of an old farm building then to Tudor Drive. St Brides Major Ogmore by Sea with the stone wall on your right hand Continue to follow the B4265 side continue until you see a field gate signs along a rough track, with a wooden stile along side it. Go over which is a registered Rosehips Acknowledgements the stile.
    [Show full text]