OPTIMIX (HONG KONG) LIMITED Selected Project Reference OPTIMIX SC228 Skimcoat
Selected Project Reference OPTIMIX RM783H (High Item Project Performance Concrete - High Flow) Job Type
1 Administration Building of Ocean Park, Wong Chuk Hang, Hong Kong Commercial
2 Cape Collinson Chinese Permanent Cemetery, Chai Wan Public
3 Victoria Dockside, Tsim Sha Tsui Commercial
4 Hong Kong-Zhuhai-Macao Bridge Ancillary Buildings Highway
5 Gleneagles Hong Kong Hospital, Wong Chuk Hang, Hong Kong Hospital
6 THEi New Campus, Shing Tai Road, Chai Wan School
7 So Uk Estate HKHA
8 MTRC Kowloon City Station & Tunnel MTRC
9 Fortune Pharmacal Company New Factory Development, Yuen Long Industrial
10 Yan Tin Estate Phase 1 & 2, Tuen Mun HKHA
11 Seanorama, 1 Choi Sha Street, Ma On Shan, Sha Tin Residential
12 Eco Park, Tuen Mun Public
13 Century Gateway, Tuen Mun Residential
14 90 Repulse Bay Road, Repulse Bay Residential
15 La Vetta, Kau To Shan, Sha Tin Residential
16 Hong Kong-Zhuhai-Macao Bridge Hong Kong Boundary Public
17 8-12 Deep Water Bay Drive Residential
18 DCH Food Processing & Logistics Center, Yuen Long Industrial Estate Industrial
19 French International School - Chai Wan Campus School
20 Oasis Kai Tak, Kai Tak Residential
1
2021.06
OPTIMIX (HONG KONG) LIMITED Selected Project Reference OPTIMIX SC228 Skimcoat
Selected Project Reference OPTIMIX RM783H (High 21 Liangtang/ HeungPerformance Yuen Wai Boundary Concrete Control - PointHigh Flow) Public
22 Hong Kong Academy for Performing Arts, Wan Chai School
23 Peel Rise, 6-16 Peel Rise, The Peak Residential
24 Stonecutters Island Sewage Treatment Plants Public
25 Greenhill Villa, 63 Siu Lek Yuen Road, Siu Lek Yuen, Sha Tin HKHS
26 Kai Long Court, 18 Muk On St, Kai Tak Residential
27 Fai Ming Estate, Fanling Area 49 (Contract No. 20160355) HKHA
28 Freespace West Kowloon Cultural District Commercial
29 Holiday Inn Hotel, Tsim Sha Tsui Hotel
30 Wings at Sea, Lohas Park Package 4, TKO86 (P170135) Residential
31 ASD Term Contract No. TC C 972 Kowloon and Outlying Islands ASD
32 Redevelopment of Ming Wah Dai Ha, 1-25 A Kung Ngam Rd, Shau Kei Wan Residential
33 Shatin to Central Link Contract no. 1109 Sung Wong Toi Tunnel MTRC
34 The Hong Kong University of Science and Technology School
35 Ruttonjee Hospital, Wan Chai Hospital
C/N HY/2017/10 Tuen Mun-Chek Lap Kok Link Northern Connection Tunnel 36 Highway Buildings
37 Hong Kong International Airport Airport
38 External Wall Renovation at Chevalier Cold Storage Warehouse Commercial
39 C/N SS C505 Const of Liantang / Heung Yuen Wai Boundary Control Point. CEDD
40 Kwun Tong Preliminary Treatment Works DSD
41 CDW Building, 382-392 Castle peak Road, Tsuen Wan Commercial
2
2021.06
OPTIMIX (HONG KONG) LIMITED Selected Project Reference OPTIMIX SC228 Skimcoat
Selected Project Reference OPTIMIX RM783H (High 42 St. Paul's College,Performance 69 Bonham Road,Concrete Hong Kong. - High Flow) School
HY/2012/08 Tuen Mun-Chek Lap Kok Link Northern Connection Sub-sea 43 MTRC Tunnel Section
44 Lai Kok Estate, Cheung Sha Wan HKHA
45 SCL 1128 Shatin to Central Link South Ventilation Building to Admiralty Tunnels MTRC
SS D513 Const of Columbarium and Garden of Remembrance at Tsang Tsui, 46 Public Tuen Mun Sky Bridge connecting Terminal 1 with North Satellite Concourse, Hong Kong 47 Airport International Airport
48 Tsing Yi Data Centre Commercial
49 Ching Tin Estate, Tuen Mun Area 54 Site 3&4 (East) HKHA
50 232 Wan Chai Road, Wan Chai Commercial
51 Hong Kong International School, 1 Red Hill Road, Tai Tam School
52 Kwai Chung Hospital Ph. 2 Hospital
53 Tin Shui Wai Swimming Pool, 1 Tin Pak Road, Tin Shui Wai Public
Please contact OPTIMIX sales representatives for detailed job reference list.
3
2021.06