PROJECT COCPLETIONNOTE

UGAN1DASECOND HIGHWAYPROJECT

(CREDIT 164-UG) Public Disclosure Authorized

;3 June 14,1984 Public Disclosure Authorized

Eastern Africa Regional Office

This document has a restricted distribution and may be used by recipients only in theperformance of their official duties. Its contents may not otherwise be disclosed without World Bank audhorization. FOR OMCLIL USE ONLY

PROJECT COMPLETION NOTE

UGANDASECOND HIGHWAYPROJECT (CREDIT 164-UG)

TABLE OF CONTENTS

Page No.

* Preface ...... Basic Data Sheet...... ii Highights .iv

I. THE PROJECT. 1

II. EVALUATION OF THE PROJECT. 2

III. CONCLUSIONS...... 5

Tables

1. Construction Costs. 6 2. Disbursements. 7 3. Traffic and Economic Evaluation. 8 4. Vehicle Operating Costs. 9

Attachment Borrower Comments.10

This document has a restricted distribution and may be used by recipients only in the performance of their official duties Its contents may not otherwise be disclosed without World Bank authorization. PROJECT COMPLETION NOTE

UGANDASECOND HIGHWAY PROJECT (CREDIT 164-UG)

PREFACE

Presented herewith is a Project CompletionNote on the Second Highway Project in for which Credit 164-UG for US$11.6 million was signed on September29, 1969. The credit was fully disbursed on November 25, 1980.

The Project CompletionNote was prepared by the Eastern Africa Regional Office in 1983. Because of the difficultpolitical conditions in Uganda from 1972-1978,during the latter part of the project period, limited informationwas availableon the implementationof the project and its comple- tion. It was, therefore,decided that a Project CompletionNote, rather than a Project CompletionReport, would be prepared.

In accordancewith the revised procedures for project performance audit reporting,this completionnote was read by the OperationsEvaluation Departmentbut was not audited by OED staff. The CompletionNote was sent for comment to the Borrower who indicatedby cable that they had no comments (see attachment). - ii -

PROJECT COMPLETIONNOTE

UGANDASECOND HIGHWAY PROJECT (CEEDIT 164-UG)

BASIC DATA SHEET

KEY PROJECT DATA Appraisal Item Estimate Actual

Total Project Cost 16.5 n.a. /a Underrun/Overrun(X) - n.a. /a Credit Amount (US$ million) 11.6 11.60 Disbursed - 13.03 /b Repaid (as of March 31, 1984) 0.52 Outstanding (as of March 31, 1984) - 12.51 Date Physical Components Completed 06/30/73 02/80 Proportion Completed by Original CompletionDate (Z) - 80 Proportion of Time Overrun (Z) - 287 Economic Rate of Return (Z) 10-28 n.a. /c

CUMULATIVEDISBURSEMENTS (US$ million)

CY69 CY70 CY71 CY72 CY73 CY74

Estimated 0.2 3.2 7.8 10.8 11.6 - Actual - - 3.7 8.0 9.0 9.4 Actual/Estimated (Z) - - 47 40 69 81

CY75 CY76 CY77 CY78 CY79 CY80

10.0 10.3 10.5 10.8 11.3 11.6 86 89 91 93 97 100

OTHERPROJECT DATA

First Mention in Files - 11/21/69 Government'sApplication - - Negotiations - 07/14-18/69 Board Approval Date - 09/23/69 Credit AgreementDate - 09/29/69 EffectivenessDate - 12/01/69 Closing Date 06/30/74 06/30/80 /d Borrower Republic of Uganda Executing Agency Ministry of Works, Communications and Housing Fiscal Year of Borrower July 1 - June 30 Follow-on Project Third Highway Credit Number 1445 Credit Amount (US$ million) 58.00 Approval Date 03/13/84 - iii -

MISSION DATA

Mouth/ No. of No. of Staff- Date of Item Year Weeks Persons Weeks Report

Preappraisal 06/68 n.a. 2 n.a. 07/01/68 Preappraisal 02/69 1.0 2 2.0 03/11/69 * Appraisal 05/69 1.4 2 2.8 08/25/69 SupervisionI 11/69 1.0 n.a. n.a. 01/15/70 SupervisionII 03/70 1.0 1 1.0 05/28/70 SupervisionIII 09/70 1.0 1 1.0 10/26/70 SupervisionIV 03/71 0.7 2 1.4 04/09/71 SupervisionV 07/71 1.9 2 3.8 07/23/71 SupervisionVI 03/72 1.0 5 5.0 05/05/72 SupervisionVII 03/74 0.3 1 0.3 04/09/74 SupervisionVIII 03/76 1.0 1 1.0 04/06/76 SupervisionIX 02/78 0.6 1 0.6 03/28/78 SupervisionX 10/78 0.4 1 0.4 12/19/78 SupervisionXI 08-09/79 1.4 1 1.4 11/13/79 SupervisionXII 03/80 2.0 2 4.0 05/01/80 SupervisionXIII 10/81 0.6 1 0.6 11/08/83

CURRENCY EXCHANGE RATES

Name of Currency (Abbreviation) Uganda Shilling (U Sh)

AppraisalYear Average (1969) US$1 = U Sh 7.14 InterveningYears Average (1970-79) US$1 = U Sh 7.49 CompletionYear Average (1980) US$1 = U Sh 7.57

La Project costs not available; costs of road construction items were estimated at US$14.1 million at appraisal and at US$ 14.5 million at completion. /b Includes exchange adjustment of US$1.4 million. /c Not possible to calculate. /d Closing extended five times from 06/30/74 to 06/30/76, 12/31/77, 06/30/79, 12/31/79 and 06/30/80. - iv -

PROJECT COMPLETIONNOTE

UGANDASECOND HIGHWAY PROJECT (CREDIT 164-UG)

HIGHLIGHTS

This credit was made in 1969 for the concludingphase of a series of road constructionand reconstructionprojects identified in 1962. The first and major parts of the project implementationgererally went well. By 1972 and early 1973 a number of important project objectiveshad been accom- plished. Since that time project supervisionhas been very difficult due to the political and security situation of the country, which also seriously constrainedthe remaining project implementation. Furthermore,organized Government activities like highway maintenance almost ceased until the early 1980s (para. 2.05).

With the exception of a one-day mission, no supervisionmissions were carried out between 1972 and 1978. Since that time the security situa- tion has prevented visits to most project road sections and the economy of Uganda has drasticallychanged. In addition many earlier records were lost during the liberationwar. Much of the informationrequirements for a PCR are therefore unavailable. For several of the project componentcosts financed by the Bank are known, but total costs are incomplete since some of the road works especially force account had to be finished by the Government. The present condition of the completed roads has obviouslybeen affected by the lack of organized maintenance,and only limited informationis now available. No organizedtraffic counts were done until 1982 and vehicle operating costs have not been estimateduntil recently and are now heavily influencedby scarcity of foreign exchange and consequent price distortions. No meaningful ex post estimate of the economic feasibilityof the project is possible under these circumstances(para. 2.07).

Some general indicationsof the progress of the project can never- theless be made and these are included in more detail below. The principal conclusion is that the main part of the project was carried out as anticipated by the original closing date, and valuable technicalassistance was provided as long as IDA funds were available (para. 3.01). PROJECT COMPLETIONNOTE

UGANDASECOND HIGHWAY PROJECT (CREDIT 164-UG)

I. THE PROJECT C. 1.01 The total project cost has been estimatedat US$16.5 million equivalentwith a foreign exchange componentof US$11.6 million.

1.02 The project included:

(a) the construction and reconstruction of about 665 km of primary, secondary and agricultural roads;

(b) a road investmentand maintenance study by consultants;

(c) feasibilitystudies and detailed engineeringof about 400 km of roads; and

(d) technical assistance for the staffing and training requirements of the Ministry of Works, Communications and Housing.

1.03 The credit was approved on September 23, 1969 and became effectiveon December 1, 1969.

1.04 A total of US$13,032,534.16(including an exchange adjustment of US$1,432,534.16)was disbursed under the credit until November 5, 1980. This was broken down by categories as follows:

Amount SAR disbursed estimate US$

Road construction and reconstruction 9,408,248.42 7,770,000

Consultantsservices 1,347,252.53 1,330,000

Technicalservices 844,499.05 350,000 11,600,000.00

Contingencies 2,150,000

Exchange adjustment 1,432,534.16

13,032,534.16 11,600,000 -2-

II. EVALUATION OF THE PROJECT

2.01 Until the late 1950's,Uganda had the best highway system in Eastern Africa in terms of coverage and technical standards. This was due to a long traditionof communal labor, the existence of an abundant supply of good road building materials and the presence of a competent and well staffed highway administration. During the 1960's, the condition of the highway system deteriorated. First, there was a loss of large numbers of personnel at executive and administrativelevels, and second, the funds available for road maintenancewere reduced to a considerableextent. Parallel with these developments,traffic was increasing so that many of the roads built for light traffic became increasinglydifficult to maintain, and the planning for future highway developmentwas not done, largely because of insufficientstaff.

2.02 IDA's efforts to assist Uganda to overcome deficienciesdated back to 1962, when an attempt was made to identify road investmentneeds. Subsequent progress in project preparationwas slow, mainly because of staffing deficienciesin the highway management. As a result, the first IDA Credit to Uganda (Credit 108-UG)for US$5.0 million equivalentfor 161 km of road constructionor reconstructionwas not signed until 1967. It took two more years to complete preparation of the present project, which constitutes the second and concluding phase of the original list of road investmentsthat were identified in 1962.

2.03 The civil works componentsof the Second Highway project were largely completedby 1974 and the road investment and maintenancestudy by 1972. By that time the highway investment study, two feasibilitystudies and detailed engineeringfor five road sections had been completed. Technical assistance to the MOW and remainingcivil works continueduntil 1980. The original closing date of June 30, 1974 was extended five times to allow for continueddisbursement of funds for technicalassistance. The credit of $11.6 million was fully disbursedon November 5, 1980. While the project was supervisedadequately up to 1972 when mDst of the civil works were completedor contracts awarded, country conditions then prevented adequate supervisionuntil 1978, except for one brief mission in 1974. In addition, the works have not been physically inspected in the last eight years, primarilybecause of security reasons in the country. For the same reasons, neither Government nor the Bank has been able to assess the impact of the project. Hence, a re-evaluation of the benefits which were forecast at appraisal would be difficult. As a result of the liberationwar in 1979, most of the Government files were either destroyed or lost. Although some of the constructioncosts are available, traffic counts and estimates of vehicle operating costs are not. In addition,many of the Ugandans in management positionsat the Ministry of Works fled the country or disappearedduring the Amin regime and staff now in place have very little knowledge or recollection of events going back to 1969 and the early years of project implementation.

2.04 Given the constrainingcircumstances above, any assessment of the project can only be very limited. The physical progress of the project can best be judged by the situation in 1972 when contracts for six of the seven main road sections had been awarded (Table 1). Awarded contracts then covered US$10.9 million of US$11.6 million in the credit. Disbursements are shown in table 2. -3-

2.05 Up until 1972, the civil works generallywent very well. This momentum meant that six of the seven main road sections were completedin early 1973. The Jinja-Bukolotoroad, however, cost almost twice the original estimate. After poor performanceof the contractor for the Bale-Kayunga-Mabuganyi road and Sezibwa swamp crossing these works were finished by the Government itself. Most of the tea roads were also complete in 1974. The roads in the relatively easy Toro and Ankole areas were finished first, whereas those in the mountainuousand therefore difficult Kigezi area were lasr. A new bridge in this area was included in the project after collapse of an old bridge during flood of the river Ishasha; and finally completed in 1980. The -Katuna( border) road also in the Kigezi area had various problems over a long time. After an initial high bid price the works were rebid and a contractwas awarded in 1974. This was also the reason for the first extension of the Credit closing date. The last section of this road, the Katuna swamp crossing, was finally completed by Rwanda in 1978. This crossing was just on the border and Rwanda at the time was constructingtheir part of the same road. Rwanda was reimbursed the cost under this Credit. Some studieswere made to use remaining funds to bitumenize part of this road but in the end all credit funds were needed for the Ishasha bridge above; and technical assistance. Traffic remains low since another road in Rwanda from , although longer, is in better condition.

2.06 Despite the fact that traffic in Uganda has generally decreased due to country conditions,traffic on the main project roads has generally increased since the road improvementswere carriedout (table 3). Furthermorevehicle operating costs have increaseddramatically (table 4) though the figures have to be consideredvery cautiously in view of the devaluationsand difficultiesin selecting the most relevant exchange rate. Even using a shadow exchange rate of several times the official rate there has been a substantialvehicle cost increase over the period. On these grounds a re-evaluationof at least most of the main roads would give a satisfactory return.

2.07 At appraisal, the economic returns on the various road components included in the project varied from 10% to 28%. A 1982 consultant survey of traffic on certain selected roads in Uganda concluded that overall traffic levels were about 50% below those which existed in 1972, corroboratedon the basis of vehicle fleet and fuel imports. Because the economic justificationfor several roads were based on the value added of increasedproduction in addition to savings in vehicle operating costs, it is likely that some of the economic returns today would be below acceptable levels. However, it is not possible to derive any specific, quantified conclusionssince they are clouded by security and political events and the entire economy of the country has been radically changed. These events which occurred during project implementationcould not have been foreseen at appraisal.

2.08 The feeder roads (includingtea roads) are thereforemuch more difficult to judge. The last area was not complete until 1980 due to cost increases and many other constraints. Neverthelessthe major parts of the works were carried out as anticipatedalthough with delays and cost overruns. -4-

2.09 One of the main reasons for extending the credit closing date was to maintain essential technical assistance as long as possible which eventually covered the period June 30, 1974 to Nuveuber 5, 1980, after most feasibilitystudies and main roads had been completed. Under normal circumstancesthis would have been difficult to justify. Under the very unusual conditions of the country in these years the technicalassistance provided a nucleus of continuityin the Ministry of Works and Housing. A collapse of the works department in this Ministry was unavoidable in the liberationwar but the effects of this were diminished. Thus four of the original eleven experts in key positions were retained until 1980 and well justified.

t -5-

III. CONCLUSIONS

3.01 The principal conclusion is that the main part of this project was carried out as anticipated despite the fact that records cannot give the complete and accurate estimate of construction costs and benefits. Six out of seven main road sections, the main studies and two of three tea road areas were completed by the original closing date.

3.02 The remaining road section Kabale-Katuma was eventually finished since it was a potentially important international road link, but the full impact of this road remains to be achieved.

3.03 Although the absence of complete cost data precludes an economic re-evaluation, traffic counts in 1982 indicate that wDst main road sections have shown increases in traffic although not quite as high as expected. Most of the project goals have therefore been achieved.

3.04 With a few exceptions, performanceof contractorsand consultants had generally been good. The vital continued technical assistanceduring a very difficult time clearly justified the prolonged extensions of the Credit.

J PROJECT COHPLETIONNOTE

UGANDASECOND HIGHWAY PROJECT (CREDIT 164-UG) ConstructionCosts

Final or ConstructionCost Appraisal Cost In 1972 Estimated Completion Road Section Cost Estimate or estimate Cost in 1980 Date U.Sh. (OOO)/_

Main roads

Masaka-Kyotera 13210 19850 19476 7/72

Kabale-Rwanda Border(Katuna) 6780 10770(E) 12362 1978

Iganga-Mbale 15710 13770 17889 12/72 Kayunga-Bale ) Kayunga-Mabugaiiyi ) 8570 10000(E) 9238 4/73 Sezibwa Swamp Crossing)

Jinja-Bukoloto 9280 19000(E) 18268 4/73

Feeder Roads

Mbale-Nkokonjeru 5710 7460 7331 12/72

Malyugo-Akororo 2500 2170 2138 5/72

Tea Roads: Toro area 4640 ) 10/70 Akkole area 5000 ) 20880(E) 23059 2/ 1973 Kigezi area 7850 ) 2j80 Contingencies 21420

100670 103900 109761

1/ 7.14 U.Sh. - US$1 in 1972-1974 2/ Including U.Sh. 2,685,000 for Ishasha Bridge. -7-

TABLE 2

PROJECT COMPLETION NOTE

UGAIDA SECOND HIGHWAY PROJECT (CREDIT 164-UG)

Disbursements

Road Construction and Reconstruction Consultants Technical Calendar Year US$(OOO) Services Services

1971 3657.1

1972 3581.2 607.7 45.7

1973 674.3 295.2 35.1

1974 212.2 158.3 43.7

1975 472.2 47.0 47.5

1976 129.6 47.1 153.1

1977 41.0 55.3 77.5

1978 92.4 42.3 204.3

1979 401.4 24.5 120.4

1980 146.8 69.9 117.2

9408.2 1347.3 844.5 PROJECT COMPLETIONNOTE

UGANDA SECOND HIGHWAY PROJECT (CREDIT164-UG) Traffic and Economic Evaluation Traffic and Economic Evolution

Road Section SAR Base SAR Econ. SAR ADT 1/ 1982 Actual Primary & SecondaryRoads Cost US$(OOO) Returt 1967/68 ADT Main roads

Masaka-Kyotera 1850 21X 335 945

Kabale-RwandaBorder(Katuna) 950 15 48 60(1978)

Iganga-Mbale 2200 10 62 357

Kayunga-Bale ) 600 13 111 315 Kayunga-Mabuganyi ) 270 11 78 315 Sezibwa Swamp Crossing) 330 15 561 286

JinJa-Bukoloto 1300 12 185 312 0 1380 2590 1 Feeder roads

Mbale-Nkokonjeru 800 20)

Maiyugo-Akororo 350 13 ) Not available Tea Roads: Toro Area 650 28 ) Ankole Area 700 19 ) Kigezi Area 1100 16 ) 11100

1/ ADT: Average daily traffic. PROJECT COMPLETIONNOTE

UGANDA SECOND IIIGUIWAYPROJECT (CREDIT164-UG) VohicleOperatiiig Costs 7-tontruck 62 passongorbun 20-tonitractor-trailr Light vehicle Bitumen Gravel Earth Bitumen Gravel Earth Bitumen. Gravol Earth BLtumen Gravcil Earth

Appraisol. US c/km 8.44 10.33 12.95 10.87 13.58 17.68 17.85 21.76 28.11 4.1 5.1 7.0 (1969) EconomicCost Typical pecel 70 55 40 70 55 40 70 55 40 - - - (Km/hr) U.Sh/kmI/ .603 .738 .925 .776 .970 1.263 1.275 1.554 2.01 .292 .364 .50

Kabale-I;nt ;inU.Sh 1km roadstnUdy (1'978) 5.05 7.61 - 6.00 9.04 -8.22 11.53 1,0 1.31 - EconomlcCost

US c/km2/ 6U.1 102.6 - 80.9 121.9 - 110.8 155.4 - 16.2 24.4

Berger6tt1tiv (1982)US8 V.km I FinaneinlcuHL 79.0 91.0 - 78.0 90.0 - 117.0 134.0 - 55.0 69.0

Economiccout 58.0 81.0 - 55.0 75.0 - 108.0 114.0 - 22.0 36.0

Roughness 25n0 4000 - 2500 4000 - 2500 4000 - 2500 4000

1/ U.Sh. 7.143 u US$1,official exchange rate 2/ U.Sh. 7.4175- US$1, officialexchange rate - 10 -

ATTACHMENT

ZiCZC DIST5164 WsBl9491 IIIST REF TCP FCA OEDLbR

WBW9491 84.05.23.0825 9491 84.05.23.0825 197638 IWORLDBKIIJT 61370 FINANCE

ATTN: MR SHIV S KAPUR

YPL1R LETTER TO MR EKINU, SECRETARY TO THE TREASURY DATED MARCH 12, 1984 STOP THE DRAFT PROJECT CONPLETION REPORT ON UGANDA SECOND HIGHWAY PROJECT HAS BEEN FOUND SATISFACTORY AND NO COMMENTS TO MfAKE. DELAYED COMMUNICATION IS REGRETTED STOP

REGARDS

ONEGI OREL HEAD, AID COORDINATION ITNISTRY OF FIMANCE KAJIPALA.

23/5/84

197688 WORLJtBKMIJT

=05230828

NNNNN