Fabian Way Innovation Corridor Masterplan Framework: Consultation Draft December 2015

Total Page:16

File Type:pdf, Size:1020Kb

Fabian Way Innovation Corridor Masterplan Framework: Consultation Draft December 2015 DRAFT Fabian Way Innovation Corridor Masterplan Framework: Consultation Draft December 2015 Fabian Way Innovation Corridor Masterplan Framework: working draft DRAFT 2 Fabian Way Innovation Corridor Masterplan Framework: working draft DRAFT C ontents 1. Introduction 4 Vision and Objectives Contact Details Acknowledgements 1.1 Overview 4.1 Vision To discuss a planning proposal with the relevant The images as follows are included with the 1.2 Why is a Framework Needed? 4.2 Objectives Local Planning Authority, please contact: permission of the relevant organisations: 1.3 Defining the Corridor Area 4.3 Precedents Images on pages 4 and 12 are included with the permission of Tidal Lagoon 5 Masterplan Framework City & County of Swansea Council 2. Policy Context Swansea Bay Ltd 2.1 National Context 5.1 Introducing the Masterplan Email: [email protected] Images on pages 4 and 13 are included 2.2 Regional Context 5.2 Movement Telephone: 01792 635701 with the permission of Swansea University 2.3 Local Context 5.3 Land Uses 5.4 Place Making Images on pages 4 and 13 are included Neath Port Talbot County Borough Council with the permission of University of Wales 3. Analysis 6 Implementation and Delivery Trinity St David 3.1 Existing Land Uses 6.1 Material Planning Consideration Email: [email protected] 3.2 Constraints The plan first featured on pages 32/33 over 6.2 Implementation Telephone: 01639 686726 3.3 History of the Area 6.3 Phasing which the masterplan is plotted is a 3.4 Economic Opportunities 6.4 Developer Contributions composite of existing masterplans with the permission of Tidal Lagoon Swansea Bay 3.5 Urban Design Opportunities 6.5 Partnership Working Ltd , Swansea University and University of 3.6 Summary of Opportunities Wales Trinity St David. 3.7 Summary of Constraints Consultation process This draft of the Fabian Way Corridor Masterplan Framework has been approved for public and stakeholder consultation by the City and County of Swansea Council and Neath Port Talbot County Borough Council. The consultation period runs from 1st December 2015 to 25th January 2016. During this period a number of drop in sessions have been arranged for interested parties to meet with Council Officers to discuss the proposals. A summary leaflet is also available. For full details of the consultation please see http://www.swansea.gov.uk/fabianwayplan If you do wish to comment on this draft Masterplan Framework, then you need to do so in writing to one or both of the Councils via email, online, or letter. Please note that comments made over the phone cannot be taken into account. Once the consultation period has closed, the Council Officers will work together to review the draft Masterplan Framework against the comments received. Please note that comments made cannot be treated as confidential. Fabian Way Innovation Corridor Masterplan Framework: working draft 3 DRAFT 1 Introduction economic and community functions. In at risk. Therefore, the Framework seeks to 1.1 Overview addition, the Framework seeks to capture, provide an integrated approach, maximise 1.1.1 This draft masterplan framework has as far as possible, all associated benefits in the benefits of each site and overcome site been produced jointly by the City and terms of third party research and constraints. The Corridor is home to a mix of County of Swansea (CCS) Council and development and high technology important established and emerging uses Neath Port Talbot (NPT) County Borough businesses seeking to locate close to the and the Framework seeks to co-ordinate Council to co-ordinate development in the Universities and SBTL. development to avoid bad neighbour effects. Fabian Way Corridor area. 1.1.4. The Lagoon provides a ‘game 1.2.3. The Corridor is one of the key 1.1.2 The vision is for an ‘Innovation changing’ opportunity to regenerate the approach routes from the M4 into Swansea Corridor’, building upon the prestigious Corridor, particularly through the anticipated City Centre, the heart of the City Region, and Higher Education developments being significant improvements it will bring to the the design principles set out by this undertaken by Swansea University and the public realm. It is anticipated that SBTL will Framework seek to enhance its gateway University of Wales Trinity St David bring clustering benefits from businesses function and maximise accessibility in-line (UWTSD); and also the Swansea Bay Tidal linked to the tidal energy sector and marine with the Fabian Way Corridor Transport Lagoon (SBTL), the world’s first man-made engineering. Assessment (TA). energy generating lagoon which was granted development consent on 9th June 1.2.4. A key aim is to better integrate the 2015. The Framework aims to reinforce 1.2 Why is a Framework Needed? communities either side of Fabian Way. the City Region’s emerging knowledge and 1.2.1. The Framework is needed to build Although the majority of the development innovation economy by supporting the upon high profile developments, such as opportunities are south of the dual development of a local Knowledge the SBTL and the Higher Education carriageway, the Framework seeks to ensure Economy Cluster, which will complement developments. These will provide the regeneration benefits are also felt to the the Swansea City Centre regeneration opportunities for growth within the Region north. aims and provide employment and a shift towards a knowledge based 1.2.5. The Framework does not set out opportunities and economic benefits for the economy. The Framework will seek to detailed development briefs for each site, but City Region. maximise such opportunities, developing does specify an overall development layout, key links and infrastructure needed to 1.1.3 It will facilitate this by guiding future desired accessibility linkages and a land use promote growth within the City Region, and land use through a place making approach, framework. co-ordinating the re-use of derelict former and identifying priority actions with the docks and related sites. 1.2.6. This draft Framework is now the potential to bring about long term subject of public/stakeholder consultation. improvement to the connectivity and 1.2.2. These development sites are in Ultimately it will be adopted as infrastructure of the Corridor area. The multiple private ownership. Each has Supplementary Planning Guidance (SPG) measures set out will serve to facilitate and physical constraints which could hinder their and form a material planning consideration to shape the future expansion of both individual development potential. Unco- the Local Development Plan (LDP) for each Universities enhancing their educational, ordinated development proposals would put area. the long-term regeneration of the Corridor 4 Fabian Way Innovation Corridor Masterplan Framework: working draft DRAFT 1.3 Defining the Corridor Area 1.3.1. The Corridor stretches for 5km along 1.3.2. It covers an area from the eastern (SSSI). To the south is Swansea Bay and 1.3.3. While the Framework covers the whole the A483 Fabian Way, which forms the bank of the River Tawe in the City and Swansea Docks. The west connects to Corridor, detailed masterplans already exist for eastern gateway road approach to Swansea County of Swansea to the Amazon Swansea City Centre, whilst the north is SA1 and the Bay Campus. This Framework City Centre from the M4 Junction 42. The roundabout in Neath Port Talbot. The edged by the Tennant Canal and restricted seeks to co-ordinate the planning of the Corridor area is illustrated in Figure 1. eastern extent is limited by the Crymlyn by the Crymlyn Bog and established intervening land with these established Burrows Site of Special Scientific Interest communities of St Thomas / Port Tennant. development frameworks. Figure 1: Defining the Fabian Way Corridor City and County of Swansea Council Neath Port Talbot County Borough Council County Boundary Fabian Way Innovation Corridor Masterplan Framework: working draft 5 DRAFT 2 Policy Context 2.1.3. It has been prepared with reference 2.1 National Context Identifies potential environmental 2.2 Regional Context risks / pollution issues and seeks to to the relevant Technical Advice Notes 2.1.1. The key principles are underpinned 2.2.1. Swansea and Neath Port Talbot form part minimise / manage them (TANs) and good practice guidance. by national planning policy contained in of the Swansea Bay City Region. The most up to Planning Policy Wales (PPW, 2014). This Is subject to public consultation and 2.1.4. Of particular note for the place date regional policy context is provided by the Framework: will be reviewed on a regular basis making approach advocated by this Swansea Bay City Region Economic document is the Manual for Streets (MfS, Regeneration Strategy (ERS) 2013-2030. Its Promotes the use of previously 2.1.2. In-line with national planning policy 2007), a companion guide to TAN 18, key aspiration is: developed land and regeneration and good practice this Framework has produced to counter the dominance of “By 2030, South West Wales will be a confident, Proposes mixed use development in been prepared collaboratively by the two vehicles in streets. Its main aim is to ambitious and connected City Region, recognised an accessible location within an Councils due to the strategic and cross facilitate the creation of streets that internationally for its emerging Knowledge and existing urban area boundary nature of the area. It is promote greater social interaction and Innovation economy”. underpinned by a cross boundary Supports development of innovative enjoyment while still performing Economic Assessment and Employment 2.2.2. The Strategy identifies the need to raise business / technology clusters successfully as movement conduits. MfS 2 Land Provision Study (2012), Housing (2010) stresses that all new streets must productivity from 77% to 90% of the UK average.
Recommended publications
  • BD22 Neath Port Talbot Unitary Development Plan
    G White, Head of Planning, The Quays, Brunel Way, Baglan Energy Park, Neath, SA11 2GG. Foreword The Unitary Development Plan has been adopted following a lengthy and com- plex preparation. Its primary aims are delivering Sustainable Development and a better quality of life. Through its strategy and policies it will guide planning decisions across the County Borough area. Councillor David Lewis Cabinet Member with responsibility for the Unitary Development Plan. CONTENTS Page 1 PART 1 INTRODUCTION Introduction 1 Supporting Information 2 Supplementary Planning Guidance 2 Format of the Plan 3 The Community Plan and related Plans and Strategies 3 Description of the County Borough Area 5 Sustainability 6 The Regional and National Planning Context 8 2 THE VISION The Vision for Neath Port Talbot 11 The Vision for Individual Localities and Communities within 12 Neath Port Talbot Cwmgors 12 Ystalyfera 13 Pontardawe 13 Dulais Valley 14 Neath Valley 14 Neath 15 Upper Afan Valley 15 Lower Afan Valley 16 Port Talbot 16 3 THE STRATEGY Introduction 18 Settlement Strategy 18 Transport Strategy 19 Coastal Strategy 21 Rural Development Strategy 21 Welsh Language Strategy 21 Environment Strategy 21 4 OBJECTIVES The Objectives in terms of the individual Topic Chapters 23 Environment 23 Housing 24 Employment 25 Community and Social Impacts 26 Town Centres, Retail and Leisure 27 Transport 28 Recreation and Open Space 29 Infrastructure and Energy 29 Minerals 30 Waste 30 Resources 31 5 PART 1 POLICIES NUMBERS 1-29 32 6 SUSTAINABILITY APPRAISAL Sustainability
    [Show full text]
  • Approval of Outline Planning Permission
    Reference No: P2012/0581 27/11/2014 P2012/0581 NEATH PORT TALBOT COUNTY BOROUGH COUNCIL CYNGOR BWRDEISTREF SIROL CASTELL-NEDD PORT TALBOT TOWN AND COUNTRY PLANNING ACT 1990 THE TOWN AND COUNTRY PLANNING (DEVELOPMENT MANAGEMENT PROCEDURE) (WALES) ORDER 2012 APPROVAL OF OUTLINE PLANNING PERMISSION Name and address of the applicant Name and Address of the agent GRACELANDS INVESTMENTS RPS PLANNING & CASTLETON BAPTIST CHURCH DEVELOPMENT NEWPORT ROAD PARK HOUSE CASTLETON GREYFRIARS ROAD NEWPORT CARDIFF CF3 2UR CF10 3AF Whereas on the Friday, 24 January 2014 you submitted an application for the following development:- PROPOSAL Variation of Condition 31 to amend the details of the landscape buffer including its size, of Planning Permission P2008/0514 granted on the 30/09/2011 (amended description, revised illustrative layout plan and revised landscaping scheme.) LOCATION LAND NORTH OF ELBA CRESCENT Crymlyn Burrows NEATH THE NEATH PORT TALBOT COUNTY BOROUGH COUNCIL AS THE LOCAL PLANNING AUTHORITY IN PURSUANCE OF ITS POWER UNDER THE ABOVE MENTIONED ACT AND ORDER HEREBY PERMITS THE DEVELOPMENT TO BE CARRIED OUT IN ACCORDANCE WITH THE APPLICATION AND THE PLANS SUBMITTED THEREWITH, SUBJECT TO COMPLIANCE WITH THE CONDITIONS SPECIFIED HEREUNDER: Conditions:- DECNOUA Page 1 of 17 Reference No: P2012/0581 (1) Approval of the details of the layout, scale and appearance of the building(s), the means of access thereto and the landscaping of the site (hereinafter called the reserved matters) shall be obtained from the Local Planning Authority in writing before any development is commenced on that phase of development. Reason The application was made for outline planning permission. (2)Plans and particulars of the reserved matters referred to in Condition 1 above, relating to the layout, scale and appearance of any buildings to be erected, the means of access to the site and the landscaping of the site, shall be submitted for that phase of development in writing to the Local Planning Authority and shall be carried out as approved.
    [Show full text]
  • Extended Relevant Representations. Neath Port Talbot Country Borough
    Extended Relevant Representations. Neath Port Talbot Country Borough Council considers that the project has the potential to have significant effects both positively and negatively upon this complex and highly dynamic coastal environment, as well as the associated communities, biodiversity and economic interests associated with it. As such, the Authority would wish to see the following relevant issues appraised through the examination process: 1) Coastal Processes and Biodiversity: These are extremely complex issues, with the project having the potential to impact directly and indirectly upon both the terrestrial and marine environments, as well as commercial and tourism economies of the area. Concerns remain about the potential uncertainties within the applicant’s submitted assessments, proposed monitoring and potential mitigation measures. Adverse impacts due to coastal processes could affect the navigable status of the River Neath through the potential requirement for addition dredging, erosion of sands from Aberavon, Port Talbot and Margam beaches, as well as the potential impacts upon the protected habitat areas of Crymlyn Burrows (SSSI) and Kenfig (SSSI, SAC and NNR). 2) Sewerage Outfall: We are concerned about the potential associated risks with the developer’s apparent preferred option to retain the sewerage outfall within the confines of the lagoon. Any failure of the proposed system would adversely impact upon water quality, but could also irreparably damage the reputation of Swansea Bay as a tourism destination. In addition such potential events would jeopardise the lagoons chances of becoming a regional resource for water sports, tourism and leisure activities as well as the proposed use of the area for shellfish farming.
    [Show full text]
  • X1 Bus Time Schedule & Line Route
    X1 bus time schedule & line map X1 Swansea - Bridgend via Briton Ferry, Baglan & Port View In Website Mode Talbot The X1 bus line (Swansea - Bridgend via Briton Ferry, Baglan & Port Talbot) has 5 routes. For regular weekdays, their operation hours are: (1) Bridgend: 6:35 AM - 6:45 PM (2) Margam: 9:50 AM - 5:50 PM (3) Port Talbot: 5:50 PM - 8:00 PM (4) Port Talbot: 6:15 PM (5) Swansea: 7:15 AM - 5:20 PM Use the Moovit App to ƒnd the closest X1 bus station near you and ƒnd out when is the next X1 bus arriving. Direction: Bridgend X1 bus Time Schedule 45 stops Bridgend Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 6:35 AM - 6:45 PM Bus Station G, Swansea Garden Street, Swansea Tuesday 6:35 AM - 6:45 PM Sainsbury'S, St Thomas Wednesday 6:35 AM - 6:45 PM Quay Parade, Swansea Thursday 6:35 AM - 6:45 PM Union Inn, Port Tennant Friday 6:35 AM - 6:45 PM Vale Of Neath, Port Tennant Saturday 6:35 AM - 6:45 PM Bevan's Row, Swansea Bay Campus, Jersey Marine Jersey Marine, Crymlyn Burrows X1 bus Info Direction: Bridgend Roundabout, Briton Ferry Stops: 45 Trip Duration: 67 min Pinewood Terrace, Baglan Line Summary: Bus Station G, Swansea, Sainsbury'S, St Thomas, Union Inn, Port Tennant, St Catherine`S Church, Baglan Vale Of Neath, Port Tennant, Bay Campus, Jersey Church Crescent, Baglan Community Marine, Jersey Marine, Crymlyn Burrows, Roundabout, Briton Ferry, Pinewood Terrace, Baglan, The Nurseries, Baglan St Catherine`S Church, Baglan, The Nurseries, Baglan, Dinas Baglan Road, Aberavon, The Elms, Dinas Baglan Road, Aberavon Aberavon,
    [Show full text]
  • Swansea Council Section 6 Biodiversity Duty Monitoring Report to Welsh Government December 2019
    Swansea Council Section 6 Biodiversity Duty Monitoring Report to Welsh Government December 2019 A. Introduction 1. Since 2015, Swansea Council (together with all other public bodies) has been given increased responsibilities and legal duties to maintain and enhance the natural environment and biodiversity as a result of the following: The Well-being of Future Generations (Wales) Act 2015, Resilient Wales Goal: ‘A nation which maintains and enhances a biodiverse natural environment with healthy functioning ecosystems that support social, economic and ecological resilience and the capacity to adapt to change (for example climate change)’ The Environment (Wales) Act 2016 (Part 1) Section 6 Biodiversity and Resilience of Ecosystems Duty which requires that : ‘A public authority must seek to maintain and enhance biodiversity in the exercise of functions in relation to Wales, and in so doing promote the resilience of ecosystems, so far as consistent with the proper exercise of those functions’ 2. In complying with the Section 6 Biodiversity Duty, the Council is required to prepare and submit to Welsh Government by the end of 2019 (and then every three years after this date) a report (Section 6 monitoring Report) outlining what it has done to comply with the Biodiversity Duty. 3. Since the Environment (Wales) Act 2016 came into force much work has been undertaken by the Council at both a strategic and operational level to maintain and enhance biodiversity and the resilience of ecosystems. 4. This report is Swansea Council’s first Section 6
    [Show full text]
  • Xxxxxx Xxxxxx Environmental Statement Chapter 18. Land Quality
    xxxxxx xxxxxx Environmental Statement Chapter 18. Land Quality and Hydrogeology www.tidallagoonswanseabay.com www.tidallagoonswanseabay.com Tidal Lagoon Swansea Bay plc Contents 18.0 Land Quality and Hydrogeology 18.1 Introduction .............................................................................................................................. 1 18.2 Legislative and policy context .................................................................................................. 1 18.2.1 Introduction ...................................................................................................................... 1 18.2.2 National legislation ............................................................................................................ 1 18.2.3 Local Planning Policy – Unitary Development Plans (UDP) ............................................... 6 18.2.4 Local Planning Policy – Local Development Plans (LDP) ................................................... 9 18.2.5 Other relevant policy ....................................................................................................... 10 18.3 Assessment methodology and significance criteria ............................................................... 12 18.3.1 Approach ......................................................................................................................... 12 18.3.2 Impact assessment methodology ................................................................................... 13 18.3.3 Impact magnitude assessment.......................................................................................
    [Show full text]
  • 2. Urban Geology of Swansea and Port Talbot
    Waters et al . Urban geology of Swansea and Port Talbot 2. Urban geology of Swansea and Port Talbot Waters, C N, Price, S J, Davies, J, Tye, A M, Brown, S E & Schofield, D I The conurbation of Swansea–Neath–Port Talbot is one of the main centres of industrial development in South Wales. A long history of mineral extraction and processing, which stoked the initial growth of the towns, declined during the 20 th Century. Many of these former industries have left a legacy of groundwater, water- course and land contamination. A project funded by the Environment & Hazards Directorate (British Geological Survey) between 2000-2005 used available geological data to determine potential areas of contaminated land and understand the influence of the geology to pollutant pathways (Waters et al ., In press a). The study covered 100 km 2 of the Swansea- Neath-Port Talbot area (Fig. 2.1) and was aimed at providing data relevant to contaminated land issues, to augment the study by Arup (1997) on earth science information relevant to planning and development for the Swansea-Llanelli district, and look at new methodologies of presenting the data. Contaminated land is defined as areas where a Source-Pathway-Receptor linkage can be established (DoE, 1995). In order to determine Source areas it is necessary to appreciate the industrial development of the region by collecting information on current and former land use and the extent and nature of artificial deposits. The degree that contamination of Source areas is a problem can be established from analysis of soil geochemistry. The Pathway component represents the migration of contaminants through the air, surface water or groundwater.
    [Show full text]
  • Swansea University Bay Campus Grounds Management Plan
    Swansea University Bay Campus Grounds Management Plan 2020 P Edwards 30/1/2019 P Edwards 07/01/20 Swansea University Bay Campus Grounds Management Plan 2020 - 2021 Contents Swansea University Bay Campus History…………………………………………………………….4 Bay Campus Location………………………………………………………………………………….5 Figure 1: Bay Campus Location…………………………………………………………………………5 Bay Campus Terrain…………………………………………………………………………………...5 Swansea University Grounds Department……………………………………………………………5 Image 1: Ditch frozen over adjacent to Fabian Way…………………………………………………….6 Crymlyn Burrows Site of Special Scientific Interest (SSSI)…………………………………………7 Image2: Strandline Beetle Eurynebria Complanata…………………………………………………………...7 Image 3: Dune Tiger Beetle Cicindela camperstris……………………………………………………………8 Image 4: Green tiger beetle larva in its burrow positioned ready for catching prey…………………..9 Image 5: Sea buckthorn (Hippophae rhamnoides) re-encroaching at Crymlyn SSSI…………………..9 Image 6: Japanese Rose Rosa rugosa…………………………………………………………………………..10 Figure 2: Volunteer web ‘Flyer’ (English)……………………………………………………………..11 Figure 3: Volunteer web ‘Flyer’ (Welsh)………………………………………………………………11 Image 7: Volunteer group litter picking the beach in front of the Great Hall………………………….11 Manmade Features……………………………………………………………………………………12 Figure 4: Active Classroom East / West……………………………………………………………….12 Image 8:Active Classroom living wall…………………………………………………………………12 Image9: The Oracle 2’………………………………………………………………………………….13 Image 10: ‘Green Roof’ Bike Shelter…………………………………………………………………..13 Bay Campus Grounds Maintenance…………………………………………………………………14
    [Show full text]
  • Of the Environmental Impact Assessment (EIA)
    Environmental Statement Non-Technical Summary high water mark (beyond which is mudflats, beach and 1. Introduction sea), and to the west by the administrative boundary of 1.1 Overview NPT CBC and the City and County of Swansea (CCS), beyond which is the remainder of the former storage Swansea University (hereafter referred to as ‘the facility and nearby Queen’s Dock (approximately 1km to Applicant’) is seeking outline planning permission for the west). development of a Science and Innovation Campus on part of a former petroleum and chemical storage facility The Site comprises an open expanse of bare ground, (hereafter referred to as ‘the Proposed Development’). devoid of any notable features, measuring approximately 800m in length and 250-300m in width. The Proposed Development is located within the administrative area of Neath Port Talbot County Borough 1.3 The EIA Process Council (NPT CBC) as shown in Figure 1. The application URS Corporation Ltd (URS) has been commissioned by boundary of the Site is shown in Figure 2. the Applicant to undertake an Environmental Impact The 27.9 hectare (ha) Site is situated approximately 3.5 Assessment (EIA) in accordance with the Town and kilometres (km) east of Swansea city centre, and 4km Country Planning (Environmental Impact Assessment) southwest of Neath. (England and Wales) Regulations 1999 (as amended) and the Town and Country Planning EIA (Wales) Regulations 1.2 The Site 2008. The results of this process are presented in the Environmental Statement (ES) and accompanying The Site is bound to the north by the A483 - Fabian Way technical appendices.
    [Show full text]
  • International Pathways Guide 2018/19 the College, Swansea University 2018/19
    International Pathways Guide 2018/19 The College, Swansea University 2018/19 Where bright futures • Improve your future earning potential, secure a good job after graduation and enjoy face-to-face begin interaction with lecturers during your course. • Ranked 26th, Swansea University is amongst the Top 30 Universities in the UK for Research (REF, 2014). • Make personal connections with students from around the globe, enjoy different cultures and discover for yourself why students voted Ranked Swansea University top for postgraduate studies (WhatUni Student Choice Awards 2017). • Ranked in the top 5 for student satisfaction (NSS 36th 2018) and the top 5 cheapest student cities in the UK (Student Living Index 2017), Swansea in The Times & gives students excellent value for money. Sunday Times Good • Swansea University is in the UK top 15 for University Guide graduate employment (Times 2018) and offer 2018 paid internships and work placements with world-leading employers. • 5* Campus Facilities and Teaching Quality (QS Stars rated for Excellence) Contents Welcome 3 Osteopathy 29 Launch your global career at Swansea University 4 Politics and International Relations 30 The College: Your pathway to a degree from Swansea Psychology 31 University 6 Science 32 Your life on campus 8 Society and Wellbeing 33 Think sport... Think Swansea 9 Sports and Exercise Science 34 Bay Campus 10 Languages and Translation 35 Singleton Park Campus 11 Postgraduate pathways 36 Your life in Swansea 12 Postgraduate degrees available 37 Getting around Swansea 14 Things
    [Show full text]
  • Useful Information
    SAILS 2019 Conference: An inclusive experience for disabled students in higher education? Useful information Venue address The Great Hall, Swansea University Bay Campus, Fabian Way, Crymlyn Burrows, Swansea, SA1 8EN, Wales, UK Download the Bay Campus Map Directions: By Road Travelling west on the M4 leave the motorway at junction 42 and follow signs for Swansea on the A483 (Fabian Way). The Bay Campus is situated to the left hand side of Fabian Way and the main entrance is controlled by traffic lights. Parking Accessible parking is available around the Great Hall and can be arranged by emailing [email protected]. A large Park and Ride facility is located on Fabian Way, which is a short distance from the Bay Campus. The site is open from 6.45 am to 7.30 pm. It costs £4.00 per car per day. Please note that parking in unauthorised areas on the Bay Campus will result in a penalty notice being issued. By Taxi Drop off outside the Great Hall can be arranged with the taxi company when you make the booking. 1 Version 1.0 30/04/2019 Mae’r ddogfen hon ar gael yn Gymraeg / This document is available in Welsh By Train High-speed InterCity trains run at hourly intervals from London (Paddington) to Swansea. Travel time approximately 2 hours 50 minutes. The main intercity services offer connections to Swansea from Birmingham, Bristol Parkway, Cardiff and London. There are also regional services via Sprinter trains to west, mid and north Wales. The nearest train station to the Bay Campus is Swansea Rail Station, which is approximately 3.3 miles from the campus.
    [Show full text]
  • TLSB Environmental Statement Addendum November 2016
    Tidal Lagoon Swansea Bay Plc Tidal Lagoon Swansea Bay Town & Country Planning Act 1990 (as amended) 275kV Cable Route – Planning Application TLSB Environmental Statement Addendum November 2016 www.tidallagoonswanseabay.com Tidal Lagoon Swansea Bay Plc Document title TLSB 275kV ES Addendum Document reference TLSB-TCPA-275 Cable Route-ES Addendum- Nov 16-1.0 Revision number 1.0 Date 17/11/2016 Version history Revision Date Description Author(s) Reviewer(s) Approval 1.0 17/11/2016 Draft 275kV ES RH FC Addendum 1 Tidal Lagoon Swansea Bay Plc – TLSB ES Addendum: 275kV Cable Route TLSB-TCPA-275 Cable Route-ES Addendum-Nov 16-1.0 Tidal Lagoon Swansea Bay Plc Table of Contents 1 Introduction ............................................................................................................ 5 1.1 The Project ............................................................................................................................... 5 1.2 Purpose and scope ................................................................................................................... 5 1.3 Structure ................................................................................................................................... 7 2 Site selection option and appraisal .......................................................................... 8 2.1 Overview................................................................................................................................... 8 3 Planning and Policy Context ....................................................................................
    [Show full text]