National Electric Transmission Study 2006 Western Interconnection
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Strategic Transmission Discussion
Section 1:4: ExecutiveStrategic SummaryTransmission Discussion Strategic Discussion Section 4 SECTION 4: NEAC STRATEGIC TRANSMISSION DISCUSSION 4.1 SECTION PURPOSE The purpose of this section is to describe and discuss the methodology, rationale, and technical assessments utilized to determine the transmission export projects presented in this report. In order to provide an overall view of the process, this section summarizes the chronological process that was completed to reach the conclusion of the three proposed export transmission routes. 4.2 BACKGROUND 4.2.1 Transmission Historical Development The existing transmission grid in the state of Nevada has generally been planned, designed, constructed, and operated to transport energy from generators located in neighboring states and generators located in rural locations to serve electric loads principally in urban centers within the state. Historically generators were sized to serve the electric loads for single concentrated urban areas and/or industrial electric customers. It was recognized over time that economies could be obtained by constructing large generation facilities. This required constructing transmission lines for interconnecting the generators with multiple concentrated electric loads (“load centers”). Further development of the transmission grid resulted from interconnecting multiple generation facilities to enhance reliability in the event of outages on the generators. The state of Nevada does not have indigenous coal, oil, or natural gas to fuel conventional generators. As a result, Nevada must rely on the import of fuels and electrical energy to supply the electric load centers throughout the State. To support this, the existing transmission grid has been constructed to a large extent to import electric energy resources. -
Pacific DC Intertie (PDCI) Upgrade Outage / De-Rate Schedule 2014
Version No. Pacific DC Intertie (PDCI) Upgrade 10 POWER SYSTEM Effective Outage / De-rate Schedule 2014-2016 1/12/2016 Date: Introduction The upcoming scheduled outages due to major upgrades on the Pacific DC Intertie (PDCI) will result in reduced available capacity on the line during various periods from 2014 to 2016. Most of the upgrades are convertor station and line work by the Bonneville Power Administration (BPA) to modernize its infrastructure at the Celilo Converter Station, which is the northern terminal of the PDCI. Other work will be performed by the Los Angeles Department of Water and Power (LADWP) in conjunction with the upgrades. Scheduling MW Capacity The schedule below will be updated as outages are scheduled. Start Date End Date Direction Scheduling Capacity (MW) June 28, 2015 October 3, 2015 North – South 1956 HE21 HE3 South – North 975 October 3, 2015 January 20, 2016 North – South 0 HE4 HE24 South – North 0 January 21, 2015 North – South 29901 HE1 South – North 975 From October 3, 2015 to January 21, 2015, the Celilo‐Sylmar Pole 3 1000kV Line and Celilo‐Sylmar Pole 4 1000kV Line will be removed from service and the PDCI will not be available [0MW (N‐S) and 0MW (S‐ N)]. Version Version Revised By Date 1 Document Creation OASIS Group 09/22/2014 2 Corrected outage information OASIS Group 10/14/2014 3 Corrected outage information OASIS Group 10/15/2014 4 Updated outage information OASIS Group 10/16/2014 5 Updated outage information OASIS Group 11/03/2014 6 Updated outage information OASIS Group 12/23/2014 7 Updated outage information OASIS Group 01/09/2015 8 Updated outage information OASIS Group 08/26/2015 Updated PDCI capacity after 12/21/2015 from 3220MW to 9 OASIS Group 09/17/2015 2990MW. -
The History of High Voltage Direct Current Transmission*
47 The history of high voltage direct current transmission* O Peake† Power Systems Electrical Engineer, Collingwood, Victoria SUMMARY: Transmission of electricity by high voltage direct current (HVDC) has provided the electric power industry with a powerful tool to move large quantities of electricity over great distances and also to expand the capacity to transmit electricity by undersea cables. The fi rst commercial HVDC scheme connected the island of Gotland to the Swedish mainland in 1954. During the subsequent 55 years, great advances in HVDC technology and the economic opportunities for HVDC have been achieved. Because of the rapid development of HVDC technology many of the early schemes have already been upgraded, modernised or decommissioned. Very little equipment from the early schemes has survived to illustrate the engineering heritage of HVDC. Conservation of the equipment remaining from the early projects is now an urgent priority, while the conservation of more recent projects, when they are retired, is a future challenge. 1 INTRODUCTION technology for the valves to convert AC to DC and vice versa. At the beginning of the electricity supply industry there was a great battle between the proponents In the late 1920s, the mercury arc rectifi er emerged of alternating current (AC) and direct current as a potential converter technology, however, it was (DC) alternatives for electricity distribution. This not until 1954 that the mercury arc valve technology eventually played out as a win for AC, which has had matured enough for it to be used in a commercial maintained its dominance for almost all domestic, project. This pioneering development led to a industrial and commercial supplies of electricity number of successful projects. -
Sustainable Guide to Surfing CONTENTS
Sustainable Guide To Surfing CONTENTS 1 IntroductIon 03 1.1 What is sustainability? 08 1.2 What is wrong with the planet 08 1.3 How will it affect us as surfers? 12 1.4 Measuring our effect on the planet 17 2 EnErGY 19 2.1 Where does it come from and where does it go? 20 2.2 Energy: what to do? 24 3 TRAVEL 29 3.1 driving 30 3.2 Flying 33 3.3 Travelling: what to do 35 4 STUFF 44 4.1 the life cycle of stuff 45 4.2 Surfwear, marketing and the media 52 4.3 Surfboards 54 4.4 Wetsuits 57 4.5 other surfing gear 59 4.6 Stuff: what to do 61 5 concLusion 69 6 Further ReadInG (And viewinG) 71 7 ReferEnces 72 Thanks to: 1 INTRODUCTION the following two alternatives were written in 1972, in a u.K. magazine called Surf Insight. It’s a beautiful day – the sun clear and strong – sky absolute blue and the air fresh on your nostrils. You wake to a bowl of fresh fruit and two huge farm 1 eggs, grab your board and walk through green, dewy fields to your favourite surf spot. Not another being in sight except for the animals and birds going about their morning’s business. The beach is pure and inviting – you dig your toes into golden sand… It’s a beautiful day? – the sun weak – half obliterated by a perfect morning smog, the sky greyish-blue and the air smarting in your nostrils and choking your lungs… You gasp for another deep breath of sweet industrial smog – a yummy bowl of plastic Krunchy Pops with pasteurized milk and two battery- hen eggs you can hardly taste gobbled down with relish before the long walk through a concrete jungle to your favourite surf spot. -
Amended and Restated Victorville-Lugo Interconnection Agreement
DWP No. 10343 AMENDED AND RESTATED VICTORVILLE-LUGO INTERCONNECTION AGREEMENT BETWEEN DEPARTMENT OF WATER AND POWER OF THE CITY OF LOS ANGELES AND SOUTHERN CALIFORNIA EDISON COMPANY -l- Table of Contents SECTION TITLE PAGE 1. Parties 4 2. Recitals ,4 3. Agreement, .5 4. Effective Date Filing and Term 5 5. Definitions .6 6. Ownership of the Victorville-Lugo Transmission Lines .9 I 7. Victorville-Lugo Transmission Line .9 i 8. LADWP Facilities ,9 9. SCE Facilities 9 10. Operation and Maintenance of Transmission System 10 11. Transmission System, 11 12. Balancing Authority 12 13. Metering and Line Losses ,12 14. Scheduling of Power Deliveries 12 15. Adverse Determination or Expansion of Obligations 12 16. Successors and Assigns 13 17. Dispute Resolution ...14 18. Liability 14 29. Willful Action 15 20. No Dedication of Facilities 16 21. No Obligation to Offer Same Service to others 16 22. No Precedent. 16 -2- 23. Notices 16 24. Severability 17 25. Right of the Parties upon Termination 17 26. Force Majeure 17 27. Waivers and Remedies 18 28. Authorizations and Approvals 18 29. Relationship of Parties 18 30. No Third Party Rights or Obligation 18 31. Warranty of Authority 18 s \ 32. Assignment of Agreement 19 33. Conflicting Provisions 19 34. Governing Law 19 35. Signature Clause .20 Exhibit A Transmission Lines & Transmission System. ,21 Exhibit B Diagram. .26 “3- AMENDED AND RESTATED VICTORVILLE-LUGO INTERCONNECTION AGREEMENT 1. Parties: The parties to this Victorville-Lugo Interconnection Agreement are the DEPARTMENT OF WATER AND POWER OF THE CITY OF LOS ANGELES (“LADWP”), a department organized and existing under the Charter of the City of Los Angeles, a municipal corporation of the State of California, and SOUTHERN CALIFORNIA EDISON COMPANY (“SCE”), a California corporation, hereinafter referred to individually as "Party" and collectively as "Parties". -
Geothermal Power and Interconnection: the Economics of Getting to Market David Hurlbut
Geothermal Power and Interconnection: The Economics of Getting to Market David Hurlbut NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. Technical Report NREL/TP-6A20-54192 April 2012 Contract No. DE-AC36-08GO28308 Geothermal Power and Interconnection: The Economics of Getting to Market David Hurlbut Prepared under Task No. WE11.0815 NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency & Renewable Energy, operated by the Alliance for Sustainable Energy, LLC. National Renewable Energy Laboratory Technical Report 15013 Denver West Parkway NREL/TP-6A20-54192 Golden, Colorado 80401 April 2012 303-275-3000 • www.nrel.gov Contract No. DE-AC36-08GO28308 NOTICE This report was prepared as an account of work sponsored by an agency of the United States government. Neither the United States government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States government or any agency thereof. Available electronically at http://www.osti.gov/bridge Available for a processing fee to U.S. -
Advanced Transmission Technologies
Advanced Transmission Technologies December 2020 United States Department of Energy Washington, DC 20585 Executive Summary The high-voltage transmission electric grid is a complex, interconnected, and interdependent system that is responsible for providing safe, reliable, and cost-effective electricity to customers. In the United States, the transmission system is comprised of three distinct power grids, or “interconnections”: the Eastern Interconnection, the Western Interconnection, and a smaller grid containing most of Texas. The three systems have weak ties between them to act as power transfers, but they largely rely on independent systems to remain stable and reliable. Along with aged assets, primarily from the 1960s and 1970s, the electric power system is evolving, from consisting of predominantly reliable, dependable, and variable-output generation sources (e.g., coal, natural gas, and hydroelectric) to increasing percentages of climate- and weather- dependent intermittent power generation sources (e.g., wind and solar). All of these generation sources rely heavily on high-voltage transmission lines, substations, and the distribution grid to bring electric power to the customers. The original vertically-integrated system design was simple, following the path of generation to transmission to distribution to customer. The centralized control paradigm in which generation is dispatched to serve variable customer demands is being challenged with greater deployment of distributed energy resources (at both the transmission and distribution level), which may not follow the traditional path mentioned above. This means an electricity customer today could be a generation source tomorrow if wind or solar assets were on their privately-owned property. The fact that customers can now be power sources means that they do not have to wholly rely on their utility to serve their needs and they could sell power back to the utility. -
2006 Annual Report on Market Issues and Performance
Annual Report Market Issues and Performance 2006 Department of Market Monitoring California Independent System Operator Department of Market Monitoring – California ISO April 2007 TABLE OF CONTENTS Executive Summary ...................................................................................................... 1 Overview................................................................................................................................................... 1 Total Wholesale Energy and Ancillary Service Costs ..............................................................................3 Market Rule Changes ............................................................................................................................... 4 Increase in Bid Cap for Energy and Ancillary Services........................................................................ 4 Enforcement of Amendment 72 – Load Scheduling Requirement....................................................... 5 System Resource Adequacy Requirements ........................................................................................ 6 Reliability Capacity Service Tariff (RCST) ........................................................................................... 7 Long-term Procurement Plans ............................................................................................................. 9 General Market Conditions..................................................................................................................... 10 Demand -
Import/Export Paths: Summary of Transmission Issues and Implications
DOCKETED Docket Number: 15-RETI-02 Project Title: Renewable Energy Transmission Initiative 2.0 TN #: 214834 Document Title: Appendix A. Transmission Assessment Focus Area Information Description: N/A Filer: Misa Milliron Organization: California Energy Commission Submitter Role: Commission Staff Submission Date: 12/16/2016 10:49:38 AM Docketed Date: 12/16/2016 Public Review Draft 12/16/2016 Appendix A. Transmission Assessment Focus Area Information Renewable Energy Transmission Initiative 2.0 PUBLIC REVIEW DRAFT December 16, 2016 Public Review Draft 12/16/2016 Contents of Appendix A Introduction .......................................................................................................................... 1 In-State TAFAs: Transmission and Environmental/Land-Use Implications ............................... 3 In-State TAFA Data Maps........................................................................................................................ 3 Imperial Valley TAFA ............................................................................................................................... 9 Riverside East TAFA .............................................................................................................................. 16 Victorville/Barstow TAFA ...................................................................................................................... 20 Tehachapi TAFA ................................................................................................................................... -
2002 ABB ELECTRIC UTILITY CONFERENCE HVDC Technologies
2002 ABB ELECTRIC UTILITY CONFERENCE PAPER IV – 3 POWER SYSTEMS HVDC Technologies – The Right Fit for the Application Michael P. Bahrman ABB Inc. 1021 Main Campus Dr. Raleigh, NC 27606 Abstract: Traditional HVDC transmission has often provided economic solutions for special transmission applications. These include long-distance, bulk-power transmission, long submarine cable crossings and asynchronous interconnections. Deregulated generation markets, open access to transmission, formation of RTO’s, regional differences in generation costs and increased difficulty in siting new transmission lines, however, have led to a renewed interest in HVDC transmission often in non-traditional applications. HVDC transmission technologies available today offer the planner increased flexibility in meeting transmission challenges. This paper describes the latest developments in conventional HVDC technology as well as in alternative HVDC transmission technologies offering supplemental system benefits. Keywords: HVDC, DC, CCC, VSC, PWM, RTO, Asynchronous, HVDC Light I. INTRODUCTION Economic signals arising from deregulation of the generation market have led developers and transmission providers alike to follow the path of least resistance much like the power flow over the network on which their mutual business interests rely. On the generation side, the developer has invoked a quick-strike strategy siting units where there is convergence of low-cost fuel supplies, relative ease of permitting, water supply, ready access to transmission and proximity to load. On the transmission side, the transmission provider has been preoccupied with cost reduction, compensation for stranded assets, potential under-utilization of assets and reacting to evolving regulatory mandates. Although such development may result in a short-term gain in new, economic power resources, the long term benefit is not all that clear. -
Preliminary Planning Study Central California Clean Energy Transmission Project
Preliminary Planning Study Central California Clean Energy Transmission Project Study Plan Version 1.2 February 29, 2008 Stakeholder Group Study 1 Table of Contents Study Objective...................................................................................................................3 Potential Alternatives ..........................................................................................................3 Alt-1: Status Quo.............................................................................................................3 Alt-2: Central California Clean Transmission Project (C3ETP).....................................3 Alt-3: Same as Alt-2, except building a Midway – E2 Single Circuit Tower Line (SCTL) ............................................................................................................................5 Alt-4: Build a Whirlwind – San Joaquin - E2 500 kV DCTL.........................................5 Alt-5: Build a Midway – E2 230 kV DCTL...................................................................5 Alt-6: Build a new PG&E and SCE Big Creek 230 kV Tie............................................6 Alt-7: Build a Midway – McCall – E2 230 kV DCTL....................................................6 Alt-8: Build a Gates – Gregg 230 kV DCTL ..................................................................6 Alt-9: Raisin City Switching Station...............................................................................7 Alt-10: New Generation..................................................................................................7 -
2021-2022 Block 4 Schedule
Brody School of Medicine, East Carolina University 2021-2022 Block 4 Schedule ECC Approved 06.23.2021 (Updated 07.12.2021) Required attendance sessions are highlighted in red. INDIVIDUAL COURSE SYLLABI TAKE PRECEDENCE OF THIS SCHEDULE FOR ATTENDANCE POLICIES. STUDENTS ARE RESPONSIBLE FOR BEING AWARE OF AND ADHERING TO ALL SYLLABUS-LISTED POLICIES. Students are expected to be available 8:00 am-5:00 pm, Monday through Friday The schedule is subject to change in the event of emergencies Ignore room numbers listed on virtual sessions Yellow highlights indicate Path lab sessions which are splitting with certain Psych sessions Block 4 – Week 1 ver 14 07/12/2021 SYST 9100 HEMATOLOGY AND RENAL Monday Tuesday Wednesday Thursday Friday 08-02-21 08-03-21 08-04-21 08-05-21 08-06-21 8:00 8:00-8:50 2S04 8:00-8:50 2S04 8:00-8:50 2S04 8:00-8:50 2S04 CLINAPP 1 PATH 3 CLINAPP 2 PATH 7 Block 4 Intro; Clinical Hematology Hematology Hematology 8:30 Reasoning RBC: Anemia - Anemia CASES WBC: Lymphomas Destruction 2 9:00 9:00-9:50 2S04 9:00-9:50 2S04 9:00-9:50 2S04 9:00-9:50 2S04 PATH 1 PATH 4 PATH 5 CLINAPP 3 ORIENTATION Hematology Hematology Hematology Hematology 9:30 RBC: Hematopoiesis; RBC: Anemia - Production WBC: Overview; Tools for White Cell Disorders Hemoglobin; Tools for Deficits Diagnosis; Reactive WBC CASES evaluation Proliferation 10:00 10:00-10:50 2S04 10:00-11:30 10:00-10:50 2S04 10:00-10:50 2S04 PATH 2 Ethics 9 PATH 6 PATH 8 Hematology 2S04, 2E100 Hematology Hematology RBC: Anemia - WBC: Hematology WBC: Myeloproliferative 10:30 Destruction 1 Neoplasms Overview; and Myelodysplastic Leukemia Disease; Plasma cell Disease 11:00 11:00-11:50 2S04 11:00-12:20 2S04 11:00-11:50 2S04 Psych 1 FoD2 2 Psych 2 11:50-12:40 2S04 Overview Value-Based Care Flipped Classroom.