Shri Narendra Modi Hon'ble Prime Minister

NEW RAILWAYS NEW A progressive journey since 2014 Parliamentary Constituency

DHENKANAL RAILWAYS’ DEVELOPMENT IN ODISHA (2014-PRESENT) DHENKANAL PARLIAMENTARY CONSTITUENCY

A. ASSEMBLY SEGMENTS : Dhenkanal, Kamakyanagar, Hindol, Parjanga, , , . RAILWAY STATIONS COVERED : Handapa, Boinda, Jarapada, Kerejanga, Angul, Talcher Road, Talcher, Burhapanka, Meramandali, Nayabhagirathipur, Hindol Road, Mahadia PH, Sadasibapur, Dandimal, Dhenkanal, Shyamacharanpur Halt, Joranda Road. B. WORKS COMPLETED IN LAST FIVE YEARS : B.1. Improvement of Passenger Amenities :  Development of Circulating area at Angul, Dhenkanal, Talcher and Talcher Road at a cost of ` 2.0 Crore.  Signages provided at Angul, Dhenkanal and Talcher Stations at a cost of ` 0.057 Crore.  Additional Ticket Window for booking facility provided at Angul, Talcher and Talcher Road Stations at a cost of `0.120 Crore.  Waiting Halls Provided at Angul, Talcher, Dhenkanal and Talcher Road Stations at a cost of `0.970 Crore.  Provision of 4 bay Platform Shelter on Platform No.1 Talcher Station Building and 6 bays on Platform No.2 at Dhenkanal Station at a cost of ` 0.910 Crore.  04 Nos. of Toilets provided at Angul, Talcher, Dhenkanal and Talcher Road Stations at a cost of ` 0.230 Crore.  03 Nos. of Foot Over Bridges provided at Meramandali, Talcher Road and Budhapanka Stations at a cost of ` 8.0 Crore.  Water Coolers have been provided at 24 Hon’ble Union Minister Shri Dharmendra Pradhan & important stations over Khurda Road Division. It Hon’ble Union Minister Shri Manoj Sinha dedicating is a combined work for 10 constituencies at a Passenger Amenities Works at Talcher Railway Station cost of ` 1.390 Crore.  01 additional Platform at Talcher Road Station at a cost of ` 1.820 Crore.  Widening of existing road at a cost of ` 30 Lakh, Development of Parking Area at a cost of ` 30 Lakh, Thematic Painting of Walls for Station Beautication at a cost of ` 3 Lakh, Provision of Welcome & Thank You Gate at a cost of ` 4 Lakh, Miscellaneous Works at a cost of ` 33 Lakh. B.2. Additional Stoppage : Improved Parking Area of Talcher Railway Station  20817/20818 -New Delhi - Bhubaneswar Rajdhani Express via Angul, City has been given additional Stoppage at Dhenkanal Station. B.3. Trafc Facilities :  Commissioning of Banker Siding at Dhenkanal. Commissioning of Auto Signalling along with 3rd line between Talcher to Talcher South Balanda. Commissioning of Long Haul loop at Hindol Road at a cost of ` 16.910 Crore.  1 No. of Road Over Bridge (ROB) at Level Crossing No. CT 39 at a cost of ` 12.700 Crore.  8 Nos. of Road Under Bridges (RUB) at Level Crossing No. CT 30, CT 37, CT 50, CT 53, CT 58, CT 59, CT 80,ST 104 at a cost of ` 20.0 Crore. Angul Station Building  R o a d O v e r B r i d g e b e t w e e n D h e n k a n a l & Opened for Public Use. RAILWAYS’ DEVELOPMENT IN ODISHA (2014-PRESENT) DHENKANAL PARLIAMENTARY CONSTITUENCY

B.4. Additional Facilities :  At Angul Electric Loco Shed augmentation of holding capacity from 100 AC locos to 150 AC locos completed at a cost of ` 22.140 Crore.  Angul Electric Loco Shed augmentation Holding capacity from 150AC locos to 200 AC locos completed at a cost of ` 39.820 Crore.  Shifting of Neutral sections and provision of feeder wire between Joranda Road to Dhenkanal and Joranda Road to Raj Athgarh section at a cost of ` 0.690 Crore.  All Unmanned Level Crossings have been eliminated. C. ON-GOING WORKS : C.1. Passenger Amenities :  Augmentation of water supply for train and coach watering at Talcher Station at a cost of ` 1.980 Crore.  Provision of Deep tube well, pump house and PVC tank at 32 stations over Khurda Road Division. It is a combined work for 10 MP constituencies at a cost of ` 1.890 Crore.  Provision of Latrines and Urinals at 32 stations over Khurda Road Division. It is a combined work for 10 MP constituencies at a cost of ` 1.280 Crore.  Provision of Public Address system at 25 stations . It is a combined work for 10 MP constituencies at a cost of `1.790 Crore.  Provision of First Foot Over Bridge at Mahadia PH, Sadasibpur PH & Talcher Thermal PH Waiting Hall at Dhenkanal Railway Station  Provision of Concrete Platform Surface at Dhenkanal, Talcher, Angul  Replacement of Old asbestos sheet with green galvanized sheets at Angul, Meramundali C.2. Trafc Facilities :  Yard remodelling of loop lines at Hindol Road, Sadasibapur, Joranda Road, Raj Athgarh, Byree, Dhanmandal, Baitarani Road and Kenduapada. It is a combined work at a cost of ` 14.190 Crore.  7 Limited Height Subways in lieu of Unmanned Level Crossing gates over Khurda Road Division. It is a combined work for 04 constituencies at the cost of ` 17.720 Crore.  9 Limited Height Subways in lieu of 11 manned Level Crossing gates over Khurda Road Division. It is a combined work for 7 MP constituencies at a cost of ` 21.460 Crore.  Increase CSL (Length of lines) at 20 stations in Khurda Road Division without shifting of points and Crossings. It is a combined work for 10MP constituencies at a cost of ` 0.950 Crore. C.3. Additional Facilities :  Provision for approach warning system and voice logger at 25 level crossings over Khurda Road Division. It is a combined work for 10 MP constituencies at a cost of ` 4.060 Crore.  Replacement of Level crossings gates by electrically operated lifting barrier over Khurda Road Division. It is a combined work for 10 MP constituencies at a cost of ` 3.750 Crore.  Integrated power supply at mid section interlocked level crossing gates. It is a combined work for 10 MP constituencies at a cost of ` 6.150 Crore.  Interlocking 10 nos. of manned LC gates over Khurda Road Division. It is a combined work for 5 MP constituencies at a cost of ` 8.650 Crore.  Provision of 6 quad cable and accessories over Khurda Road Division. It is a combined work for 11 MP constituencies at a cost of ` 10.790 Crore.  Replacement of old point machines at various station yards over Khurda Road Division. It is a combined work for 11 MP constituencies at a cost of ` 2.800 Crore.  Replacement of worn out point machines at different stations over Khurda Road Division. It is a combined work for 11 MP constituencies at a cost of ` 0.840 Crore.  Provision for earthing improvement by maintenance free earth for signalling and telecom installations over Khurda Road Division. It is a combined work for 11 MP constituencies at a cost of ` 0.960 Crore.  Construction of 102 Quarters at Talcher at a cost of ` 13.340 Crore.  Construction of 05 unit quarters in replacement of existing old quarters at Talcher Station at a cost of ` 0.380 Crore.  Construction of 12 nos. of quarters for running staff at Talcher Station at a cost of ` 0.870 Crore. Digital Transaction at Angul Railway Station  Water treatment plant for potable water at Railway colony at Talcher Station at a cost of ` 2.870 Crore.  Construction of Crew Booking ofce cum lobby and 20 bedded running room at Talcher at a cost of ` 1.890 Crore.  Replacement of old SCADA system by latest SCADA system as per latest RDSO specication over Khurda Road Division. It is combined work for 11 MP constituencies at a cost of ` 7.570 Crore.