FORM –I

SUBMISSION TO STATE ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, . BY M/s Surya Stone Crusher, Mg.P: M.Srinivasa Rao ROAD METAL , BOULDERS, EARTH & GRAVEL Production : Earth/Gravel - 1928 M3 Max./A Road Metal / Boulders – 17920 Max./A Land Details : Govt Land Extent : 1.629Ha. SY. NO. : 297 VILLAGE : J.Annavaram MANDAL : Yeleswaram DISTRICT : East Godavarai STATE : ANDHRA PRADESH.

Prepared For M/s Surya Stone Crusher, M/P Sri M. Srinivasa Rao, D.No. 12-22-6/1, J.Aryapuram, Rajamahendravaram,

East Godavari District.

SUBMITTED TO STATE LEVEL ENVIRONMENT IMPACT ASSESSMENT AUTHORITY, ANDHRA PRADESH, GOVERNMENT OF .

Prepared by Coastal Mining Consultancy Dr.P Vijaya Kumar M.sc. ,P.hd., Srikakulam, Visakhapatnam & Rajamahendravaram. BASIC INFORMATION S.NO. Item Details 1 Name of the Project Road Metal, Boulders, Gravel & Earth. 2 S.No. in the schedule 1(a) 3 Proposed capacity/ area/ length/ tonnage Maximum Production of Road to be handled/ command area/ Lease Metal/Boulders : 17920 M3/ area/ number of wells to be drilled Annum, Gravel/Earth: 1928 M3/ Annum

4 New/ expansion/ modernization New 5 Existing capacity/ Area etc. 1.629 Ha. 6 Category of Project i.e. ‘A’ or ‘B’ The Project Comes Under Category- B and as Category B2. 7 Does it attract the general condition? If No yes please specify. 8 Does it attract the specific condition? If No yes please specify. 9 Location Plot/ Survey No. Sy.No.297 Village J.Annavaram Village Tehsil Yeleswaram Mandal District . State Andhra Pradesh. 10 Nearest railway station/ airport along with Annavaram Railway Station 35 distance in kms. Km. 11 Nearest town, city, district headquarters J.Annavaram – 1.5Km along with distance in kms. 12 Village panchayaths, Zilla parishad, M/s Surya Sone Crusher, Municipal Corporation, Local body M/P Sri M. Srinivasa Rao, (Complete postal address with telephone D.No. 12-22-8/1, Aryapuram, no’s to be given) Rajamahendravaram, East Godavari District.

13 Name of the applicant Sri M. Srinivasa Rao 14 Registered address M/s Surya Sone Crusher, M/P Sri M. Srinivasa Rao, D.No. 12-22-8/1, J.Aryapuram, Rajamahendravaram, East Godavari District.

15 Address for Correspondence Same as Above Name Sri M. Srinivasa Rao, Designation/Owner/Partner/CEO) Managing Partner Address Same As Above. Pin code e-mail

2

Telephone no. Fax no. 16 Details of Alternative sites examined, if Not Applicable, as it is a Site any location of these sites should be Specific Project. Tops Sheet No- shown on a toposheet. 65 K/3. 17 Interlinked projects None 18 Whether separate application of Not Applicable interlinked project has been submitted? If yes, date of submission Not Applicable If no, reason Not Yet Planned. 19 Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given. Not Applicable (a) The Forest (Conservation) Act, 1980 (b) The Wild Life (Protection) Act, 1972 (c) The CRZ Notification, 1991 20 Whether there is any Government Order/ Notice No: 916/Q/2019-4 Policy relevant/ relating to the site? Dt:28-05-2019. Issued by Govt.of Andhra Pradesh, Dept of Mines and Geology. Kakinada. 21 Forest Land Involved (Hectare) Nill. 22 Whether there is any litigation pending against the project and / or land in which the project is propose to be set up? (a) Name of the court None (b) Case No. (c) Orders/ directions of the court, if any and its relevance with the proposed project.

(I) ACTIVITY 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Details thereof (with approximate quantities /rates, S.No. Information/Checklist Yes/No wherever possible) with source confirmation of information data 1.1 Permanent or temporary Yes Permanent Change in Land Use. change in land use, land cover or topography including increase in intensity of land use (with respect to local land use plan) 1.2 Clearance of existing land, Yes Clearing existing Minor vegetation and buildings? Vegetation in the Mining Area. 1.3 Creation of new land uses? Yes Mining Activity. 1.4 Pre-construction No Survey completed, Site service investigations e.g. bore building will e constructed. houses, soil testing? 1.5 Construction works? Yes Site Service building will be

3

constructed. 1.6 Demolition works? No None. 1.7 Temporary sites used for No Local Villagers shall be employed construction works or housing of construction workers? 1.8 Above ground buildings, Yes A site service building will be structures or earthworks constructed within the Quarry including linear structures, Lease area. No major construction cut and fill or excavations work is involved. 1.9 Underground works No Road Metal, Boulders, Gravel and including Mining or Earth Quarrying by Open – Cast tunneling? Semi Mechanized Method. 1.10 Reclamation works? Yes Can be done after completion of Mining Activity.

1.11 Dredging? No Not Applicable

1.12 Offshore structures? No Not Applicable

1.13 Production and Yes Maximum Production of Road manufacturing processes? Metal/Boulders : 17920 M3/ Annum, Gravel/Earth: 1928 M3/ Annum

1.14 Facilities for storage of goods Yes Open Yard Storage. or materials? 1.15 Facilities for treatment or No Not Applicable. disposal of solid waste or liquid effluents? 1.16 Facilities for long term No Not required, local villagers shall housing of operational be employed. workers? 1.17 New Road, rail or sea traffic No Existing Temporary Roads are during construction or sufficient for the Quarrying operation? activities. No rail line is required. Sea traffic is not applicable. 1.18 New Road, rail, air No Existing Roads are sufficient for waterborne or other transport the Quarrying activities. No rail infrastructure including new line is required. or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of No Not required existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission No Not required

4

lines or pipelines? 1.21 Impoundment, damming, No Nil culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No None 1.23 Abstraction or transfers of No Purchased Locally. water form ground or surface waters? 1.24 Changes in water bodies or No The project no way affects the the land surface affecting existing drainage pattern/run off. drainage or run-off? Precautions should be taken for dump yard. 1.25 Transport of personnel or Yes Mined Products will be materials for construction, Transported through Covered operation or Trucks. decommissioning? 1.26 Long-term dismantling or No NA decommissioning or restoration works? 1.27 Ongoing activity during No Positive Impact on Environment, decommissioning which Due to tree Plantation. could have an impact on the environment? 1.28 Influx of people to an area in No NA either temporarily or permanently? 1.29 Introduction of alien species? No No alien species will be introduced. 1.30 Loss of native species or No No native species or generic genetic diversity? diversity is lost. The proposed Q.L area is slightly elevated and covered with Rock mass, shrubs, bushes and small trees. 1.31 Any other actions? No None

5

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): Details thereof (with S.No. Information/Checklist approximate quantities /rates, confirmation Yes/No wherever possible) with source of information data 2.1 Land especially undeveloped NO Govt. Land or agricultural land (ha)

2.2 Water (expected source & Yes Water requirement will be meet competing users) unit: KLD through tankers from the nearby villages. Requirement of Water in the Mine is about 1200 L/day for Domestic Purpose. 2400 L/day for Dust Suppression.

2.3 Minerals (M³) Yes Maximum Production for Road Metal/Boulders : 17920 M3/ Annum, Gravel/Earth: 1928 M3/ Annum.

2.4 Construction material – Yes No major construction work is stone, aggregates, sand / soil involved. A site service building (expected source – MT) will be constructed. 2.5 Forests and timber (source – No No timber is used. MT) 2.6 Energy including electricity No Only Diesel for the Mining and fuels (source, competing Machineries. users) Unit: fuel (MT), energy (MW) 2.7 Any other natural resources No No other natural resources will be (use appropriate standard used. units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. Details thereof (with Information/Checklist approximate quantities /rates, S.No. confirmation Yes/No wherever possible) with source of information data 3.1 Use of substances or No There are no Hazardous materials, which are substances or material is to hazardous (as per MSIHC human health or the rules) to human health or the environment. environment (flora, fauna, and water supplies)

6

Changes in occurrence of No Not Applicable 3.2 disease or affect disease vectors (e.g. insect or water borne diseases) Affect the welfare of people The Mining operations will bring 3.3 e.g. by changing living Yes improvement in the socio- conditions? economic levels in the study area. 3.4 Vulnerable groups of people No Mine workers are likely to get who could be affected by the exposed to dust. Dust masks will project e.g. hospital patients, be provided to all the employees. children, the elderly etc., 3.5 Any other causes No None

4. Production of solid wastes during construction or operation or decommissioning (MT/month). Details thereof (with approximate quantities /rates, S.No. Information/Checklist Yes/No wherever possible) with source confirmation of information data 4.1 Spoil, overburden or Mine No There is No Waste as 100% of wastes Produced Road Metal, Boulders, Gravel & Earth Stone will be Useful. 4.2 Municipal waste (domestic No No municipal waste will be and or commercial generated. wastes) 4.3 Hazardous wastes (as per No No Hazardous waste is Hazardous Waste anticipated. Management Rules) 4.4 Other industrial process No No process wastes are anticipated. wastes 4.5 Surplus product No No Surplus products are envisaged.

4.6 Sewage sludge or other sludge No No effluent treatment is involved from effluent treatment in the proposed project.

4.7 Construction or demolition No No constructions exist in the wastes proposed Mine Lease area. 4.8 Redundant machinery or No Machinery is good working equipment condition will be employed. 4.9 Contaminated soils or other No NA materials 4.10 Agricultural wastes No No Agricultural activity is involved.

4.11 Other solid wastes No No other solid wastes are anticipated.

7

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Details thereof (with S.No. Information/Checklist approximate quantities/rates, confirmation Yes/No wherever possible) with source of information data 5.1 Emissions from combustion No Combustion of HSD, By Mining of fossil fuels from stationary Machinery will result in or mobile sources emissions, whenever operated. 5.2 Emissions from production Yes Dust emissions are the major processes pollutant from Mining activities. 5.3 Emissions from materials Yes Dust emissions are anticipated handling including storage during transportation, loading or transport and unloading of material. 5.4 Emissions from construction No No major construction activity is activities including plant and involved except for site service equipment building. 5.5 Dust or odours from handling Yes Mine workers are likely to get of materials including exposed to dust. Dust masks will construction materials, be provided to all the employees. sewage and waste 5.6 Emissions from incineration No Not applicable of waste 5.7 Emissions from burning of No Not applicable waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No None sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with Information/Checklist Yes/No approximate quantities/rates, S.No. confirmation wherever possible) with source of information data with source of information data 6.1 From operation of equipment Yes Expected noise from Vehicular e.g. engines, ventilation movement. plant, crushers 6.2 From industrial or similar No Not applicable. processes. 6.3 From construction or No Not applicable. demolition 6.4 From blasting or piling Yes By Drilling and Blasting. 6.5 From construction or Yes During the operation due to operational traffic vehicular movement (Tippers)

8

noise will be generated.

6.6 From lighting or cooling No Not applicable systems 6.7 From any other sources No None

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea: Details thereof (with Information/Checklist approximate quantities/rates, S.No. confirmation Yes/No wherever possible) with source of information data 7.1 From handling, storage, use No Not applicable or spillage of hazardous materials

7.2 From discharge of sewage or No Not applicable other effluents to water or the land (expected mode and place of discharge) 7.3 By deposition of pollutants Yes Air quality will be maintained with emitted to air into the land or in permissible limits by adopting into water dust suppression on haul Roads with sprinkling of water. The dust generated during the drilling will be suppressed by covering the drill rods by gunny cloth and dust extractors will be deployed. 7.4 From any other sources No None 7.5 Is there a risk of long term No Not applicable build up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment Details thereof (with approximate quantities/rates, S.No. Information/Checklist Yes/No wherever possible) with source confirmation of information data

8.1 From explosions, spillages, No None fires etc from storage, handling, use or production of hazardous substances

9

8.2 From any other causes No None 8.3 Could the project be affected No None by natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality Details thereof (with approximate quantities/rates, S. Information/Checklist Yes/No wherever possible) with source No. confirmation of information data 9.1 Lead to development of Yes supporting utilities, ancillary Supporting Infrastructure like development or development Roads, alternative Business Opportunities etc may Improve. stimulated by the project which could have impact on the environment e.g.:

• Supporting infrastructure (Roads, power supply, waste or waste water treatment, etc.)

• housing development

• extractive industries

• supply industries

• other 9.2 Lead to after-use of the site, Yes After Mining, Quarry will be re which could have an impact used for agriculture purpose or on the environment Plantations. 9.3 Set a precedent for later Yes Some Employment Opportunity developments will be Generated. 9.4 Have cumulative effects due No None to proximity to other existing or planned projects with similar effects

10

(III) Environmental Sensitivity

Aerial distance S.No. A Name/ Identity (within 15 km.) r Proposed project e location boundary a s 1 Areas protected under None They area is not international conventions, Covered under any national or local international legislation for their Conventions. ecological, landscape, cultural or other related value 2 Areas which are 1.J.Annavarm Local 3.23 km[SW] important or sensitive for Tank. ecological reasons - 2.Timmaraju Cheruvu Wetlands, watercourses 3.Subbareddi Sagar. 4.14 km[SW] or other 4.Yeleru Reservoir water bodies, coastal 10.85 km[SE] zone, biospheres, 1.Lingamparti mountains, forests R.F 3.54 km[SW]. 2.Uligogula R.F 3.Girijanapur- -am R.F 11.10 km [SE] 4.Annavaram R.F 8.66 km [SE] 5.Veerabadhr- -apuram R.F 10.00km [SE]

4.6 km [NE]

2.11 km [N] 3 Areas used by protected, None None important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, mari o None None underground waters ne r

5 State, National boundaries Yes NH – 15.2 Km.

6 Routes or facilities used None None by the public for access to recreation or other tourist, pilgrim areas 7 Defence installations None None

8 Densely populated or J.Annavaram J.Annavaram Village built-up area – 1.74 km Km. 11

9 Areas occupied by Yes Yeleswaram sensitive man- made land Hospital- uses (hospitals, schools, 7.61 km places of worship, community facilities) 10 Areas containing 1.J.Annavarm Local 3.23 km[SW] important, high quality or Tank. scarce resources 2.Timmaraju Cheruvu (ground water resources, 3.Subbareddi Sagar. 4.14 km[SW] surface resources, 4.Yeleru Reservoir forestry, agriculture, 10.85 km[SE] fisheries, tourism, 1.Lingamparti Minerals) R.F 3.54 km[SW]. 2.Uligogula R.F 3.Girijanapur- -am R.F 11.10 km [SE] 4.Annavaram R.F 8.66 km [SE] 5.Veerabadhr- -apuram R.F 10.km [SE]

4.6 km [NE]

2.11 km [N] 11 Areas already subjected None None to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to None None natural hazard which could cause the project to present environmental problems (earthquakes,subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

I hereby give undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance given, if any to the project will be revoked at out risk and cost.

Date: -0 -2019. Place: East Godavari.

12

Signature of the Applicant (Project proponent/ Authorized signatory)

Name M.Srinivasa Rao Designation Managing Partner. Address D.No. 12-22-8/1, Aryapuram, Rajamahendravaram, East Godavari District.