East Godavari District lies in between 16° 30' to 17° 00' N Latitude and 81° 30' to 82° 30'E Longitude and occupies a geographical area of 10,807 Sq. Km. spread over in 60 Mandals with population of 51.515 lakhs (2011 census). The East Godavari District is bordered by river Godavari on West and Bay of Bengal on Eastern side. The district flourishes with lands of fertile soils, good rain fall and balance climatic conditions and possesses all the nature's hand work like perennial rivers, mountains, forests and also the sea coast. The district is enriched by huge water resources of River Godavari and major streams like Yeleru, Suddagedda, Pampa and Thandava. The Delta coastal line is around 150 Kms in the Eastern sea board of India with minor ports at Kakinada and Odalarevu. The mean annual rainfall precipitation is 1219 mm and is mostly confined to the period from June to November.
Details Of Irrigation Projects In East Godavari District
S.No Name of the project Ayacut in Acres Ayacut in Acres Completed Projects
a. Major Irrigation Projects
1 Sir Arthur Cotton Barrage (under Godavari Delta System) 4,79,736
2 Yeleru Reservoir (Yeleru Irrigation System) 53,017
3 Thandava Reservoir (Part) 16,947
b. Medium Irrigation projects
1 Pampa Reservoir 12,005
2 Torrigedda LIS 13,758 http://irrigationap.cgg.gov.in/wrd/getDistricts 1/91 10/31/2018 District Irrigation Profiles 3 Subbareddy Sagar 9,900
4 Bhupathipalem Reservoir 11,526
5 Sri K.V.Ramakrishna Surampalem Reservoir 11,560
Ongoing Projects
a. Major Irrigation Projects
1 Polavaram Irrigation Project Left Main Canal 2,50,000
2 Thota Venkatachalam Pushkara Lift Irrigation Scheme 1,85,906
3 Venkatanagaram Pumping Scheme 34,000
b.Medium Irrigation Projects
1 Musurumilli Reservoir 22,316
2 Maddigedda Reservoir Project 4,000
Contemplated Projects
a. Major Irrigation Projects (Partially Completed)
1 Chagalnadu L.I.S. 35,000
b. Medium Irrigation Projects (Partially Completed)
Nil
c. Minor Irrigation Projects
1 Minor Irrigation Tanks 1488 98,315
2 Mini L.I. Scheme of APSIDC 45 9,047
3 Open Head Channel + Anicut System +Check Dams (Spl.M.I. Division) 225 24,475
Total 1758 1,31,837
COMPLETED MAJOR IRRIGATION PROJECTS
(A) Sir Arthur Cotton Barrage( G.D.System)
Preamble
Godavari Delta System (GDS) is an established old Irrigation System in operation since 1862. The old anicut was constructed by Sir Arthur Cotton during 1857-62 which has served the delta system for more than a century. As it was showing http://irrigationap.cgg.gov.in/wrd/getDistricts 2/91 10/31/2018 District Irrigation Profiles signs of distress, the anicut was replaced by Sir Arthur Cotton Barrage (S.A.C.B.) during the years 1970-88.
Salient features
Between Dowlaiswaram (V),Rajahmundry Rural(M),East Godavari Location: : District and Vijjeswaram (V),Nidadavolu (M), West Godavari District. Latitude : 81° 45' 00'' East Longitude : 16° 55' 00'' North Ayacut: : 10,09,009 Acres ( East and West Godavari District ) I.P Contemplated : 10,09,009 Acres(Stabilization) I.P Created : 8,96,533 Acres(Stabilization) I.P Utilized (2014-15) : 8,96,533 Acres(Stabilization) Gross Storage : 2.931 TMC FRL : +13.64 M MDDL : +9.62 M Cropping Pattern : Paddy, Sugarcane, Banana, Chillies and Turmeric. ( Khariff and Rabi ) 36 Mandals in East Godavari District and 29 Mandals in West Godavari Population Benefited : District. Present Stage : Completed Funding Details : World Bank Assistance Project Starting Date : 1970 Project Completion Date : 1982 IRRIGATION POTENTIAL (A)District wise : (I) East Godavari District : a) Godavari Eastern Delta : 2,45,333 Acres. b) Godavari Central Delta : 2,01,898 Acres. c) Pithapuram Br Channel : 32,507 Acres Total : 4,79,736 Acres. ------(II)West Godavari District : 5,29,273 Acres Grand Total : 10,09,009 Acres. Budget for the Year 2015-16 : Plan-30.0000 Crs. Non-Plan-0.2261 Crs. (Modernization of GDS) Cumulative Expenditure up to : 953.44 Crs. 05/2015 ------
(i)Mandal Wise Ayacut in East Godavari District ( Acres)
Mandal Name Ayacut in Acres Mandal Name Ayacut in Acres Anaparty 9,712 Alamuru 12,000
Biccavole 12,157 Kadiam 8,913
Razole 15,700 Kakinada (R) 9,152
Kakinada (U) 1,105 Karapa 18,542
Amalapuram 7,666 Allavaram 18,120
K.Gangavaram 18,033 Kazuluru 23,961
Pedapudi 22,311 Rayavaram 17,237
Kapileswarapuram 17,149 Samalkota 23,407
Tallarevu 22,262 Mandapeta 15,738 http://irrigationap.cgg.gov.in/wrd/getDistricts 3/91 10/31/2018 District Irrigation Profiles Mamidikuduru 8,480 Kothapalli 13,434
Pithapuram 1,937 Gollaprolu 5,053
Ramachandrapuram 22,539 Kothapeta 13,111
I.Polavaram 18,126 Thondangi 3,198
Mummidivaram 9,688 Inavilli 11,628
Katrenikona 17,220 Ravulapalem 9,787
Uppalaguptham 26,158 Ambajipeta 5,636
Gannavaram 7,742 Malikipuram 8,417
Sakhinetipalli 12,424 Atreyapuram 11,903
Total Ayacut 4,79,736 Acres
(ii) Mandal Wise Ayacut in West Godavari District ( Acres)
Achanta :14,890 Attili :8,048 Ponduru :19,227 Bhimavaram :38,568
Veravasaram :18,933 Eluru :2,510 Kalla :32,916 Eragavaram :19,583
Ganapavaram :20,537 Kovvuru : 83 Undi :27,670 Mogalturu :16,194
Yelamanchili :14,753 Nidadavolu :11,637 Palkolu :17,102 Palakoderu :18,864
Narasapuram :25,978 Pentapadu :24,910 Penugonda:13,565 Penmatra :17,540
Bhimadolu :19,504 Peravali :16,218 Tanuku :15,232 Nidamanuru :26,017
Tadepalli Gudem :5,116 Unguturu :20,242 Akiveedu :22,275
Undrajavaram :18,025 Denduluru :13,136
Total Ayacut: 5,29,273 Acres
The Barrage consists of 4 Arms with 175 Bays with a length of 3.599 Km .
1) Dowlaiswaram Arm with 70 Bays 2) Ralli Arm with 43 Bays. 3) Madduru Arm with 23 Bays and 4) Vijjeswaram Arm with 39 Bays.
(B)Yeleru Reservoir Project(Yeleru Irrigation System)
River : Yeleru Basin : Yeleru
http://irrigationap.cgg.gov.in/wrd/getDistricts 4/91 10/31/2018 District Irrigation Profiles
Preamble:
Yeleru Reservoir Project (Y.R.P.) envisages formation of earth dam across river Yeleru to form a Reservoir near Yeleswaram Village in East Godavari District with gross storage capacity of 24.110 TMC. This Project is proposed to be implemented in two phases.
(i) The Phase - I of the project envisages to supply 73 million gallons per day of water to the steel plant at Visakhapatnam and to stabilize 67,614 acres of existing ayacut of Yeleru Irrigation System. An allocation of 23.440 TMC water for Visakhapatnam was provided in Polavaram Project report under Left Main Canal.
(ii) The Phase - II of the project envisages to irrigate an extent of 1.55 lakh acres in East Godavari and Visakhapatnam Districts, after completion of Polavaram Project and its Left Main Canal.
Salient features
Location : Yeleswaram (Village & Mandal) Longitude : 82° 5' 30'' E Latitude : 17° 18' 0'' N Year of Completion : 1991 Ayacut : 53,017 Acres Gross Storage : 24.110 TMC Dead Storage : 6.160 TMC Live Storage : 17.950 TMC MDDL : + 72.54 Mts. Area of Foreshore at F.R.L : 59.36 Sq.Km. Spillway Crest Level : + 76.56 Mts. FRL : + 86.56 Mts. Lowest River Bed Level : + 48.00 Mts. Dependable net yield : 24 TMC Water Allocation : 12.95 TMC Maximum flood discharge : 2.85 Lakhs, 2h cusecs Canals : Open Head Channels Water Allocation for Irrigation : 12.95 TMC ( Both Khariff and Rabi ) http://irrigationap.cgg.gov.in/wrd/getDistricts 5/91 10/31/2018 District Irrigation Profiles Water Allocation for Industries : 5.00 TMC (for G.V.M.C or VIWSCo,. ) Kirlampudi, Gollaprolu, Pithapuram, Jaggampeta, Yeleswaram and Mandals benefited : Prathipadu Villages benefited : 76 Nos Budget for the Year 2015-16 : 11.60 Crs Cumulative Expenditure up to : 11.0400 Crores 05/2015
(iii) Thandava Reservoir Project (PART)
Thandava Reservoir across Thandava River is located near G.K. Gudem Location : village in Visakhapatnam District of Andhra Pradesh Ayacut : 16,947 Acres Mandals benefited : Kotananduru, Tuni and Rowthulapudi in East-Godavari District. Dependable Net Yield : 4,339 Water allocation : 1.700 TMC Maximum Flood Discharge : 0.84 Lakh Cusecs Canal Length 52 Kms. Discharge : 200 Cusecs Cropping pattern : Sugarcane, Paddy Villages benefited : 25 Nos
(C)Chagalnadu Lift Irrigation Scheme:- (Partially Completed)
[HANDED OVER TO IRRIGATION CIRCLE, DOWLAISWARAM FROM I.S.L.M.C. CIRCLE, TUNI.]
Location : Chagalnadu Lift Irrigation Scheme Pumps 232 Cusecs (6.56 Cumecs) of water over a static head of 47.40 m in three Stages form the river Godavari near Katheru (V), East Godavari District to provide irrigation facilities to 22,000 Acres during Khariff season and drinking water to a population of 1.02 lakhs people in 35 Villages of East Godavari District.
Ayacut : 35,000 Acres Villages Benifitted : 35 Villages in East Godavari Water Utilization : 2.850 TMC Intake location : River Godavari, Katheru (V), E.G. District. Estimate cost : 7077 Lakhs. Pump House: 1st Stage : Pump house @KM 14.23 of AGLB near Katheru village.3 Nos. of 0.56 http://irrigationap.cgg.gov.in/wrd/getDistricts 6/91 10/31/2018 District Irrigation Profiles MW each (2+1) 2nd Stage : Pump house in Katheru (V) 3 Nos. of 1.36 MW each (2+1) 3rd Stage : Pump house in Palacherla (V) Limits. 3 Nos. of 1.044 MW each (2+1) No. of Lifts : 3 No's Length of Pressure main : 2 Rows of 1960 M Total static head : 47.40 M 7 Mandals i.e. (1) Rangampeta (2) Rajanagaram, (3) Korukonda (4) Mandals Benefited : Rajahmundry (Rural) (5) Bikkavolu (6) Anaparthi (7) Mandapeta . Source of Funding : NABARD under R.I.D.F-III and under State Plan. Land Acquisition : Land required : 1,139 Acres. Land acquired : 857 Acres. Balance : 282 Acres. Canals : : Length : Total length of main canal is about 23 Km Discharge : 6.56 Cumecs Cropping pattern : Paddy, Chillies, Groundnut and Maize etc. Cumulative Expenditure up to 5/2015 : 85.47 Crs Budget for the Year 2015-16 : Plan 2.0000 Crs. Non-Plan 5.9000 Crs.
Index Map
II. MEDIUM IRRGATION PROJECTS (COMPLETED)
1.Pampa Reservoir Project
(UNDER THE CONTROL OF IRRIGATION CIRCLE, DOWLAISWARAM)
http://irrigationap.cgg.gov.in/wrd/getDistricts 7/91 10/31/2018 District Irrigation Profiles
Preamble
Pampa Reservoir Project was completed in the year 1969. Modernisation of canals is taken up to stabilize the ayacut of 12,005 acres under the project in 13 villages in Sankhavaram Mandal.
Location:
Pampa Reservoir across river Pampa is located near Annavaram village in East Godavari District of Andhra Pradesh in between Latitude is 17° 33' 0" N and Longitude is 82° 19' 0" E
Ayacut: : 12,005 Acres. Mandals benefited : Thondangi, Tuni and Sankavaram Dependable net yield : 1.450 TMC Water allocation : 1.250 TMC Maximum Flood Discharge : 49,400 Cusecs Canals Length : 12.70Kms Discharge : 250 Cusecs Cropping pattern : Paddy Villages Benefited : 13 Nos. Budget for the Year 2015-16 : Plan Rs 1.0000 Crs.
Village wise Ayacut Particulars in Acres :-
Srungavruksham 1,975.97 Krishnapuram 1,239.87
Vemavaram 434.86 Pydikonda 698.5
A.Kothapalli 1,172.09 P.Agraharam 574.86
Thondangi 3,514.05 Hamsavaram 1,215.77
Thetagunta 235.72 Gopalapatnam 189.23
P.E.chinnayapalem 346.41 Arempudi 165.82
Annavaram 242.19 Total : 12,005.34 Acres
2. Torrigedda Pumping Scheme http://irrigationap.cgg.gov.in/wrd/getDistricts 8/91 10/31/2018 District Irrigation Profiles
(UNDER THE CONTROL OF IRRIGATION CIRCLE, DOWLAISWARAM)
Preamble
The Torrigedda Pumping Scheme is situated in between Km.41.400 to Km.41.600 of Akhanda Godavari Left Bank near Purushothapatnam Village in Seetanagaram Mandal of East Godavari District in Rajanagaram Assembly Constituency (2009). The longitude and latitude of the scheme are 81° 39' 30'' and 17° 16' 00''respectively vide S.I. Sheet No. 65 G/11. The source of water for this scheme is River Godavari which is a perennial river and as such there is no scarcity of water for pumping during Khariff season (July to November). The construction of the scheme was commenced in the year 1958 and completed during 1964. The scheme envisages lifting of water from River Godavari with a pumping head of 11.88 meters i.e. 39 ft to provide irrigation facility to an extent of 13,758 acres at 70 duty of 14 Villages in Seethanagaram Mandal.
The work of remodeling the pump house was commenced in the year 1999 with NABARD assistance to construction of pump house with 850 HP 3 vertical turbine pumps (2 working, 1 stand by) and funds from R.I.D.F-3 and completed in the year 2003.
Location:
Torrigedda Pumping Scheme is located between KM 41/4-6 of Akhanda Godavari left bank near Purushothapatnam village in East Godavari District of Andhra Pradesh between Latitude is 17° 16' 0" N and Longitude is 81° 38' 30" E
Ayacut: : 13,758 Acres Mandals benefited : Sitanagaram & Korukonda Dependable net yield : -- Water allocation : 1.350 TMC Canal Details: Details Main Canal Left Canal Right Canal Length 3.925 KMs 28.00 KMs 17.72 KMs
Discharge 240 Cusecs 75 Cusecs 105 Cusecs
Ayacut in Acres 659 4,804 8,295
Cropping pattern Paddy Paddy Paddy Villages benefited : 13 Nos. Budget for the Year 2015-16 : Plan - 1.0000 Crs.
3. Subbareddy Sagar Project
http://irrigationap.cgg.gov.in/wrd/getDistricts 9/91 10/31/2018 District Irrigation Profiles
(UNDER THE CONTROL OF IRRIGATION CIRCLE, DOWLAISWARAM)
Preamble
Subbareddy Sagar Project was constructed in the year 1969 across Kunthi Devi Vagu (Godavari Basin) near E.Gokavaram Village of Prathipadu Mandal, in East Godavari District which is situated 54 Km from Kakinada to irrigate a total ayacut of 9,900 acres benefiting Villages in Prathipadu Mandal.
The upstream catchment area is 89.73 Sq.Kms. The capacity of the Reservoir is 234 Mcft. The maximum flood discharge is 19,410 C/s.
The MWL of the reservoir and the heitht of the Project bund was rised steeply by 2.00 mts with NABARD assistance under RIDF-111 in the year 1998, due to the high floods observed during the year 1996. The Project commands the ayacut through 2 Head sluices for main canal i.e. Right Main Canal of ayacut 900 acres and Left Main Canal 8979 acres.
Location:
Subbareddy Sagar Reservoir Project across Kunthi Devi Vagu is located near E. Gokavaram Village of Prathipadu Mandal in East Godavari District of Andhra Pradesh.
Ayacut: : 9,900 Acres Mandals benefited : Prathipadu Dependable net yield : 1.000 TMC Water allocation : 0.936 TMC Max.flood discharge : 19140 Cusecs(542 M.Cum) Canal Details: Details Left Canal Right Canal Length 3.60 KMs 2.54 KMs
Discharge 106 Cusecs 19.98 Cusecs
Ayacut in Acres 9,000 900
Cropping pattern Sugarcane,Paddy Sugarcane,Paddy,Banana
Villages benefited :13 Nos. 3 Nos.
http://irrigationap.cgg.gov.in/wrd/getDistricts 10/91 10/31/2018 District Irrigation Profiles SALIENT FEATURES:
Location: : E.Gokavaram (Village ) Prathipadu (Mandal) Latitude : 17° 19' 40'' N Longitude : 82° 12' 20'' E Year of Completion : 2003 Ayacut : 9,822 Acres Gross Storage : 0.232 TMC Dead Storage : 0.025 TMC Live Storage : 0.209 TMC MDDL : + 75.28 Mts. Area of Foreshore at F.R.L : 0.783 Sq.Km. Spillway Crest Level : + 87.00 Mts. FRL : + 87.00 Mts. Lowest River Bed Level : + 72.50 Mts.
4. Maddigedda Reservoir Project:
(UNDER THE CONTROL OF IRRIGATION CIRCLE, DOWLAISWARAM)
Preamble
This was originally contemplated with creating an irrigation potential of 4,000 acres. The head works and main canal up to Km. 13.000 were completed by 1984. Further, works could not be taken up due to paucity of funds. The irrigation potential created so far is 2,718.10 acres (1100 Ha). The balance works are proposed to be completed under A.I.B.P. with an estimated cost of Rs.7.20 Crores to creating balance irrigation potential of 1507.31 Acres (610 Ha). The work was started during the year 2002 and the work was completed. Forest clearance is received for the excavation of canal from Km. 13.410 to Km.15.700 in 12/2007. Total Irrigation potential created only 4000 Acres excluding Achayyapeta No.II distributory. Due to the align proposal of the Achayyapeta No.II distributory is passing through Forest area and it is in high elevation then the Achayyapeta No.I distributor and the Proposed Achayyapeta No.II Distributory has not been taken-up.
http://irrigationap.cgg.gov.in/wrd/getDistricts 11/91 10/31/2018 District Irrigation Profiles Salient features
Location : Addategela (Village & Mandal) Longitude : 82° 0' 41" E Latitude : 17° 28' 7" N Year of Completion : 1981 Ayacut : 4,000 Acres Gross Storage : 0.485 TMC Dead Storage : 0.051 TMC Live Storage : 0.434 TMC MDDL : + 177.30 Mts. Area of Foreshore at F.R.L : 1.821 Sq.Km. Spillway Crest Level : + 183.5 Mts. F.R.L : + 188.00 Mts. Lowest River Bed Level : + 48.00 Mts Dependable net yield : 1.125 TMC Water allocation : 0.400 TMC Max.flood discharge : 34,221 Cusecs Cropping pattern : Paddy and Sugar cane, Banana, Cotton, Sago, Palmoil Villages to be benefited : 10 Nos Budget for the Year 2015-16 : Plan-0.2000 Crs.
http://irrigationap.cgg.gov.in/wrd/getDistricts 12/91 10/31/2018 District Irrigation Profiles
5. Bhupathipalem Reservoir Project
(Under The Control of Irrigation Circle, Dowlaiswaram)
Preamble
The Bhupathipalem Reservoir Project is a medium irrigation project constructed on Seethapalli Vagu, which is a hill stream and tributary to river Godavari near Bhupathipalem (V), Rampachodavaram (M) in East Godavari District. Total water utilization of the project is 1,151Mc.ft. The project is intended to provide irrigation facilities to an extent of 11,526 Acres of tribal ayacut covered in 32 villages of Rampachoadavaram & Gangavaram Mandals of East Godavari Districts and to provide drinking water to a enrouted 32 Villages population of 56,600. The Government have accorded Administrative Approval for Rs.187.91Crs vide G.O.Ms.No. 218, Dt.7-11-2007 and 185; Dt.31-10-2008. The project was completed in all respects. Necessary localization proposals was submitted to the District Collector,East Godavari District, Kakinada for Approval.
Salient Features:
FRL : 204.00 Mts Gross Capacity : 645 Mcft MDDL : 194.75 Mts http://irrigationap.cgg.gov.in/wrd/getDistricts 13/91 10/31/2018 District Irrigation Profiles Dead Storage : 240 Mcft Crest Level : 196.50 Mts Sill Level of Head Sluice : 196.60 Mts
Objectives:
To utilize 1.151TMC of Godavari River flood water. To provide reservoir with a storage capacity of 0.64TMC. Drinking water facility to a population of 56,600 persons living in 32 villages.
1. Contemplated Ayacut:11,526 Acres
2. I.P. Created :11,526 Acres
3. I.P. Targeted for irrigation for the year 2015-16:11,526 Acres
4. Budget provision for the year 2015-16:9.0000 Crs
5. Cumulative Expenditure up to 5/2015:161.45 Crs
6. Surampalem Reservoir Scheme
(UNDER THE CONTROL OF IRRIGATION CIRCLE, DOWLAISWARAM)
http://irrigationap.cgg.gov.in/wrd/getDistricts 14/91 10/31/2018 District Irrigation Profiles
Preamble
Sri K.V.Rama Krishna Surampalem Reservoir Project is a medium irrigation project constructed on Burada Kalva, which is a hill stream near Surampalem (V) in Agency Gangavaram Mandal of East Godavari District. Total water utilization of the project is 730Mc.ft. The revised cost of the project is Rs.69.74 Crores. It is intended to provide irrigation facilities to an extent of 11,560 Acres covered in 20 villages under Gokavaram, Agency Gangavaram and Korukonda Mandals of East Godavari Disrtrict and provide drinking water to enrooted 20 Villages for population of 42,800 at cost of Rs. 69.74 Crs.The Project is completed in all respects. Necessary localization proposals was submitted to the District Collector, East Godavari District, Kakinada for Approval.
Objectives:
To utilize 0.730 TMC of Burada Kalva water.
To provide reservoir with a storage capacity of 0.249TMC. The main canal carries discharge of 2.36 cumecs and runs for the length of 38.121Km with Distributory system.
1.Contemplated Ayacut : 11,560 Acres 2.I.P. Created : 11,560 Acres 3.I.P. Targeted for irrigation for the year of 2015-16 : 11,560 Acres
Expenditure and Budget required:
Budget provision for the year 2015-16 : Rs. 3.0000 Crs
Cumulative Expenditure up to 5/2015 : Rs. 54.29 Crs
7. Musurumilli Reservoir Scheme
http://irrigationap.cgg.gov.in/wrd/getDistricts 15/91 10/31/2018 District Irrigation Profiles
(Under the control of superintending engineer, i.s.l.m.c. Circle, tuni)
Project Profile
Musurumilli Reservoir Project is a Medium Irrigation Project proposed across Seethapallivagu near Musurumilli (v) of Rampachodavaram (M) in East Godavari District. The scheme is intended to create an irrigation facility to an extent of 9164 Hectares (22,643 Acres) besides drinking water facilities for 23 villages enroot the canal.Administrative approval of Musurumilli Reservoir Scheme was accorded by the Government of Andhra Pradesh vide G.O.Ms.No.204, dt. 31.12.2004 for Rs.207.00 Crores based on SSR 2004-05.
The Project is under progress. Execution of canals completed and 83% of Head works completed. The ayacut irrigated under the project is 22,316 Acres. Necessary localization proposals was submitted to the District Collector, East Godavari District, and Kakinada for Approval.
Salient Features:
FRL : 123.00 Mts
Gross Capacity : 1600 Mcft
MDDL :109.5 Mts
Dead Storage : 1427 Mcft
Crest Level :115.00 Mts
Sill Level of Head Sluice :107.730 Mts
1.Contemplated Ayacut
a)Tribal Area -12,100 Acres : 22,643 Acres
b) Non Tribal Area -10,543 Acres
2.I.P. Created :22,316 Acres
3. I.P. Targeted for irrigation for the year of 2015-16 :22,316 Acres
http://irrigationap.cgg.gov.in/wrd/getDistricts 16/91 10/31/2018 District Irrigation Profiles
MAJOR IRRIGATION PROJECTS (ONGOING)
(i) Polavaram Project
(Under the Control of SUPERINTENDING ENGINEER, I.S.L.M.C. Circle, TUNI)
Preamble http://irrigationap.cgg.gov.in/wrd/getDistricts 17/91 10/31/2018 District Irrigation Profiles The Polavaram Project is proposed across River Godavari near Ramayyapeta (V) of Polavaram Mandal, West Godavari District which is about 42 km u/s of existing SAC Barrage at Dowlaiswaram.
The Project envisages formation of a Reservoir across River Godavari with a live capacity of 75.200 TMC and two main canals one on the Right side and another on the left side to provide irrigation facilities to 7.21 lakh acres in East Godavari, Visakhapatnam, West Godavari and Krishna Districts. The objectives are:
i) To Generate 960 MW of Hydel Power
ii) To divert 80.000 TMC of Godavari waters to Krishna Delta.
iii)To provide 23.440 TMC of water for industrial and Drinking water needs of Visakhapatnam City.
iv) To provide drinking water facility to a population of about 28.50 lakhs living in 540 Villages enroute the canals.
v) To supplement irrigated dry crops of about 16.00 lakh acres in the upland areas of Visakhapatnam, Vizianagaram, Srikakulam, West Godavari and Krishna districts under phase-II by lift.
vi)Multipurpose Terminal Reservoir Project.
vii)About 32 % of the total work completed.
viii)All the requisite clearances are obtained.
ix)Total cost of the project is Rs.16010.45 Crores (2010-11 price level).
x)The cumulative expenditure incurred to end of 07/2015 is Rs.6978.69 Crores.
xi)The Project is proposed to be completed by 03/2018.
Salient Features of Polavaram Multipurpose Project (as per TAC of MoWR)
Name of the Project : Polavaram Irrigation Project State : Andhra Pradesh Reservoir : East Godavari, West Godavari, Khammam Head Works : East & West Godavari Districts in A.P Longitude/Latitude : 81° - 46' E / 17° - 13' N Total IP Contemplated Ayacut : 2,50,000 Ac Multipurpose Aspects : Navigation : Provision made for river navigation Water supply Domestic : 23.440 TMC Names of Towns/Villages served : Visakhapatnam City, Anakapalli Municipality and 62 villages enroute Irrigation (Upstream) : Left Main Canal : L: 181.50 Km., Discharge : 226 Cumec Right Main Canal : L: 174.00 Km., Discharge : 342 Cumec Irrigation (Downstream) : Godavari Delta/ Samalkot Dam / Reservoir : Catchment Area : 306643 Sq.Km. Type of Dam : Earth cum Rock fill Dam Length of Dam : 2454 M Maximum height : 57.90 M (above foundation) FRL : 45.72 M MDDL : 41.15 M Gross Capacity : 194.600 TMC http://irrigationap.cgg.gov.in/wrd/getDistricts 18/91 10/31/2018 District Irrigation Profiles Live Capacity : 75.200 TMC Design PMF : 141435 Cumec (49.93 lakh cusec) Construction Diversion : 0.072 M.Cumec (25.54 lakh cusecs) Spillway : Length between abutments : 1128.4 M Type : Gated with Ogee Profile No. of gates/ Size : 48 Nos. (16M x 20M) Crest Level : 25.72 Submergence Details : Land Submergence in A.P : 38694.07 Ha (95612 Ac) Villages affected : 276 Families affected : 44574 Population affected : 177275 Property affected : Permanent Houses : 3500 Semi Permanent Houses : 6258 Katcha Houses : 33743 Area of Submergence : Andhra Pradesh : 552.38 Sq. Km Submergence level considered in : No submergence allowed (Natural submergence) Orissa and Madhya Pradesh
Benefits
Provide irrigation to 2.91 Lakh ha. (7.2 lakh acres) in the upland areas of East Godavari, Visakhapatnam, West Godavari and Krishna Districts.
Produce Hydro Power with installed capacity of 960 MW (12 x 80 MW).
Diversion of 80 TMC of Godavari water into Krishna River above Prakasam Barrage. The water thus saved in Krishna basin will be shared in the proportion of 45 TMC for Andhra Pradesh and 35 TMC (21+14) for Karnataka and Maharashtra.
Supply 23.44 TMC of water for Visakhapatnam city.
Provide drinking water facility to 540 villages (28.5 lakh population) en-route the canals.
Benefits to other Basin States
Odisha and Chattisgarh can use in their territories 5 TMCft and 1.5 TMCft respectively by lifting from pondage of Polavaram Irrigation Project without bearing any cost of storage.
The Odisha and Chattisgarh can develop and export pisciculture and boating facilities in their own territories.
On account of diversion of 80TMC of Godavari water into Krishna River, above Prakasam barrage, equal extent of water in Krishna River will be saved.
80 TMC of water thus saved in river Krishna will be shared in proportion of 45 TMC for Andhra Pradesh, 35 TMC (21 TMC +14 TMC) for Karnataka & Maharashtra.
Declaration as 'National Projects'
The Government of India, recognising the importance of the project, declared this project to be a National Project (Section-90 of A.P. Reorganisation Act,2014) and also declared that it is expedient in the public interest that the Union should take under its control the regulation and development of the Polavaram Irrigation Project for the purpose of irrigation. It also http://irrigationap.cgg.gov.in/wrd/getDistricts 19/91 10/31/2018 District Irrigation Profiles specified that the Central Government shall execute the project and obtain all requisite clearances including environmental, forest, and resettlement norms.