Appendix a Project Descriptions As of Amendment 20-00, Approved January 10, 2020

Total Page:16

File Type:pdf, Size:1020Kb

Appendix a Project Descriptions As of Amendment 20-00, Approved January 10, 2020 Central Puget Sound - Regional Transportation Improvement Program Appendix A Project Descriptions As of Amendment 20-00, Approved January 10, 2020 Jurisdiction: Algona Project Number: ALG-2 County: King Title: Milwaukee Avenue Sidewalks Phase Programmed Year Oblig. Date Funding Source Federal Funds State Funds Local Funds Phase Total CN 2020 2/1/17 Safe Routes To Schools $7,051 $0 $0 $7,051 CN 2020 2/1/17 Local $0 $0 $34,588 $34,588 WSDOT PIN: Totals: $7,051 $0 $34,588 $41,639 Federal Aid/FTA Grant Number(s): 1017(009) Functional Class: Not applicable (transit, enhancements, Etc.) Improvement Type: Sidewalk Location: Milwaukee Avenue between 1st Avenue and 5th Avenue South From: 1st Avenue To: 5th Avenue South Total Cost $784,561 Regionally Significant: No Environmental Status: CE Year of Expenditure for Total Cost: 2016 MTP Status: Exempt MTP Reference(s): N/A Description: The project will replace sidewalk on both sides of the road from 1st Avenue to the south City limits. The project may over excavate the existing subgrade and compact the new subgrade material. Small retaining walls may be needed in some locations due to the steep slope on the backside of the existing sidewalks. Marked crosswalks may be added on each side road crossing. A - 1 Appendix A: Project Descriptions Jurisdiction: Arlington Project Number: ARL-15 County: Snohomish Title: 67th Ave Rail/Trail Crossing Improvement Phase Programmed Year Oblig. Date Funding Source Federal Funds State Funds Local Funds Phase Total PE 2019 10/1/18 Local $0 $0 $4,000 $4,000 ROW 2020 1/4/19 Local $0 $0 $2,500 $2,500 ROW 2020 1/4/19 HSIP $22,500 $0 $0 $22,500 CN 2020 6/1/19 HSIP $335,000 $0 $0 $335,000 WSDOT PIN: Totals: $357,500 $0 $6,500 $364,000 Federal Aid/FTA Grant Number(s): 2699(005) Functional Class: Not applicable (transit, enhancements, Etc.) Improvement Type: Non-Regional Trail (Separate Facility) Location: 67th Ave From: 191st St To: N/A Total Cost $400,000 Regionally Significant: No Environmental Status: CE Year of Expenditure for Total Cost: 2019 MTP Status: Exempt MTP Reference(s): N/A Description: The Centennial Trail alignment through Arlington is located on the east side of 67th Ave and crosses the Burlington Northern Santa Fe railroad tracks at a very skewed angle (approx. 30-degree angle). The proposed solution is for advanced rail crossing signalization and realignment of the trail so that it crosses the rails at a perpendicular angle. This project is for the design, ROW, and construction of advanced signalization and realignment of Centennial Trail. A - 2 Appendix A: Project Descriptions Jurisdiction: Arlington Project Number: ARL-16 County: Snohomish Title: Smokey Point Blvd Overlay Phase Programmed Year Oblig. Date Funding Source Federal Funds State Funds Local Funds Phase Total PE 2021 6/1/21 STP(US) $58,080 $0 $0 $58,080 PE 2021 6/1/21 Local $0 $0 $14,520 $14,520 CN 2021 6/1/21 STP(US) $667,920 $0 $0 $667,920 CN 2021 6/1/21 Local $0 $0 $166,980 $166,980 WSDOT PIN: Totals: $726,000 $0 $181,500 $907,500 Federal Aid/FTA Grant Number(s): Functional Class: Urban Principal Arterial Improvement Type: Resurfacing Location: Smokey Point Blvd From: 174th Pl NE To: 164th St Total Cost $907,500 Regionally Significant: No Environmental Status: CE Year of Expenditure for Total Cost: 2021 MTP Status: Exempt MTP Reference(s): N/A Description: This project is for pavement preservation, it proposes to install a 2-inch pavement overlay along the project area and remark the new pavement (striping, raised markers, crosswalks, etc.). This alignment crosses a state route (SR-531) that will not receive an overlay. Work includes replacement of non-compliant ADA ramps and upgrading ADA pedestrian crossing facilities at the 168th intersection (ADA ramp, landing, etc.). A - 3 Appendix A: Project Descriptions Jurisdiction: Arlington Project Number: ARL-17 County: Snohomish Title: Smokey Point Blvd Corridor Phase Programmed Year Oblig. Date Funding Source Federal Funds State Funds Local Funds Phase Total PE 2019 1/1/19 Local $0 $0 $180,000 $180,000 PE 2019 6/20/19* STP(US) $959,788 $0 $0 $959,788 WSDOT PIN: Totals: $959,788 $0 $180,000 $1,139,788 Federal Aid/FTA Grant Number(s): 2691(010) Functional Class: Urban Minor Arterial Improvement Type: Major Widening -- GP Location: Smokey Point Blvd From: 74th St To: 200th St Total Cost $13,487,997 Regionally Significant: No Environmental Status: EA Year of Expenditure for Total Cost: 2019 MTP Status: Exempt MTP Reference(s): N/A Description: The scope of work for this project entails the planning, design, engineering, preliminary ROW research and public outreach to redevelop a current two-lane rural corridor into a four-lane urban corridor consistent with Arlington's current Horizontal Mixed-Use planning model. This corridor project will include two general-purpose travel lanes, two drop lanes for protected on-street parking and dedicated bike lanes, a center median, sidewalks, and enhanced bus stops. Work will also include location and identification of existing water/sewer utilities, and design of LID drainage facilities. The work will entail outreach with the community; we need their feedback to make this not only a corridor project, but a Smokey Point neighborhood project as well. As the project develops, ROW needs and property valuations will be developed through independent analysis. The final delivery will be an estimate for ROW procurement and a set of construction documents ready for funding and bid. * = Asterisk by Obligation Date indicates funds for this phase obligated earlier this calendar year A - 4 Appendix A: Project Descriptions Jurisdiction: Auburn Project Number: AUB-49 County: King Title: F Street SE Non-Motorized Improvements Phase Programmed Year Oblig. Date Funding Source Federal Funds State Funds Local Funds Phase Total CN 2021 6/1/21 Local $0 $0 $1,264,000 $1,264,000 CN 2021 6/1/21 CMAQ $2,000,000 $0 $0 $2,000,000 WSDOT PIN: Totals: $2,000,000 $0 $1,264,000 $3,264,000 Federal Aid/FTA Grant Number(s): CM-1094(002) 1094(002) Functional Class: Urban Collector Improvement Type: Bike Lanes Location: F Street SE From: 4th Street SE To: Auburn Way S Total Cost $3,954,000 Regionally Significant: No Environmental Status: DCE Year of Expenditure for Total Cost: 2021 MTP Status: Exempt MTP Reference(s): N/A Description: Project will complete non-motorized improvements connecting the Les Gove Community Campus to Auburn's Designated Regional Growth Center. Elements of this project include pavement rehabilitation, construction of curb & gutter, new sidewalk along west side, ADA accessibility improvements, shared-use trail with landscaping buffer, wayfinding signage, Rectangular Rapid Flashing Beacons,"Bicycle Boulevard" improvements on Main St to the west of F St, F St from Main to 4th, and through the neighborhood to the east of F St, utility undergrounding, streetscape improvements, safety improvements, traffic signal interconnect, and right of way acquisition needed to accommodate new ADA ramps at corners. A - 5 Appendix A: Project Descriptions Jurisdiction: Auburn Project Number: AUB-55 County: King Title: A Street SE Preservation Phase Programmed Year Oblig. Date Funding Source Federal Funds State Funds Local Funds Phase Total CN 2019 6/1/19* STP(UL) $792,440 $0 $0 $792,440 CN 2019 6/1/19 Local $0 $0 $234,871 $234,871 CN 2019 7/15/19* STP(UL) $760,610 $0 $0 $760,610 WSDOT PIN: Totals: $1,553,050 $0 $234,871 $1,787,921 Federal Aid/FTA Grant Number(s): 1069(009) Functional Class: Urban Principal Arterial Improvement Type: Resurfacing Location: A Street SE From: 17th Street SE To: E Main Street Total Cost $1,763,600 Regionally Significant: No Environmental Status: DCE Year of Expenditure for Total Cost: 2020 MTP Status: Exempt MTP Reference(s): N/A Description: This project will grind and overlay A Street SE from East Main Street to 17th Street SE, remove unused driveways, and upgrade all curb ramps and pedestrian signals to meet ADA requirements. * = Asterisk by Obligation Date indicates funds for this phase obligated earlier this calendar year A - 6 Appendix A: Project Descriptions Jurisdiction: Auburn Project Number: AUB-56 County: King Title: Auburn Way N Preservation Phase 2 Phase Programmed Year Oblig. Date Funding Source Federal Funds State Funds Local Funds Phase Total CN 2020 6/1/20 STP(UL) $439,720 $0 $0 $439,720 CN 2020 6/1/20 Local $0 $0 $1,068,280 $1,068,280 WSDOT PIN: Totals: $439,720 $0 $1,068,280 $1,508,000 Federal Aid/FTA Grant Number(s): Functional Class: Urban Principal Arterial Improvement Type: Resurfacing Location: Auburn Way N From: 22nd Street NE To: 8th Street NE Total Cost $1,628,000 Regionally Significant: No Environmental Status: DCE Year of Expenditure for Total Cost: 2020 MTP Status: Exempt MTP Reference(s): N/A Description: This project will grind and overlay Auburn Way N from the 22nd Street NE to 8th Street NE, remove unused driveways, and upgrade all curb ramps and pedestrian signals to meet ADA requirements. A - 7 Appendix A: Project Descriptions Jurisdiction: Auburn Project Number: AUB-57 County: King Title: Auburn Way N Preservation Phase 3 Phase Programmed Year Oblig. Date Funding Source Federal Funds State Funds Local Funds Phase Total PE 2019 6/1/19* STP(UL) $111,220 $0 $0 $111,220 PE 2019 6/1/19 Local $0 $0 $111,220 $111,220 CN 2020 6/1/20 STP(UL) $863,920 $0 $0 $863,920 CN 2020 6/1/20 Local $0 $0 $863,920 $863,920 WSDOT PIN: Totals: $975,140 $0 $975,140 $1,950,280 Federal Aid/FTA Grant Number(s): 1071(008) Functional Class: Urban Principal Arterial Improvement Type: Resurfacing Location: Auburn Way N From: 8th Street NE To: SR-18 Total Cost $1,950,280 Regionally Significant: No Environmental Status: DCE Year of Expenditure for Total Cost: 2020 MTP Status: Exempt MTP Reference(s): N/A Description: This project will grind and overlay Auburn Way N from the 8th Street NE vicinity to SR18 vicinity, remove unused driveways, and upgrade all curb ramps and pedestrian signals to meet ADA requirements.
Recommended publications
  • Bridgessupporting Mobility and Connectivity
    supporting mobility and connectivity Bridges through three east King County interchanges NE 8th Street Crossing Wilburton Trestle at SE 8th St BUILD Application DUNS Number: 120806745 Totem Lake Cage Number: 5P3X3 Connector kingcounty.gov/BuildGrant July 2018 BUILD Grant Application Better Utilizing Investments to Leverage Development Transportation Discretionary Grants Program Project Name Bridges Supporting Mobility and Connectivity Through Three East King County Interchanges Co-Applicants · King County · City of Kirkland Project Partners · City of Bellevue · Regional Advisory Council (Management): Cities of Bellevue, Kirkland, Redmond, Renton, and Woodinville, Puget Sound Energy, Sound Transit, Eastside Greenway Alliance, and King and Snohomish counties Contact Susan Oxholm, Grants Administrator, King County Department of Transportation Information 201 South Jackson Street, Seattle, WA 98104 206-477-3629, [email protected] Project Type Urban Project King County and the City of Kirkland submit this request for $24 million in 2018 BUILD Description funding to support the Bridges Supporting Mobility and Connectivity Through Three East King County Interchanges. This innovative, multi-modal transportation investment would eliminate three critical gaps along the Eastside Rail Corridor (ERC) trail: the Totem Lake Connector; NE 8th Street Crossing; and the Wilburton Trestle at SE 8th St. The ERC trail is a long-planned, regional trail stretching for more than 15 miles on the eastern edge of Lake Washington. When complete, the trail will provide non-motorized access to booming job centers, transit connections, and recreational destinations to rural and urban communities throughout King County. Project Cost $57 million BUILD Funds $24 million Requested Local Match $33 million Total Local Match, 58% Local and 42% BUILD Funds Requested NEPA Status NEPA review for the NE 8th Street Crossing is anticipated in Spring of 2019, and for the Wilburton Trestle at SE 8th St in Fall 2019.
    [Show full text]
  • Bridges and Tunnels in WA State
    rHR~ (11-tl) United States Depar~mentof the Interior Heritage ",';on5ervation and Recreatioll Service National Register of His.toric Plac s Inventory-Nomination Form See Instructions in H,>w to Complete Naiional Register Forms Type all entrles--complete applicable sections 1. Name historic Hi~toric Bridges and Tunnels in Washington Stt_te _ r and-or common l I \ " • 2. location I f street & number see i ndi vi dua 1 i nventorv fonns not for publication city, town vicinity of c ~gresslonal district state code county code < 3. Classification , . i' Category Ownership Status ~resent Use _district _" public __ occupied _ agriculture _museum _ bUildlng(s) _private _ unoccupied _ commercial _park" v if\ -A- structure -..X- both _ work in progress , _ educational _ private residence _site Public Acquisition Accessible _ entertainment _religious / _ob~ect _in process _ yes: restricted f _ government _ scientific ! ~thematic _ being considered _ y~s: unrestricted _ industrial ....L- transportatl~,n .i oroup no _military other: , 1 _4_._O_w_n_e_r_o_f_P_r_o..:p"-e_rt..:y'-- ~_:__----' ~< \ j J;"'--- \ <.\ :ame Muitiple Ownership , 'r i ! street & number , 1 city, town vicinity of .!"' alate 5. Location of Legal Descript_io~n...:..- .:...-..;,.._, courthouse, registry of deeds, etc. State Deoartment of ransoorti on: county ~ourthouses; atreet & number city ha I "I s clty,town state 6. Representation in Existi ,gSurveys t::.It::.le=----'.:H~i.:.s.:.to.:.r=-l~·c~B=-,r-,i",d=Q1e....::.Su~r=-v'-.:e:.Lv --.:h~a::.fth::.II:::I..!p:.:.ro=_'pe=rty:!....:be=e::.n..:d::.et::e::.:rm.::l:::necI=",8:::lag=lb:.:le:.:':.-:=yel _ no date January 1979 - April 1980 I _federal Lstate county 1oca1 depolltoryforaurveyrecorClI State Office of Archaeology and Historic Preservation III West 21st Avenue.
    [Show full text]
  • Cowen Park Bridge Project SEPA Checklist.Pdf
    Cowen Park Bridge Retrofit Project Seattle, Washington SEPA Checklist December 6, 2018 Cowen Park Bridge Retrofit Project SEPA Checklist Page 2 of 22 STATE ENVIRONMENTAL POLICY ACT (SEPA) ENVIRONMENTAL CHECKLIST A. BACKGROUND 1. Name of proposed project, if applicable: Cowen Park Bridge Retrofit Project 2. Name of applicant: Seattle Department of Transportation (SDOT) 3. Address and phone number of applicant and contact person: Vanessa Bacurin, Project Manager Seattle Department of Transportation Capital Projects and Roadway Structures Division 700 Fifth Avenue, Suite 3900 P.O. Box 34996 Seattle, WA 98124 206-684-5167 4. Date checklist prepared: December 6, 2018 5. Agency requesting checklist: City of Seattle Department of Transportation (SDOT) 6. Proposed timing or schedule (including phasing, if applicable): Construction is anticipated to begin in spring 2019 with a construction duration of approximately six months pending approvals and permits. 7. Do you have any plans for future additions, expansion, or further activity related to or connected with this proposal? If yes, explain. There are no future additions, expansions or further activity related to the project. 8. List any environmental information you know about that has been prepared, or will be prepared, directly related to this proposal. The following environmental information has been prepared for this project: • HWA Geosciences Inc. 2018. Final Geotechnical Report - Cowen Park Bridge Retrofit Project. September. • WSP. 2018a. Wetland, Stream and Wildlife Habitat Impact Assessment for the Proposed Cowen Park Bridge Retrofit Project. December. Cowen Park Bridge Retrofit Project SEPA Checklist Page 3 of 22 • WSP. 2018b. Confidential Cultural Resources Report for the Proposed Cowen Park Bridge Retrofit Project.
    [Show full text]
  • COMMUNITY FORUM on ENERGIZE EASTSIDE June 3, 2014 Hosted By
    COMMUNITY FORUM ON ENERGIZE EASTSIDE June 3, 2014 Hosted by the City of Bellevue City of Bellevue Community Forum on Energize Eastside June 3, 2014 Input & Feedback Received CITY OF BELLEVUE COMMUNITY FORUM ON ENERGIZE EASTSIDE MINUTES Tuesday Council Chambers June 3, 2014 Bellevue City Hall 7:30 p.m. Bellevue, Washington Introduction: Councilmember Lynne Robinson welcomed the audience and thanked everyone for coming to the community forum. She expressed appreciation on behalf of the Council for all the comments the City has already received. Brad Miyaki, City Manager, gave some background on the Energize Eastside issue and explained that the purpose of tonight’s meeting was to take written and oral comments to take back to Council and to share with PSE. Mike Brennan, Director of Development Services, expressed appreciation for the public input and participation tonight. He explained that reliable power is important, but it is challenging to find ways to bring new infrastructure into the city. He noted that in addition to the written comment cards and oral comments, there is also a link on the City’s website to provide comments. He reiterated that comments will be captured and reported to the City Council on June 16. He introduced key staff: Carol Helland, Land Use Division Director and Bellevue’s SEPA-responsible official; Nicholas Matz, Senior Planner in Planning and Community Development; Mike McCormick Huentelman, City of Bellevue Neighborhood and Community Outreach Manager; David Pyle, Senior Planner in Development Services. Mike McCormick Huentelman, City of Bellevue Neighborhood and Community Outreach Manager, reviewed how the public comment process would be handled.
    [Show full text]
  • APPENDIX H NRHP-Listed Architectural Historic Properties and Districts in the Plan Area
    APPENDIX H NRHP-listed Architectural Historic Properties and Districts in the Plan Area November 2014 Final Supplemental Environmental Impact Statement This appendix lists the architectural historic properties and districts in the Plan area that are National Historic Landmarks or are listed in the National Register of Historic Places (NRHP). The list is based on data from the Washington State Department of Archaeology and Historic Preservation (DAHP 2014). The Figure ID numbers in Table H-1 correspond to those ID numbers on Figure H-1 through Figure H-3 while the Figure ID numbers in Table H-2 correspond to those ID numbers on Figure H-4 and Figure H-5. DAHP also maintains records of previously recorded archaeological sites and traditional cultural properties. However, site-specific information about these properties is exempt from public disclosure under state law (RCW 42.56.300) to prevent looting and vandalism. Table H-1. NRHP-listed architectural historic properties in the Plan area Figure ID DAHP ID Property name Historic designation 1 KI00231 12th Avenue South Bridge NRHP 2 KI00599 1411 Fourth Avenue Building NRHP 3 KI00259 14th Avenue South Bridge NRHP 4 KI01140 1600 East John Street Apartments NRHP 5 KI00773 A. L. Palmer Building NRHP 6 PI00599 Adjutant General's Residence NRHP 7 KI01127 Admiral's House, 13th Naval District NRHP 8 KI00632 Agen Warehouse NRHP 9 KI00243 Alaska Trade Building NRHP 10 PI00696 Albers Brothers Mill NRHP 11 PI00638 Alderton School NRHP 12 PI00705 Annobee Apartments NRHP 13 KI00226 Arboretum Sewer Trestle
    [Show full text]
  • City of Bellevue Bellevue, WA 98004
    450 110th Avenue NE City of Bellevue Bellevue, WA 98004 Meeting Agenda City Council Extended Study Session Monday, July 24, 2017 6:00 PM Council Conference Room (1E-113) 1. Executive Session a) Pending Litigation - RCW 42.30.110(1)(i) (Approximately 20 minutes.) 2. Approval of Agenda a) Scheduled Visit by State Representative Patty Kuderer 3. Communications - Written and Oral Note: The time allowed shall not exceed 30 minutes, and speakers will be called in order from the sign-up sheet. If the number of speakers signed up to speak will exceed the 30-minute period, the Chair is authorized to give preference to (1) persons speaking to items on that meeting's Agenda or anticipated to come on the Agenda within one month and/or (2) to persons who have not spoken to Council in the last quarter. A maximum of three persons are permitted to speak to each side of any one topic. 4. Study Session Items a) Council Business and New Initiatives b) Continued Discussion of Eastgate/I-90 Land Use Code Amendments (LUCA) Recommended by the Planning Commission (For direction. Staff seek Council direction on whether to modify the Neighborhood Mixed Use and Transient Lodging provisions of the Planning Commission recommendation, including a prohibition of safe injection sites, and to set an adoption date for the Eastgate LUCA ordinance.) c) Update on the Eastside Men's Shelter and Supportive Housing Project (For information. Staff will present information on developing a schedule and a path forward for potential additional code amendments applied citywide associated with homelessness managment.) d) Regional Issues Overview (For information.
    [Show full text]
  • Transportation Levy to Move Seattle
    TRANSPORTATION LEVY TO MOVE SEATTLE + + + + + + WHAT SPECIFIC PROJECTS ARE INCLUDED? The levy proposal includes funding for these specific projects plus many more, including extensive paving, traffic signal upgrades, sidewalk repair, safe walking and biking routes to schools and many others. Please consult the map provided with the levy brochure for additional information on levy-funded improvements. CORRIDOR SAFETY PAVING PROJECTS* • NE 45th Pl BRIDGE SEISMIC PROJECTS • 3rd Ave • NE 65th St RETROFIT PROJECTS • Rainier Avenue S • 4th Ave S • NE Pacific St • Fremont Bridge • 35th Ave SW • 6th Ave • Nickerson St Bascule • SW Roxbury St • 11th Ave NE/Eastlake • NW 36th St/Fremont • Ballard Bridge • Greenwood/Phinney Ave NE Pl N Bascule • 1st Ave/1st Ave S • 12th Ave NE • NW Market St • 15th Ave NE/NE 105th • 12th Ave/12th Ave E • 15th Ave NE • Rainier Ave S • 1st Ave S Viaduct/Argo • Aurora Ave N • 15th Ave S • Renton Ave S Mainspan • Lake City Way • 23rd Ave S • Roosevelt Way NE • 4th Ave S/Argo • Sand Point Way • 25th Ave NE • S Bailey St Mainspan • E Marginal Way • 35th Ave NE • S Columbian Way/ • Delridge Way Ped • Airport Way • 35th Ave SW S Alaska St Bridge • 35th Ave NE • Corson Ave S • S Columbian Wy • Cowen Park Bridge • 15th Ave NE • Cowen Pl NE • S Dearborn St • McGraw Street Bridge • MLK Jr. Way S • E Green Lake Dr N • S Michigan St • W Howe Street Bridge • 5th Ave NE • E Green Lake Wy N • S Myrtle Pl • 8th Ave NW Near NW • Erickson Pl NE • S Myrtle St 133rd St • Fremont Ave N • S Othello St • Admiral Way -North • Green Lake
    [Show full text]
  • Levy to Move Seattle 2018 Annual Report
    Seattle Department of Transportation LEVY TO MOVE SEATTLE 2018 ANNUAL REPORT Published: March 2019 MESSAGE FROM THE MAYOR We are building a city of the future with fewer cars, more transit, and less climate pollution. The Levy to Move Seattle is critical in delivering on that shared vision for a world-class transportation system that connects people to jobs, training, school, health care, and opportunity, and provides safe options for driving, walking, and biking. We have a responsibility to deliver on our promises to voters for safer streets, better roads, and more reliable transit options. That’s why in 2018, I asked the Seattle Department of Transportation to ensure we have a realistic plan for delivering on our Move Seattle investments, and to listen to the community on the investments that are most important to them. Now, we have a blueprint and clear path forward for delivering on Move Seattle investments. This report shows that we are making progress on delivering on some of the promises made and better aligning projects with the resources we have. The City of Seattle will continue to be accountable and transparent, and we will continue to partner with community to keep building a city of the future. Jenny Durkan, Mayor MESSAGE FROM THE DIRECTOR I am pleased to present my first Move Seattle report as Director of SDOT. This report memorializes an important year and substantial work that was accomplished, both to deliver on Levy commitments and to evaluate the Levy overall, through the Move Seattle Assessment. At Mayor Durkan’s direction and with help from the Move Seattle Levy Oversight Committee, our modal advisory boards, and third-party consultants, SDOT carefully analyzed the Move Seattle Assessment and published the Updated Workplan Report that outlines a clear and measurable plan for the remaining years of the Levy.
    [Show full text]
  • Historic Bridges and Tunnels in Washington State
    NFS Form 10-900 (7-81) United States Department of the Interior National Park Service National Register of Historic Places Inventory Nomination Form See instructions in How to Complete National Register Forms Type all entries complete applicable sections _______^ 1. Name historic Historic Bridges and Tunnels in Washington State and/or common 2. Location street & number (see Individual inventory forms) not for publication city, town vicinity of state code county code 3. Classification Category Ownership Status Present Use district public A)/fl occupied agriculture museum building(s) private ftM unoccupied commercial park XX structure XX both M wofk in progress educational private residence site Public Acquisition Accessible entertainment religious object N/A in process .I'M yes: restricted government scientific XX thematic -flp? being considered -Ajjpyes: unrestricted industrial XX transportation group military other: 4. Owner of Property name multiple ownership street & number city, town __ vicinity of state 5. Location of Legal Description courthouse, registry off deeds, etc. State Department of Transportation; county courthouses; street & number city halls city, town state 6. Representation in Existing Surveys title Historic Bride Survey has this property been determined eligible? yes /ffo no date January 1979 - April 1980 federal JQL state ,'. __ county __ local depository for survey records Office of Archaeology and Historic Preservation city, town 111 West 21st Avenue, Olympia state Washington 98504 Form No. 10-300a (Rev. 10-74)
    [Show full text]
  • CITY of BELLEVUE CITY COUNCIL Summary Minutes of Extended
    CITY OF BELLEVUE CITY COUNCIL Summary Minutes of Extended Study Session May 24, 2010 Council Conference Room 1E-113 6:00 p.m. Bellevue, Washington PRESENT: Mayor Davidson, Deputy Mayor Lee, and Councilmembers Balducci, Chelminiak, Degginger, and Robertson ABSENT: Councilmember Wallace 1. Executive Session The meeting was called to order at 6:05 p.m., with Mayor Davidson presiding. There was no Executive Session. 2. Oral Communications (a) Aaron Dichter spoke on behalf of the 10000 Meydenbauer Way Homeowners Association regarding the Meydenbauer Bay Park Plan. He expressed concern that the City is not listening to the approximately 4,000 residents who live around the park, who have been consistently expressing concerns and providing input regarding the park plan. The 10000 HOA supports all of the positions taken by the Meydenbauer Bay Neighbors Association to improve the park and the park experience, including concerns about the value and enjoyment of their homes. Mr. Dichter said it is essential that the road remain open to ensure the safety of lives and property. The taking of the road interferes with entry to the 10000 Meydenbauer Way community, which diminishes the value of the homes and potentially threatens timely emergency access. (b) Marv Peterson, Meydenbauer Bay Neighbors Association, thanked Council for hearing the concerns of neighbors and interested parties who are affected by the Meydenbauer Bay Park Plan. He acknowledged the time and effort of the Council and staff in working on this project, and said that residents look forward to a resolution of the multiple issues. 3. Study Session (a) Council Business and New Initiatives May 24, 2010 Extended Study Session Page 2 Councilmember Balducci reported on an email from a resident related to cell phone towers in a number of locations, including next to Lake Hills Shopping Center, and their visual impacts.
    [Show full text]
  • BNSF Corridor Preservation Study
    BNSF Corridor Preservation Study FINAL REPORT May 2007 Prepared for: Puget Sound Regional Council 1011 Western Avenue, Suite 500 Seattle, WA 98104 500 108th Avenue NE Suite 1200 Bellevue, WA 98004-5549 (425) 450-6200 ACKNOWLEDGEMENTS STUDY SPONSOR Puget Sound Regional Council King Cushman, Regional Strategy Advisor BNSF CORRIDOR ADVISORY COMMITTEE Chairperson: Julia Patterson, King County Councilmember COMMITTEE MEMBERS ♦ LOCAL JURISDICTIONS ♦ CITY OF BELLEVUE CITY OF RENTON Councilmember Don Davidson Councilmember Marcie Palmer CITY OF KIRKLAND CITY OF SNOHOMISH Councilmember Tom Hodgson Councilmember Larry Countryman CITY OF REDMOND CITY OF WOODINVILLE Mayor Rosemarie Ives Mick Monken, Public Works Director KING COUNTY SNOHOMISH COUNTY Councilmember Julia Patterson (Committee Chair) Councilmember Dave Somers Rod Brandon, County Executive’s Office Marc Krandel, Parks Planning and County Executive’s Representative ♦ TRANSPORTATION INTERESTS ♦ BNSF RAILWAY COMPANY SOUND TRANSIT Jerome Johnson, Assist. VP, Network Dev. Councilmember Mary-Alyce Burleigh (City of Kirkland) PORT OF SEATTLE SPIRIT OF WASHINGTON DINNER TRAIN Geri Poor, Regional Transportation Manager, Eric Temple, President/Owner Economic Development Washington State Dept. of Transportation (WSDOT) Chris Picard, Manager, Urban Planning Office ♦ BNSF CORRIDOR USERS/BENEFICIARIES ♦ BICYCLE ALLIANCE OF WASHINGTON DISCOVERY INSTITUTE Louise McGrody, Trails Program Bruce Agnew, Cascadia Project Director BOEING COMPANY EASTSIDE TRANSPORTATION CHOICES Shaunta Hyde, Manager, Local Government Relations, Councilmember Kathy Huckabay (City of Sammamish) Puget Sound PUGET SOUND ENERGY CASCADE BIKE CLUB Susan Hempstead, Local Govt & Community Relations Chuck Ayers, Executive Director WEYERHAEUSER COMPANY CASCADE LAND CONSERVANCY Dale King, Manager, Puget Sound Government & Chip Nevins, Senior King County Conservation Director Community Affairs Funding for this document was provided in part by PSRC’s member jurisdictions, grants from U.S.
    [Show full text]
  • Historylink.Org Supplement for Washington: a State of Contrasts
    Photo of Gatewood School students on last day of school, Seattle, June 17, 1949. Courtesy Museum of History & Industry. HistoryLink.org Supplement for Washington: A State of Contrasts 1 Washington: A State of Contrasts has been identified as the most commonly used Washington state History textbook for 7th and 8th grades for the 2011-12 school year. Using this textbook as a base for identifying the specific themes and topics that are being covered in required Pacific Northwest History middle school classes, the Education Team at HistoryLink.org has created this supplement for teacher and students. This supplement was developed as a tool to assist in identifying HistoryLink.org essays that can be used to study and research the state history themes and topic in more depth. The name of each relevant essay is listed as well as the abstract, number, and link to the full essay. This supplement also aids HistoryLink.org in identifying general or specific topics for which more essays are needed or would be helpful in the Washington state History classroom. In addition, as a part of this exercise, HistoryLink.org staff assigned appropriate key words to selected essays to match those used in this textbook. A set of HistoryLink Elementary essays was added to the HistoryLink encyclopedia in 2014. (http://www.historylink.org/Index.cfm?DisplayPage=education/elementary- educators.cfm.) These essays were written for beginning readers who are studying Washington state history or anyone who wants to learn more about Washington. They may be helpful for some of your students. All HistoryLink Elementary essays are based on existing HistoryLink essays.