ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW -110016

1. BACKGROUND INFORMATION

Existing Qutub Hotel at plot no. C-1, Shaheed Jeet Singh Marg is owned by Edenpark Hotels Pvt. Ltd. which was acquired from Govt. of under disinvestment scheme on 20/03/2002.

Hotel is situated on a piece of land admeasuring 4.286 acre which was leased to Edenpark Hotel Pvt. Ltd. by L&DO by executing lease deed dated 20/3/2002.

The existing project consist of following building blocks with total Built-up area approx.. 12,260 sqm comprising of; 1. Hotel Block – 1 no. 2. Service apartment block – 2 nos.

Out of above, total 3 building blocks, it is proposed to demolish one existing hotel block and to be construct new hotel block in place of demolished Hotel block.

As per prevailing building bye commercial activity is permissible to the extent of 20 FAR. Hence PP has planned for one commercial office block.

In existing campus, 100 KLD STP, 1 DG set of 750 kVA DG set & 3 nos. of rain water harvesting are already been provided and are functional.

It is proposed to integrate services of existing retained buildings i.e. 2 nos. service apartment buildings with the services of New Hotel Blocks & Commercial block.

Fig. 1. Delhi Master Plan 2021

ITHC/PRJ/19-20/EIA/207/Rev.01 50 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, -110016

PROJECT SITE

https://dda.org.in/planning/docs/A1% 20SCANNING%20COLOR.jpg

Table-1 Existing structure to be retained Building No of Floors Area in sqmt Existing Service Aptt Bldg no:2 - Block A,B,C B+G+6 3863.486 Existing Service Aptt Bldg no:3 - Block D & E G+6 1925.35 Mumty Machine Rm etc of above 2 Blocks 32.95 TOTAL AREA 5821.79

Table-2: Existing to be demolished

Building No of Floors Area in sqmt Existing hotel block B+G+6 6264.004 Mumty Machine Rm etc 173.279 TOTAL AREA 6437.283

Table-3: Combined Services

Details Existing Proposed Total Unit WATER 1 Total Water Requirement 40 237.0 277 KLD 2 Fresh water requirement 32 165 197 KLD 3 Treated Water Requirement 8 72 80 KLD

ITHC/PRJ/19-20/EIA/207/Rev.01 51 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

4 Waste water Generation 33 154 187 KLD 5 Required Capacity of STP 40 185 190 KLD 6 Actual capacity STP 100 90 190 KLD Treated Water Available for 7 26 123 152 KLD Reuse 8 Treated Water Recycled 8 72 80 KLD Surplus treated water to be 9 18 51 69 KLD discharged in Municipal Sewer RAIN WATER HARVESTING 10 No of RWH of Pits 3 1 4 No. PARKING 11 Total Parking 177 650 827 ECS GREEN AREA Required Green Area (38.25% 12 6634.72 6634.72 SQM of plot area) Proposed Green Area (43.2% 13 7485.237 7485.237 7485.237 SQM of plot area) WASTE 14 Total Solid Waste Generation 0.096 0.658 0.754 TPD 15 Organic waste 0.06 0.41 0.47 TPD Quantity of Hazardous waste 16 0.39 1.00 1.39 LPD Generation Quantity of Sludge Generated 17 7 41 48 KG/DAY from STP ENERGY 18 Total Power Requirement 620 950 1570 KVA 19 DG set backup 750 320 1070 KVA 20 No of DG Sets 1 1 2 No.

PROJECT DETAILS

The salient features of the project are given in table: 4 below

Table4. Salient features of proposed project (New Construction) PROJECT SUMMARY Sl. No. Description Quantity Unit GENERAL 1 Gross Plot Area 17344.69 SQMT 2 Area Under Rd Widening etc. 576.62 SQMT 3 Net Plot Area 16767.97 SQMT 4 Proposed Built Up Area (New Construction) 46490.038 SQMT 5 Number of Building Blocks 2 No. 6 Proposed No of Hotel Suites 231 7 Max Height of Building (Upto Terrace) 29.95 M 8 Max No of Floors 3B+G+8 No. 9 Expected Total Population 2060 No. 10 Cost of Project ( New construction) 44.23 CR 11 Proposed New Bldgs - Hotel, Commercial, Basement 3 Lvl .

ITHC/PRJ/19-20/EIA/207/Rev.01 52 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

AREAS 12 Permissible Ground Coverage Area (30%) 5030.39 SQMT 13 Proposed Ground Coverage Area (New Construction) 3372.536 SQMT 14 Permissible FAR Area 150 25151.96 SQMT 15 Proposed FAR Area (New Constn) 17309.38 SQMT 16 Non FAR areas - Total Basement Area (New Constn) 26028.02 SQMT 17 Non FAR areas - Service Floor Mumty Machine Rm etc. 3152.63 SQMT 18 Proposed Total Built Up Area 46490.044 SQMT WATER 19 Total Water Requirement 237 KLD 20 Fresh water requirement 165 KLD 21 Treated Water Requirement 72 KLD 22 Waste water Generation 154 KLD 23 Required Capacity of STP 185 KLD 24 Treated Water Available for Reuse 123 KLD 25 Treated Water Recycled 72 KLD 26 Surplus treated water to be discharged in Municipal Sewer 51 KLD RAIN WATER HARVESTING 27 Rain Water Harvesting Potential 2701.51 KL 28 No of RWH of Pits Required 4 No. PARKING 29 Total Parking Required as / Building Bye Laws 520 ECS 30 Proposed Total Parking 650.7 ECS 32 Parking in Basements 650.7 ECS GREEN AREA 33 Required Green Area (38.25% of plot area) 6634.72 SQMT 34 Proposed Green Area (43.2% of plot area) 7485.237 SQMT WASTE 35 Total Solid Waste Generation 0.658 TPD 36 Organic waste 0.41 TPD 37 Quantity of Hazardous waste Generation 1.00 LPD 38 Quantity of Sludge Generated from STP 41 KG/DAY ENERGY 39 Total Power Requirement 950 KVA 40 DG set backup 750 KVA 41 No of DG Sets 1 No.

3.0 CONNECTIVITY

The Project site is well connected to the Major National highways NH-2, NH-8 & NH-24. Almost all the surrounding and nearby areas are connected with network of roads. Hazrat Nizzammudin Station is around 8 km in North East direction and IGI Airport is approx. 7.91 km in SW direction. Google image showing location and connectivity of project site is as given below (Ref, fig.2).

ITHC/PRJ/19-20/EIA/207/Rev.01 53 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

Fig 2: Project site Location on Google Image

4.0 PROJECT SURROUNDINGS

The proposed project site “Qutub Hotel” is located at Shaheed Jeet Singh Marg, New Delhi. The location coordinate of project site are 280 32’ 18.96”N and 770 11’ 20.07” E. The Project site is well connected to the Major National highways NH-2, NH-8 & NH-24. Almost all the surrounding and nearby areas are connected with network of roads. Hazrat Nizzammudin Station is around 8 km in North East direction and IGI Airport is approx. 7.91 km in SW direction. The details of site surroundings are given below in Table- 5.

Table-5: Site and Surrounding of the project Site

S. No. Particulars Details 1. Nearest National Highway NH-8: 5.75 km/NW NH-24: 9.34 km/NE NH-2: 7.66 km/NH NH-236: 4.01 km/SW 2. Nearest Railway Station New Delhi Railway Station: 12.05 Km/NW Hazarat Nizzamuddin Railway Station: 8 Km/NE 3. Nearest Airport IGI Airport:7.91 Km/SW 4. Nearest Town/ City Delhi

ITHC/PRJ/19-20/EIA/207/Rev.01 54 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

5. River Body Yamuna River: 9.06 Km/NE 6. Hills/ Valleys Plain 7. Site Topography Nil 8. State Boundary Delhi Haryana Border: 9.19 km/SW Delhi UP Border: 12.04 km/NE 9. Seismicity The study area falls under Seismic Zone-IV 10 Delhi Fire Station 3.36 km/NW

Table6 : Archeological/ Historical Places Sl Name Location District Distance Direction Ramp and gateways of RaiPithora's 2.13 km South East 2. Adchini South Fort, Adchini 3. Begumpuri Masjid Begumpur South 1.46 km East 4. LalGumbad, Chirag Delhi Chirag Delhi South 2.28 km East 5. Tomb of Bahlol Lodi Chirag Delhi South 3.58 km fort or LalQila, NaubatKhana, 13.42 km North East Diwan-i-am, MumtazMahal' Rang Mahal, Baithak,MaseuBurj, diwan-i- 6. Khas' Moti Masjid, sawanBhadon ,Shah North Burj, Hammam with all surrounding including the gardens, paths, terraces and water courses. 7. HazratNizamuddinkiBaoli Nizamuddin South East 7.75 km North East 8. Tomb of MirzaMuzaffer, ChotaBatasha Nizamuddin South East 8.18 km North East 9. Tomb of Amir Khusro Nizamuddin South East 7.73 km North East 10. Tomb of MirzaMuzaffer, Bara Batasha Nizamuddin South East 8.23 km North East 11. Tomb of NizamuddinOlia Nizamuddin South East 7.72 km North East 12. Unknown tomb Nizamuddin South East 7.77 km North East HauzKhas:- Group of Building at 1.5 km North HauzKhas consisting of the following i. The tomb of Ferozshah ii. Domed Building to the west of No.1 iii. Dalan between 1&2 iv. Domed Building & its court to the south of No. 3, v. Dalans and all ruined Buildings to the north of no. 1 and existing upto No.10 vi. Five Chhatris to the East of No. 1& No.5 vii. Old Gate to the north of No.6 viii. Three Chhatris to the north-west of No.7 13. ix. Ruined courtyard and its Dalans with HauzKhas South the Domed building to the north-west to the No.8 x. Old wall running east from No.4 xi. 2.23 Acres of land surrounding the above and bouded on the North by house of Chhange and Mehra Chand sons of Hansram and house of Udairam, son of Kushla South Ghairmumkan Rasta East By village site belonging to village community. Others West By field no. 185 & 186.

ITHC/PRJ/19-20/EIA/207/Rev.01 55 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

Humayunpur 2.07 km North 14. Bagh-i-AlamGumbad with a Mosque Village South (HauzKhas) 15. Kali Gumti HauzKhas South 2.10 km North Humayunpur 2.41 km North East Village 16. TohfewalaGumbad South (HauzKhas), ShahpurJat Near 8 km North East 17. Arab Sarai Humayun’s South East Tomb Near 8.12 km North East The Gate way of Arab Sarai facing 18. Humayun’s South East North towards PuranaQila Tomb Near 8.21 km North East The Gate way of Arab Sarai facing East 19. Humayun’s South East towards the tomb of Humayun Tomb Near 8.15 km North East Remaining Gateways of Arab Sarai and 20. Humayun’s South East of Abadi-Bagh-Buhalima Tomb Near 8.14 km North East 21. LakharwalGumbad (Tomb) Humayun’s South East Tomb Near 8.33 km North East 22. SunderwalaBurj Humayun’s South East Tomb Near 8.4 km North East 23. SunderwalaMahal Humayun’s South East Tomb BijayMandal, neighbouring domes, 1.59 km East 24. buildings and dalan to north of South Begumpur 25. Bandi or PotikaGumbad III-280 HauzKhas South 2.07 km North East 27. Biran-Ka-Gumbad-282 HauzKhas South 2.23 km North East 28. Biwi or Dadi-ka-Gumbad-281 HauzKhas South 2.07 km North East 29. ChorMinar No. 289 Vol III HauzKhas South 1.81 km North East 30. ChotiGumti HauzKhas South 1.99 km North East HauzKhas 1.85 km North East 31. Idgah of Kharehra South Enclave HauzKhas 2.33 km North East 32. Nili Mosque South Enclave HauzKhas 1.96 km North East 33. Sakri Gumti-284 Enclave near South Green Park Khirki Village 3.01 km East 34. Khirkee Masjid near Malviya South Nagar Khirki Village 3.39 km South East 35. -III –216 near Malviya South Nagar Khirki Village 2.92 km South East 36. Tomb of Usuf-Quttal situated at Khirki South near Malviya

ITHC/PRJ/19-20/EIA/207/Rev.01 56 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

Nagar 37. JahazMahal in Mehrauli Village South 2.74 km South Mosque known by the name of 2.86 km South 38. ShamsiTallab together with both Mehrauli Village South platform entrance gates. 39. Moti Masjid Mehrauli Village South 2.21 km South West Old Palace of Bahadur Shah II alias 2.21 km South West 40. Mehrauli Village South LalMahal in Mehrauli 41. Qutub Minar Mehrauli Village South 1.29 km South 42. Tomb of (Rest House) Mehrauli South 1.71 km South Tomb and Mosque of 1.98 South 43. Mehrauli South MaulanaJamaliKamali Behind South 3.83 km North East 49. Moth-ki-Masjid South Extension-II Tombs of Bade-Khan, and KotlaMubrakpur 4.81 km North East 52. South MubarakpurKotla, Kotla Village Tombs of Chote Khan, Mubarakpur, KotlaMubrakpur 4.82 km North East 53. South Kotla Village Tomb of Mubarik Shah in Mubarikpur, KotlaMubrakpur 4.95 km North East 54. South Kotla Village Mosque attached to Mubarak shah KotlaMubrakpur 4.88 km North East 55. South Tomb Village Tin BurjiWalaGumbad, MommadPur Mohammad Pur 2.44 km North East 57. South Village Village 60. MundaGumbad, Munirka South 1.93 km North 70. Bara Pulah bridge near Nizammudin Nizamuddin South East 6.40 km North East The ChausathKhamba and tomb of 7.79 km North East 71. Nizamuddin South East Mirza Aziz Kokaltash 72. The Grave of Jahanara Begum Nizamuddin South East 7.70 km North East 73. The Grave of Muhammad Shah Nizamuddin South East 6.40 km North East NilaGumbaz outside the south corner of 8.53 km North East 76. Nizamuddin South East the enclosure of Humayun's tomb. The NilaChhatri or SubazBurj, once 7.98 km North East 77. used as a Police Station at Nizam-ud- Nizamuddin South East Din. The with its 8.08 km North East 80. surrounding enclosure walls and turret, Nizamuddin South East garden, gateways and mosque. 81. Tomb of Khan-i-Khana Nizamuddin South East 7.87 km North East 86. Nai-ka-kot in Tughlaqabad Tughlaqabad South East 9.63 km South East Tomb of GhiyasuddinTughlakabad. 7.73 km South East 87. walls and bastions, gates and cause Tughlaqabad South East way including the tomb of Dad Khan 92. Mound known as JogaBai Jamia Nagar South East 93. Ashokan Rock Edict at Bahapur East of Kailash South East 6.89 km North East LadoSarai 2.04 km South West 94. Mandi Mosque South Village LadoSarai 2.13 km South East 98. Gateways of RaiPithoria's Fort south Village MalikpurKothiop 5 km South East 100. Tomb of South posite

ITHC/PRJ/19-20/EIA/207/Rev.01 57 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

VasantKunj Mehrauli (Qutb 1.15 km South 104. Iron Pillar, Hindu remains South Complex) 108. Mazar of MirzaGhalib Nizamuddin South East 7.80 km North East

Schools/ Collegs/ Institutes in 1 km vicinity 1 Department of science and technology Institutional East 0.01 km 2 Administrative Staff College of India Institutional South 0.01 km 3 Indian Institute of Foreign Trade Institutional West 0.46 km 4 Fore School of Management Institutional West 0.32 km 5 NCERT Campus Institutional East 0.27 km 6 Southern Boundary of IIT Delhi Institutional North 0.71 km 7 Police training School East 1.04 km 8 IIT Delhi Institutional North East to North 0.71 km 9 National Science Library Public Building West 1.03 km 10 ShriLalBahadurShastriRashtriya Institutional West 0.66 km Sanskrit Vidyapeeth 11 International management Institute Institutional West 0.67 km

Hospitals/ Clinics/ Nursing Homes in 1 km Vicinity 1 Sitaram Bhartia Institute of Science and Health Care West 0.32 km Research Establishment 2 IIT Hospital JiaSarai Health Care North 0.77 km Establishment 3 Rockland Hospital Health Care West 0.73 km Establishment

Parks/ Garden/Forests

S.NO. PLACE DISTANCE 1 Asola Wildlife Sanctuary 5.36 Km/SE(project site is 3.62 km away from the eco sensitive zone of Asola wildlife sanctuary, so NBWL permission is not required) (Eco sensitive zone is 1km) 2 Pusha Hill Forest 8.64 km/NW 3 Aravali Biodiversity Park 9.63 Km/SW 4 Okhla Bird Sanctuary 11.28 km/NE 5 1 km/N 6 Sanjay Van 0.16 km/S 7 Buddha Jyanti Park 7.10 km/N 8 City Protected Forest 4.2 km/E 9 Rajokri Protected Forest 5.61 km/SW 10 Safdarjang Airport 5 km/N 11 Sanjay Lake 4.8 km/N 12 Butterfly Park, Hauz Khas 2.12 km/NE

5.0 OCCUPANCY DETAILS

The total population of the project will be approx. 2060 persons including 632 visitors. Details of population are given below in Table -7.

ITHC/PRJ/19-20/EIA/207/Rev.01 58 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

Table -7 Population Detail POPULATION

SUITES/ POP/ SUIT/ TOTAL HOTEL / RESDL (24 Hrs use) SERV APPT APPT POPULATION HOTEL SUITES 231 2 462 TOTAL 231 TOTAL 462 NON RESIDENTIAL (8to 10 Hrs use) Employees Area Rate Population COMMERCIAL OFFICES 4208.325 1/10 sqm 421 HOTEL STAFF As/norms 471 BANQUET HALL STAFF L.S. 45 FACILITY MANAGEMENT STAFF/DRIVERS L.S. 29 TOTAL 966 VISITORS (1.5 to 2 Hrs use) 10% of COMMERCIAL OFFICES commercial 42 population BANQUET HALL 826 1/1.4 sqm 590 TOTAL VISITORS 632 TOTAL POPULATION 2060

6.0 WATER DEMAND

6.1 Water supply & source

The water supply for the project during operation phase will be sourced from DJB. The total water demand works out to approximately 237 KLD. Net fresh water requirement will be 165 KLD. Details of daily water requirement, waste water generation & reuse of treated water are given below in Table 8 and water balance diagram is given in Figure-5. below.

Table 8: Calculations for Daily Water Demand for the Project WATER REQUIREMENT POPULATION/ RATE IN TOTAL QTY

AREA/UNIT LTS IN KL HOTEL SUITES DOMESTIC 462 260 120.12 FLUSHING 462 60 27.72

COMMERCIAL (Working Population) DOMESTIC 495 25 12.36

ITHC/PRJ/19-20/EIA/207/Rev.01 59 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

FLUSHING 495 20 9.89

FACILITIES- BANQ HALL (Working Population) DOMESTIC 45 25 1.12 FLUSHING 45 20 0.89

VISITORS DOMESTIC 632 5 3.16 FLUSHING 632 10 6.32

KG LAUNDARY 1145 20 22.89 Area in sqm GARDENING 7485 3.5 26.20 KVA D G COOLING 750 0.9 1.35

SWIMMING POOL/WATER BODY 1 5

TOTAL WATER REQUIREMENT 237.03 TOTAL TREATED WATER REQUIREMENT 72.37 TOTAL FRESH WATER 164.65

WASTE WATER GENERATION WATER FLOW TO STP (DOMESTIC) 80% 109.41 WATER FLOW TO STP (FLUSHING) 100% 44.83 TOTAL WASTE WATER GENERATION 154.24

REQUIRED CAPACITY OF STP 185 SAY 185 TREATED WATER GENERATION 123

SURPLUS TREATED WATER TO BE DISCHARGED 51 IN MUNICIPAL SEWER

ITHC/PRJ/19-20/EIA/207/Rev.01 60 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

WATER BALANCE

Table 9: Complete water statement of project Details Existing Proposed Total Unit WATER 1 Total Water Requirement 40 237 277 KLD 2 Fresh water requirement 32 165 197 KLD 3 Treated Water Requirement 8 72 80 KLD 4 Waste water Generation 33 154 187 KLD 5 Required Capacity of STP 40 185 190 KLD 6 Actual capacity STP 100 90 190 KLD Treated Water Available for 7 26 123 152 KLD Reuse 8 Treated Water Recycled 8 72 80 KLD Surplus treated water to be 9 18 51 69 KLD discharged in Municipal Sewer

7.0 SEWAGE GENERATION

Construction phase: Quantity of sewage generated during the construction phase will be negligible and proper management will be done by providing mobile toilets. Septic tank & soak pit will be provided on site for treatment.

Operational Phase:

ITHC/PRJ/19-20/EIA/207/Rev.01 61 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

Approx. 154 KLD total domestic waste water will be generated from the hotel which will be treated in onsite STP of capacity proposed 150 KLD alongwith 100 KLD existing to meet the treated water demand in the project.

8.0 WASTE GENERATION, COLLECTION, TRANSPORT AND DISPOSAL

Solid waste would be generated both during the construction as well as during the operation phase. The solid waste expected to be generated during the construction phase will comprise of excavated materials, used bags, bricks, concrete, MS roads, tiles, wood etc. The following steps are to be followed for the management solid waste:

 Construction yards are used for storage of construction materials.  The excavated material such as topsoil and stones will be stacked for reuse during later stages of construction.  Excavated top soil will be stored in temporary constructed soil bank and will be reused for landscaping of the Project.  Remaining soil will be utilized for back filling / road work / raising of site level at locations.

Waste generation during Operation Phase During operation phase municipal solid waste would be generated from the project. The quantification of different type of waste likely to be generated are given below in table:10 below

Table 10: Quantity of Waste Generation during operation phase

Existing Proposed Total Unit Total Solid Waste Generation 0.096 0.658 0.754 TPD Organic waste 0.06 0.41 0.47 TPD Quantity of Hazardous waste 0.39 1.00 1.39 LPD Generation Quantity of Sludge Generated 7 41 48 KG/DAY from STP

Following arrangements will be made at the site in accordance to Solid Waste (Management and Handling) Rules, 2016.

 Collection and Segregation of waste

1. System will be adopted for collection of domestic waste in colored bins. 2. Biodegradable & non biodegradable waste shall be separately collected to ensure segregation at source.

Treatment of Bio-Degradable wastes Biodegradable /Organic and Horticultural Waste would be treated in Organic Waste Converter installed at site. Generated compost would be used as manure for horticulture development.

Non Biodegradable waste Recyclables, such as plastic, rubber, wood pieces, glass etc will be segregated from non biodegradable waste & sold to authorize vendors for recycling & remaining inert waste shall be sent to land fill site through authorized vendor as per the guidelines of Solid Wastes (Management and Handling) Rules, 2016 STP sludge will also be used for horticultural purposes as manure.

ITHC/PRJ/19-20/EIA/207/Rev.01 62 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

9.0 POWER REQUIREMENT DETAILS

The power supply shall be supplied by BSES Rajdhani Power Ltd. the estimated electrical demand load & proposed power back to be used during power failure shall be as per details given in Table:11 below.

Table:11 Power & DG detail Existing Proposed Total Unit Total Power Requirement 620 950 1570 KVA DG set backup 750 320 1070 KVA No of DG Sets 1 1 2 No.

9.1 BACKUP POWER DETAILS

There is provision of 1 no. of DG set of 750 kva shall be provided for power back-up. The DG sets will be equipped with acoustic enclosure to minimize noise generation and adequate stack height for proper dispersion.

Energy Conservation Measures: The energy conservation measures shall be adopted to minimize the demand on non- renewable resources and maximize the utilization efficiency of these resources. The benefits of Energy Conservation measures are as follows:  Reduced Energy Consumption without sacrificing comfort levels.  Reduced destruction of natural resources.  Reduced air pollution.  Reduced Pollution Loads.  Increased user productivity.

9.2 STORM WATER DRAINAGE & RAIN WATER HARVESTING SYSTEM

A network of covered/underground storm water drain is already present at site. Three rainwater harvesting pits will be provided to collect rain water runoff from roof tops, hard & soft areas – roads, paths, parking & open areas, vegetated surfaces planned on the ground. Strom water would be channelized to rain water harvesting structure designed to charge the rain water to ground water aquifer.

The storm water will pass through the desilting chamber/oil& grease separator before finally discharging to percolation tank. Design details of Rain Water Harvesting structure are given in the table 7 & Figure 8 below

For basement parking, the rainwater from ramps will be collected in the basement storm water storage tank. This water will be pumped out to the nearest external storm water drain. Four numbers of Rain Water Harvesting pits are planed rain water recharge within the project premises.

ITHC/PRJ/19-20/EIA/207/Rev.01 63 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

Table 7: Calculations for storm water Harvesting Potential

Figure-6: A typical Recharge pit

10.0 LANDSCAPE & SHELTERBELT DEVELOPMENT

Total green area measures 7485.237 m2 i.e. 43.2 % of the total plot area. Approx. 50% of area would be used for peripherial tree plantation, road side plantation & remaining area would be used for plantation of shrubs, lawn, and ground cover.

It is also mentioned that approx. 250 trees are present at site which will be retained. On the additional area, approx. 25 nos. of trees will be cut with prior permission from Forest department. The plant species would be selected from the list given below:

THE LIST OF PLANT SPECIES LIKELY TO BE PLANTED

SN Botanical Name Common Name 1 Ficus Infectoria Pakur 2 Delonix regia Gulmohur 3 Cassia fistula Amaltas 4 Azadirachtha Indica Neem 5 Peltophorum ferrugineum Copper pod 6 Ficus retusa Usha 7 Alstonia Scholaris Scholar tree 8 Thespesia populnea Paras Pipal

ITHC/PRJ/19-20/EIA/207/Rev.01 64 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

9 Churasia tabularis Chukrasia 10 Anthocephalus cadamba Kadamba 11 Jacaranda mimosifolia Jacaranda 12 Mimusops Elengi Maulsari 13 Plumeria alba Temple tree 14 Terminalia arjuna Arjuna 15 Bauhinea Variegata Kachnar 16 Sarca indica Ashoka 17 Silver oak Grevillea Robusta 18 Semal Bombax Ceiba 19 Pilkhan Ficus

11.0 PARKING FACILITIES

For smooth circulation & reduction of pollution separate entry & exits with gates of adequate sizes are planned for the vehicles & also for the movement of fire engine. Provision for car/vehicle parking is planned in the basements. Apart from peripheral roads for vehicular movement internal roads/pavements are planned for traffic free movement of pedestrians. Details of parking provision are given in table:8

Table-8: Parking Details Existing Proposed Total Unit Total Parking 177 650 827 ECS

12.0 Risk and Hazards

12.1 Seismicity

Based on the tectonic features and records of earthquake, a Seismic Zoning map has been developed for the country by Bureau of Indian Standard (BIS). The area under study falls in Seismic Zone-IV. Suitable seismic coefficients in horizontal and vertical directions respectively, will be adopted while designing the structures. The structural design shall be vetted by the agency nominated by local body. Earthquake resistant construction techniques will also be used.

12.2 Emergency Lighting

The emergency lights operated on battery power would be provided at appropriate locations – such as corridors, common area, staircase, exit and entrance doors, parking, etc.

12.3 Fire Safety

 Fire Fighting Designed: As per National Building Code 2016  Provision fire detection, alarm & rescue system.  Provision of infrastructure required for suppression of fire as per norms.  Provision of fire escape staircase  Provision of Fire Extinguishers, Fire Hose Cabinet, Internal & External hydrant, Fire sprinkler system in basements & residential towers are planned as per applicable codes & norms of local fire department.  Nearest fir station will be at approx. 3 km in NW direction from project site.

ITHC/PRJ/19-20/EIA/207/Rev.01 65 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

13.0 ENVIRONMENTAL POLLUTION MITIGATION MEASURES

13.1 Air Pollution

Increased traffic generation due to project will not affect significant as the existing tower will demolish and then new one will be constructed. So no. of ECS will not be significantly increased.

Mitigation Measures for Air Pollution during Construction Stage Air quality around the project site will be impacted during construction stage. Various construction activities especially related to handling of loose material are likely to generate fugitive dust that will affect the air quality of the surrounding area of the project site. To minimize such impacts following measures has been proposed:

. Construction area shall be covered with green sheet and confined. . All the loose material either stacked or transported will be provided with suitable covering such as tarpaulin, etc. . Water sprinkling shall be done at the locations where dust generation is anticipated. . To minimize the occupational health hazard, proper personal protective gears i.e. mask shall be provided to the workers who are engaged in dust generation activity.

Mitigation Measures for Air Pollution during Operational Stage Operation of DG Sets is the only source of air pollution during operational phase. Sufficient stack height will be provided for proper dispersion of pollutants. Also, it is proposed to minimize air pollution by providing plantation as buffer on the periphery of the project site and on the open spaces. An area of 7485.237 m2 i.e. 43.2 % of the total area has been kept for green development & plantation purposes.

13.2 Water Pollution

The source of water pollution during construction and operation phase is due to waste water generated from toilets and washing.

13.3 Noise Environment

It is envisaged that within the project site there shall be maximum movement of light motor vehicles like cars and 2-wheelers which will lead to some increase in noise levels. It is proposed to minimize the noise levels by providing plantation as buffer on the sides of internal roads, on the open spaces inside and around the periphery of whole complex. Proper maintenance of the internal roads will also be carried out and Informatory signboards shall be provided to encourage vehicle owners to maintain their vehicle, not to blow horns and follow the emission standards fixed by Government Authorities. DG sets will be kept in the acoustic chamber and ambient noise will be within the CPCB standard limits.

Mitigation Measures for Noise Pollution during Construction Stage During the construction stage, expected noise levels shall be in the range of 80-85 dB (A) which will decrease with increase in distance as per the Inverse Square Law. Administrative as well as engineering control of noise will be implemented. Isolation of noise generation sources and temporal differentiation of noise generating activities will ensure minimum noise at receiver’s end. To prevent any occupational hazard, ear muff / ear plug shall be given to the workers working around or operating plant and machinery emitting high noise levels. Use of such plant or machinery shall not be allowed during night hour. Careful planning of machinery operation and scheduling of operations shall be done to minimize such impact.

Mitigation Measures for Noise Pollution during Operation Stage

ITHC/PRJ/19-20/EIA/207/Rev.01 66 IND TECH HOUSE CONSULT

ENVIRONMENTAL CLEARANCE FOR ADDITION & CONCEPTUAL PLAN M/S EDENPARK ALTERATION OF “QUTUB HOTEL” SHAHEED JEET HOTEL PVT. LTD. SINGH MARG, NEW DELHI-110016

It is envisaged that there shall be maximum movement of light motor vehicles like cars and 2-wheelers which will lead to some increase in noise levels. It is proposed to minimize the noise levels by providing plantation as buffer on the open spaces and around the periphery of whole complex. Informatory signboards shall be provided to encourage vehicle owners to maintain their vehicle, not to blow horns and follow the emission standards fixed by Government Authorities. DG sets will be kept in the acoustic chamber and ambient noise will be within the CPCB standard limits.

14.0 CONSTRUCTION MATERIALS

The following construction materials are required for residential construction; 1. Coarse sand 11. P.V.C. conduit 2. Fine sand 12. MCBs/DBs 3. Stone aggregate 13. Overhead water tanks 4. Cement 14. Pavors 5. Fly Ash 15. Conc, CI, GI, CPVC, UPVC pipes 6. Reinforcement steel 16. Sanitary fittings & fixtures 7. Plywood & steel shuttering 17. Stainless steel sink 8. Pipe scaffolding (cup lock system) 18. Glass 9. Bricks 19. Joinery hardware 10. Marble/vitrified/ceramic floor & wall tiles 20. Aluminium Frames 21. Electrical equipments, fittings & fixtures.

15.0 LIST OF MACHINERY USED DURING CONSTRUCTION (i) Dumper (ii) Concrete mixer with hopper (iii) Excavator (iv)Concrete Batching Plant (v) Cranes (vi) Road roller (vii Bulldozer (viii) Tower Cranes (ix) Hoist (x) Labor Lifts (xi) Concrete pressure pumps (xii) Mobile transit mixer

16.0 PROJECT COST The total construction cost of the project is approximately Rs. 44.23 Crore.