Invitation for Initial Selection Works (Design and Build)

Total Page:16

File Type:pdf, Size:1020Kb

Invitation for Initial Selection Works (Design and Build) Invitation for Initial Selection Works (Design and Build) Employer: Ministry of Agriculture, Forestry and Water Management of Republika Srpska / Agriculture Projects Coordination Unit (APCU) Project: Sava and Drina Rivers Corridors Integrated Development Program Contract title: Detailed design and reconstruction of the main channel from the mouth of the Sava river to the mouth of the Majevica Obod channel Country: Bosnia and Herzegovina / Republika Srpska Loan No.: to be provided accordingly ISD No: BA-RS-SDIP-D&W-ISD-20-1.1.2 Issued on: 14.12.2020 1. The Borrower, Bosnia and Herzegovina, and Republika Srpska through subsidiary agreement with the Borrower has applied for financing from the World Bank toward the cost of the Sava and Drina Rivers Corridors Integrated Development Program and intends to apply part of the proceeds toward payments under the contract for “Detailed design and reconstruction of the main channel from the mouth to the Sava river to the mouth of the Majevica circumferential channel”. 2. The Agriculture Projects Coordination Unit (APCU) on behalf of the Ministry of Agriculture, Forestry and Water management of Republika Srpska (“the Employer”) intends to initially select Applicants for “Detailed design and works reconstruction of the main channel from the mouth to the Sava river to the mouth of the Majevica circumferential channel”, BA-RS-SDIP-D&W-RFP-20-1.1.2 The subject of Detailed Design (DD), and later the execution of works, is the rehabilitation and reconstruction of the Main Perimeter Canal from the mouth of the Sava River St.0+000 to the mouth of the Majevica Obod Canal St.7+489. The DD will provide a technical solution for the rehabilitation, reconstruction and extension of the Main Perimeter Canal, taking into account all analyzes and conclusions from the preliminary design of the main project, the analysis of previous study-project documentation, hydrological-morphological analyzes and geodetic-geological conditions. The DD will consider appropriate technical solutions, and adapt them to the phased execution of works. The goal of this project is: to bring the channel into a safe and functional condition by performing remediation works on the stabilization of degraded slopes of the main riverbed on the observed existing and potential landslides. Technical solutions will consider: (i) urgent - selective remediation of landslides estimated length of about 1.5-2.8 km on both, left and right banks and (ii) long-term - integral rehabilitation of the entire stretch of the canal - stabilization of the slopes of the main channel bed, planning and construction of continuous stabilizing structures on both sides. The site is located in Republika Srpska, protected area “Semberija”. It is expected that the Request for Proposals will be made in January 2021. Time for completion of the construction work is 12 months. To be qualified for the award of a short-list, Applicants must meet all the following requirements: Historical non-performance: A consistent history of historical non-performance and/or litigation awards against the Applicants or any partner of a Joint Venture Contract Agreement (JVCA) may result in rejection of the application. Moreover, if an Applicant is formally debarred from contracting activities by the law or official regulation of the Bosnia and Herzegovina and Republika Srpska or by the Bank, and the Employer may not enter into a contract with such applicant, the Employer may reject the application. Historical financial performance: The audited balance sheets for the last 5 (five) years shall be submitted and must demonstrate the soundness of the Applicants’ financial position, showing long-term profitability. Where necessary, the Employer will make inquiries with the Applicants' bankers. Financial Capabilities: The audited balance sheets for the last 3 (three) years shall be submitted and must demonstrate the soundness of the Applicants’ financial position, showing long-term profitability. Where necessary, the Employer will make inquiries with the Applicants' bankers. (i) the average annual turnover of the Applicant must exceed EUR 9 million for the last 3 years (2017, 2018 and 2019) for which accounts have been closed; (ii) the average of cash and cash equivalents at the end and beginning of each year for the years 2017, 2018 and 2019 must be positive; (iii) The Applicants shall demonstrate that it has access to, or has available liquid assets, unencumbered real assets, lines of credit, and other financial means sufficient to meet the construction cash flow for the contract for a period of 4 (four) months, estimated as not less than EUR 1.5 million equivalent, taking into account the Applicants’ commitments for other contracts. Construction Experience: the Applicant has implemented and completed, but not necessarily commenced, during the last 5 years up to the deadline for the receipt of applications indicated below, at least two (2) contracts of nature and complexity comparable to the proposed contract within the last 5 years of a minimum value of EUR 4.0 million each and shall demonstrate that it had a minimum participation of 70 % in each of the contracts brought as reference. The similarity shall be based on the physical size, complexity, methods/technology or other characteristics similar to this one. At least one of the above required projects must include: river or channel reconstruction of minimum length of 10 km. Design Experience: the Applicants shall include in his application a designer who shall meet the following minimum criteria: (a) The designer shall have an average annual turnover (defined as annual earnings, expressed in its equivalent of a defined currency) over the last 5 (five) years of not less than EUR 1,0 million equivalent. (b) successful experience as a designer (prime contractor, lead partner or partner in joint venture) with the satisfactory execution and Client’s approval of at least 2 (two) projects of a nature and complexity comparable to the proposed contract. At least one of the above required projects must include: river or channel reconstruction of minimum length of 10 km. The Applicants may satisfy criteria for designer by himself or in joint venture. Documentary evidences shall be submitted in the form of a table with a list of executed contracts, job description, contract value and contact person of the Investor for data verification, as well as confirmation of the investor on well performed works for each specified contract. Prior to contract signing, the Applicant will be required to have company licenses for performance of Services and Works as well as having key experts with particular personal licenses for each type of works, as defined in the Republic of Srpska Law on Planning and Construction and its bylaws. The both type of licenses, company and personal, must be issued by the Ministry of Physical Planning, Construction and Ecology of the Republic of Srpska. In the case of JV, any member of JV shall be authorized as above. The experience and financial record of any proposed sub-contractor shall not be included in the evaluation. The APCU intends to shortlist qualified and eligible firms to whom a subsequent request for proposals (RFP), both technical and financial, shall be sent. 3. Initial Selection will be conducted through the procedures as specified in the World Bank’s Procurement Regulations for IPF Borrowers, July 2026, revised in August 2018 (“Procurement Regulations”), and is open to all eligible Applicants as defined in the Procurement Regulations. 4. Interested eligible Applicants may obtain further information from the APCU at the address below during office hours (0900 to 1500 hours]. A complete set of Initial Selection documents in English language may be purchased by interested Applicants on the submission of a written application to the address below and upon payment of a nonrefundable fee of BAM 200 or 100 EUR. The method of payment will be: PAYMENT IN EUR Beneficiary: IBAN BA395672410000610769 Ministarstvo finansija i trezora BiH Sarajevo, Trg BiH 1 Bosnia and Herzegovina 57A:Account with Institution Account No: EUR 936 5503 00 Swift code: SABRBA2B SBERBANK A.D. Banja Luka Jevrejska 71, 78000 Banja Luka Bosnia and Herzegovina Intermediary Bank: DEUTSCHE BANK AG FRANKFURT AM MAIN Swift code: DEUTDEFF Details of Payment: RSAPCU- SDIP-1.1.2 Details of Charges: OUR PAYMENT IN BAM 567241-82000033-09 Ministarstvo poljoprivrede, šumarstva i vodoprivrede Jedinica za koordinaciju poljoprivrednih projekata Banja Luka The printed version of the document will be sent by courier and by e-mail. In case of any discrepancies between the electronic version and hard copy of the bidding documents, the latter will prevail. 5. Applications for Initial Selection should be submitted in clearly marked envelopes and delivered to the address below by 14:00 CET on January 29, 2021. Late applications may be rejected. Ministry of Agriculture, Forestry and Water Management of Republika Srpska / Agriculture Projects Coordination Unit (APCU) Mr. Stevan Raonic, Procurement officer 78000 Banja Luka, Republika Srpska Trg Republike srpske 1, Lamela A, 8. sprat, kancelarija 18 Bosnia and Herzegovina +387 (0)51/338-362 e-mail: [email protected].
Recommended publications
  • Tuzla Is a City in the Northeastern Part of Bosnia and Herzegovina. It Is the Seat of the Tuzla Canton and Is the Econo
    Summary: Tuzla is a city in the northeastern part of Bosnia and Herzegovina. It is the seat of the Tuzla Canton and is the economic, scientific, cultural, educational, health and tourist centre of northeast Bosnia. Preliminary results from the 2013 Census indicate that the municipality has a population of 120,441. District Heating System of Tuzla City started in October 1983. Project to supply Tuzla City with heat energy from Tuzla Power Plant that will have combined production of electricity and heat was happened in 4 phases. The requirements for connection to Tuzla District Heating brought of system in position that in 2005 we got to the maximum capacity and we had to do wide modernization of network pipes and heat substations. Facts about the Tuzla district energy system Annual heat carrying capacity: 300,000 MWth Temperature: 130–60°C Transmission network length: 19.6 km (2x9.8 km) Distribution network length: 142.4 km (2x71.2 km) Power station fuel: Coal Number of users: Total: 22934 Flats snd Houses: 20979 Public Institutions: 156 Commercial units: 1799 Heated area (square meters): Total: 1718787 Flats and Houses: 1158402 Public Institutions: 220460 Commercial units: 339925 Results achieved by reengineering the Tuzla district energy system • 30 % energy savings compared to old system before retrofit • Capacity expanded by 36 % within the existing flow of 2,300 m3/h • Reengineering of 98 substations: ball valves, strainers, pressure regulators, control valves, temperature and pressure sensors, safety thermostats, weather stations, electronic controllers, thermostatic radiator valves (TRVs), energy meters Tuzla is a city in Bosnia and Herzegovina. It is the seat of the Tuzla Canton and is the economic, scientific, cultural, educational, health and tourist centre of northeast Bosnia.
    [Show full text]
  • MAIN STAFF of the ARMY of REPUBLIKA SRPSKA /VRS/ DT No
    Translation 00898420 MAIN STAFF OF THE ARMY OF REPUBLIKA SRPSKA /VRS/ DT No. 02/2-15 NATIONAL DEFENCE 31 March 1995 STA TE SECRET SADEJSTVO /coordination/ 95 VERY URGENT To the commands of the 1st KK /Krajina Corps/, IBK /Eastern Bosnia Corps/, DK /Drina Corps/, V /Air Force/ and PVO /Anti-aircraft Defence/ (to the 2nd KK /Krajina Corps/, SRK /Sarajevo-Romanija Corps/ and HK /Herzegovina Corps/, for their information). DIRECTIVE FOR FURTHER OPERATIONS, Operative No. 711 1. BASIC CHARACTERISTICS OF THE MILITARY AND POLITICAL SITUATION Since the start of the year, but particularly during the second half of March, Muslim armed forces have started wantonly violating in a synchronised manner the Agreement on a Four-month Cessation of Hostilities, focussing on offensive actions in the wider area of Bihac and Vlasic, in the zone of operations of the 30th Infantry Division and Task Group 2 of the 1st Krajina Corps, and on Majevica mountain, as well as regrouping and bringing in new forces to continue offensive actions in Posavina, towards Teslic and Srbobran. In synchronised activities, forces of the Muslim-Croatian Federation, forces of the HVO /Croatian Defence Council/ and units of the HV /Croatian Army/ are waiting for the result of the struggle on the Vlasic plateau and on Majevica, and in the event of a favourable development of the situation will join in with the aim of cutting the corridor and taking control of the Posavina, continuing operations in the direction of Glamoc and Grahovo, and, in cooperation with Muslim forces, taking Sipovo
    [Show full text]
  • Bosnia-Hercegovina "Ethnic Cleansing"
    November 1994 Vol. 6, No. 16 BOSNIA-HERCEGOVINA "ETHNIC CLEANSING" CONTINUES IN NORTHERN BOSNIA SUMMARY........................................................................................................................ 2 RECOMMENDATIONS .................................................................................................... 3 BACKGROUND ................................................................................................................ 4 Bosanska Krajina ................................................................................................... 4 The Bijeljina Region .............................................................................................. 6 ABUSES ............................................................................................................................. 7 Murders and Beatings ............................................................................................ 7 Torture.................................................................................................................. 15 Rape16 Disappearances 17 Evictions ................................................................................................................ 19 Forced Labor........................................................................................................ 20 Terrorization and Harassment .............................................................................. 27 Extortion .............................................................................................................
    [Show full text]
  • Condition of the Cultural and Natural Heritage in the Balkan Region – South East Europe, Vol 2
    CONDITION OF THE CULTURAL [ AND NATURAL HERITAGE IN THE BALKAN REGION Volume 2 Moldavia Slovenia Romania Croatia Serbia Bosnia and Hercegovina Montenegro Bulgaria Macedonia Albania Project REVITALISATION OF THE CULTURAL AND HERITAGE IN THE BALKAN REGION - South East Europe Project initiator and coordinator ICOM SEE - Working Group of ICOM Europe Partners National Committees of ICOM of Bulgaria, Bosnia and Herzegovina, Croatia, Macedonia, Montenegro, Romania, Serbia and Slovenia UNESCO Office in Venice - UNESCO Regional Bureau for Science and Culture in Europe (BRESCE) Co-partner National Museum in Belgrade CONDITION OF THE CULTURAL [ AND NATURAL HERITAGE IN THE BALKAN REGION Volume 2 Belgrade, 2011 Condition of the Cultural and Natural Heritage in the Balkan Region – South East Europe, Vol 2 Publishers: Central Institute for Conservation in Belgrade www.cik.org.rs Institute Goša d.o.o. www.institutgosa.rs Ministry of Culture of Republic of Serbia www.kultura.gov.rs Editors in chief: Mila Popović-Živančević, PhD, conservator-councillor Marina Kutin, PhD, Senior Research Associate Editor: Suzana Polić Radovanović, PhD, Research Associate, Central Institute for Conservation Reviewers: Prof. Kiril Temkov, PhD,Institute for Philosophy, Faculty of Philosophy, Skopje Prof. Simeon Nedkov, PhD, University Sveti Kliment Ohridski, Sofia Joakim Striber, PhD, Senior Researcher III, National Institute of Research-Development of Optoelectronics INOE, Romania Scientific Board: Prof. Denis Guillemard (France) Krassimira Frangova, PhD (Bulgaria) Jedert Vodopivec, PhD (Slovenia) Ilirjan Gjipali, PhD (Albania) Sergiu Pana, PhD (Moldova) Ljiljana Gavrilović, PhD (Serbia) Virgil Stefan Nitulescu, PhD (Romania) Donatella Cavezzali, PhD (Italy) Prof. Tomislav Šola, PhD (Croatia) Enver Imamović, PhD (Bosnia and Herzegovina) Davorin Trpeski, PhD (Macedonia) Editorial Board: Mila Popović-Živančević, PhD, ICOM Serbia Sabina Veseli, ICOM Albania Azra Bečević-Šarenkapa, MA, ICOM Bosnia and Herzegovina Prof.
    [Show full text]
  • BHY CR 2006/15 (Translation)
    BHY CR 2006/15 (translation) CR 2006/15 (traduction) Friday 10 March 2006 at 10 a.m. Vendredi 10 mars 2006 à 10 heures - 2 - 10 The PRESIDENT: Please be seated. Professor Stojanović, you have the floor. Mr. STOJANOVIĆ: Thank you, Madam President, Members of the Court. I will continue my presentation with an analysis of the preparations for war and the arming of the population in Bosnia and Herzegovina. Part Three Preparations for war and the arming of the population 113. In the autumn of 1991, the war in Croatia was coming to an end. The United Nations Security Council had characterized the conflict in Croatia by resolution 713 of 25 September 1991 (pursuant to Chapter 7 of the United Nations Charter) as a direct threat to peace and international security. This resolution imposed an embargo on the export of arms to Yugoslavia. The Security Council gave Cyrus Vance a mandate to act as an intermediary in the ceasefire negotiations. Also, a United Nations peacekeeping force, UNPROFOR, was set up. It was to keep the two sides apart along the boundaries that their respective military forces held at that point. 114. The situation became tense when the Parliament of Bosnia and Herzegovina adopted a memorandum on the sovereignty and independence of Bosnia and Herzegovina on 15 October 1991. Representatives of the Serb parties walked out, and the two Serb representatives of the Presidency of Bosnia and Herzegovina voted against the memorandum. A few days later, the Serb representatives who had walked out of the Parliament of Bosnia and Herzegovina set up their own separate parliament and announced a referendum to let the citizens decide if they wanted to stay inside Yugoslavia or not.
    [Show full text]
  • ABD Strategy for Drina Sava Region
    Author: Natalija Bogdanov Aleksandra Nikolic June 2012 Sava Region Sava Drina for ABD Strategy ABD Strategy for Drina for ABD Strategy Region Sava 1 ABD Strategy for Drina for ABD Strategy Region Sava 2 The project is financed by the European Union This document has been produced with the financial assistance of the European Union. The contents of this document are the sole responsibility of the Regional Rural Development Standing Working Group in South-East Europe (SWG) and can under no circumstances be regarded as reflecting the position of the European Union. This document is output of the IPA Multi-beneficiary Annual Programme 2011 Project Preparation Facility Preparation of a Proposal for an Area Based Development in the Western Balkans Contract number: 2011/271-250 CONTENTS 1 Introduction 3 2 Country (ies) and administrative region covered 6 2.1 ABD selection criteria applied 6 2.2 Geographical area covered by the plan 6 3 A quantified description of the current situation 9 3.1 Natural Resources & Environment 9 3.1.1 Natural resources 9 3.1.2 Environmental protection 10 3.2 Human capital 13 3.3 Economic Structures 15 3.3.1 Agriculture 18 3.3.2 Tourism 20 3.3.3 SME sector 22 3.4 Infrastructure 22 3.5 Social and institutional capital 24 4 The assessment of development capitals 27 4.1 Environmental capital 27 4.2 Cultural capital – identity and share values 28 4.3 Social capital 29 4.4 Institutional capital 29 4.5 Human capital 30 4.6 Economic capital 31 5 SWOT ANALYSIS 34 5.1 SWOT analysis process 35 5.2 SWOT analysis 38 5.3 Identification
    [Show full text]
  • Groundwater Vulnerability Determination of Northeastern Bosnia According to Drastic Method
    Acta geographica Bosniae et Herzegovinae 2019, 12, (87-99) Original scientific paper __________________________________________________________________________________ GROUNDWATER VULNERABILITY DETERMINATION OF NORTHEASTERN BOSNIA ACCORDING TO DRASTIC METHOD Srkalović Dado1, Željka Stjepić Srkalović2 1Faculty of mining, geology amd civil engineering Tuzla, e-mail: [email protected] 2Faculty of Sciences and Mathematics Tuzla, e-mail: [email protected] The paper assesses the vulnerability of groundwater bodies in the basin of the river Bosna and Spreča, then the river basin of the Drina river (Drinjača), as well as parts of the immediate Sava river basin (Čelić area - Gnjica river and Turija basin) by the DRASTIC method. All water bodies were analyzed in terms of groundwater depth, roof sediment thickness, infiltration, slope angle, hydraulic conductivity and lithological composition of aquifers. The pollution potential formula was used to assess the vulnerability of groundwater. Key words: groundwater bodies, groundwater, DRASTIC method, northeast Bosnia INTRODUCTION The term "groundwater vulnerability to pollution" was first used by MARGAT in 1968. The term 'groundwater vulnerability' is used in opposition to the term 'natural pollution protection'. Although many efforts have been made to come up with a common groundwater vulnerability concept, different authors still use it under different conditions. In 1988, FOSTER & Hirata defined "aquatic pollution and vulnerability" as the sensitivity of different parts of an aquifer to negative loads (FOSTER & HIRATA, 1988). PHYSICAL-GEOGRAPHICAL POSITION OF NORTHEASTERN BOSNIA AND HERZEGOVINA Geographical position. The exploration area is contoured by the rivers Sava in the north, Drina in the east, Bosnia in the west and the rivers Drinjača and Krivaja in the south. The area covers about 6350km2 and belongs to the most populated part of Bosnia and Hercegovina (Figure 1).
    [Show full text]
  • Bosnia and Herzegovina
    BOSNIA AND HERZEGOVINA Sead Vojnikovic Summary of climate change dimensions Although Bosnia and Herzegovina ratified the United Nations Framework Convention on Climate Change (UNFCCC) in 2000, and its Kyoto Protocol in 2008, research activities and capacity building have not developed sufficiently, as policy on and scientific research into climate change in Bosnia and Herzegovina have been affected by the post-war situation, with a very complex state administration; lack of state and regional level legislation; absence of national, international and inter-sectoral cooperation; etc. Bosnia and Herzegovina has lacked studies addressing climate changing problems and their regional and local influences on forestry, forest productivity, biodiversity, etc. No models have been developed that could be used for assessing impact on forestry or for evaluating possible national areal changes to plant and animal communities. The most complete report regarding climate change is the Initial National Communication (INC) of Bosnia and Herzegovina to UNFCCC. The majority of this text derives from that report. Forestry Forests represent one of the major natural resources of the country. Due to their natural and diverse structure, as well as extensive natural regeneration, they represent crucial resources for the further development of Bosnia and Herzegovina. The country itself is geographically optimally positioned in terms of diverse climatic influences (Mediterranean, sub-Mediterranean and middle continental climate zones) and is home to over one hundred tree species. The main species found are fir, spruce, Scots and European pine, beech, different species of oak, and less significant numbers of noble broadleaves, including maples, elms, ash, together with fruit trees (cherry, apple, pear).
    [Show full text]
  • Annex 1 Types of Anti-Personnel Mines In
    ANNEX 1 TYPES OF ANTI‐PERSONNEL MINES IN BOSNIA AND HERZEGOVINA ‐ PROM ‐ 1 Anti‐personnel bounding fragmentation mine, designed to be buried into the ground with the fuse above the ground surface. While its activation, the steel body breaks and fragments have a killing radius in 50 m diameter, while the hazard radius is up to 100 m. Due to its characteristic, this mine represents the single largest long‐term threat for people; ‐ PMA 1 Anti‐personnel anti‐magnet pressure mine, activated with approximately 3 kg of pressure. It may be buried into the ground at 3‐5 cm depth. There is often an underneath TNT charge to elevate the killing factor; ‐ PMA 2 Anti‐personnel anti‐magnet pressure mine, mainly laid on the surface and hidden by vegetation. On activation, the explosive wave damages the lower part of pressuring leg while the shock wave damages the other leg too; ‐ PMR 2A Anti‐personnel fragmentation mine activated by tripwire. Mine is masked with vegetation and the tripwire itself is hard to notice. Fragments have a 40 m kill radius in diameter, while the hazard radius is up to 100 m in diameter; ‐ PMA 3 Anti‐personnel blast resistant minimum metal mine, activated by pressure onto the upper part of the mine creating a tilt in any direction. The body of the mine is cylindrical, with upper and lower parts connected in the centre by the circular rubber cover. The mine is waterproof and often found on the river banks, remaining operational long after it has been laid. ‐ MRUD Anti‐personnel directional fragmentation mine with plastic body shaped in arch and designed to fragment in a certain direction.
    [Show full text]
  • 1. Babajicc Et Al Compressed
    Babaji ć, A. et al: Petrographic …… Archives for Technical Sciences 2017, 16(1), 1-8 Preliminary report UDC: 622.33:550.8.01(497.6) DOI: 10.7251/afts.2017.0916.001B COBISS.RS-ID 6436632 PETROGRAPHIC CHARACTERISTICS OF MAFIC EXTRUSIVE ROCKS ALONG THE SOUTHWESTERN PART OF MAJEVICA Babaji ć Alisa 1, Babaji ć Elvir 1, Danica Sre ćkovi ć-Bato ćanin 2, Dragan Milovanovi ć2 1Faculty of mining, geology and civil engineering, University of Tuzla, Bosnia and Herzegovina, email: [email protected] 2Faculty of mining and geology, University of Belgrade, Serbia SUMMARY Total number of nineteen mafic extrusive rock samples is subjected to the detailed optical examination. Based on definition of mineral composition, structure, texture, type and intensity of alteration processes, and taking into consideration the recent classification schemes, different lithotypes are defined. The most frequent are spilites distinguished by classical "spilite" mineralogy (albite), and very often with "quench" texture and amygdaloidal structure. Diabases consist of primary plagioclase and clinopyroxene which are often decomposed and disintegrated. Diabase rocks are mostly characterised with ophitic texture and massive structure. Coarse grained varieties are characterized as dolerites, the rocks in which intensity of alteration process is significantly lower than in previous lithotypes. Varieties with frequent occurrences of amphibole got adjective amphibolic. The most common and the most intense alteration processes are albitization and chloritization. Alteration processes of lower intensity are actinolitization, pumpellytization, zeolitization, carbonation-calcitization, limonitization, kaolinitization and silicification. Depending on alteration degree a certain lithotypes are named with prefix meta (metadiabases and metadolerites). Key words: optical examinations, spilites, diabases, dolerites, alterations, Majevica Mountain INTRODUCTION Mafic extrusive rocks of the Majevica area have not been researched systematically, so the data about these rocks are very scant.
    [Show full text]
  • Službeni Glasnik Br. 5/17
    Utorak, 04.04.2017.godine Godina: LII Broj: 5 K A L E S I J A OPĆINSKO VIJEĆE 86 Na osnovu člana 13. Zakona o principima lokalne samouprave (“Sl. novine FBiH”, br: 49/06 i 51/09), člana 14., 15. i 16. Zakona o prostornom planiranju i korištenju zemljišta na nivou FBiH (“Sl. novine FBiH”, br: 2/06, 72/07, 32/08, 4/10, 13/10 i 45/10), člana 22., 25. i 34. Zakona o prost- ornom uređenju i građenju (“Sl. novine TK”, broj: 6/11, 4/13, 15/13, 3/15 i 2/16) i člana 40., 41. i 42. Uredbe o jedinstvenoj metodologiji za izradu planskih dokumenata (“Sl. novine FBiH”, br: 63/04, 50/07 i 84/10) i 42. Statuta općine Kalesija-Prećišćeni tekst ("Sl. glasnik općine Kalesija", broj: 10/07, 7/08, 10/11, 3/12 i 6/13), Općinsko vijeće na sjednici održanoj dana 28.01.2017.godine, d o n o s i : O D L U K U o usvajanju Prostornog plana općine Kalesija za period 2015-2035 godinu Član 1. Usvaja se Prostorni plan općine Kalesija za period 2015-2035 godinu sa primjedbama iznesenim u obrazloženju Saglasnosti na Prostorni plan općine Kalesija za period 2015-2035 godinu od strane Ministarstva prostornog uređenja i zaštite okolice TK broj: 12/05-23-1298/17 od 25.01.2017. godine a koje će IPSA INSTITUT d.o.o Sarajevo kao nosilac izrade planskog dokumenta ugraditi u finalnu verziju Prostornog plana i dostaviti Općinskom vijeću na objavljivanje u Službenom glasniku Općine Kalesija. Član 2.
    [Show full text]
  • The Tuzla Canton Development Strategy for the Period of 2016 – 2020
    THE TUZLA CANTON DEVELOPMENT STRATEGY FOR THE PERIOD OF 2016 – 2020 Tuzla, November 2015 The Tuzla Canton Development Strategy was created with the support of Integrated Local Development Project (ILDP), a joint initiative of the Government of Switzerland and the United Nations Development Programme (UNDP) in Bosnia and Herzegovina. The views and opinions expressed in this document do not necessarily reflect the views and opinions of the Government of Switzerland or UNDP. The principle of gender equality is integrated in the document as one of the fundamental principles. In this regard, certain terms used in the masculine gender (e.g. the Prime Minister, Mayor, etc.) are neutral and apply to both men and women. 2 CONTENT Introduction.................................................................................................................................4 The methodology of strategy design .............................................................................................6 1. STRATEGIC PLATFORM............................................................................................................8 1.1. The excerpt from the socio-economic analysis....................................................................8 1.1.1. Geographic, natural, cultural and historical characteristics ..........................................8 1.1.2. Demographic characteristics and trends .....................................................................10 1.1.3. The overview of the situation and trends in the economy of Tuzla Canton
    [Show full text]