Tasiast Mauritanie Limited SA Tasiast Gold Mine Expansion Project Phase 2: On-Site Mine, Process and Infrastructure

Total Page:16

File Type:pdf, Size:1020Kb

Tasiast Mauritanie Limited SA Tasiast Gold Mine Expansion Project Phase 2: On-Site Mine, Process and Infrastructure Tasiast Mauritanie Limited SA Tasiast Gold Mine Expansion Project Phase 2: On-Site Mine, Process and Infrastructure Environmental Impact Assessment Final 30 March 2012 Prepared for Prepared for Tasiast Mauritanie Limited SA Tasiast Gold Mine Expansion Project Revision Schedule Phase 2 Environmental Impact Assessment 30 March 2012 Final Rev Date Details Prepared by Reviewed by Approved by 01 21/12/2011 Draft for review Reine Loader Julie Raynor Russell Foxwell Environmental Consultant Associate Associate Fraser Paterson Associate 02 01/03/2012 Draft for Reine Loader Julie Raynor Russell Foxwell translation Environmental Consultant Associate Associate Fraser Paterson Associate 03 30/03/2012 FINAL Reine Loader Fraser Paterson Russell Foxwell Environmental Consultant Associate Associate URS Infrastructure & Environment UK Limited 6-8 Greencoat Place London SW1P 1PL United Kingdom Tel +44 (0) 20 7798 5000 Fax +44 (0) 20 7798 5001 www.ursglobal.com Tasiast Mauritanie Limited SA Tasiast Gold Mine Expansion Project Limitations URS Infrastructure & Environment UK Limited (“URS”) (formerly URS Scott Wilson Ltd) has prepared this Report for the use of Tasiast Mauritanie Limited SA (“Client”) in accordance with the Agreement under which our services were performed. No other warranty, expressed or implied, is made as to the professional advice included in this Report or any other services provided by URS. Notwithstanding anything to the contrary, URS acknowledge that the Report may be disclosed by the Client to any third party, including members of the public for the specific purposes which have been advised to URS. URS shall not have any liability to any third parties for the unauthorised copying and any subsequent reliance on this Report. The conclusions and recommendations contained in this Report are based upon information provided by others and upon the assumption that all relevant information has been provided by those parties from whom it has been requested and that such information is accurate. Information issued and provided to URS as provided above has not been independently verified by URS, unless otherwise stated in the Report. The methodology adopted and the sources of information used by URS in providing its services are outlined in this Report. The work described in this Report was undertaken between September 2011 and March 2012 and is based on the conditions encountered and the information available during the said period of time. Where assessments of works or costs identified in this Report are made, such assessments are based upon the information available at the time and where appropriate are subject to further investigations or information which may become available. Certain statements made in the Report that are not historical facts may constitute estimates, projections or other forward-looking statements and even though they are based on reasonable assumptions as of the date of the Report, such forward-looking statements by their nature involve risks and uncertainties that could cause actual results to differ materially from the results predicted. URS specifically does not guarantee or warrant any estimate or projections contained in this Report. Tasiast Mauritanie Limited SA Tasiast Gold Mine Expansion Project Table of Contents 1 Introduction .................................................................................... 20 1.1 Background .................................................................................................................... 20 1.2 The Project ..................................................................................................................... 20 1.3 Approach to Permitting ................................................................................................... 21 1.4 Phase 2 Reporting .......................................................................................................... 23 2 Legislation and Policy Framework ............................................... 25 2.1 Introduction ..................................................................................................................... 25 2.2 National .......................................................................................................................... 25 2.3 International Standards .................................................................................................. 33 3 The Project – Phase 2 .................................................................... 38 3.1 Overview of Existing Mine Operations ........................................................................... 38 3.2 Project Components - Phase 2 ...................................................................................... 40 4 Project Setting ................................................................................ 68 4.1 Mining in Mauritania ....................................................................................................... 68 4.2 Location .......................................................................................................................... 68 4.3 Baseline Conditions ........................................................................................................ 69 5 Impact Assessment Methodology ................................................ 72 5.1 Introduction ..................................................................................................................... 72 5.2 Terms of Reference ........................................................................................................ 72 5.3 Environmental Impact Assessment ................................................................................ 72 6 Surface Water and Groundwater ................................................... 78 6.1 Methodology ................................................................................................................... 78 6.2 Baseline Conditions ........................................................................................................ 80 6.3 Potential Impacts ............................................................................................................ 89 6.4 Mitigation Measures ....................................................................................................... 97 6.5 Cumulative Impacts ........................................................................................................ 98 6.6 Evaluation of Mitigated Impacts ..................................................................................... 98 6.7 Summary ...................................................................................................................... 101 7 Air Quality ..................................................................................... 102 7.1 Introduction ................................................................................................................... 102 7.2 Methodology ................................................................................................................. 103 7.3 Baseline Conditions ...................................................................................................... 109 7.4 Baseline Air Quality Survey .......................................................................................... 110 7.5 Hydrogen Cyanide Gas Detection ................................................................................ 111 7.6 Potential Impacts .......................................................................................................... 112 Phase 2 Environmental Impact Assessment March 2012 1 Tasiast Mauritanie Limited SA Tasiast Gold Mine Expansion Project 7.7 Mitigation Measures ..................................................................................................... 131 7.8 Cumulative Impacts ...................................................................................................... 132 7.9 Evaluation of Mitigated Impacts ................................................................................... 132 7.10 Summary ...................................................................................................................... 133 8 Noise and Vibration ...................................................................... 135 8.1 Methodology ................................................................................................................. 135 8.2 Baseline Conditions ...................................................................................................... 139 8.3 Potential Impacts .......................................................................................................... 140 8.4 Mitigation Measures ..................................................................................................... 148 8.5 Cumulative Impacts ...................................................................................................... 149 8.6 Evaluation of Mitigated Impacts ................................................................................... 149 8.7 Summary ...................................................................................................................... 150 9 Soils and Land Use ...................................................................... 151 9.1 Methodology ................................................................................................................. 151 9.2 Baseline Conditions .....................................................................................................
Recommended publications
  • FEWS Country Report BURKINA, CHAD, MALI, MAURITANIA, and NIGER
    Report Number 10 April 1987 FEWS Country Report BURKINA, CHAD, MALI, MAURITANIA, and NIGER Africa Bureau U.S. Agency for International Development Summary Map __ Chad lMurltanl fL People displaced by fighting High percentage of population have bothL.J in B.E.T. un~tfood needsa nd no source of income - High crop oss cobied with WESTERN Definite increases in retes of malnutrition at CRS centers :rom scarce mrket and low SAHARA .ct 1985 through Nov 196 ,cash income Areas with high percentage MA RTAI of vulnerable LIBYA MAU~lAN~A/populations / ,,NIGER SENEGAL %.t'"S-"X UIDA Areas at-risk I/TGI IEI BurkinaCAMEROON Areas where grasshoppers r Less than 50z of food needs met combined / CENTRAL AFRICAN would have worst impact Fi with absence of government stocks REPLTL IC if expected irdestat ions occur W Less than r59 of food needs met combined ith absence of government stocks FEYIS/PWA. April 1987 Famine Early Warning System Country Report BURKINA CHAD MALI MAURITANIA NIGER Populations Under Duress Prepared for the Africa Bureau of the U.S. Agency for International Development Prepared by Price, Williams & Associates, Inc. April 1987 Contents Page i Introduction 1 Summary 2 Burkina 6 Chad 9 Mali 12 Mauritania 18 Niger 2f FiAures 3 Map 2 Burkina, Grain Supply and OFNACER Stocks 4 Table I Burkina, Production and OFNACER Stocks 6 Figure I Chad, Prices of Staple Grains in N'Djamcna 7 Map 3 Chad, Populations At-Risk 10 Table 2 Mali, Free Food Distribution Plan for 1987 II Map 4 Mali, Population to Receive Food Aid 12 Figure 2 Mauritania, Decreasing
    [Show full text]
  • Cricket Longtail Breeding in Southern Morocco Mohamed Amezian, Mohamed Radi, Mohamed Ibn Tattou, Mohamed Laghdaf Khayya, Mohamed Lamine Samlali & Abdeljebbar Qninba
    Cricket Longtail breeding in southern Morocco Mohamed Amezian, Mohamed Radi, Mohamed Ibn Tattou, Mohamed Laghdaf Khayya, Mohamed Lamine Samlali & Abdeljebbar Qninba ricket Longtail Spiloptila clamans is a small discovered in Oued Jenna along the Aousserd Cbird of the Cisticolidae family which breeds in (Awserd) road in Western Sahara, Morocco (van a narrow band from southern Mauritania and den Berg & Haas 2008, Pettersson et al 2008). northern Senegal across northern Nigeria and Since then, it was reported regularly from this area Chad to Sudan and Eritrea (Perrins 1998, del Hoyo in most months (eg, van den Berg & Haas 2009, et al 2006). Inside the boundary of the Western Bergier et al 2010a, 2011a, 2011b). Palearctic (WP) (as defined in Cramp & Simmons The species breeds almost throughout the year: 1977) it was until recently only recorded from an in June-September in Mauritania, from January to isolated area around Atâr in northern Mauritania November but mainly in September-October in (Lamarche 1988, Urban et al 1997, Perrins 1998, Senegal and in January-April and August in former Snow & Perrins 1998). In recent years, there have Sudan (Urban et al 1997, Perrins 1998, Snow & been numerous more northern records and breed- Perrins 1998, del Hoyo et al 2006, Isenmann et al ing evidence in Saharan Mauritania with, for 2010). In the Sahel zone, it may be partially instance, 15 individuals found near Choûm on migratory at the northern edge of the range, since 4 December 2006, three near Boû Lanouâr on some move south in the dry season (April-May in 9 December 2006, and six near Teïchot, Banc Mali), returning north during the rains (July- d’Arguin, in December 2007 (van den Berg 2005, September) (Perrins 1998, Snow & Perrins 1998).
    [Show full text]
  • An Inventory of Avian Species in Aldesa Valley, Saudi Arabia
    14 5 LIST OF SPECIES Check List 14 (5): 743–750 https://doi.org/10.15560/14.5.743 An inventory of avian species in Aldesa Valley, Saudi Arabia Abdulaziz S. Alatawi1, Florent Bled1, Jerrold L. Belant2 1 Mississippi State University, Forest and Wildlife Research Center, Carnivore Ecology Laboratory, Box 9690, Mississippi State, MS, USA 39762. 2 State University of New York, College of Environmental Science and Forestry, 1 Forestry Drive, Syracuse, NY, USA 13210. Corresponding author: Abdulaziz S. Alatawi, [email protected] Abstract Conducting species inventories is important to provide baseline information essential for management and conserva- tion. Aldesa Valley lies in the Tabuk Province of northwest Saudi Arabia and because of the presence of permanent water, is thought to contain high avian richness. We conducted an inventory of avian species in Aldesa Valley, using timed area-searches during May 10–August 10 in 2014 and 2015 to detect species occurrence. We detected 6860 birds belonging to 19 species. We also noted high human use of this area including agriculture and recreational activities. Maintaining species diversity is important in areas receiving anthropogenic pressures, and we encourage additional surveys to further identify species occurrence in Aldesa Valley. Key words Arabian Peninsula; bird inventory; desert fauna. Academic editor: Mansour Aliabadian | Received 21 April 2016 | Accepted 27 May 2018 | Published 14 September 2018 Citation: Alatawi AS, Bled F, Belant JL (2018) An inventory of avian species in Aldesa Valley, Saudi Arabia. Check List 14 (5): 743–750. https:// doi.org/10.15560/14.5.743 Introduction living therein (Balvanera et al.
    [Show full text]
  • Phase 2 Environmental Impact Assessment On-Site Mine Process
    Tasiast Mauritanie Limited SA Tasiast Gold Mine Expansion Project Phase 2: On-Site Mine, Process and Infrastructure Environmental Impact Assessment Final 30 March 2012 Prepared for Prepared for Tasiast Mauritanie Limited SA Tasiast Gold Mine Expansion Project Revision Schedule Phase 2 Environmental Impact Assessment 30 March 2012 Final Rev Date Details Prepared by Reviewed by Approved by 01 21/12/2011 Draft for review Reine Loader Julie Raynor Russell Foxwell Environmental Consultant Associate Associate Fraser Paterson Associate 02 01/03/2012 Draft for Reine Loader Julie Raynor Russell Foxwell translation Environmental Consultant Associate Associate Fraser Paterson Associate 03 30/03/2012 FINAL Reine Loader Fraser Paterson Russell Foxwell Environmental Consultant Associate Associate URS Infrastructure & Environment UK Limited 6-8 Greencoat Place London SW1P 1PL United Kingdom Tel +44 (0) 20 7798 5000 Fax +44 (0) 20 7798 5001 www.ursglobal.com Tasiast Mauritanie Limited SA Tasiast Gold Mine Expansion Project Limitations URS Infrastructure & Environment UK Limited (“URS”) (formerly URS Scott Wilson Ltd) has prepared this Report for the use of Tasiast Mauritanie Limited SA (“Client”) in accordance with the Agreement under which our services were performed. No other warranty, expressed or implied, is made as to the professional advice included in this Report or any other services provided by URS. Notwithstanding anything to the contrary, URS acknowledge that the Report may be disclosed by the Client to any third party, including members of the public for the specific purposes which have been advised to URS. URS shall not have any liability to any third parties for the unauthorised copying and any subsequent reliance on this Report.
    [Show full text]
  • World Bank Document
    Document of The World Bank FOR OFFICIAL USE ONLY Public Disclosure Authorized Report No: 75030-MR INTERNATIONAL DEVELOPMENT ASSOCIATION INTERNATIONAL FINANCE CORPORATION AND MULTILATERAL INVESTMENT GUARANTEE AGENCY Public Disclosure Authorized COUNTRY PARTNERSHIP STRATEGY (FY2014-2016) FOR THE ISLAMIC REPUBLIC OF MAURITANIA September 5, 2013 Public Disclosure Authorized Country Department AFCF1 Africa Region International Development Association International Finance Corporation Africa Region Multilateral Investment Guarantee Agency This document has a restricted distribution and may be used by recipient only in the performance of their official duties. Its contents may not otherwise be disclosed without World Bank authorization. Public Disclosure Authorized The date of the previous IDA Country Assistance Strategy for Mauritania (Report No. 39532-MR) was June 14, 2007. CURRENCY EQUIVALENTS (As of 30 November 2012) Currency Unit: Mauritanian Ouguiya UM 1 UM = US$0.0033 1.52US $ = SDR1 0.654950 FISCAL YEAR 01 January – 31 December WEIGHTS AND MEASURES Metric System ABBREVIATIONS AND ACRONYMS AAA Analytical and Advisory Activities ACE Africa Coast to Europe Submarine Cable AFD Agence Française de Développement (French Development Agency) AfDB African Development Bank AIDS Acquired Immune Deficiency Syndrome APL Adaptable Program Loan AQMI Al Qaeda in the Islamic Maghreb BCM Banque Centrale de Mauritanie (Central Bank of Mauritania) BEEP Business Environment Enhancement Project CAS Country Assistance Strategy CASCR Country Assistance Strategy
    [Show full text]
  • Pressing the Undo Button; a Policy Gap Analysis of Ghana's Minerals
    Avenue D, Hse. No. 119 D, North Legon MAY, 2016 | REPORT P. O. Box CT2121 Cantonment, Accra-Ghana Tel: 030-290 0730 PRESSING THE UNDO BUTTON facebook: Africa Centre for Energy Policy twitter@AcepPower A POLICY GAP ANALYSIS OF GHANA’S MINERALS AND MINING SECTOR www.acepghana.com TO OPTIMIZE GAINS FROM THE SHEINI IRON ORE WEALTH SUPPORTED BY: Created by iONE +233.24.305.9983 Inset: A map of Ghana showing the location of the Sheini iron ore mine 1 Executive Summary In the quest to improve the existing narrative contractual terms. While the Sheini iron ore of the impacts of Ghana’s mining sector on the grade is known, this knowledge was unilaterally sustainable development of host communities generated by the contractor. That there is no and the nation as a whole, the discovery of iron mechanism for parallel verification of this ore mine in commercial quantities at Sheini in the information by the government potentially Northern Region of Ghana presents an opportunity weakens government’s negotiation capacity to review Ghana’s mining sector laws and policies with prospective contractors to develop the to identify gaps, and provide recommendations that mine. It is important that government gets a can achieve transformative effects of the mineral’s second opinion about Sheini iron ore grade extraction. This report does precisely so. The before any block is awarded for development. minerals and mining sector policies of Ghana were The Government of Ghana should also put compared against global and regional standards – in place the necessary strategic investment specifically the NRGI’s precepts along the decision attraction mechanisms to get the mine value chain, and the tenets of the Africa Mining developed.
    [Show full text]
  • Estudio Geológico Y Metalogenético Del Basamento Precámbrico Del Sáhara Occidental
    Estudio Geológico y Metalogenético del Basamento Precámbrico del Sáhara Occidental Saleh Lehbib Nayem ADVERTIMENT. La consulta d’aquesta tesi queda condicionada a l’acceptació de les següents condicions d'ús: La difusió d’aquesta tesi per mitjà del servei TDX (www.tdx.cat) i a través del Dipòsit Digital de la UB (diposit.ub.edu) ha estat autoritzada pels titulars dels drets de propietat intel·lectual únicament per a usos privats emmarcats en activitats d’investigació i docència. No s’autoritza la seva reproducció amb finalitats de lucre ni la seva difusió i posada a disposició des d’un lloc aliè al servei TDX ni al Dipòsit Digital de la UB. No s’autoritza la presentació del seu contingut en una finestra o marc aliè a TDX o al Dipòsit Digital de la UB (framing). Aquesta reserva de drets afecta tant al resum de presentació de la tesi com als seus continguts. En la utilització o cita de parts de la tesi és obligat indicar el nom de la persona autora. ADVERTENCIA. La consulta de esta tesis queda condicionada a la aceptación de las siguientes condiciones de uso: La difusión de esta tesis por medio del servicio TDR (www.tdx.cat) y a través del Repositorio Digital de la UB (diposit.ub.edu) ha sido autorizada por los titulares de los derechos de propiedad intelectual únicamente para usos privados enmarcados en actividades de investigación y docencia. No se autoriza su reproducción con finalidades de lucro ni su difusión y puesta a disposición desde un sitio ajeno al servicio TDR o al Repositorio Digital de la UB.
    [Show full text]
  • Senegal and Gambia
    BIRDING AFRICA THE AFRICA SPECIALISTS Senegal and Gambia 2019 Tour Report Vinaceous Black-faced Firefi nch Text by tour leader Michael Mills Photos by Gus Mills SUMMARY ESSENTIAL DETAILS Our first trip to Senegal and Gambia was highly successful and netted a Dates 16 Jan: Full day in the Kedougou area seeing Mali good selection of localised and rarely-seen specials. For this private trip we Firefinch.. ran a flexible itinerary to target a small selection of tricky species. In Senegal 11-23 January 2019 17 Jan: Early departure from Kedougou. Lunch Savile's Bustard was the last African bustard for the entire party, and was at Wassadou Camp. Evening boat trip on Gambia Birding Africa Tour Report Tour Africa Birding seen well both at the Marigots and in the Kaolack area. Other Senegalese Leaders River with Adamawa Turtle Dove and Egyptian Report Tour Africa Birding Plover.. highlights included Western Red-billed Hornbill, Sahel Paradise Whydah Michael Mills assisted by Solomon Jallow in full breeding plumage, Little Grey Woodpecker, Mali Firefinch, Egyptian 18 Jan: Morning at Wassadou Camp, before driving to Gambia. Afternoon around Bansang with Plover and African Finfoot. Large numbers of waterbirds at Djoudj and the Participants Exclamatory Paradise Whydah in full plumage. Marigots were memorable too. Julian Francis and Gus Mills 19 Jan: Early departure from Bansang, driving to Tendaba for lunch via north bank. Afternoon at Tendaba seeing Bronze-winged Courser. Itinerary 20 Jan: Early morning on the Bateling Track seeing 11 Jan: Dakar to St Louis. Afternoon at the Marigots, Yellow Penduline Tit, White-fronted Black Chat, hearing Savile's Bustard.
    [Show full text]
  • PIF) Entry – Full Sized Project – GEF - 7 Development of an Integrated System to Promote the Natural Capital in the Drylands of Mauritania
    5/5/2020 WbgGefportal Project Identification Form (PIF) entry – Full Sized Project – GEF - 7 Development of an integrated system to promote the natural capital in the drylands of Mauritania Part I: Project Information GEF ID 10444 Project Type FSP Type of Trust Fund GET CBIT/NGI CBIT NGI Project Title Development of an integrated system to promote the natural capital in the drylands of Mauritania Countries Mauritania Agency(ies) IUCN Other Executing Partner(s) Executing Partner Type CNEOZA, Ministère de l'Environnement et du Développement Durable Government https://gefportal2.worldbank.org 1/51 5/5/2020 WbgGefportal GEF Focal Area Land Degradation Taxonomy Climate Change Adaptation, Climate Change, Focal Areas, Climate resilience, Livelihoods, Disaster risk management, Land Degradation, Sustainable Land Management, Drought Mitigation, Integrated and Cross-sectoral approach, Improved Soil and Water Management Techniques, Sustainable Livelihoods, Sustainable Pasture Management, Ecosystem Approach, Restoration and Rehabilitation of Degraded Lands, Community-Based Natural Resource Management, Sustainable Agriculture, Income Generating Activities, Food Security, Land Degradation Neutrality, Land Productivity, Influencing models, Transform policy and regulatory environments, Strengthen institutional capacity and decision-making, Convene multi-stakeholder alliances, Private Sector, Stakeholders, Individuals/Entrepreneurs, Large corporations, SMEs, Beneficiaries, Non-Governmental Organization, Civil Society, Community Based Organization, Participation,
    [Show full text]
  • Poverty and the Struggle to Survive in the Fuuta Tooro Region Of
    What Development? Poverty and the Struggle to Survive in the Fuuta Tooro Region of Southern Mauritania Dissertation Presented in Partial Fulfillment of the Requirements for the Degree Doctor of Philosophy in the Graduate School of The Ohio State University By Christopher Hemmig, M.A. Graduate Program in Near Eastern Languages and Cultures. The Ohio State University 2015 Dissertation Committee: Sabra Webber, Advisor Morgan Liu Katey Borland Copyright by Christopher T. Hemmig 2015 Abstract Like much of Subsaharan Africa, development has been an ever-present aspect to postcolonial life for the Halpulaar populations of the Fuuta Tooro region of southern Mauritania. With the collapse of locally historical modes of production by which the population formerly sustained itself, Fuuta communities recognize the need for change and adaptation to the different political, economic, social, and ecological circumstances in which they find themselves. Development has taken on a particular urgency as people look for effective strategies to adjust to new realities while maintaining their sense of cultural identity. Unfortunately, the initiatives, projects, and partnerships that have come to fruition through development have not been enough to bring improvements to the quality of life in the region. Fuuta communities find their capacity to develop hindered by three macro challenges: climate change, their marginalized status within the Mauritanian national community, and the region's unfavorable integration into the global economy by which the local markets act as backwaters that accumulate the detritus of global trade. Any headway that communities can make against any of these challenges tends to be swallowed up by the forces associated with the other challenges.
    [Show full text]
  • Issue 4 (December, 2019)
    Geological Society of Africa Newsletter Volume 9 - Issue 4 (December, 2019) Since the Nobel prize was established, 27 African and African-born persons and African organizations got it. YES Africa can do it !!! Stories inside the issue Africa and Nobel prize CAG28 is approaching Toward a better communication Edited by Tamer Abu-Alam Editor of the GSAf Newsletter In the issue GSAF MATTERS 1 KNOW AFRICA (COVER STORY) 10 GEOLOGY COMIC 11 GEOLOGICAL EXPRESSIONS 11 AFRICAN GEOPARK AND GEOHERITAGE 13 AFRICA'S NOBEL PRIZE WINNERS: A LIST 14 NEWS 23 LITERATURE 30 OPPORTUNITIES 38 CONTACT THE COUNCIL 42 Geological Society of Africa – Newsletter Volume 9 – Issue 4 December 2019 © Geological Society of Africa http://gsafr.org Temporary contact: [email protected] GSAf MATTERS Toward a better and a faster communication among the African community of Geosciences By Tamer Abu-Alam (GSAf newsletter editor and information officer) Information and news should be communicated in a faster way than a newsletter. For example, a deadline to apply for a scholarship can be easily missed if it is not posted to the community at a proper time. As a result, and for better and faster communication among the geological society of Africa, the GSAf will use a Gmail group ([email protected]) to facilitate the communication between society members. Some advice and rules: Since any member can post and all the members will receive your message, please do not overload the society by un-related news. Post only important news that wants immediate action from members. Improper messages can lead its owner to be blocked from posting.
    [Show full text]
  • AERC Wplist July 2015
    AERC Western Palearctic list, July 2015 About the list: 1) The limits of the Western Palearctic region follow for convenience the limits defined in the “Birds of the Western Palearctic” (BWP) series (Oxford University Press). 2) The AERC WP list follows the systematics of Voous (1973; 1977a; 1977b) modified by the changes listed in the AERC TAC systematic recommendations published online on the AERC web site. For species not in Voous (a few introduced or accidental species) the default systematics is the IOC world bird list. 3) Only species either admitted into an "official" national list (for countries with a national avifaunistic commission or national rarities committee) or whose occurrence in the WP has been published in detail (description or photo and circumstances allowing review of the evidence, usually in a journal) have been admitted on the list. Category D species have not been admitted. 4) The information in the "remarks" column is by no mean exhaustive. It is aimed at providing some supporting information for the species whose status on the WP list is less well known than average. This is obviously a subjective criterion. Citation: Crochet P.-A., Joynt G. (2015). AERC list of Western Palearctic birds. July 2015 version. Available at http://www.aerc.eu/tac.html Families Voous sequence 2015 INTERNATIONAL ENGLISH NAME SCIENTIFIC NAME remarks changes since last edition ORDER STRUTHIONIFORMES OSTRICHES Family Struthionidae Ostrich Struthio camelus ORDER ANSERIFORMES DUCKS, GEESE, SWANS Family Anatidae Fulvous Whistling Duck Dendrocygna bicolor cat. A/D in Morocco (flock of 11-12 suggesting natural vagrancy, hence accepted here) Lesser Whistling Duck Dendrocygna javanica cat.
    [Show full text]