Consolidated Quarterly Progress Report DOLE-QF-COP-05.01 Revision No.03 Consolidated Quarterly Progress Report Effective Date: 16 March 2018 DOLE Integrated Livelihood and Emergency Employment Program (DILEEP) From October to December , 2018 DOLE Regional Office No. 02 A. DOLE Integrated Livelihood Program Beneficiaries Project Cost Fund Source Name & Nature of Project Location Please Project (i.e. meat Name of Purpose Type of (Barangay/Munic specify: Operational processing, rice retailing, Proponent of Project Date d c Regular GAA, Status ipality/Province, a b Total Female Type Total ACP Equity Amount Released Release Issues ginger tea production, /ACP Project SinTax, DOLE- District) d etc.) AMP, BUB, SPF, others NO TRANSACTION Total 0 0 ₱0.00 ₱0.00 ₱0.00 B. Tulong Panghanapbuhay sa Ating Displaced/Disadvantaged Workers Program Beneficiaries Project Cost Fund Source Name & Nature of Please Project Location Project (i.e. declogging of Name of specify: (Barangay/Munic canal, debris clearing, Proponent Date Regular GAA, Statusd Operational Issues ipality/Province, Total Female Typec Total ACP Equity Amount Released basic repair of /ACP Released SinTax, DOLE- District) infrastructures) AMP, BUB, SPF, others CAGAYAN Clearing of DOLE Tuguegarao City, Displaced Regular 1 Barangay Roads 5 3 43,750.00 8,750.00 35,000.00 Operational CBFO Cagayan worker 2018 and Nursery Clearing along DOLE Displaced 2 Poblacion 02 and Piat, Cagayan 18 10 119,520.00 24,120.00 95,400.00 SPF 2018 Operational CBFO worker Elementary School Clean-up drive/ Clearing of roads, DOLE Displaced Regular 3 Enrile, Cagayan 39 11 341,300.00 68,300.00 273,000.00 Operational declogging of CBFO worker 2018 canals De-clogging of canals, clearing/cleaning Farm worker/ DOLE 4 of drainage, Piat, Cagayan 7 2 Displaced 48,530.00 11,430.00 37,100.00 SPF 2018 Operational CBFO school, and worker community premises Clearing of DOLE Allacapan, Displaced 5 27 7 178,875.00 35,775.00 143,100.00 SPF 2018 Operational roadside CBFO Cagayan worker Clearing of DOLE Allacapan, Displaced 6 15 8 99,375.00 19,875.00 79,500.00 SPF 2018 Operational roadside CBFO Cagayan worker Clearing of roads, tree planting, de- Displaced DOLE Tuguegarao City, 7 clogging of canals, 600 272 farmers/ 2,769,000.00 609,000.00 2,160,000.00 SPF 2018 Operational CBFO Cagayan Repair of public laborers infrastructures Clearing of roads, tree planting, de- Displaced DOLE 28 Municipalities 8 clogging of canals, 311 117 farmers/ 1,416,395.00 296,795.00 1,119,600.00 SPF 2018 Operational CBFO of Cagayan Repair of public laborers infrastructures Clearing of roads DOLE Sanchez Mira, Displaced 9 and de-clogging of 48 24 322,770.00 68,370.00 254,400.00 SPF 2018 Operational CBFO Cagayan worker canals Clearing of roads and de-clogging of DOLE Sta. Praxedes, Displaced 10 canals, 115 95 558,350.00 144,350.00 414,000.00 SPF 2018 Operational CBFO Cagayan worker Maintenance of communal gardens Tuao, Solana, Clearing of roads, Enrile, tree planting, de- DOLE Peñablanca, Displaced 11 clogging of canals, 400 184 1,835,000.00 395,000.00 1,440,000.00 SPF 2018 Operational CBFO Amulung, Iguig, worker Repair of public Tuguegarao City, infrastructures Cagayan Cleaning/ Clearing Cataggaman DOLE Displaced 12 of Streets, Gutters, Nuevo, 130 100 592,550.00 124,550.00 468,000.00 SPF 2018 Operational CBFO worker Sidewalks Tuguegarao City Clearing and DOLE Allacapan, Displaced 13 beautification of 45 24 205,400.00 50,150.00 155,250.00 SPF 2018 Operational CBFO Cagayan worker community roads Clearing and DOLE Claveria, Displaced 14 beautification of 36 26 165,180.00 40,980.00 124,200.00 SPF 2018 Operational CBFO Cagayan worker community roads De-clogging of canals, clearing/cleaning DOLE Pamplona, Displaced 15 of drainage, 16 6 70,595.00 15,395.00 55,200.00 SPF 2018 Operational CBFO Cagayan worker school, and community premises Cleaning/ Clearing DOLE Displaced 16 and beautification Lasam, Cagayan 55 38 237,600.00 47,850.00 189,750.00 SPF 2018 Operational CBFO worker of school premises Clearing and beautification of DOLE Ballesteros, Displaced 17 community road 19 11 87,955.00 22,405.00 65,550.00 SPF 2018 Operational CBFO Cagayan worker sides and coastal clean up Roadside clearing/ DOLE Displaced 18 cleaning and Abulug, Cagayan 5 0 21,875.00 4,625.00 17,250.00 SPF 2018 Operational CBFO worker beautification Roadside clearing/ DOLE Sta. Praxedes, Displaced 19 cleaning and 9 7 40,330.00 9,280.00 31,050.00 SPF 2018 Operational CBFO Cagayan worker beautification Cleaning/ Clearing and beautification DOLE Sto. Niño, Displaced 20 32 8 138,185.00 27,785.00 110,400.00 SPF 2018 Operational of community CBFO Cagayan worker premises Roadside clearing/ DOLE Displaced 21 cleaning and Piat, Cagayan 18 8 78,985.00 16,885.00 62,100.00 SPF 2018 Operational CBFO worker beautification Roadside clearing/ DOLE Displaced 22 cleaning and Rizal, Cagayan 29 22 126,615.00 26,565.00 100,050.00 SPF 2018 Operational CBFO worker beautification ISABELA Repair and maintenance and improvement of public facilities, Cleaning and LGU beautification of Angadanan, Disadvantage 23 Angadana 225 118 2,371,525.00 475,900.00 1,895,625.00 11/14/2018 SPF 2018 Operational barangay Roads/ Isabela d workers n hall, Municipal hall, Public market, Rehabilitation of farm to market roads Repair and maintenance and improvement of public facilities, Cleaning and LGU beautification of Angadanan, Disadvantage 24 Angadana 1127 488 11,876,915.00 2,381,940.00 9,494,975.00 11/14/2018 SPF 2018 Operational barangay Roads/ Isabela d workers n hall, Municipal hall, Public market, Rehabilitation of farm to market roads Clearing/ cleaning of canals, road shoulders, school Sta. Maria, Displaced 25 DOLE IFO 550 358 2,475,000.00 495,000.00 1,980,000.00 SPF 2018 Operational lots, municipal and Isabela worker barangay sites, tree planting Sweeping of Barangay roads, declogging of Sto. Tomas, Displaced 26 street canals, DOLE IFO 550 177 2,475,000.00 495,000.00 1,980,000.00 SPF 2018 Operational Isabela worker community cleaning and beautification Sweeping of Barangay roads, declogging of Delfin Albano, Displaced 27 street canals, DOLE IFO 550 308 2,475,000.00 495,000.00 1,980,000.00 SPF 2018 Operational Isabela worker community cleaning and beautification Debris clearing and cutting of trees, clearing/cleaning of the road shoulders, school Divilacan, Displaced 28 DOLE IFO 249 109 1,121,400.00 225,000.00 896,400.00 SPF 2018 Operational lots, municipal and Isabela worker barangay sites, water ways, tree planting and beautification Clearing/cleaning of the road shoulders, school San Pablo, Displaced 29 DOLE IFO 555 434 2,497,500.00 499,500.00 1,998,000.00 SPF 2018 Operational lots, municipal and Isabela worker barangay sites, tree planting Clearing/cleaning of the road shoulders, school Displaced 30 DOLE IFO Palanan, Isabela 100 79 450,000.00 90,000.00 360,000.00 SPF 2018 Operational lots, municipal and worker barangay sites, tree planting Clearing/cleaning of the road shoulders, school Cabagan, Displaced 31 DOLE IFO 550 381 2,475,000.00 495,000.00 1,980,000.00 SPF 2018 Operational lots, municipal and Isabela worker barangay sites, tree planting Clearing/cleaning of the road shoulders, school Ilagan City, Displaced 32 DOLE IFO 820 428 3,690,000.00 738,000.00 2,952,000.00 SPF 2018 Operational lots, municipal and Isabela worker barangay sites, tree planting Clearing/cleaning of the road shoulders, school Ilagan City, Displaced 33 DOLE IFO 880 686 3,960,000.00 792,000.00 3,168,000.00 SPF 2018 Operational lots, municipal and Isabela worker barangay sites, tree planting Clearing/cleaning of the road shoulders, school Maconacon, Displaced 34 DOLE IFO 200 124 900,000.00 180,000.00 720,000.00 SPF 2018 Operational lots, municipal and Isabela worker barangay sites, tree planting Sweeping of Barangay roads, declogging of Tumauini, Displaced 35 street canals, DOLE IFO 549 320 2,471,400.00 495,000.00 1,976,400.00 SPF 2018 Operational Isabela worker community cleaning and beautification NUEVA VIZCAYA Community cleaning excavation, clearing, and DOLE Sta. Fe, Nueva Displaced 36 299 174 1,378,860.00 290,500.00 1,088,360.00 SPF 2018 Operational cleaning, of NVFO Vizcaya worker drainage canals, clearing of roads and bridges Community cleaning excavation, clearing, and DOLE Diadi, Nueva Displaced 37 123 102 590,400.00 118,080.00 472,320.00 SPF 2018 Operational cleaning, of NVFO Vizcaya worker drainage canals, clearing of roads and bridges Declogging of canals, brushing DOLE Bambang, Nueva Displaced 38 10 7 91,750.00 21,750.00 70,000.00 SPF 2018 Operational and cleaning of NVFO Vizcaya worker road shoulder QUIRINO Weeding, cleaning, sweeping of Aglipay, barangay roads Cabarroguis, Displaced 39 and sheds, pruning DOLE QFO Diffun, Maddela, 600 322 2,781,000.00 561,000.00 2,220,000.00 SPF 2018 Operational worker trees and plants, Nagtipunan, de-clogging of Saguday street canals Weeding, cleaning, Aglipay, sweeping of Cabarroguis, barangay roads Displaced 40 DOLE QFO Diffun, Maddela, 172 90 1,526,600.00 305,400.00 1,221,200.00 SPF 2018 Operational and sheds, de- worker Nagtipunan, clogging of street Saguday canals BATANES DOLE Displaced 41 Cleaning/ Cleaning Uyugan, Batanes 40 22 516,950.00 105,500.00 411,450.00 SPF 2018 Operational CBFO Worker DOLE Sabtang, Displaced 42 Cleaning/ Cleaning 57 28 751,687.00 150,337.00 601,350.00 SPF 2018 Operational CBFO Batanes Worker DOLE Displaced 43 Cleaning/ Cleaning Itbayat, Batanes 77 62 1,015,437.50 203,087.50 812,350.00 SPF 2018 Operational CBFO Worker DOLE Mahatao, Displaced 44 Cleaning/ Cleaning 40 9 527,500.00 105,500.00 422,000.00 SPF
Recommended publications
  • Pdf | 308.16 Kb
    2. Damaged Infrastructure and Agriculture (Tab D) Total Estimated Cost of Damages PhP 411,239,802 Infrastructure PhP 29,213,821.00 Roads & Bridges 24,800,000.00 Transmission Lines 4,413,821.00 Agriculture 382,025,981.00 Crops 61,403,111.00 HVCC 5,060,950.00 Fisheries 313,871,920.00 Facilities 1,690,000.00 No report of damage on school buildings and health facilities as of this time. D. Emergency Incidents Monitored 1. Region II a) On or about 10:00 AM, 08 May 2009, one (1) ferry boat owned by Brgy Captain Nicanor Taguba of Gagabutan, Rizal, bound to Cambabangan, Rizal, Cagayan, to attend patronal fiesta with twelve (12) passengers on board, capsized while crossing the Matalad River. Nine (9) passengers survived while three (3) are still missing identified as Carmen Acasio Anguluan (48 yrs /old), Vladimir Acasio Anguluan (7 yrs /old) and Mac Dave Talay Calibuso (5 yrs/old), all from Gagabutan East Rizal, Cagayan. The 501st Infantry Division (ID) headed by Col. Remegio de Vera, PNP personnel and some volunteers from Rizal, Cagayan conducted search and rescue operations. b) In Nueva Vizcaya, 31 barangays were flooded: Solano (16), Bagabag (5), Bayombong (4), Bambang (4), in Dupax del Norte (1) and in Dupax del Sur (1). c) Barangays San Pedro and Manglad in Maddela, Quirino were isolated due to flooding. e) The low-lying areas of Brgys Mabini and Batal in Santiago City, 2 barangays in Dupax del Norte and 4 barangays in Bambang were rendered underwater with 20 families evacuated at Bgy Mabasa Elementary School.
    [Show full text]
  • Directory of Local Chief Executives and P/C/Mnaos Region 2
    Updated as of 12 January 2018 Directory of Local Chief Executives and P/C/MNAOs Region 2 Local Chief Executive PNAO/CNAO/MNAO Province of Cagayan GOVERNOR MANUEL N. MAMBA DR. CARLOS D. CORTINA III Provincial Capitol, Tuguegarao City Provincial Nutrition Action Officer Provincial Capitol, Cagayan 0917-587-8708 MAYOR EMMANUEL JESUS P. VARGAS MR. BRAULIO MANGUPAG Abulug, Cagayan Municipal Nutrition Action Officer 3517 862-1008/ 862-1002 0917-887-9992 [email protected] MAYOR CRISELDA I. ANTONIO MS. NORMA A. FENEQUITO Alcala, Cagayan Municipal Nutrition Action Officer 3506 824-8567 0917-895-4081 0917-393-4749 [email protected] MAYOR HARRY D. FLORIDA MS. FRANCES ANN SALUD Allacapan, Cagayan Municipal Nutrition Action Officer 3523 0918-391-0912 855-1006/ 855-1048/ 855-1033 [email protected] MAYOR NICANOR C. DE LEON MR. MARIO L. ABELLA Amulung, Cagayan Municipal Nutrition Action Officer 3505 0915-714-2757 824-8562 [email protected] MAYOR SHALIMAR D. TUMARU DR. MA. ROWENA B. GUZMAN Aparri, Cagayan Municipal Nutrition Action Officer 3515 0917-585-3471 822-8752/ 822-8694 [email protected] MAYOR LEONARDO PATTUNG MS. CLARA JAVIER Baggao, Cagayan Municipal Nutrition Action Officer 3506 0916-315-3832 824-8566/ 844-2186 [email protected] [email protected] MAYOR VICENTE G. UNITE DR. ARNOLD TALLA Ballesteros, Cagayan Municipal Nutrition Action Officer 3516 MAYOR LLOYD M. ANTIPORDA MS. MILDRED AGGASID Buguey, Cagayan Municipal Nutrition Action Officer 3511 MAYOR ALFONSO M. LLOPIS MS. MA. CLAIRE CAPA Calayan, Cagayan Municipal Nutrition Action Officer 3520 0920-560-8583 MAYOR ISIDRO T. CABADDU DR. DESIREE GRACIA BALAUITAN Camalaniugan, Cagayan MNAO 3510; 854-4904/ 854-2022/ 854-2051 Updated as of 12 January 2018 MAYOR CELIA T.
    [Show full text]
  • DEPARTMENT of LABOR and EMPLOYMENT Regional Office No
    DEPARTMENT OF LABOR AND EMPLOYMENT Regional Office No. 2 GOVERNMENT INTERNSHIP PROGRAM Province of Cagayan District No. : Dist. I to Dist. III OSEC-FMS Form No. 4 LIST OF BENEFICIARIES Name of Beneficiary Age Birthdate Sex Address Highest Date Started Office / Place Proponent No. Contact No. Surname First Name Middle Name (18-30) (M/F) Barangay Municipality Province Educational mm/dd/yyyy of Assignment (LGU/PG/NGA/P 1 ACENA JERWIN TOMAS 27 07/23/1988 M MISSION STA. TERESITA CAGAYAN TECH-VOC (FRONTApril OFFICE 18, SERVICES2016 - October NCII)09753780723 18, 2016 LGU STA. TERESITASTA. TERESITA 2 ACOSTA MARK ANTHONYTANTE 21 06/26/1994 M SAN ANTONIO STA. ANA CAGAYAN COLLEGE GRADUATEApril 25, 2016 - October09358415250 25,2016 LGU STA. ANA STA. ANA 3 ACOSTA AGNES M 21 10/12/1994 F CENTRO NORTEGATTARAN CAGAYAN COLLEGE GRADUATEMarch 7, 2016 - September09751485114 6, 2016 GATTARAN LGU TUAO 4 ADAMI LOVELY BIETRESE RUBIO 29 06/13/1986 F LUCBAN ABULUG CAGAYAN COLLEGE GRADUATEMarch 7, 2016 - September09267954553 6, 2016 ABULUG LGU TUAO 5 ADAY SHERYL GALANG 22 02/20/1993 F ANAGGUAN RIZAL CAGAYAN COLLEGE GRADUATEJanuary 1, 2016 - June09351323493 30,2016 NBI NBI 6 ADDUN HAZEL NARAG 28 09/21/1988 F LINAO EAST TUGUEGARAO CAGAYAN COLLEGE GRADUATEOct. 1, 2016 - December 31, 2016 TUGUEGARAO TUGUEGARAO 7 ADVIENTO LARRY CORDOVA 22 03/13/1994 M ABARIONGAN STO.NIÑO CAGAYAN HIGH SCHOOL GRADUATEFebruary 15, 2016 - May09068172530 15,2037 STO.NIÑO STO.NIÑO 8 AGAMANOS JANET MANZANO 23 06/29/1992 F CENTRO 1 STA. PRAXEDES CAGAYAN COLLEGE GRADUATEMarch 7, 2016 - September09058500614
    [Show full text]
  • World Bank Document
    Public Disclosure Authorized PHILIPPINES Participatory Irrigation Development Project (PO88926) Public Disclosure Authorized ABBREVIATED RESETTLEMENT ACTION PLAN Banurbur Creek IS, Region 2 Public Disclosure Authorized Public Disclosure Authorized Banurbur Creek IS, Region 2 To increase the irrigated area of the system it was proposed to utilize drainage water re - use and groundwater at strategic points. For these improvement works, ROW for canal system is to be negotiated with 26 farmers for a total area of 1.68 ha wherein 23 farmers donated a total area of 1.5588 ha. Farm - to -market roads will also be constructed to be used as service and operation roads, and for farmers use in transporting their produce. Hence, ROW will also be negotiated with 41 farmers for a total area of 1.3092 ha wherein 0.7512 ha was donated by 23 farmers. The total cost of ROW to be acquired thru deed of sale is estimated at P44,451.00 from 21 farmers (3 farmers for ,the construction of canal, and 18 farmers for the farm - to - market roads). Participatory Lnigation Development Project (PIDP) Banurbur Creek Lnigation System Maddalero, Buguey. Cagayan RIGHT OF-OF-WAY ACQUISITION The Banurbur Creek Irrigation System (BCIS) has a service area of 1,838 ha being cultivated by 1,538 farmers distributed within 14 Barangays in Buguey, Cagayan; 1 Barangay in Sta. Teresita, Cagayan; and, 2 Barangays in Lal-lo. Cagayan. The system has three sources of water, namely: Banurbur Creek, Papira Creek and Sicuan Creek. The Banurbur Creek has an Ogee Dam; while, Papira and Sicuan Creeks have intake type of structure.
    [Show full text]
  • Energy Regulatory Commission Decision
    ci Republic of the Philippines ENERGY REGULATORY COMMISSION San Miguel Avenue, Pasig City IN THE MATTER OF THE APPLICATION FOR THE FRANCHISING OF A CONSORTIUM TO OWN AND OPERATE SUBTRANSMISSION ASSETS AND ISSUANCE OF A CERTIFICATE OF PUBLIC CONVENIENCE AND NECESSITY (CPCN) ERC CASE NO. 201 2-002 MC CAGAYAN SUBTRANSMISSION COMPANY, INC. (CSl), Applicant. D 0 C K E T B B x------------------------ x Date: DECISION Before this Commission for resolution is the application filed on February 6, 2012 by Cagayan Subtransmission Company, Inc. (CSCI) for approval of the franchising of a consortium to own and operate subtransmission assets and issuance of a Certificate of Public Convenience and Necessity (CPCN). Having found the said application sufficient in form and in substance, with the required fees having been paid, an Order and a Notice of Public Hearing, both dated May 7, 2012, were issued setting the same for initial hearing on June 18, 2012. CSCI was directed to cause the publication of the Notice of Public Hearing, at its own expense, once (lx) in a newspaper of general circulation in the Philippines, at least ten (10) days before the scheduled date of initial hearing. It was also directed to inform the customers within its franchise area,by any other means available and appropriate, of the filing of the ins aht application, its reasons therefor and of the scheduled hearin,, ERC CASE NO. 2012-002 MC DECISION/April 15, 2013 Paae2ofll The Office of the Solicitor General (OSG), the Commission on Audit (COA) and the Committees on Energy of both Houses of Congress were furnished with copies of the Order and the Notice of Public Hearing and were requested to have their respective duly authorized representatives present at the aforesaid initial hearing.
    [Show full text]
  • Province, City, Municipality Total and Barangay Population BATANES
    2010 Census of Population and Housing Batanes Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population BATANES 16,604 BASCO (Capital) 7,907 Ihubok II (Kayvaluganan) 2,103 Ihubok I (Kaychanarianan) 1,665 San Antonio 1,772 San Joaquin 392 Chanarian 334 Kayhuvokan 1,641 ITBAYAT 2,988 Raele 442 San Rafael (Idiang) 789 Santa Lucia (Kauhauhasan) 478 Santa Maria (Marapuy) 438 Santa Rosa (Kaynatuan) 841 IVANA 1,249 Radiwan 368 Salagao 319 San Vicente (Igang) 230 Tuhel (Pob.) 332 MAHATAO 1,583 Hanib 372 Kaumbakan 483 Panatayan 416 Uvoy (Pob.) 312 SABTANG 1,637 Chavayan 169 Malakdang (Pob.) 245 Nakanmuan 134 Savidug 190 Sinakan (Pob.) 552 Sumnanga 347 National Statistics Office 1 2010 Census of Population and Housing Batanes Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population UYUGAN 1,240 Kayvaluganan (Pob.) 324 Imnajbu 159 Itbud 463 Kayuganan (Pob.) 294 National Statistics Office 2 2010 Census of Population and Housing Cagayan Total Population by Province, City, Municipality and Barangay: as of May 1, 2010 Province, City, Municipality Total and Barangay Population CAGAYAN 1,124,773 ABULUG 30,675 Alinunu 1,269 Bagu 1,774 Banguian 1,778 Calog Norte 934 Calog Sur 2,309 Canayun 1,328 Centro (Pob.) 2,400 Dana-Ili 1,201 Guiddam 3,084 Libertad 3,219 Lucban 2,646 Pinili 683 Santa Filomena 1,053 Santo Tomas 884 Siguiran 1,258 Simayung 1,321 Sirit 792 San Agustin 771 San Julian 627 Santa
    [Show full text]
  • DOTR Presentation FINAL
    1 Philippine Infrastructure Development Agenda Secretary Arthur P. Tugade Department of Transportation 2 WE ARE AN ARCHIPELAGO 3 Image from https://www.kisspng.com/png-philippines-map-stock-photography-philippines-730866/ No. of Islands: 7,107 Major Islands: 3 (Luzon, Visayas, & Mindanao) 4 Image from https://www.kisspng.com/png-philippines-map-stock-photography-philippines-730866/ TOTAL POPULATION: over 100 Million MANILA POPULATION DENSITY: 42,857 persons/sq.km Photo from: http://investvine.com/philippines-population-reach-107-million-year/philippines-population/ 5 20 years behind in infrastructure 6 PHILIPPINE GOVERNMENT SPENDING ON INFRASTRUCTURE UNTIL 2022 7 8 Dept. of Public Works and Highways (DPWH): Strategic Infrastructure Programs and Policies 9 Philippine High Standard Highway Network Program 1,044.6 kilometers PHP518.0bn (USD10.1bn) Davao High Standard Highway Network 86.1 kilometers PHP65.3bn (USD1.3bn ) Luzon Spine Expressway Network 884.7 kilometers PHP424.7bn (USD8.3bn) Cebu High Standard Highway Network 73.8 kilometers 10 10 PHP28.0bn (USD544.1mn) Luzon Spine Expressway Network • From 382 km to 1,267 km High Standard Highways in Luzon. Travel time from Ilocos to Bicol will be reduced from 19 hours and 40 minutes to 8 hours and 15 minutes. • 884.7 kilometers • PHP424.7bn (USD8.3bn) Cavite-Laguna Expressway Plaridel By-Pass Road Central Luzon Link Expressway, Phase I 11 Agri-Infrastructure Support Program A total of PHP 24.80 bn (USD 481.55mn) was released from 2016 to 2018 for the construction / Improvement of 2,269.51 kilometers of Farm to Market Roads and Farm to Mill Roads. 2,269.51 kilometers PHP24.80 Billion (£368.35 GBP ) 12 12 Mindanao Road Development Network Program • Construction / improvement of 2,600.7 km road network in Agusan Del Norte-Bukidnon Bdry.
    [Show full text]
  • 389 Families 3,266 Individuals 972 Families
    Super Typhoon Ompong (Mangkhut): WASH Cluster Update No. 1 October 2, 2018 On 15 September 2018, Typhoon Mangkhut locally known as Ompong, made landfall in Baggao, Cagayan at around 1:40 AM with maximum sustained winds of 205 kph near the center and gustiness of up to 285 kph with movement of 35 kph West Northwest (Philippine Atmospheric, Geophysical and Astronomical Services Administration). Based on official reports by government and non-government agencies, Typhoon Mangkhut affected around 1.4 million people across Regions I (Ilocos), II (Cagayan Valley), III (Central Luzon), and the Cordillera Autonomous Region (CAR). Key Assessment Findings: The WASH Cluster partners have conducted assessments from Day 1 and have since been responding to the emergency needs of the affected population through the leadership of the Department of Health (DOH). Some of the key assessment findings are: • Most of the affected population are using Level I and II water systems (handpumps and deep well). These systems were either heavily damaged, destroyed, or have temporarily become non-functional. Some water sources have not undergone bacteriological testing even before the typhoon. • Level III or piped water systems in some municipalities like Gattaran in Cagayan are dependent on electricity. Because there is no electricity in some areas, people are looking for other sources of water or buying bottled water (additional expense). • Out of the assessed areas, 12 municipalities have reported that houses were partially/totally damaged, along with their toilet facilities. People expressed their need for support in repairing toilet bowls, walls and roofing. • In Barangay Siniking in Rizal and some areas of Sto.Nino both in Cagayan, open defecation were observed.
    [Show full text]
  • L\Epublic of Tbe ~Bilippine1' ~Upreme Qcourt
    l\epublic of tbe ~bilippine1' ~upreme QCourt . :fflanila EN BANC OFFICE OF THE COURT A.M. No. P-14-3209 ADMINISTRATOR, Complainant, Present: SERENO, C.J., CARPIO,* VELASCO, JR., LEONARDO-DE CASTRO, - versus - BRION, PERALTA, BERSAMIN, DEL CASTILLO,* VILLARAMA, JR., PEREZ,* MENDOZA, REYES, PERLAS-BERNABE, LEONEN, and FREDELITO R. BALTAZAR, JARDELEZA, JJ. Clerk of Court II, Municipal Circuit Trial Court, Allacapan­ Promulgated: Lasam, Cagayan, Respondent. October 20, 2015 x- -------------------------------?1 h~ ~-x RESOLUTION PERCURIAM: Before us is the May 6, 2015 Evaluation, Report and Recommendation1 of the Office of the Court Administrator (OCA) finding Fredelito R. Baltazar, Clerk of Court II, Municipal Circuit Trial Court (MCTC), Allacapan-Lasam, Cagayan guilty of dishonesty and misconduct and recommending his suspension for one year. • On official leave. 1 Rollo, pp. 78-85. Signed by Court Administrator Jose Midas P. Marquez and Deputy Court Administrator Thelma C. Bahia. Resolution 2 A.M. No. P-14-3209 A financial audit was conducted by the audit team on the books of account of the MCTC, Allacapan-Lasam, Cagayan for the period covering January 1, 2005 to May 24, 2013. The audit was prompted by the request of the Financial Management Office (FMO) of the OCA due to Baltazar's failure to submit monthly financial reports despite the notices sent to him. In its Memorandum2 dated January 22, 2014, the audit team reported that there were cash shortages in the Fiduciary Fund (FF), Judiciary Development Fund (JDF), Special Allowance for the Judiciary Fund (SAJF), Mediation Fund (MF), and General Fund (GF) amounting to P72,376.80. It also noticed discrepancies in the collection and allocation of filing fees, tampering of official receipts, and unexplained withdrawals from the funds.
    [Show full text]
  • I. INTRODUCTION the Philippines Has So Many Ethnic and Minority
    Gilbert C. Magulod Jr., Ph.D.1, Janilete R. Cortez, MAEd2, Bernard P. Madarang, MAEd3 Cagayan State University at Lasam, Lasam, Cagayan, Philippines [email protected] This research investigated the ethnic intermarriage, community involvement, aspirations and concept of education among the Agays of Lasam, Cagayan, Philippines with the end goal of proposing interventions for the extension program of Cagayan State University at Lasam. It employed ethnographic and descriptive survey research designs. Using informal retrospective interview and photo documentation techniques to the eighteen Agay-informants located in the three communities of Lasam, Cagayan. Findings of the study indicate that majority of the Agats were intermarried to Ilocano lowlanders. They married at the church, and they had had permanent habitation with an average of four children. Most of them were unable to attain formal education. The intermarried phenomenon of the Agays is attributed to their migration and economic engagement with the Ilocano lowlanders and other ethnic groups. Engagement in farming and paid labor was their livelihood, revealing low-income standard of living. In like manner, intermarried Agays had a moderate level of community participation particularly in barangay assemblies, voting, and training sponsored by agencies. A good life for them was measured by the provision of basic needs of their families. They manifested a high regard for the value of education to improve their standard of living, mainly to their children's future. The result of the study may serve as a basis for proposing a model of community development approach to improve the life quality of indigenous peoples in the Philippine countryside.
    [Show full text]
  • Cagayan Ph.Pdf
    121°0' 121°10' 121°20' 121°30' 121°40' 121°50' 122°0' 122°10' 122°20' R E P U B L I C O F T H E P H I L I P P I N E S D E P A R T M E N T O F A G R I C U LT U R E BUREAU OF SOILS AND 19°30' WATER M ANAGEM ENT 19°30' Elliptical Road Cor. Visayas Ave., Diliman, Quezon City SOIL pH MAP ( Key Rice Areas ) PROVINCE OF CAGAYAN ° SCALE 1:200,000 0 2 4 6 8 10 12 14 16 18 20 Kilometers 19°20' Projection : Transverse Mercator Datum : Luzon 1911 19°20' DISCLAIMER : All political boundaries are not authoritative Calayan ! 19°10' 19°10' 19°0' 19°0' B a b u y a n C h a n n e l W E S T 18°50' P H I L I P P I N E 18°50' S E A 18°40' 18°40' Claveria Bay Claveria ! Pasaleng Bay Santa Praxedes ! Sanchez Mira ! 18°30' 18°30' Pamplona ! Santa Ana ! Abulug ! Province of Ilocos Norte Pasmacanan Bay Ballesteros ! Aparri ! 18°20' 18°20' Buguey ! Camalaniugan ! Gonzaga ! Santa Teresita ! Allacapan ! Lal-lo ! 18°10' 18°10' Province of Apayao LEGEND Tu bua n Bay Lasam ! Gattaran MAPPING pH Value GENERAL AREA ! DESCRIPTION UNIT (1:1 Ratio) RATING ha % Nearly Neutral 4 ,539 3.47 > 6.8 to Extremely Alkaline 14,279 10.93 Low - - or <4.5 Extremely Acid 18°0' - - 18°0' - - 4.6 - 5.0 Moderately Low Very Strongly Acid - - 16,012 12.26 5.1 - 5.5 Moderately High Strongly Acid 16,657 12.75 P H I L I P P I N E Moderately Acid 26,965 20.64 S E A 5.6 - 6.8 High to Slightly Acid 52,186 39.95 TOTAL 130,638 100.00 Paddy Irrigated Paddy Non-Irrigated Alcala ! AArreeaa e srteimfeartse dto b atsheed aonct fuiealdl asurervae ys,u ortvhery eindfo brmy atthioen ffireolmd DsuAr-RvFeOy'
    [Show full text]
  • Humanitarian Topographic Atlas (HTA) Is a Collection Are Available with 25 M
    121°0'0"E 121°5'0"E 121°10'0"E 121°15'0"E 121°20'0"E 121°25'0"E 121°30'0"E 121°35'0"E 121°40'0"E 121°45'0"E 121°50'0"E 121°55'0"E 122°0'0"E 122°5'0"E 122°10'0"E 122°15'0"E C 7 o 6 Y r N VALLE YAN n 7 CAGA " C e 8 0 A ' r A G 0 T M N 4 A " : G ° Y 0 e ' 8 A R c 0 1 N S n 4 e r V ° r e A 8 e f f 1 L e e L r r e E n S Y c R e G : M U A r e 6 n 4 r 6 o Baketbaket Point 6 C Lacaylacay Point Taggat r Claveria e v i 1 Puac Point R ;A 6 H 2 t N a 2 " 6 a H 0 ' A ; P 5 N 1 3 " ° 0 ' 8 5 1 3 ° 8 Santa 1 Praxedes Sanchez-Mira 261 v e r r R i d i c a Palaui Island ad C Punta Verde r e Ri v Bangan n o Pilig r a b N " g Pozo Robo a a Bidduang 0 ' N 0 N 3 " ° 0 ' 8 0 1 Lubac 3 ° 8 1 429 C M AG A A Pamplona YA N V P A LL Santa Ana C E R Bagu Y E Abulug A T E D N B " 0 Y ' 5 N G 2 C 513 " ° O 0 I ' 8 R S 5 1 D 2 IL C Santa Cruz U L A ° N E G 414 8 R Ballesteros 1 A A I A YA T D N O M V IN A F I L ST LE T R Y H A Bulala Sur Bulala Norte T 1 E IV ; E A E R H Linao M E 2 G 6 E IO R N Punta G Cagayan Navagan Aparri E Payagan East River N Bisagu C N " Y 0 ' P 0 Gaddang 779 N 2 R Dodan " ° 0 Tallungan E ' 8 P 0 1 Luna Sanja 2 Binalan A ° Paddaya R Caagaman 8 1 E Toran D Bukig N E Plaza Paruddun Norte S S 908 659 A Bangag Catotoran N 3 Backiling Paraddun Sur D 2 Santa Marcela 2 Mabanguc S Buguey Minanga, U P Camalaniugan Gonzaga P Matucay Tubel Baggao O Buguey Lagoon R N " Bulala T 0 l ' a R 5 Calanasan Gonzaga N E 1 n " a ° C S 0 ' 8 P 5 1 n Santa 1 O ° o N Pudtol Teresita Wella Pascual Farm 8 i r i g a t a n a Daan-Ili 1 t r i C l Pacac Palagao Norte S a I o n g E i r D r I I Allacapan V 1375 I S Consuelo I Flora CAGAYAN 1160 1130 O N .
    [Show full text]