REDEVELOPMENT FACTSHEET APRIL 2021

Introductions School Introduction

Thank you for taking the time to read this Our school community is incredibly information factsheet regarding the proposed “excited about the announcement that redevelopment of Kineton High School it will be one of the first schools in the country to benefit from a rebuild. Initial ( Rd, Kineton CV35 0JX). planning meetings have indicated that a purpose-built school that provides Kineton High School was announced as one of fifty first class facilities, for example ICT; Helen Bridge schools to receive funding under the Government’s sport and enhanced dining spaces Headteacher School Rebuilding Programme (SRP) in February 2021. will serve to provide current and The SRP will undertake major rebuilding and refurbishment future generations of students with the projects, with school buildings prioritised according to excellent learning environment they their condition. Details of the first fifty schools selected deserve. The buildings and landscaping for the rebuilding programme are available here as well will almost certainly complement the as the detailed government press release here. existing site and its surroundings. I’m personally delighted that the design Laing O’Rourke has been selected as the contractor to teams will ensure that the final project deliver the school and with the wider design team in has environmental sustainability at consultation with the school and Department for Education its heart.” (DfE) is currently in the process of preparing a planning application for the proposed scheme, and the purpose of This rebuild is long overdue and this factsheet is to clearly set out our proposals in advance “represents a huge leap in the Kineton of the planning application being submitted to Stratford- High School facilities available to its on-Avon District Council. We trust that you find this to be pupils, staff and wider community. informative and we very much hope that you will welcome Furthermore, due to its inherent design and support the proposals. features and layout, it will enhance learning and provide a vibrant atmosphere and a ‘feel-good’ factor for everyone when on site. This really Mark Davis |is a good news story; it is a stepping- Chair of stone to the future good health of the Governors school and is fully supported by the Governing Board.” KINETON HIGH SCHOOL REDEVELOPMENT FACTSHEET APRIL 2021 • 2

Our proposals INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE COPYRIGHT OF DLA ARCHITECTURE LTD AND IS We will be seeking full planning permission Education at Kineton High School will continue NOT TO BE REPRODUCED WITHOUT PERMISSION from Stratford-on-Avon District Council to uninterrupted while we complete the redevelopment. DO NOT SCALE, REFER TO FIGURED DIMENSIONS ONLY REVISIONS demolish the existing Kineton High School A new car park and coach drop off area will be created P01 09/03/21 PSL LM THIS DRAWING REPLACES SK0001 buildings, with the exception of the existing at the front of the site, significantly improving existing FIRST ISSUE - FOR COMMENT P02 29/03/21 PSL LM parking provision in both capacity and ease of operation. Science Block, and replace them with a brand LPG TANKS INDICATED P03 08/04/21 PSL LM The new car park will comprise 92 spaces and 14 coach PV ARRANGEMENT ADDED AND SERVICE AREA REVISED new three storey teaching block and sports drop off/waiting bays. New dedicated cycle parking is

hall. The existing outdoor swimming pool also proposed to further encourage sustainable travel. will also be demolished as part of the There will be new hard and soft landscaping throughout proposed scheme. the site, including the creation of a new hard surface play area and the retention and slight relocation of the existing The School Rebuilding Programme will not be expanding rugby pitch. the school and the proposals do not include an uplift in Indicative existing pupil or staff numbers. sports pitches The existing access to the school off Banbury Road will be maintained as part of the proposals.

INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE COPYRIGHT OF DLA ARCHITECTURE LTD AND IS NOT TO BE REPRODUCED WITHOUT PERMISSION

DO NOT SCALE, REFER TO FIGURED DIMENSIONS ONLY

REVISIONS P01 09/03/21 PSL LM THIS DRAWING REPLACES SK0001 Indicative existing FIRST ISSUE - FOR COMMENT P02 29/03/21 PSL LM sports pitches LPG TANKS INDICATED P03 08/04/21 PSL LM

PV ARRANGEMENT ADDED AND SERVICE AREA REVISED

Exg 4G floodlit outdoor sports Indicative existing sports pitches

Indicative existing sports pitches

Exg 4G floodlit outdoor sports

Relocated rugby pitch Relocated rugby pitch Existing hard Existing hard Sports Parking Schedule Sports outdoor PE Parking Schedule outdoor PE pitch pitch access Car spaces = 99 new car parking spaces Outdoor dining includes access Sports 5 No disabled bays (≈ 5%) pitch Car spaces = 99 new car parking spaces Retaining wall 6 No EVCP BAYS (≈ 5%) PV's on access Outdoor dining frame 5 No future EVCP BAYS (≈ 5%) includes 1 No caretaker parking space Sports New 1 No parking bay in service area delivery 5 No disabled bays (≈ 5%) New School Building New Sports Hall pitch area Note 2 No mini-bus parking and 2 No accessible bays to be 5 No Accessible 6 No EVCP providedBAYS in lieu (≈ of existing5%) spaces Retaining wall parking PV's on access 10 No Pupil entrance Refuse cycle 5 No Drop-offfuture =EVCP 14 No coach BAYS spaces (≈ 5%) frame parking = 3 No taxi spaces Main PV's on Relocated 1 No caretaker parking space entrance frame Existing building memorial Cycles = 10 sheltered spaces 'Micro forest' garden to remain New delivery planting New 2 No Accessible parking 1 No parking bay in service area access road Site boundary / School demise delivery Indicative SW (1 No EVCP) New School Building New Sports Hall attenuation features 2 No Mini Bus parking area Note 2Refer No to DLA mini-bus Drawings parking and 2 No accessible bays to be 5 No Accessible New LPG tanks DRAFT provided900002 infor Proposedlieu of Levels existing spaces parking Caretakers New illuminated 900013 to 900017 large scale Proposed Level plans FOR COMMENT Pupil access parking 3G outdoor PE 10 No bay and container 900003 for External Works cycle entrance storage area New EVCP bays 900004 for BB103 areas Refuse Drop-off = 14 No900005 coach for Access andspaces Security Schematic parking 900006 for Fencing = 3 No900007 taxi for Delivery spaces Access PV's on New car park and 900008 for Fire Tender Access Main bus drop-off area 900009 for Existing Site Plan 1 of 2 Relocated New taxi frame 900010 for Existing Site Plan 2 of 2 memorial entrance Existing building drop-off A R C H I T E C T U R E area Cycles = 10 sheltered900011 for Existing spacesTree removal 'Micro forest' garden to remain New sub 900018 for New Works extent 55 St Pauls Street | Leeds | LS1 2TE station and 900019 for Urban Green factor proposals 0113 887 3100 New delivery meter planting www.dla-architecture.co.uk 2 No Accessible parkingenclosure 900020 for Relocated Rugby Pitch Levels access road Site boundary / School demise Indicative SW (1 No EVCP) PROJECT attenuation features 2 No Mini Bus parking KINETON HIGH SCHOOL KINETON Existing site access TITLE Refer to DLA Drawings SITE PLAN New LPG tanks DRAFT B A N B U R Y R O A D 900002 for Proposed Levels SCALE DATE Existing site 1:1000 @A1 09/03/21 Caretakers New illuminated access - Out FOR COMMENT 900013 to 900017 large scale ProposedSITE LevelPLAN PROPOSALS plans BASED ON TOPOGRAPHICAL SURVEY BY access parking DLA REF DRAWN REVIEWED 3G outdoor PE MALCOLM HUGHES (DRAWING 56116 - SEPT 2020) bay and container 900003 for External Works 2021-010 PSL LM

New EVCP bays 0 10 20 30 40 60 80 100 120 storage area 900004 for BB103 areas PROJECT ORIGIN'R ZONE LEVEL TYPE ROLE NUMBER 900005 for Access and Security Schematic SRP1009 DLA Z3 00 GA L 900001 Note: This is a colour drawing, in order to ensure STATUS REVISION 900006 for Fencing any subsequent reproduction is viewed correctly it is to be re-printed in full colour S3 P03 900007 for Delivery Access T:\2021\2021-010\CAD\05-Autocad\Dwgs\900001.dwg New car park and 900008 for Fire Tender Access bus drop-off area 900009 for Existing Site Plan 1 of 2 New taxi Redevelopment of the existing site presents the school with the opportunity to further realise its aspirations and deliver its drop-off 900010 for Existing Site Plan 2 of 2 A R C H I T E C T U R E area educational model in a rich and forward-thinking learning environment.900011 for Existing Tree removal New sub 900018 for New Works extent 55 St Pauls Street | Leeds | LS1 2TE station and 900019 for Urban Green factor proposals 0113 887 3100 meter www.dla-architecture.co.uk enclosure 900020 for Relocated Rugby Pitch Levels

PROJECT KINETON HIGH SCHOOL KINETON Existing site access TITLE SITE PLAN

B A N B U R Y R O A D SCALE DATE Existing site @ access - Out 1:1000 A1 09/03/21 SITE PLAN PROPOSALS BASED ON TOPOGRAPHICAL SURVEY BY DLA REF DRAWN REVIEWED MALCOLM HUGHES (DRAWING 56116 - SEPT 2020) 2021-010 PSL LM 0 10 20 30 40 60 80 100 120 PROJECT ORIGIN'R ZONE LEVEL TYPE ROLE NUMBER SRP1009 DLA Z3 00 GA L 900001 Note: This is a colour drawing, in order to ensure STATUS REVISION any subsequent reproduction is viewed correctly it is to be re-printed in full colour S3 P03 T:\2021\2021-010\CAD\05-Autocad\Dwgs\900001.dwg KINETON HIGH SCHOOL REDEVELOPMENT FACTSHEET APRIL 2021 • 3

Your questions answered .

Why will the number of pupils not increase as a result of I live near to the school, am I going to be affected by the the proposed works? new school building? The new school building is being designed for the At its closest point, the new building will be 30m from current Published Admission Number (PAN) of 1,100 pupils. the rear gardens of Shortacres. As well as being a long The Local Education Authority has advised that expansion way from the boundary, careful thought has gone into is not required at this stage. The School Rebuilding designing the building to minimise the potential for Programme is a condition-based programme. overlooking, loss of privacy or loss of daylight/sunlight. As a result of the development, the school buildings will However, in any event, the new building is designed in a be located further away from properties on Banbury Road way to allow future expansion if, and when, required. than they currently are. Construction activities will also be carefully managed to minimise any potential disruption Why has Kineton High School been selected as one of the through a comprehensive construction management plan. fifty schools to receive funding under the Government’s School Rebuilding Programme (SRP)? Will I still be able to use the community facilities at the The Department for Education has prioritised schools school? for the first 50 projects based on the condition of Yes. The playing fields, Astro pitch and sports facilities their buildings. Details about the programme can are currently well used by the school and the local be found here. community, and this will continue as part of the proposed development. Will there be any additional parking as part of the proposed development? The local community will also be able to make use of the brand-new sports hall upon completion. Yes, a new car park will be created which will comprise 99 car park spaces, including 7 new accessible bays Access to the community facilities will also continue as together with two minibus parking bays, in line with local unhindered as possible during the construction works. planning policy. How will the school be constructed? Will you be improving the existing coach pick up/drop off arrangements? The project is being funded under the Government’s Modern Methods of Construction (MMC) Framework, Yes, as part of our proposals, we will be creating a new which uses pre-engineered building unit modules coach drop off area which will comprise of 14 (5 existing) manufactured off site in factory conditions. The modules coach drop off/waiting bays. This is additional to the will be delivered to site and assembled to form the proposed car parking outlined above. building. Compared to a traditional build, this means the construction period is shorter, reducing disruption on site This will significantly improve the current situation at drop and to the local community, and that the build quality is off and pick up times. improved. It is highly energy efficient, using up to 67% less energy than a traditional build. Why are you demolishing the outdoor swimming pool? The pool is in a poor condition and is only used by the The facades of the building will be formed using school for 3 months of the year, and it is not open for reconstituted stone facade panels which provide community use. Over the years the pool has become an excellent thermal performance and a robust, durable inefficient resource for the school to use and operate. finish. Coloured panels will also be used within the fenestration / window design. The colours have been Whilst the swimming pool will be demolished, the carefully selected to tie in with the proposed palette of development will deliver a brand-new sports hall, Multi- materials and complement the overall appearance. Use Games Area (MUGA), activity studio and associated changing and other facilities, which will all be available What sustainability features are proposed as part of the for community use. development? The new building has been designed to achieve net zero I can see you are building the new school on part of the carbon in operation, which means that the amount of existing rugby pitch. carbon emissions associated with the buildings’ usage will Yes, the new sports hall has to be sited on a small part of equal zero or negative. the existing rugby pitch. However, this will be retained and relocated as part of our proposals. In this case photovoltaic solar panels will be introduced on the buildings and potentially on landscape canopies elsewhere on site to maximise provision and sustainable performance.

The new building has also been designed to BREEAM ‘Very Good’ standards, offering numerous sustainability benefits, designed into the fabric of the building. KINETON HIGH SCHOOL REDEVELOPMENT FACTSHEET APRIL 2021 • 4

What will be the impact during construction? Next steps The first phase of development will see the construction of the sports hall, followed by the new teaching block We are in the process of preparing a planning (phase 2), prior to the demolition of the existing school application and this information is part of buildings and completion of the landscaping works in their that process. place (phase 3). This will ensure that all pupils and staff can remain on site during the build and there will be no A range of assessments and reports on matters such as need for temporary accommodation on site. ecology, flooding, highways and landscape will further help shape our proposals. A detailed construction method statement will be submitted as part of the planning application to provide a better Once a planning application has been submitted you will understanding of the extent of the construction site and also be able to make further representations to Stratford- how the site will operate during the construction phases. on-Avon District Council, who will take these into account before making their decision on the planning application. It is important to note that the construction team will arrange letter drops and provide further information well in advance of any work starting on site. Health and safety Contact is a top priority, and the development will be registered under the Considerate Constructors Scheme. If you have any outstanding questions or concerns that we’ve been unable to answer as part of this factsheet, Will there be any disruption to pupils during exam please feel free to contact us by email: periods once construction commences? [email protected]

The school has provided Laing O’Rourke with their Given current Covid-19 restrictions, emailed responses end of year examination timetable, which has been are preferred. If, however, this is not possible hard incorporated into the detailed construction programme for copy correspondence can be hand delivered or posted the works. During these agreed periods Laing O’Rourke to the school (address below), and passed on to the will undertake a cessation of noisy works to enable project team: examinations to complete as agreed with the school. Laing O’Rourke The school and Laing O’Rourke will continue to liaise closely c/o Kineton High School throughout construction increasing to daily during the Banbury Rd, examination period to ensure students are provided with Kineton the appropriate environment to undertake their exams. CV35 0JX Will pupils get any learning benefits during construction? Yes. Laing O’Rourke will work closely with the school to provide learning opportunities arising from having a construction site at the school. This is an excellent opportunity for students to learn about the construction industry and the many varied roles available within it and in particular, broaden learning around sustainability and net zero carbon buildings.

How long will the build take? If we are successful at the planning application stage, and planning permission is granted by Stratford-on-Avon District Council, construction is programmed to commence in Autumn 2021.

It is anticipated that the sports hall (phase 1) will be completed Summer 2022 with the main teaching block (phase 2) completed Autumn 2023. Final demolition and completion of all external areas is anticipated for Summer 2024.