Community Planning & Development General Application Checklist

Landmark Preservation 5/19/15 Design Review General Application Checklist Design review is a collaborative process used to examine projects in designated historic areas or properties for architectural design and compatibility with - scribes or studies the proposal. To comply with the required submittal standards of Denver Landmark Preservation, submitted documentation shall clearly illustrate the existing conditions as well as any proposed alteration(s).

Submit this form, completed, with the required submittal documentation

Project Address:

The following is REQUIRED: 1. Complete Application for Design Review

2. Plans / drawings / sketches that adequately depict the project

3. Details and materials of the project

4. Color photos of existing conditions

Review is based on a comparison of the proposal and the Secretary of the Interior’s Standards, Design Guidelines for Landmark Structures and Districts, Landmark Preservation Ordinance; Chapter 30 Revised Municipal Code building or zoning review. Please submit plans to those agencies for comment.

Please note: If the proposal includes demolition of an existing structure a separate demolition application will need to be approved.

Additional documentation may be required to adequately depict the project and its impact on a historic property or historic district.

LEGAL DISCLAIMER: This Advisory should not be used as a substitute for codes and regulations. The applicant is responsible for compliance with all code, guideline and/or rule requirements, whether or not described in this Advisory.

201 W. Colfax Ave., Dept. 205 Denver, CO 80202 720.865.2709 or [email protected] Community Planning & Development Application

Landmark Preservation LANDMARK CERTIFICATE OF APPROPRIATENESS – Application 3/15/16 Design review for this project will not begin until a complete application and required submittal materials are received. Landmark Preservation reserves the right to delay consideration and/or action on a submittal in the event that information is missing and/or changed at the time of the scheduled de- sign review or public hearing. Please use the appropriate project checklist for guidance. A pre-application review is required first for certain projects.

SUBJECT PROPERTY INFORMATION Property Address

Property Type/Use q 1 or 2 Unit Building (Single Family Home, Duplex) Historic District q Commercial q Multi-Unit Residential q Other

Applicant Name: Street: Company: City: Phone: Zip: Email ITEMIZED LISTING OF PROPOSED WORK ITEMS - only listed items will be reviewed: [Example: Replace roof shingles, Construct 2-car detached garage, etc.] Only work listed below will be considered.

q q

q q q q

Materials of work: (Example: Type of window materials, siding, roofing, etc.) q

q

q

Amount of demolition of original features/materials q feet APPLICATIONS ARE NOT CONSIDERED COMPLETE UNTIL ALL INFORMATION REQUIRED ON THE APPROPRIATE SUBMITTAL CHECKLIST IS SUBMITTED I attest that no additional exterior work or window work will occur under this application (sign, and print application).

Design Review Deadline: The filing deadline is 4 weeks prior to scheduled Landmark Preservation Commission (LPC) meetings, and 23 days (3 weeks and 2 days) prior to the first Thursdayof  each month for the Lower Downtown Design Review Board (LDDRB). A complete application, including full supporting documentation, is due in the Landmark Preservation office by 12:00pm (noon) on the filing deadline. Landmark staff will determine whether LPC or LDDRB review is required based on adopted design guidelines. Staff will contact the applicant regarding staff comments, meeting dates (if applicable) and any additional materials that may be required. To submit electronically: Email this form and supporting materials to [email protected]. Electronic submission should include two attachments: one pdf with the completed form (“yourname-app.pdf”) and one pdf that combines all supporting materials (“yourname-app-materials.pdf”). File size should not exceed 25MB combined. Contact us if you are having trouble with your electronic submission. To submit in person: Submit this form and supporting materials to the Records Counter weekdays between 7:30am and 4:30pm on the 2nd floor of the Webb Munici- pal Building, 201 W. Colfax Ave.

All submittals become the property of the City & County of Denver. Submittals are open records. Submittals will be posted online or made available to any party that requests a copy. 201 W. Colfax Ave., Dept. 205 Denver, CO 80202 720.865.2709 or [email protected] CITY AND COUNTY OF DENVER WOODBURY LIBRARY 3265 N FEDERAL BLVD, DENVER, CO 80211-3211

2018 INTERNATIONAL BUILDING CODE + 2019 DENVER AMENDMENTS

ISSUE DATE: 02.01.2021 100% CD ISSUED FOR LANDMARK REVIEW GENERAL NOTES: ARCHITECTURAL SYMBOLS: DEMOLITION LEGEND: PROJECT INFORMATION: fax: 303.531.4998 1. ALL WORK TO BE PERFORMED IN STRICT COMPLIANCE WITH OSHA OWNER:

AND CONSTRUCTION STANDARDS AND COMPLIANCE WITH ALL phone: 303.531.4990 LOCAL LAWS, ORDINANCES, RULES AND REGULATIONS OF THE CITY AND COUNTY OF DENVER BUILDING SECTION INDICATES DEMOLISHED WALL. DEMOLITION TO GOVERNMENT AUTHORITIES HAVING JURISDICTION. 1 INCLUDE ALL STUDS, TYP. BD. & FINISHES, MECHANICAL, 2. THE WORD "CONTRACTOR" AS USED HEREIN SHALL MEAN THE REFERENCE lakewood, colorado 80215 A4.01 PLUMBING AND ELECTRICAL DEVICES, BLOCKING AND 201 WEST COLFAX AVENUE GENERAL CONTRACTOR, SUBCONTRACTORS AND ALL PERSONS MISCELLANEOUS ACCESSORIES. REFER TO www.theabogroup.com DIRECTLY OR INDIRECTLY EMPLOYED BY ANY OF THEM. DENVER, CO. 80202 MECHANICAL, PLUMBING AND ELECTRICAL DRAWINGS © 2014 The Abo Group, Inc. 12600 west colfax avenue, c210 CONTRACTOR TO COORDINATE WORK OF ALL TRADES FOR MORE DETAILS. NECESSARY TO COMPLETE THE WORK. WALL SECTION PAUL SOBIECH, PE 3. CONTRACTOR FOR THE PROJECT SHALL BE RESPONSIBLE FOR 1 REFERENCE INDICATES DEMOLISHED DOOR. DEMOLITION TO OBTAINING ALL REQUIRED BUILDING PERMITS AND PAYING ALL A4.01 [email protected] FEES. INCLUDE DOOR PANEL, FRAME, SIDE LIGHT, HARDWARE 4. THE GENERAL CONTRACTOR SHALL FIELD VERIFY ALL EXISTING AND ALL ASSOCIATED FASTENERS AND ACCESSORIES. 720.913.4528 CONDITIONS AND FAMILIARIZE THEMSELVES WITH REQUIREMENTS WALL SECTION 1 OF ALL NEW WORK AND DIMENSIONS PRIOR TO BIDDING. THE REFERENCE 303.995.1847 DIMENSIONS ON THE DRAWINGS ARE BASED ON EXISTING A101 DOCUMENTS. THE GENERAL CONTRACTOR SHALL NOTIFY THE ARCHITECT OF ANY CONDITIONS OR DISCREPANCIES ADVERSELY AFFECTING THE DESIGN INSTALLATION PRIOR TO PROCEEDING X WITH THE WORK (INCLUDING CONFLICTS WITH MECHANICAL ARCHITECT: DUCTS, STRUCTURE, PIPING, CONDUIT RUNS, MECHANICAL UNITS, INTERIOR ELEVATION

X EXISTING WALLS AND DOORS TO REMAIN LIGHT FIXTURES, ETC.), WHETHER EXISTING AND/OR NEW. REFERENCE X A7.01 THE ABO GROUP, INC. 5. ANY MISCELLANEOUS ITEMS OR MATERIALS NOT SPECIFICALLY NOTED, BUT REQUIRED FOR THE PROPER EXECUTION, 12600 WEST COLFAX AVENUE INSTALLATION, OR PERFORMANCE OF THE WORK, SHALL BE X PROVIDED BY THE GENERAL CONTRACTOR / SUBCONTRACTORS. X SUITE C-210 6. DO NOT SCALE THE DRAWINGS. WRITTEN DIMENSIONS GOVERN. LARGE SCALE DETAILS GOVERN OVER SMALL SCALE. DIMENSIONS EXTERIOR ELEVATION LAKEWOOD, CO. 80215 SHOWN ARE TO FINISH FACE OF WALLS (UNLESS NOTED REFERENCE A3.01 DEMOLITION AREA OTHERWISE). IF CRITICAL DIMENSIONS DO NOT APPEAR ON 720.214.7806 CONSTRUCTION DOCUMENTS, NOTIFY THE GENERAL CONTRACTOR WHO WILL NOTIFY THE ARCHITECT. JACK BRINKLEY, NCARB 7. "TYPICAL" AS USED IN THESE DOCUMENTS SHALL MEAN THAT THE 6' - 0" CONDITION IS THE SAME OR REPRESENTATIVE FOR ALL SIMILAR [email protected] CONDITIONS, UNLESS NOTED OTHERWISE. ACTUAL CONDITIONS DIMENSION LINE MAY VARY, BUT DO NOT REVOKE THE INTENT OF THE CONFIGURATION INDICATED. DETAILS ARE USUALLY KEYED AND NOTED "TYPICAL" ONLY ONCE WHEN THEY FIRST OCCUR AND ARE 100'-0" NOMINAL ROOFING CONSULTANT: REPRESENTATIVE FOR ALL SIMILAR CONDITIONS THROUGHOUT, (RELATIVE TO LEVEL 0) UNLESS NOTED OTHERWISE. SPOT 8. CONTRACTOR SHALL PERFORM HIGH QUALITY PROFESSIONAL ELEVATION ROOFTECH CONSULTANTS, INC. WORK. MATERIALS TO BE UNIFORM AND AN ACCURATE FIT SO 14828 W. 6TH AVENUE THEY MEET WITH NEAT & STRAIGHT LINES, FREE OF SMEARS AND NOTE AND LEADER TO MATCH (E) OVERLAPS. INSTALL EXPOSED MATERIALS LEVEL, PLUMB AND AT ACCURATE RIGHT ANGLES. UNIT B-8 9. CONTRACTOR SHALL ARRANGE TO ACCOMMODATE ALL "NOT IN 1 GOLDEN, COLORADO 80401 CONTRACT (N.I.C.) WORK" WHEN INFORMATION IS INADEQUATE. A6.01 REQUEST FURTHER INSTRUCTIONS BEFORE PROCEEDING. DETAIL CALLOUT 10. NEW WORK THAT ADJOINS EXISTING SURFACES SHALL BE FLUSH, EXISTING WALLS AND DOORS 303.233.1092 TRUE, PLUMB AND/OR IN SAME AS THE EXISTING WORK AND FINISHED TO BLEND AND MATCH IN EVERY WAY WITH ADJACENT RON SCOTT SURFACES. PATCHES AND JOINTS A MINIMUM OF 24" WIDE TO BLEND AND FINISH INVISIBLY. [email protected] 11. WHERE EXISTING WORK IS TO REMAIN, PATCH AND REPAIR AS REQUIRED, SO THAT ALL PATCHED AREAS ARE NOT 2308B DISTINGUISHABLE. PATCH ALL EXISTING FLOORS, WALLS, DOOR TAG CEILINGS AND ROOFS AS REQUIRED TO MATCH EXISTING MATERIALS AND FINISHES WHERE DISTURBED BY CONSTRUCTION. DRAWING INDEX: 12. PROVIDE ELECTROLYTIC PROTECTION/ISOLATION BETWEEN ALL PROVIDE WALLS AND DOORS GENERAL DISSIMILAR METALS, WHERE THEY OCCUR TO PREVENT CENTERLINE G 0.0 COVER PAGE ROOFING ELECTROLYTIC REACTION AND/OR CORROSION. Occupancy 13. ANY FINISH INDICATED FOR A PARTICULAR INTERIOR WALL MEANS Room name G 0.1 PROJECT INFORMATION/SHEET INDEX R 1.0 ROOF PLAN THAT THE ENTIRE UNINTERRUPTED LENGTH OR SURFACE OF THE ROOM TAG WALL IS TO BE FINISHED AS INDICATED, UNLESS SHOWN OR R 2.0 ROOF DETAILS NOTED OTHERWISE. Room name ARCHITECTURAL 14. THE GENERAL CONTRACTOR/SUBCONTRACTORS SHALL PROVIDE AREA TAG ADEQUATE BLOCKING, BACKING OR STRUCTURAL SUPPORT AS 150 SF A 1.0 SITE REQUIRED FOR PROPER INSTALLATION OF ALL MOUNTED ASSEMBLIES, INCLUDING ALL ATTACHED EQUIPMENT (OWNER AND 8'-6" A 1.1 SITE - EAST CONTRACTOR FURNISHED ITEMS). NOTE: ALL FRAMING OR CEILING TAG (RELATIVE TO FLOOR) A 1.2 SITE - NORTH CONCEALED BLOCKING SHALL BE METAL OR NON SCOPE OF WORK: COMBUSTIBLE/FIRE RETARDANT . A 1.3 SITE - WEST 15. THE GENERAL CONTRACTOR/SUBCONTRACTORS SHALL TAKE ELEVATION LABEL A 1.4 SITE - SOUTH CARE TO PROTECT ALL NEWLY INSTALLED MATERIALS AND BASE: SCOPE OF WORK FOR THIS PROJECT CONSISTS OF ROOF WORK, FINISHES UNTIL WORK IS FORMALLY ACCEPTED BY THE ARCHITECT INCLUDING GUTTER REPLACEMENT, SOFFIT AND CHIMNEY REPAIR, A 2.0 EAST ELEVATION AND OWNER. W0 AND PRESERVATION OF HISTORIC WINDOWS AS DESCRIBED IN THESE A 2.1 EAST ELEVATION 16. THE CONSTRUCTION SITE IS TO BE KEPT CLEAN AND FREE OF WALL TAG DOCUMENTS. DEBRIS. THE GENERAL CONTRACTOR/SUBCONTRACTORS ARE A 2.2 NORTH ELEVATION RESPONSIBLE FOR ALL PHASES OF SECURING, HANDLING, ADD ALTERNATE: ALL OTHER WORK INCLUDING REPAIR/REPLACEMENT TRANSPORTING AND DISPOSING OF DEBRIS. CONTRACTOR IS TO BB A 2.3 WEST ELEVATION WINDOW TAG OF CONCRETE SIDEWALK, STEPS AND BENCHES, REPOINTUING OF REVIEW DISPOSAL OF DEBRIS WITH PROPERTY MANAGEMENT. BRICK, REPLACEMENT OF DAMAGED LIGHT FIXTURES, REPLACEMENT A 2.4 SOUTH ELEVATION 17. ANY WORK PERFORMED IN SCOPE THAT AFFECTS AREAS OUTSIDE OF RAILING AT STAIRWELL, PAINTING OF RAILING, EXTENSIVE CITY AND COUNTY OF DENVER WOODBURY LIBRARY CO 80211-3211 DENVER, 3265 N FEDERAL BLVD, OF SCOPE NEEDS TO BE COORDINATED SUCH AS AREAS OUTSIDE A 3.0 WINDOW SCHEDULE CLEANING ADDITION OF SIDEWALK CHASE AS DESCRIBED IN THESE OF SCOPE ARE UNINTERRUPTED. IF SERVICE INTERRUPTION A 3.1 DETAILS CANNOT BE AVOIDED GC TO COORDINATE WITH OWNER THREE NORTH ARROW DOCUMENTS. DAYS PRIOR TO SERVICE INTERRUPTION. 18. CONTRACTOR RESPONSIBLE FOR PROTECTION OF ALL EXISTING BUILDING MATERIALS AND SURFACES - REPAIR AND/OR REPLACE REVISION CLOUD 1 ALL MATERIALS AND SURFACES DAMAGED DURING AND TAG CONSTRUCTION ACTIVITIES - INCLUDING BUT NOT LIMITED TO WALLS, FRAMED OPENINGS, ETC. SATELLITE PHOTO: LOCATION MAP: 19. CONTRACTOR SHALL PERFORM WORK IN A MANNER, AND WITH GRAPHIC SCALE TOOLS THAT WILL ABSOLUTELY MINIMIZE DUST MIGRATION. USE OF COMPARTMENTALIZED WORK AREAS SHOULD BE CONSIDERED 0'1' 5' 10' 20' 20. THE CONTRACTOR TO TAKE ABSOLUTE CARE TO PROTECT NEWLY INSTALLED MATERIALS AND FINISHES. 21. CONTRACTOR TO SUBMIT A SCHEDULE WITH BID. 22. NO EXCLUSIONS ACCEPTED WITHOUT WRITTEN AUTHORIZATION. 23. TOUCH UP PAINTED SURFACES AFFECTED BY CONSTRUCTION. MATCH EXISTING PAINT COLOR. CODE STUDY: 24. THE CONTRACTOR AND HIS/HER SUBCONTRACTORS SHALL TURN PROJECT ADDRESS: THE PROJECT OVER TO THE OWNER: 3265 N FEDERAL BLVD, DENVER, CO 80211-3211 A) FREE FROM ALL CONSTRUCTION DEBRIS, SCRAPS, MATERIAL AND EQUIPMENT. AUTHORITY JURISDICTION: B) ALL EXISTING INTERIOR GLASS IS CLEANED. CITY & COUNTY OF DENVER 1 02.01.2021 100% CD ISSUED FOR LANDMARK C) ALL WALL MATERIAL IS FREE OF DIRT, GREASE AND 201 WEST COLFAX AVENUE OTHER FOREIGN MATERIAL. DENVER, COLORADO 80202 25. GENERAL CONTRACTOR TO FINISH ALL EXISTING / NEWLY 720-865-2705 INSTALLED EXPOSED & VISIBLE FLASHING & COUNTER FLASHING TO MATCH EXISTING FINISHES&COLORS. APPLICABLE CODES: 26. GENERAL CONTRACTOR TO PROVIDE FALL RESTRAINT TO 2018 INTERNATIONAL BUILDING CODE WITHSTAND AT LEAST 3.000 LB. OF FORCE WITHIN 6'-0" OF ROOF 2018 INTERNATIONAL EXISTING BUILDING CODE EDGE PER OSHA. 2018 INTERNATIONAL MECHANICAL CODE 2018 INTERNATIONAL PLUMBING CODE 2020 NATIONAL ELECTRICAL CODE 2018 INTERNATIONAL FUEL GAS CODE 2018 INTERNATIONAL FIRE CODE 2018 INTERNATIONAL ENERGY CONSERVATION CODE (PERSCRIPTIVE METHOD) UNIFORM CODE FOR THE ABATEMENT OF DANGEROUS BUILDINGS DRAWN BY: KV CHECKED BY: JB GENERAL BUILDING INFORMATION: YEAR BUILT: 1912 ORIGINAL, 1958 ADDITION DATE: 02.01.2021 OCCUPANCY TYPE: A-3 NO CHANGE PROJECT NO: 1811.04 CONSTRUCTION TYPE: III-B

STORIES BELOW GRADE: 1 STORIES ABOVE GRADE: 2

TOTAL AREA: 8,901 SF NO CHANGE PROJECT INFORMATION/SHEET AUTOMATIC SPRINKLER SYSTEM / FIRE ALARM & DETECTION NO CHANGE INDEX

PER 2015 IECC: TABLE C402.1.3: CLIMATE ZONE: 5B = R-30 ci (CONTINUOUS INSULATION) ABOVE ROOF DECK => DOES NOT APPLY: INSULATION BELOW ROOF DECK G 0.1 fax: 303.531.4998

1958 ADDITION (NON-HISTORIC) HISTORIC 1912 ORIGINAL BUILDING phone: 303.531.4990 lakewood, colorado 80215 www.theabogroup.com

A 2.2 © 2014 The Abo Group, Inc. 12600 west colfax avenue, c210

2

BASE BID - KEYNOTE PRESERVATION LEGEND ADD ALTERNATE: REPLACE EXISTING Key Value Keynote Text CONCRETE ~ 225 SF P30 SOFFIT MEDALLION MISSING REPLACE WITH REPLICA TO MATCH EXISTING P31 SOFFIT SHALL BE SANDED AROUND ENTIRE PERIMETER OF GABLED ROOF. PAINT TO MATCH EXISTING FINISH WITH P-1. REPLACE EXISTING SOFFIT BOARD WHERE DETERIORATING AND UNABLE TO ACCEPT SAND AND PAINT WITH IDENTICAL PIECE, CONCEAL SPLICE. 3 P32 SOFFIT SHOWS SIGNIFICANT DETERIORATION AT THIS LOCATION A 1.2

4 1 A 2.3 A 1.2 ~ 476 SF OF SOFFIT

38' 2' 2' P30

LIGHT P32

23 6" / 12" A 1.3 ADD ALTERNATE: LIGHT REPLACE EXISTING CONCRETE P31 LIGHT ~ 19 SF ADD ALTERNATE: REPLACE CONCRETE STEPS DN ~ 107 SF LIGHT

6" / 12" 6" / 12"

LIGHT ADD ALTERNATE: REPLACE EXISTING LIGHT 2 BENCHES A 1.1 ~ 35 SF

1 2 A 2.0 A 2.3 2 A 1.1

3 A 2.3 A 2.1 3 81'

LIGHT

LIGHT

LIGHT LIGHT ADD ALTERNATE: REPLACE LIGHT

FIXTURES IN CITY AND COUNTY OF DENVER WOODBURY LIBRARY CO 80211-3211 DENVER, 3265 N FEDERAL BLVD, BRICK ADD ALTERNATE: COLUMNS, 10 RESURFACE EXISTING STEP FIXTURES ~ 5 SF 6" / 12"

2 A 1.4

1 A 1.4

ADD ALTERNATE: ADD ALTERNATE: 1 02.01.2021 100% CD ISSUED FOR LANDMARK ADD SIDEWALK CHASE AT DOWNSPOUT LOCATION REMOVE (E) LOW RAIL ~ 100 LF SITE AVOID TREE ROOTS (~ 8 SF EACH) REFLECTED CEILING PLAN - SOFFIT 1 1/8" = 1'-0" 2 1/8" = 1'-0"

DRAWN BY: KV

2 CHECKED BY: JB

DATE: 02.01.2021 A 2.4 PROJECT NO: 1811.04

SITE A 1.0 BASE BID - KEYNOTE DEMOLITION LEGEND BASE BID - KEYNOTE PRESERVATION LEGEND HISTORIC MAIN ENTRANCE Key Value Keynote Text Key Value Keynote Text

P3 CLEAN AND REMOVE LEAVES AND DEBRIS BUILD UP TO PROVIDE POSITIVE DRAINAGE fax: 303.531.4998

(D6/P13) phone: 303.531.4990 Concrete lakewood, colorado 80215 steps www.theabogroup.com crackled ADD ALTERNATE - KEYNOTE DEMOLITION LEGEND ADD ALTERNATE - KEYNOTE PRESERVATION LEGEND © 2014 The Abo Group, Inc. 12600 west colfax avenue, c210 and Key Value Keynote Text Key Value Keynote Text chipped D1 ADD ALTERNATE - CONCRETE BENCHES FAILING, REMOVE EXISTING BENCHES P2 ADD ALTERNATE - BRICK MORTAR FAILING/MISSING, REPOINT IN THIS AREA TO MAINTAIN STRUCTURAL D6 ADD ALTERNATE - CONCRETE STEP(S) CRACKED AND CHIPPED, REMOVE LOOSE PIECES, INTEGRITY AND PREVENT WATER INFILTRATION, COLOR MATCH TO EXISTING WITH TYPE "O" MORTAR PREPARE SURFACE FOR PATCH P8 ADD ALTERNATE - CONCRETE BENCHES SHALL BE REPLACE WITH BENCHES OF IDENTICAL SIZE AND MATERIAL D7 ADD ALTERNATE - CONCRETE STEP(S) FAILING, REMOVE EXISTING CONCRETE AS NEEDED TO INCLUDING STEEL REINFORCEMENT ALLOW STEPS TO BE RESURFACED P13 ADD ALTERNATE - CONCRETE STEP(S) CRACKED, PATCH WITH COLOR MATCHED CONCRETE REPAIR MATERIAL TO PREVENT WATER INFILTRATION P14 ADD ALTERNATE - CONCRETE STEP(S) REMOVED, REPLACE CONCRETE STEP(S) WITH IDENTICAL COLOR MATCHED CONCRETE. RISER HEIGHT NOT TO EXCEED 7". PROVIDE CONTROL JOINS AT LOCATIONS IDENTIFIED ON DRAWINGS P15 ADD ALTERNATE - CONCRETE WALL CAP PATCH WITH COLOR MATCHED CONCRETE REPAIR MATERIAL P16 ADD ALTERNATE - CONCRETE WALL SPALLING AND CRACKING, PREP FOR PATCH WITH COLOR MATCHED CONCRETE REPAIR MATERIAL

(D6/P13) Concrete cracked and corners broken out P3 (D7/P14) Damaged concrete and tripping hazard as identified by

the yellow paint D7 P14

(P2) Exposed foundation brick

D1 P16

P8 D6 P13

(P15)Cracks at CITY AND COUNTY OF DENVER WOODBURY LIBRARY CO 80211-3211 DENVER, 3265 N FEDERAL BLVD, P16 concrete wall cap D6 P15 LANDSCAPE WALL /BENCH (NOT HISTORIC) D7 A 2.1 3 P14 P15 P2

P13 D1

P8

D6 P13

1 02.01.2021 100% CD ISSUED FOR LANDMARK

(P16)Spalling, cracking and (D1/P8)Concrete P3 parts crumbling off on benches failing concrete base (D7/P14) Spalling on concrete sidewalk and slabs that have heaved more the 1/2", tripping hazard SIDEWALK DRAWN BY: KV CHECKED BY: JB

DATE: 02.01.2021

PROJECT NO: 1811.04

SITE - EAST SITE - EAST DEMOLITION SITE - EAST PRESERVATION 1 3/16" = 1'-0" 2 3/16" = 1'-0" A 1.1 SIDEWALK AND DRAINAGE fax: 303.531.4998 phone: 303.531.4990 Concrete

sidewalk lakewood, colorado 80215 crackled and www.theabogroup.com heaving and is © 2014 The Abo Group, Inc. 12600 west colfax avenue, c210 a tripping hazard (D5/P12)

D5

P12

P29 P29 P13 P26

D12 P3 4 4 FD D9 FD D9 A 1.2 A 1.2

SITE - NORTH DEMOLITION SITE - NORTH PRESERVATION 1 1/4" = 1'-0" 3 1/4" = 1'-0"

BASE BID - KEYNOTE DEMOLITION LEGEND

Key Value Keynote Text P17 P2 D9 GUTTER AND DOWNSPOUTS TO BE REPLACED, REMOVE RE: ROOFING PLANS Slabs heaving more than 1/2" (D5/P12) BASE BID - KEYNOTE PRESERVATION LEGEND

Key Value Keynote Text

P3 CLEAN AND REMOVE LEAVES AND DEBRIS BUILD UP TO PROVIDE POSITIVE DRAINAGE

ADD ALTERNATE - KEYNOTE DEMOLITION LEGEND Key Value Keynote Text STAIRWELL 1/4" = 1'-0" D5 ADD ALTERNATE - CONCRETE SIDEWALK FAILING, REMOVE AS INDICATED 4 D12 ADD ALTERNATE - RAILING AT STAIRS REMOVE EXISTING RAILING AT STAIRS, PREP FOR NEW RAILING

ADD ALTERNATE - KEYNOTE PRESERVATION LEGEND

Key Value Keynote Text CITY AND COUNTY OF DENVER WOODBURY LIBRARY CO 80211-3211 DENVER, 3265 N FEDERAL BLVD, P2 ADD ALTERNATE - BRICK MORTAR FAILING/MISSING, REPOINT IN THIS AREA TO MAINTAIN STRUCTURAL INTEGRITY AND PREVENT WATER INFILTRATION, COLOR MATCH TO EXISTING WITH TYPE "O" MORTAR Caulking failing P12 ADD ALTERNATE - CONCRETE SIDEWALK SHALL BE REPLACED IN SIMILAR CONFIGURATION WITH POSITIVE DRAINAGE (D5/P12) P13 ADD ALTERNATE - CONCRETE STEP(S) CRACKED, PATCH WITH COLOR MATCHED CONCRETE REPAIR MATERIAL TO PREVENT WATER INFILTRATION P17 ADD ALTERNATE - DOOR WEATHERED, PREP SURFACE AND PAINT DOOR AND JAMB TO MATCH EXISTING USING PAINT P-4 P26 ADD ALTERNATE - RAILING (GUARDRAIL) REPLACE WITH RAILING TO MATCH RAILING AT WEST, BALUSTERS SHOULD NOT ALLOW THE PASSAGE OF A 4" SPHERE, PAINT P-3. SEE DETAIL A3.1/2. P29 ADD ALTERNATE - SIDE WALK CHASE SHALL BE CLEANED OUT, REPLACE RUSTED COVER WITH STEEL COVER WITH HEAVY DUTY INHIBITING PAINT P-4

BASEMENT ENTRANCE AND STAIRWELL

1 02.01.2021 100% CD ISSUED FOR LANDMARK Handrail not tight to Sidewalk building chase (D12/P26) covers rusted (P29) Foundati on brick has Post at top missing of stairs has grout (P2) rusted through DRAWN BY: KV Paint at door Stairs also rail is CHECKED BY: JB and jamb cracked and unsafe DATE: 02.01.2021

weathered chipping (D12/P26) PROJECT NO: 1811.04 and pealing (P13) (P17) Debris built up at drain, clean to SITE - NORTH provide drainage (P3) A 1.2 Light covers are cracked and impinging on WEST SITE the gap needed at the handrail (D10/P23) fax: 303.531.4998 phone: 303.531.4990 lakewood, colorado 80215 www.theabogroup.com

© 2014 The Abo Group, Inc. 12600 west colfax avenue, c210

Grout failing (P2) Iron railing Concrete steps crackled (P13) rusting (P28)

Iron railing rusting (P28)

Concrete caps and benches are badly stained and water marked (P6) Concrete steps crackled and crumbling (D7/P14) Grout failing (P2)

Previous concrete patch failing (D7/P14)

Repaint bike racks (P25)

Discolored concrete

P6

D10 P23 BASE BID - KEYNOTE DEMOLITION LEGEND BASE BID - KEYNOTE PRESERVATION LEGEND

Key Value Keynote Text Key Value Keynote Text P28 P6 P6 ADD ALTERNATE - KEYNOTE DEMOLITION LEGEND ADD ALTERNATE - KEYNOTE PRESERVATION LEGEND

Key Value Keynote Text P28 Key Value Keynote Text D10 P23 D10 D7 ADD ALTERNATE - CONCRETE STEP(S) FAILING, REMOVE P28 P28 P2 ADD ALTERNATE - BRICK MORTAR FAILING/MISSING, REPOINT IN THIS AREA TO MAINTAIN STRUCTURAL INTEGRITY EXISTING CONCRETE AS NEEDED TO ALLOW STEPS TO BE P6 P23 P6 P28 AND PREVENT WATER INFILTRATION, COLOR MATCH TO EXISTING WITH TYPE "O" MORTAR RESURFACED P6 ADD ALTERNATE - CLEAN CONCRETE CAPS AND BENCH USING "D/2 BIOLOGICAL SOLUTION" OR SIMILAR PRODUCT D10 ADD ALTERNATE - LIGHTING DAMAGED AND/OR TO REMOVE STAINING CAUSED BY TREE. FOLLOW MANUFACTURE INSTRUCTIONS. DETERIORATING REMOVE EXISTING LIGHT FIXTURES P13 ADD ALTERNATE - CONCRETE STEP(S) CRACKED, PATCH WITH COLOR MATCHED CONCRETE REPAIR MATERIAL TO

PREVENT WATER INFILTRATION CITY AND COUNTY OF DENVER WOODBURY LIBRARY CO 80211-3211 DENVER, 3265 N FEDERAL BLVD, P14 ADD ALTERNATE - CONCRETE STEP(S) REMOVED, REPLACE CONCRETE STEP(S) WITH IDENTICAL COLOR MATCHED CONCRETE. RISER HEIGHT NOT TO EXCEED 7". PROVIDE CONTROL JOINS AT LOCATIONS IDENTIFIED ON DRAWINGS P2 P23 P23 P6 P23 ADD ALTERNATE - LIGHTING DETERIORATING, REPLACE WITH RECESSED, FLUSH MOUNT LED LIGHT FIXTURES P25 ADD ALTERNATE - PAINT METAL, REMOVE RUST, PAINT WITH RUST INHIBITING PAINT TO MATCH EXISTING WITH P-3 D10 D10 P28 P28 ADD ALTERNATE - RAILING REMOVE RUST, PAINT WITH RUST INHIBITING PAINT TO MATCH EXISTING WITH P-3

D7 P14 P6

P6 P28

P23

D10 3 A 3.1 1 02.01.2021 100% CD ISSUED FOR LANDMARK

3 A 2.3

D10 P6 P23

P28 P6 DRAWN BY: KV

P6 CHECKED BY: JB

DATE: 02.01.2021

PROJECT NO: 1811.04 P23 P28

D10 D10 D10 P2 P23

P28 SITE - WEST

P13 P23 P25 P25 P25 P28 P28 SITE - WEST DEMOLITION SITE - WEST PRESERVATION A 1.3 2 3/16" = 1'-0" 3 3/16" = 1'-0" BASE BID - KEYNOTE DEMOLITION LEGEND

Key Value Keynote Text fax: 303.531.4998 D9 GUTTER AND DOWNSPOUTS TO BE REPLACED, REMOVE RE: ROOFING PLANS phone: 303.531.4990 lakewood, colorado 80215 ADD ALTERNATE - KEYNOTE DEMOLITION LEGEND www.theabogroup.com

Key Value Keynote Text © 2014 The Abo Group, Inc. 12600 west colfax avenue, c210

D4 ADD ALTERNATE - CONCRETE SIDEWALK CHASE REMOVE EXISTING CONCRETE TO PROVIDE SIDEWALK CHASE AT DOWNSPOUT D11 ADD ALTERNATE - RAILING LOW, REMOVE ALL LOW RAILING, TRIPPING HAZARD Down spouts should be replaced with DRAINAGE ISSUES historically accurate round profile (D9/P18)

D9 D9 D11

D11

D4 D4

Downspouts drain onto sidewalk, causing unsafe conditions in winter (D4/P10)

Pipe rail section missing, broken and SITE - SOUTH DEMOLITION bent (D11/P27) 1 1/4" = 1'-0" SIDEWALK

BASE BID - KEYNOTE PRESERVATION LEGEND

Key Value Keynote Text

P3 CLEAN AND REMOVE LEAVES AND DEBRIS BUILD UP TO PROVIDE POSITIVE DRAINAGE P18 GUTTER AND DOWNSPOUTS SHALL BE PROVIDED, WITH HISTORICALLY ACCURATE 1/2 ROUND AND ROUND PROFILE, PAINTED P-2, RE: ROOF PLANS CITY AND COUNTY OF DENVER WOODBURY LIBRARY CO 80211-3211 DENVER, 3265 N FEDERAL BLVD,

ADD ALTERNATE - KEYNOTE PRESERVATION LEGEND

Key Value Keynote Text

P10 ADD ALTERNATE - CONCRETE SIDEWALK CHASE SHALL BE PROVIDED, SIDEWALK CHASE SHOULD BE COVERED WITH STEEL PLATES FOR CLEAN OUT ACCESS P11 ADD ALTERNATE - CONCRETE SIDEWALK SHALL BE PATCHED WITH COLOR MATCHED CONCRETE REPAIR MATERIAL P27 ADD ALTERNATE - RAILING LOW REMOVED, PATCH HOLES TO MATCH CONCRETE

1 02.01.2021 100% CD ISSUED FOR LANDMARK

19 20

P18 P3 P11 P3 P18 P27 P27

DRAWN BY: KV P10 P10 CHECKED BY: JB

DATE: 02.01.2021

PROJECT NO: 1811.04

SITE - SOUTH SITE - SOUTH PRESERVATION 2 1/4" = 1'-0" A 1.4 HISTORIC EAST FACADE HISTORIC SOFFIT Tarnished historical signs Historic (P7) terra- fax: 303.531.4998 cotta work is phone: 303.531.4990 dirty lakewood, colorado 80215 and Terra- www.theabogroup.com water cotta

© 2014 The Abo Group, Inc. 12600 west colfax avenue, c210 marked work (P5) cracked (P35)

Historic wood work to be Terra-cotta is broken Terra- maintained Replace (D13/P36) cotta through work gutter routine (D9/P18) chipped maintenance (P35) (P19)

Deep grout lines where grout Down spout has fallen out (P2) should be replaced with Chipped terra-cotta historically work (P35) accurate round Chipped column base (P35) profile (D9/P18)

Cracked column base (P35)

Chipped terra-cotta Pipe rail section missing work (P35) (D11/P27) Foundation brick showing Grout on (P2) terra-cotta work failing(P34)

BASE BID - KEYNOTE DEMOLITION LEGEND

Key Value Keynote Text CLEAN BY POWER WASHING ENTIRE BUILDING AND SIDEWALK TO PRESERVE AND PREP. TYPICAL CLEANING SHOULD BE WATER ONLY AT 500 PSI MAX. TEST CLEANING METHOD TO ENSURE NO DAMAGE TO ADD ALTERNATE - KEYNOTE DEMOLITION LEGEND HISTORIC FACADE OCCURS BY REMOVING THE GLAZE FROM THE Key Value Keynote Text TERRA-COTTA . USE CLEANING CHEMICALS ONLY WHERE INDICATED.

D11 ADD ALTERNATE - RAILING LOW, REMOVE ALL LOW RAILING, TRIPPING HAZARD P-1 P-2 D13 ADD ALTERNATE - TERRA-COTTA SIGNIFICANTLY DAMAGED, REMOVE AND SALVAGE TO PREPARE MATCHING REPLACEMENT PIECE P1 P1 SOFFIT AND WINDOW PAINT: GUTTER AND DOWNSPOUT PAINT: SHERWIN WILLIAMS HISTORIC COLLECTION SHERWIN WILLIAMS HISTORIC COLLECTION SW 0050 SW 0045 CITY AND COUNTY OF DENVER WOODBURY LIBRARY CO 80211-3211 DENVER, 3265 N FEDERAL BLVD, CLASSIC LIGHT BUFF ANTIQUARIAN BROWN

BASE BID - KEYNOTE PRESERVATION LEGEND P31 Key Value Keynote Text

P1 BRICK AT EXISTING CHIMNEYS (2) DETERIORATING, REPAIR AND REPOINT TO MAINTAIN STRUCTURAL INTEGRITY AND HISTORIC APPEARANCE WITH TYPE "O" MORTAR P5 CLEAN BY POWER WASHING ENTIRE BUILDING AND SIDEWALK TO PRESERVE AND PREP. TYPICAL CLEANING P40 SHOULD BE WATER ONLY AT 500 PSI MAX. TEST CLEANING METHOD TO ENSURE NO DAMAGE TO HISTORIC P40 P40 P40 P40 P40 P40 FACADE OCCURS DUE TO THE REMOVAL OF THE GLAZE FROM THE TERRA-COTTA . USE CLEANING CHEMICALS 4 ONLY WHERE INDICATED. P31 SOFFIT SHALL BE SANDED AROUND ENTIRE PERIMETER OF GABLED ROOF. PAINT TO MATCH EXISTING FINISH WITH P-1. REPLACE EXISTING SOFFIT BOARD WHERE DETERIORATING AND UNABLE TO ACCEPT SAND AND PAINT WITH IDENTICAL PIECE, CONCEAL SPLICE. P40 WINDOW TO BE PRESERVED - REMOVE AND SALVAGE STORM WINDOWS TO CLEAN, REMOVE LOOSE PAINT, P7 P-3 P-4 WINDOW FRAME SHALL BE SANDED, REPLACE EXISTING WINDOW BOARDS WHERE DETERIORATED AND P5 1 2 3 5 6 7 UNABLE TO ACCEPT SAND AND PAINT WITH IDENTICAL WOOD PROFILE TYPE, CONCEAL SPLICE. REMOVE P35 RAILING AND BIKE RACK: DOOR AND LAMP POST: 1 02.01.2021 100% CD ISSUED FOR LANDMARK LOOSE CAULK, RE-CAULK WINDOW PERMITTER BEFORE PAINTING, REPAINT ENTIRE WINDOW FRAME TO MATCH SHERWIN WILLIAMS HISTORIC COLLECTION SW 6992 EXISTING WITH P-1 PAINT COLOR, REINSTALL STORM WINDOW. SW 2810 INKWELL D13 P2 ROOKWOOD SASH GREEN ADD ALTERNATE - KEYNOTE PRESERVATION LEGEND P27 D11 P36 Key Value Keynote Text 21 22 23 24 P35 P2 ADD ALTERNATE - BRICK MORTAR FAILING/MISSING, REPOINT IN THIS AREA TO MAINTAIN STRUCTURAL INTEGRITY AND PREVENT WATER INFILTRATION, COLOR MATCH TO EXISTING WITH TYPE "O" MORTAR P7 ADD ALTERNATE - CLEAN METAL SIGNS WITH SOFT BRISTLE BRUSH P27 ADD ALTERNATE - RAILING LOW REMOVED, PATCH HOLES TO MATCH CONCRETE P35 ADD ALTERNATE - TERRA-COTTA DAMAGED, GENTLY REMOVE LOOSE MATERIAL AND SEAL TERRA-COTTA WHERE BISQUES IS SHOWING WITH TERRA COTTA COATING GLAZE BY JAHN CATHEDRAL STONE PRODUCTS OR EDDISON COATINGS BY EXPERT IN HISTORIC MASONRY REPAIR 2 DRAWN BY: KV A 2.1 P36 ADD ALTERNATE - TERRA-COTTA SIGNIFICANTLY DAMAGED, REPLACE DAMAGED TERRA-COTTA WITH CHECKED BY: JB IDENTICAL REPLICA MADE OF TERRA-COTTA, CAST STONE WITH GLAZE, OR FIBERGLASS REPLACEMENT. MATCH SHEEN, COLOR AND PROFILE. EXISTING EAST ELEVATION DATE: 02.01.2021 1/8" = 1'-0" 2 PROJECT NO: 1811.04

P-4 MECHINICAL ROOM DOORS SHERWIN WILLIAMS HISTORIC COLLECTION SW 2808 EAST ELEVATION ROOKWOOD DARK BROWN

FINISHES 3 1/4" = 1'-0" A 2.0 Bugs and dirt trapped between Wasp nest HISTORIC DOOR HISTORIC WINDOWS storm glass (P40) at arch (P5) fax: 303.531.4998 phone: 303.531.4990 lakewood, colorado 80215

4 www.theabogroup.com

© 2014 The Abo Group, Inc. 12600 west colfax avenue, c210

P20 P20

3 5

P21 P21 P35 Mail slot no longer closes (P24) Grout missing (P34)

P24 P34

P17

P14

Preserve historic windows (P40) 1 A 3.1

EXISTING EAST ELEVATION @ DOOR Paint on door 2 1/4" = 1'-0" weathered (P17)

Lamp shade is dirty (P20)

D1

P8

Caulk at window perimeter failing (P40)

EXISTING EAST ELEVATION @ LANDSCAPE WALL 3 1/4" = 1'-0" CITY AND COUNTY OF DENVER WOODBURY LIBRARY CO 80211-3211 DENVER, 3265 N FEDERAL BLVD,

Terra-cotta work behind lamp is cracking (P35)

BASE BID - KEYNOTE DEMOLITION LEGEND Loose Key Value Keynote Text paint on lamp stand (P21)

BASE BID - KEYNOTE PRESERVATION LEGEND 1 02.01.2021 100% CD ISSUED FOR LANDMARK

Key Value Keynote Text

ADD ALTERNATE - KEYNOTE DEMOLITION LEGEND

Key Value Keynote Text

D1 ADD ALTERNATE - CONCRETE BENCHES FAILING, REMOVE EXISTING BENCHES

DRAWN BY: KV

CHECKED BY: JB

ADD ALTERNATE - KEYNOTE PRESERVATION LEGEND DATE: 02.01.2021

Key Value Keynote Text PROJECT NO: 1811.04

P8 ADD ALTERNATE - CONCRETE BENCHES SHALL BE REPLACE WITH BENCHES OF IDENTICAL SIZE AND MATERIAL INCLUDING STEEL REINFORCEMENT P14 ADD ALTERNATE - CONCRETE STEP(S) REMOVED, REPLACE CONCRETE STEP(S) WITH IDENTICAL COLOR MATCHED CONCRETE. RISER HEIGHT NOT TO EXCEED 7". PROVIDE CONTROL JOINS AT LOCATIONS IDENTIFIED ON DRAWINGS P17 ADD ALTERNATE - DOOR WEATHERED, PREP SURFACE AND PAINT DOOR AND JAMB TO MATCH EXISTING USING PAINT Debris built up in window P-4 well (P3) P20 ADD ALTERNATE - LAMP SHADE, REMOVE, CLEAN AND REINSTALL P21 ADD ALTERNATE - LAMP STAND, REMOVE LOOSE PAINT, PREP SURFACE AND RE-PAINT WITH P-4 EAST ELEVATION P24 ADD ALTERNATE - MAIL SLOT NO LONGER CLOSES, REPAIR SO MAIL SLOT CLOSES COMPLETELY P34 ADD ALTERNATE - TERRA-COTTA GROUT FAILING, REMOVE LOOSE GROUT, REPOINT GROUT IN THIS AREA TO MAINTAIN INTEGRITY AND PREVENT WATER INFILTRATION, COLOR MATCH TO EXISTING GROUT WITH TYPE "O" MORTAR P35 ADD ALTERNATE - TERRA-COTTA DAMAGED, GENTLY REMOVE LOOSE MATERIAL AND SEAL TERRA-COTTA WHERE BISQUES IS SHOWING WITH TERRA COTTA COATING GLAZE BY JAHN CATHEDRAL STONE PRODUCTS OR EDDISON COATINGS BY EXPERT IN HISTORIC MASONRY REPAIR A 2.1 HISTORIC NORTH FACADE HISTORIC SOFFIT fax: 303.531.4998 phone: 303.531.4990 lakewood, colorado 80215 www.theabogroup.com

© 2014 The Abo Group, Inc. 12600 west colfax avenue, c210

Gated and fenced off nook between original building and Chipped terra- addition shows significant cotta work deterioration (P35)

Medallion on soffit missing Historic wood work to be maintained Down spout should be replaced with (P30) through routine maintenance (P19) historically accurate round profile (P18)

Previous patch on Chipped terra- Chipped terra- Chipped base (P35) Paint on metal terra-cotta work failing cotta work cotta work doors weathered (P35) (P35) (P35) (P17) HISTORIC WINDOWS

1/4 round wood warped (P38) CITY AND COUNTY OF DENVER WOODBURY LIBRARY CO 80211-3211 DENVER, 3265 N FEDERAL BLVD,

Preserve historical windows (P40)

Previous patch on Gap at pipe (P2) Brick chipped (P2) Gas meter rusting Terra-cotta cracked Grout on terra- Bugs and terra-cotta work failing (P25) (P35) cotta work failing dirt trapped (P35) (P34) between storm BASE BID - KEYNOTE DEMOLITION LEGEND

window Key Value Keynote Text 8' 4 (P40) A 2.3 D9 GUTTER AND DOWNSPOUTS TO BE REPLACED, REMOVE RE: ROOFING PLANS P1 CLEAN BY POWER WASHING ENTIRE BUILDING AND SIDEWALK TO PRESERVE, AND PREP FOR REPAINTING, PATCHING, AND REPOINTING. TEST CLEANING BASE BID - KEYNOTE PRESERVATION LEGEND METHOD TO ENSURE NO DAMAGE TO HISTORIC FAÇADE OCCURS.

11' Caulk at window Key Value Keynote Text perimeter failing P1 BRICK AT EXISTING CHIMNEYS (2) DETERIORATING, REPAIR AND REPOINT TO MAINTAIN STRUCTURAL INTEGRITY AND (P40) HISTORIC APPEARANCE WITH TYPE "O" MORTAR 1 02.01.2021 100% CD ISSUED FOR LANDMARK P31 P18 GUTTER AND DOWNSPOUTS SHALL BE PROVIDED, WITH HISTORICALLY ACCURATE 1/2 ROUND AND ROUND PROFILE, PAINTED P-2, RE: ROOF PLANS P32 P19 HISTORIC WOOD WORK TO BE MAINTAINED THROUGH ROUTINE MAINTAINED, CLEAN, PATCH AND REPAINT TO MATCH P30 EXISTING WITH APPROVED PAINT COLOR P30 SOFFIT MEDALLION MISSING REPLACE WITH REPLICA TO MATCH EXISTING P19 P31 SOFFIT SHALL BE SANDED AROUND ENTIRE PERIMETER OF GABLED ROOF. PAINT TO MATCH EXISTING FINISH WITH P-1. REPLACE EXISTING SOFFIT BOARD WHERE DETERIORATING AND UNABLE TO ACCEPT SAND AND PAINT WITH IDENTICAL PIECE, CONCEAL SPLICE. P32 SOFFIT SHOWS SIGNIFICANT DETERIORATION AT THIS LOCATION P38 WINDOW FRAME DETERIORATING, REPLACE ROTTING OR WARPED WOOD WITH IDENTICAL PROFILE, CONCEAL D9 P40 P40 P40 SPLICES P18 P40 WINDOW TO BE PRESERVED - REMOVE AND SALVAGE STORM WINDOWS TO CLEAN, REMOVE LOOSE PAINT, WINDOW FRAME SHALL BE SANDED, REPLACE EXISTING WINDOW BOARDS WHERE DETERIORATED AND UNABLE TO ACCEPT 3 SAND AND PAINT WITH IDENTICAL WOOD PROFILE TYPE, CONCEAL SPLICE. REMOVE LOOSE CAULK, RE-CAULK DRAWN BY: KV P35 8 9 A 2.2 WINDOW PERMITTER BEFORE PAINTING, REPAINT ENTIRE WINDOW FRAME TO MATCH EXISTING WITH P-1 PAINT COLOR, REINSTALL STORM WINDOW. CHECKED BY: JB P38 12 12 DATE: 02.01.2021 P35 P35 PROJECT NO: 1811.04 ADD ALTERNATE - KEYNOTE DEMOLITION LEGEND

Key Value Keynote Text

P35 ADD ALTERNATE - KEYNOTE PRESERVATION LEGEND Key Value Keynote Text NORTH ELEVATION P25 P34 P26 P35 2 D9 P25 ADD ALTERNATE - PAINT METAL, REMOVE RUST, PAINT WITH RUST INHIBITING PAINT TO MATCH EXISTING WITH P-3 P18 A 3.1 P26 ADD ALTERNATE - RAILING (GUARDRAIL) REPLACE WITH RAILING TO MATCH RAILING AT WEST, BALUSTERS SHOULD NOT ALLOW THE PASSAGE OF A 4" SPHERE, PAINT P-3. SEE DETAIL A3.1/2. P34 ADD ALTERNATE - TERRA-COTTA GROUT FAILING, REMOVE LOOSE GROUT, REPOINT GROUT IN THIS AREA TO MAINTAIN INTEGRITY AND PREVENT WATER INFILTRATION, COLOR MATCH TO EXISTING GROUT WITH TYPE "O" MORTAR EXISTING NORTH ELEVATIONS EXISTING NORTH ELEVATIONS @ RAMP P35 ADD ALTERNATE - TERRA-COTTA DAMAGED, GENTLY REMOVE LOOSE MATERIAL AND SEAL TERRA-COTTA WHERE BISQUES IS SHOWING WITH TERRA COTTA COATING GLAZE BY JAHN CATHEDRAL STONE PRODUCTS OR EDDISON A 2.2 2 1/8" = 1'-0" 3 1/8" = 1'-0" COATINGS BY EXPERT IN HISTORIC MASONRY REPAIR fax: 303.531.4998

HISTORIC WEST FACADE phone: 303.531.4990 CLEAN BY POWER WASHING ENTIRE BUILDING AND SIDEWALK TO HISTORIC WINDOWS

Preserve historical windows (P40) lakewood, colorado 80215 PRESERVE AND PREP. TYPICAL CLEANING SHOULD BE WATER ONLY AT 500 PSI MAX. TEST CLEANING METHOD TO ENSURE NO DAMAGE TO www.theabogroup.com

HISTORIC FACADE OCCURS BY REMOVING THE GLAZE FROM THE © 2014 The Abo Group, Inc. 12600 west colfax avenue, c210 TERRA-COTTA . USE CLEANING CHEMICALS ONLY WHERE INDICATED. 2' 2'

P1 P1 11' 11'

P40 P40 P40

17 18 14

P21 P21 13 15 P38

EXISTING WEST P2ELEVATIONP28 P28 P28 P17 P2 P28 P23 P28 BASE BID - KEYNOTE DEMOLITION LEGEND 2 1/8" = 1'-0" Key Value Keynote Text

BASE BID - KEYNOTE PRESERVATION LEGEND Warped 1/4 round wood Bugs and dirt trapped (P38) between glass (P40) Key Value Keynote Text

P1 BRICK AT EXISTING CHIMNEYS (2) DETERIORATING, REPAIR AND REPOINT TO MAINTAIN STRUCTURAL INTEGRITY AND HISTORIC APPEARANCE WITH TYPE "O" MORTAR P31 SOFFIT SHALL BE SANDED AROUND ENTIRE PERIMETER OF GABLED ROOF. PAINT TO MATCH EXISTING FINISH WITH P-1. REPLACE EXISTING SOFFIT BOARD WHERE DETERIORATING AND UNABLE TO ACCEPT SAND AND PAINT WITH IDENTICAL PIECE, CONCEAL SPLICE. P32 SOFFIT SHOWS SIGNIFICANT DETERIORATION AT THIS LOCATION P38 WINDOW FRAME DETERIORATING, REPLACE ROTTING OR WARPED WOOD WITH IDENTICAL PROFILE, CONCEAL SPLICES P40 WINDOW TO BE PRESERVED - REMOVE AND SALVAGE STORM WINDOWS TO CLEAN, REMOVE LOOSE PAINT, WINDOW FRAME SHALL BE SANDED, REPLACE EXISTING WINDOW BOARDS WHERE DETERIORATED AND UNABLE TO ACCEPT SAND AND PAINT WITH IDENTICAL WOOD PROFILE TYPE, CONCEAL SPLICE. REMOVE LOOSE CAULK, RE-CAULK WINDOW PERMITTER BEFORE PAINTING, REPAINT ENTIRE WINDOW HISTORIC DOOR FRAME TO MATCH EXISTING WITH P-1 PAINT COLOR, REINSTALL STORM WINDOW.

ADD ALTERNATE - KEYNOTE DEMOLITION LEGEND

Key Value Keynote Text P31 P32 ADD ALTERNATE - KEYNOTE PRESERVATION LEGEND Preserve historic windows (P40) Key Value Keynote Text

P2 ADD ALTERNATE - BRICK MORTAR FAILING/MISSING, REPOINT IN THIS AREA TO MAINTAIN STRUCTURAL INTEGRITY AND PREVENT WATER INFILTRATION, COLOR MATCH TO EXISTING WITH TYPE "O" MORTAR P17 ADD ALTERNATE - DOOR WEATHERED, PREP SURFACE AND PAINT DOOR AND JAMB TO MATCH EXISTING USING PAINT P-4 CITY AND COUNTY OF DENVER WOODBURY LIBRARY CO 80211-3211 DENVER, 3265 N FEDERAL BLVD, P21 ADD ALTERNATE - LAMP STAND, REMOVE LOOSE PAINT, PREP SURFACE AND RE-PAINT WITH P-4 P23 ADD ALTERNATE - LIGHTING DETERIORATING, REPLACE WITH RECESSED, FLUSH MOUNT LED LIGHT FIXTURES P28 ADD ALTERNATE - RAILING REMOVE RUST, PAINT WITH RUST INHIBITING PAINT TO MATCH EXISTING WITH P-3 P40 P40 P40 P40

10 11 17 18

P21 P21

P23 P23 P23 P23

EXISTING WEST ELEVATION @ LANDSCAPE WALL EXISTING WEST BETWEEN BUILDINGS P2 Paint on 3 1/8" = 1'-0" 4 1/8" = 1'-0" door 1 02.01.2021 100% CD ISSUED FOR LANDMARK weathered Loose paint on (P17) Deep grout lines lamp stand (P21) where grout has fallen out (P2) Light covers are badly discolored and impinging on the gap needed at the Iron railing rusting Hole in grout, clean handrail (D10/P23) (P28) brick and repoint (P2)

DRAWN BY: KV

CHECKED BY: JB

DATE: 02.01.2021

PROJECT NO: 1811.04

WEST ELEVATION Remove loose paint (P17) Wood around hinge discolored (P17) A 2.3 HISTORIC SOUTH FACADE HISTORIC SOFFIT

Graffiti on Mortar on chimney failing door (P17) (P1) fax: 303.531.4998 phone: 303.531.4990 lakewood, colorado 80215 www.theabogroup.com

© 2014 The Abo Group, Inc. 12600 west colfax avenue, c210 Chipped brick (P2)

Historic wood work to be maintained through routine maintenance (P31)

Terra- Remove cotta graffiti chipped (P4) (P35)

Dirt and debris collecting (P5)

Terra-cotta work Chipped Terra-cotta work Historic terra- HISTORIC WINDOWS cracked and column base cracked (P35) cotta work is chipped (P35) (P35) dirty and water marked (P5) Preserve historic windows (P40)

Remove graffiti (P4) Historic terra-cotta work is dirty and water Significant marked deterioration of (P5) wood window Deep grout lines (P2) Grout on terra-cotta failing Caulk at wall/sidewalk (P34) connection failing (P11) frame at this location (P38/P40) Grout at Wall louvers damaged, window Bugs and dirt replace with similar looking sills failing trapped between wall louvers (P42)_ (P34) Caulk at window storm glass (P40) Terra-cotta perimeter failing cracked (P35) (P40)

Bars bent Debris built up in window and well (P3) Bars rusting Leaves and rusting (P41) debris collecting (P41) (P5) CITY AND COUNTY OF DENVER WOODBURY LIBRARY CO 80211-3211 DENVER, 3265 N FEDERAL BLVD,

Debris built up at window (P3)

CLEAN BY POWER WASHING ENTIRE BUILDING AND SIDEWALK TO PRESERVE AND PREP. TYPICAL CLEANING SHOULD BE WATER ONLY AT

500 PSI MAX. TEST CLEANING METHOD TO ENSURE NO DAMAGE TO 4 BASE BID - KEYNOTE DEMOLITION LEGEND HISTORIC FACADE OCCURS BY REMOVING THE GLAZE FROM THE P1 A 2.3 Key Value Keynote Text TERRA-COTTA . USE CLEANING CHEMICALS ONLY WHERE INDICATED.

BASE BID - KEYNOTE PRESERVATION LEGEND

Key Value Keynote Text

1 02.01.2021 100% CD ISSUED FOR LANDMARK P1 BRICK AT EXISTING CHIMNEYS (2) DETERIORATING, REPAIR AND REPOINT TO MAINTAIN STRUCTURAL INTEGRITY AND HISTORIC APPEARANCE WITH TYPE "O" MORTAR P31 P3 CLEAN AND REMOVE LEAVES AND DEBRIS BUILD UP TO PROVIDE POSITIVE DRAINAGE P33 P31 SOFFIT SHALL BE SANDED AROUND ENTIRE PERIMETER OF GABLED ROOF. PAINT TO MATCH EXISTING FINISH WITH P-1. REPLACE EXISTING SOFFIT BOARD WHERE DETERIORATING AND UNABLE TO ACCEPT SAND AND PAINT WITH IDENTICAL PIECE, CONCEAL SPLICE. P33 SOFFIT VENTS CLOGGED, CLEAN VENTS TO MAINTAIN ROOF VENTILATION P38 WINDOW FRAME DETERIORATING, REPLACE ROTTING OR WARPED WOOD WITH IDENTICAL PROFILE, CONCEAL SPLICES P40 WINDOW TO BE PRESERVED - REMOVE AND SALVAGE STORM WINDOWS TO CLEAN, REMOVE LOOSE PAINT, WINDOW FRAME SHALL BE SANDED, REPLACE EXISTING WINDOW BOARDS WHERE DETERIORATED AND UNABLE TO ACCEPT SAND AND PAINT WITH IDENTICAL WOOD PROFILE TYPE, CONCEAL SPLICE. REMOVE LOOSE CAULK, RE-CAULK WINDOW PERMITTER BEFORE PAINTING, REPAINT ENTIRE WINDOW FRAME TO MATCH EXISTING P40 WITH P-1 PAINT COLOR, REINSTALL STORM WINDOW.

P35 19 20 ADD ALTERNATE - KEYNOTE DEMOLITION LEGEND 16 DRAWN BY: KV Key Value Keynote Text P34 CHECKED BY: JB P35 DATE: 02.01.2021 P38 ADD ALTERNATE - KEYNOTE PRESERVATION LEGEND PROJECT NO: 1811.04

Key Value Keynote Text

25 26 27 P2 ADD ALTERNATE - BRICK MORTAR FAILING/MISSING, REPOINT IN THIS AREA TO MAINTAIN STRUCTURAL INTEGRITY AND PREVENT WATER INFILTRATION, COLOR MATCH TO EXISTING WITH TYPE "O" MORTAR P4 ADD ALTERNATE - CLEAN AND REMOVE TRACES OF GRAFFITI P11 ADD ALTERNATE - CONCRETE SIDEWALK SHALL BE PATCHED WITH COLOR MATCHED CONCRETE REPAIR MATERIAL P17 ADD ALTERNATE - DOOR WEATHERED, PREP SURFACE AND PAINT DOOR AND JAMB TO MATCH EXISTING USING PAINT P-4 P3 P41 P42 P17 P2 P4 P34 P41 P11 P35 P41 P3 P35 P34 ADD ALTERNATE - TERRA-COTTA GROUT FAILING, REMOVE LOOSE GROUT, REPOINT GROUT IN THIS AREA TO MAINTAIN INTEGRITY AND PREVENT WATER SOUTH ELEVATION P35 P3 INFILTRATION, COLOR MATCH TO EXISTING GROUT WITH TYPE "O" MORTAR P35 ADD ALTERNATE - TERRA-COTTA DAMAGED, GENTLY REMOVE LOOSE MATERIAL AND SEAL TERRA-COTTA WHERE BISQUES IS SHOWING WITH TERRA COTTA COATING GLAZE BY JAHN CATHEDRAL STONE PRODUCTS OR EDDISON COATINGS BY EXPERT IN HISTORIC MASONRY REPAIR P41 ADD ALTERNATE - WINDOW WELL GRATE BENT AND RUSTING, REPAIR BARS AND REPAINT WITH APPROVED RUST INHIBITING PAINT - P-4 EXISTING SOUTH ELEVATION P42 ADD ALTERNATE - WALL LOUVER DAMAGED, REPLACES FINS TO RESTORE APPEARANCE 2 1/8" = 1'-0" A 2.4 HISTORIC WINDOW SCHEDULE

MARK WINDOW TYPE AREA fax: 303.531.4998 1 WINDOW TALL 63 SF

2 WINDOW TALL 63 SF phone: 303.531.4990 3 WINDOW TALL 63 SF 4 WINDOW AT DOOR 19 SF lakewood, colorado 80215 5 WINDOW TALL 63 SF 6 WINDOW TALL 63 SF www.theabogroup.com

7 WINDOW TALL 63 SF © 2014 The Abo Group, Inc. 12600 west colfax avenue, c210 8 WINDOW SHORT 39 SF 9 WINDOW SHORT 39 SF 10 WINDOW SHORT 39 SF 11 WINDOW SHORT 39 SF 12 WINDOW TALL 63 SF 13 WINDOW TALL 63 SF 14 WINDOW AT DOOR 50 SF 15 WINDOW TALL 63 SF 16 WINDOW TALL 63 SF 17 WINDOW SHORT 39 SF 18 WINDOW SHORT 39 SF 19 WINDOW SHORT 39 SF 20 WINDOW SHORT 39 SF Grand total: 20 1,011 SF

BASEMENT WINDOW SCHEDULE

MARK WINDOW TYPE AREA

21 BASEMENT WINDOW 20 SF 22 BASEMENT WINDOW 20 SF 23 BASEMENT WINDOW 20 SF 24 BASEMENT WINDOW 20 SF 25 BASEMENT WINDOW 15 SF 26 BASEMENT WINDOW 20 SF 27 BASEMENT WINDOW 20 SF Grand total: 7 137 SF

21' 21' 34'

9 8

7 10 15' 8' 12

11 6 CITY AND COUNTY OF DENVER WOODBURY LIBRARY CO 80211-3211 DENVER, 3265 N FEDERAL BLVD, 13' 13 5

14 4 42' 77'

15 3

5'

HISTORIC WINDOW SHORT 1 02.01.2021 100% CD ISSUED FOR LANDMARK 3 1" = 1'-0"

17 2

16

18 1 18' DRAWN BY: KV

CHECKED BY: JB

DATE: 02.01.2021

PROJECT NO: 1811.04

19 20

5' 41' 34' WINDOW SCHEDULE

WINDOW PLAN HISTORIC WINDOW TALL 1 1/8" = 1'-0" 2 1" = 1'-0" A 3.0 2 Key Value NORTH RAILING DETAIL 1" = 1'-0" = 1" BASE BID - KEYNOTE PRESERVATION LEGEND BASE BID-KEYNOTE Keynote Text P26 3 3/16"

3 1/2" 1/2" 1/2" 2" 2' - 1 1/2" 4" 1 3 PROVIDE CONTROL JOINTS PROVIDE MAIN ENTRANCE STEP DETAIL SITE - WEST PRESERVATION - CONTROL JOINTS CONTROL - PRESERVATION WEST - SITE 1" = 1'-0" = 1" 1/4" = 1'-0" = 1/4" P14 PROVIDE CONTROL JOINTS

6

6 0

0 .0 .

0 0

0 ° ° JOINTS CONTROL EXISTING

3 3 0

0 . . 0

0 0 0 °

JOINTS CONTROL EXISTING ° CONTROL P14 EXISTING EXISTING JOINTS

0' - 7" DETAILS A 3.1 PROJECT NO: DATE: CHECKED BY: DRAWN BY: 1 02.01.2021 100% CD ISSUED FORLANDMARK 100% ISSUED CD 02.01.2021 1 Inc. Group, Abo The 2014 © www.theabogroup.com CITY AND COUNTY OF DENVER

WOODBURY LIBRARY 12600 west colfax avenue, c210

02.01.2021 3265 N FEDERAL BLVD, DENVER, CO 80211-3211

1811.04 lakewood, colorado 80215 phone: 303.531.4990 KV JB fax: 303.531.4998

January 8, 2021

Ms. Kathy Van der Weert The Abo Group 12600 W. Colfax Suite C-210 Lakewood, CO 80215

re: Historic Considerations Review Replace Roofing – Woodbury Branch Library

Kathy:

The roofing systems on the high slope portions of the Woodbury Branch Library are to be removed as part of a City and County of Denver FIT Project. The eastern portion of the building is one of the original Carnegie Libraries built in the Denver area. As such, this structure is on the Landmark Preservation Commission’s list of historic places. Because of this, the roofing replacement design for this building needs to be reviewed by the Commission. This letter report has been prepared to address the historic aspects of the new high slope tile roofing system.

Roof Type

The high slope roofs on the library are identical in color and type. The west portion of the building consists of an addition to the main building. There is a small tile roof on this addition that is to be replaced at the same time as the tile on the original structure. At both clay tile covered high slope roof decks relatively new 0.75” thick Ludowici one piece 13.25” Mission clay tile roofing has been installed. The color blend has a primary tile that has an orange/red color. The highlight tiles are dark brown and tan.

The proposed new tile will be the 0.75” thick Mission one piece tile offered by Ludowici. A product sheet is attached that shows the tile and provides its dimensions. The new tile pieces are of the same dimension as the tile roofing to be replaced. The tile will be formed from the same clay mix type as the original tile that were placed on the older library roofs.

Tile Color

Both tile roofs will be removed as part of the project. When the tile roofing is replaced, the design documents will indicate the new colors to be used along with their percentages of the blend. We propose to base the new tile colors on the much older tile found on both the Byers and Park Hill Branch Libraries that our firm is also working on. We believe this was most likely the color blend used on the original portion of this structure. Using the Ludowici Color Guide and samples obtained from Ludowici we have determined a very close match using the following blend of colors. Again, it should be noted that this is the color blend that was approved for the new tile at the Byers Branch Library.

14828 West 6th Avenue □ Unit B8 □ Golden, CO 80401 Phone: 303/233-1092 □ Fax: 303/233-2205 January 8, 2021 Historic Considerations Review Replace Roofing – Woodbury Branch Library

Ludowici Color Percent of Blend Historic Red 75% Aged 15% Aged Cedar 10%

Two photos have been attached after this report. Both photos show the color blend proposed sitting on the existing clay tile roof.

Gutters

There are gutters on the east eave edge of the eastern original building’s high slope roof. At the north and south ends of the gutter, pieces return to the west about 8’. These gutters are old and were most likely placed after the original roof was constructed, as the original structure has a sloped roof with an internal gutter system. The gutters were probably placed to catch the small amount of water that runs off the main original structure’s roof just below the internal gutter. The gutters are 24 painted galvanized pieces broken in a semi-half round profile. A larger 6” gutter was installed.

We propose to replace the existing painted half round gutter with new galvanized steel 6” half round gutters. We would also like to take the gutters along the north, south and west eave edges. This will help with drainage at the grade level around the building. The interior gutter will remain active. Literature showing the half round gutters has been attached along with a photo of the currently installed gutters.

If there are any questions or concerns with this report, please feel free to call.

Reported By:

Ronald D. Scott, P.E. attachments

RDS/\\moe\word\sddd\abo woodbury bl\ccd woodbury library roof landmark rpt.docx

Page - 2 LEGACY COLLECTION SPANISH 13 1/4" BARREL TILE

One of the most popular profiles in Ludowici’s Legacy Collection, Spanish tile is prized for its simple, one-piece barrel design which provides a pattern of distinctive ripples across a roof. Spanish 13 ¼" tile provides an authentic, old European look to any style of architecture from small bungalows to large public institutions. Spanish tiles have a smooth surface, but may be customized with a number of custom textures. Our Spanish tiles are available in all standard and custom colors, mists and blends offered by Ludowici. See the Colors of Ludowici brochure for more information about our extensive color program.

Ludowici Spanish barrel tile is also available in an 18 3/8" profile.

PHYSICAL CHARACTERISTICS

CHARACTERISTIC SPANISH 13 1/4" BARREL TILE PROFILE

Weight Per Square 900 lbs.

Pieces Per Square 171 pcs.

Overall Size 9 3/4" x 13 1/4"

Exposure 8 1/4" x 10 1/4"

Installed Barrel Height 3" Nominal Off Deck

Minimum Slope 4:12

Available in all standard and custom colors. Color Blends For more information about Ludowici’s color program, please see the Colors of Ludowici brochure.

Smooth Base Texture Also available in custom textures.* Please see the Terra Cotta Textures brochure for more information.

APPROVALS & CERTIFICATIONS LUDOWICI WARRANTY GREEN ATTRIBUTES Miami-Dade NOA No: 12-0904.18 All Ludowici tiles are manufactured in the Ludowici terra cotta is an energy-efficient, sustainable choice for your new roof. State of Florida Approval No: FL 13777 United States and carry a 75-year warranty against color fading and manufacturing Learn more about our green story in the ASTM C1167 Grade 1 Roof Tile With defects. For complete warranty details, Ludowici Green Promise brochure. Water Absorption Less Than 2% please visit www.ludowici.com. Class A Fire Rated MADE IN IAPMO UES ER-452 AMERICA FOR OVER 130 YEARS

© Ludowici Roof Tile, Inc. All Rights Reserved. www.ludowici.com LRT-518-1017 SPANISH 13 1/4" BARREL TILE

4 Closed Ridge End 3 Ridge (Not shown on diagram, see below)

5 Terminal 43 Top Fixture Field Tile

2 Hip 40 Rake

1 Hip Starter 41 End Band

42 Eave Closure

HIP & RIDGE Visit www.ludowici.com to download a detailed product sheet on Hip, Ridge and Decorative Hip Starters.

1 2 3 4 5 CLOSED PROFILE HIP STARTER HIP RIDGE RIDGE END TERMINAL

Circular Cover Hip & Ridge Trim Group CC-2 Hip CC-Low Bump CC-Hip Starter CC-Hip CC-Ridge CC-Closed Ridge End 1 Ridge Terminal 2 Hip 1 Ridge Terminal

#102/#206 Hip & Ridge Trim Group #206 #102/#206 #405 High Bump #406 High Bump #152 Hip Starter #102 Hip Roll #206 Ridge Closed Ridge End 2 Hip 1 Ridge Terminal 2 Hip 1 Ridge Terminal Gable Terminal

FITTINGS

40 41 42 43

PROFILE RAKES END BAND EAVES TOP FIXTURE

Left Detached Right Detached Gable Rake Gable Rake Rolled Rake Eave Closure Closed Eave Length 13 1/4" 13 1/4" 13 1/4" 8 1/4" 13 1/4" 5" Exposure 10 1/4" 10 1/4" 10 1/4" 8 1/4" 8 1/4" x 10 1/4" 8 1/4" Weight 2.1 lbs./pc. 5.7 lbs./pc. 4.5 lbs./pc. 1.2 lbs./pc. 6.3 lbs./pc. 1.2 lbs./pc.

* Textures available include brushed butt, battered butt, heavy machine score, hand roughed, top sand and weathered. Please see a sales representative for more details. Photos are for representation purposes only and should not be used for final product selection. Tiles ordered should be chosen from actual samples available at the time of order. Ludowici reserves the right to alter and adjust products, colors and finishes at any time. Please contact a sales representative for more information.

© Ludowici Roof Tile, Inc. All Rights Reserved. www.ludowici.com LRT-518-1017 Image 1: Overview of existing tile roof at original building – Note interior gutter

Aged Oak

Aged Cedar

Historic Red

Image 2: Ludowici clay tile color sample set on east roof (original structure) Image 3: The roofs are currently collared with semi-half round gutters P hotos

Color Palette

Specialized Kynar colors ronze available only upon t B gh special request. Li ronze rk B Da rtone Coppe

Almond Gr ecian G Hi reen gh Pea rl G & rey L M ow Gloss usket B Bla

Royal B Royal c k

Galvalume Clay Coppe

W r own i c

Wh r

ke

own r

ite r

Adorn your home with Classic Gutter Systems. We have a wide range of colors, metals, and installation options to suit your every need. It’s like ‘jewelry for your home’.

(269) 665-2700 22 CITY & COUNTY OF DENVER FIT ROOF REPAIR

SPECIFICATIONS

WOODBURY LIBRARY 3265 N FEDERAL BLVD DENVER, CO 80211-3211

100% CONSTRUCTION DOCUMENTS ISSUE DATE: 02.01.2021

FIT Roof Replacement Technical Specifications

TABLE OF CONTENTS

DIVISION 01 – GENERAL REQUIREMENTS 01 0100 SUMMARY OF WORK 01 0500 LAYOUT OF WORK AND SURVEYS 01 0600 REGULATORY REQUIREMENTS 01 1100 CONSTRUCTION SAFETY 01 2000 PROJECT MEETINGS 01 2300 ALTERNATES 01 3000 SUBMITTALS 01 3100 SCHEDULE 01 3400 SHOP AND WORKING DRAWINGS PRODUCT DATA AND SAMPLES 01 3700 SCHEDULE OF VALUES 01 4000 CONTRACTOR QUALITY CONTROL 01 4020 QUALITY ASSURANCE 01 5000 TEMPORARY FACILITIES 01 6200 STORAGE AND PROTECTION 01 6300 SUBSTITUTIONS 01 7000 CONTRACT CLOSEOUT 01 7100 CLEANING 01 7200 CONTRACT RECORD DOCUMENTS 01 7300 OPERATION AND MAINTENANCE DATA 01 7320 CUTTING AND PATCHING 01 7360 SELECTIVE DEMOLITION 01 7400 WARRANTIES AND BONDS 01 7419 CONSTRUCTION WASTE MANAGEMENT

DIVISION 02 -- EXISTING CONDITIONS 02 4100 DEMOLITION

DIVISION 03 -- CONCRETE 03 1000 CONCRETE FORMWORK 03 2000 CONCRETE REINFORCING 03 3000 CAST-IN-PLACE CONCRETE

DIVISION 04 -- MASONRY 04 0100 MAINTENANCE OF MASONRY 04 0101 REPAIR OF BRICK AND TERRA COTTA 04 0511 MASONRY MORTARING AND GROUTING 04 0900 MASONRY RESTORATION AND CLEANING

DIVISION 05 -- METALS 05 7000 DECORATIVE METAL

DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES 06 1000 ROUGH 06 2000 FINISH CARPENTRY

DIVISION 7– THERMAL AND MOISTURE PROTECTION 07 3213 CLAY ROOF TILES 07 6000 SHEET METAL FLASHING AND TRIM 07 9200 SEALANT AND CAULKING

TABLE OF CONTENTS TOC - 1

FIT Roof Replacement Technical Specifications

DIVISION 08 -- OPENINGS 08_5900 WOOD WINDOW RESTORATION

DIVISION 09 -- FINISHES 09 9113 EXTERIOR PAINTING 09 96 53 ELASTOMERIC COATINGS

END OF SECTION

TABLE OF CONTENTS TOC - 2

FIT Roof Replacement Technical Specifications

SECTION 01 0100

SUMMARY OF WORK

PART 1 - GENERAL

1.1 DESCRIPTION

A. The Work specified in this contract consists of furnishing all management, supervision, labor, materials, tools, equipment, services, testing and incidentals for the construction of the Work indicated in the contract documents including lump sum items and unit price items.

B. Reference: City and County of Denver Standard Specifications for Construction General Contract Conditions 2011 Edition ( the yellow book) Contract General Conditions, GC 301 Consideration, GC 306 Working Hours and Schedule, GC Title 8 Protection of Persons and Property and GC Title 14 Site Conditions

C. Replace/Repair Roofing: 1. Refer to the Drawings for roof assembly and repair systems. 2. Refer to the roofing Technical Specifications for additional roofing requirements. D. Building Maintenance and Repair: 1. Refer to the Drawings for masonry, terra-cotta, concrete and carpentry repairs. 2. Refer to the roofing Technical Specifications for additional repair requirements.

E. Project Team Members: 1. Project Manager: Paul Sobiech, City & County of Denver – (720) 913-4528. 2. Principle Architect: Jack Brinkley, The Abo Group – (303) 902-3317 3. Roofing Consultant: Ronald Scott, Roof Tech Consultants, Inc. – (303) 233-1092.

1.2 SITE CONDITIONS

A. The Contractor acknowledges that he has reviewed sections 1401 and 1402 of Title 14 of City and County of Denver Standard Specifications for Construction General Contract Conditions 2011 Edition (the yellow book). The Contractor warrants that as a result of examination and investigation of all the aforesaid data and the site, that the Contractor can per-form the Work in a good and workmanlike manner and to the satisfaction of the City. The City assumes no responsibility for any representations made by any of its officers or agents during or prior to the execution of this contract unless such representation is expressly stat- ed in the contract.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 CONTRACTOR'S DUTIES

A. Except as otherwise specified, furnish the following to the full extent required by the con- tract: 1. Labor, superintendence, supervision, and products. 2. Construction equipment, tools, machinery, and materials. SUMMARY OF WORK 01 0100 - 1

FIT Roof Replacement Technical Specifications 3. Utilities required for construction and related activities.

4. Other facilities and services necessary to properly execute and complete the Work, including security for worksite, and storage and protection of all materials awaiting in- corporation into the Work, providing a safe working environment for workers, City and County of Denver representatives, and the public in accordance with all local, state and federal requirements.

B. Prosecute the Work as specified and in a timely manner. Submit a schedule of Work in accordance with GC 306 Working Hours and Schedule.

3.2 COORDINATION

A. Coordinate prosecution of the Work in accordance with GC 801 Safety of Persons and GC 802 Protective Devices and Safety Precautions; GC 803 Protection of Property and Work in Progress; and GC 804 Protection of Municipal Public Service and Utility Systems with those ongoing City and County of Denver operations, public utilities, governmental bodies, private utilities and other contractors performing work on and adjacent to the worksites. Eliminate or minimize delays in the Work and conflicts with those operations, utilities, bodies and con- tractors. Schedule governmental, private utility and public utility work that relies upon survey points, lines and grades established by the Contractor to occur immediately after those points, lines and grades have been established. Confirm coordination measures for each individual case with the City in writing.

B. In the coordination effort of work by others, the Contractor shall obtain and refer to equipment locations and other layouts, as available, to avoid interface problems.

C. The City reserves the right to permit access to the site of the Work for the performance of work by other contractors and persons at such times that the City deems proper. The exercise of such reserved right shall in no way or to any extent relieve the Contractor from liability for loss and damage to the work due to or resulting from its operations or from responsibility for complete execution of the Contract. The Contractor shall cooperate with other con- tractors and persons in all matters requiring common effort.

3.3 CONTRACTOR USE OF WORKSITE

A. Confine worksite operations to areas permitted by law, ordinances, permits and the con- tract.

B. Per GC 801, consider the safety of the Work and that of the people and property on and ad- jacent to the worksite when determining amount, location, movement and use of materials and equipment on worksite.

C. Do not load worksite with equipment and products that would interfere with the Work. Only equipment, tools or materials required for this Work may be stored at the worksite.

D. Per GC 803, Protect products, equipment and materials stored on worksite.

E. Relocate stored products, equipment and materials which interfere with operations of City, government bodies, public and private utilities, and other contractors.

END OF SECTION 01 0100

SUMMARY OF WORK 01 0100 - 2

FIT Roof Replacement Technical Specifications

SECTION 01 0500

LAYOUT OF WORK AND SURVEYS

PART 1 - GENERAL

1.1 SCOPE

A. This Section covers the procedures and accuracy requirements for survey services for lay- out of work and field measurement of work quantities to be determined by surveys.

B. Reference Contract General Conditions, GC 318and GC 319

1.2 SUBMITTAL

A. Refer to Technical Specifications Section 01 3000 for submittal requirements. 1. Copies of original pages of field notes. 2. Original field notebooks when filled and at end of contract. 3. As-built measurements.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 CONSTRUCTION LINES AND GRADES

A. The Contractor shall make surveys and layouts as necessary to delineate the work. The Contractor shall review GC 318 and CG 319 to assure construction surveys for the proper performance of the Work. The City will provide all reference points shown on the contract documents. The Contractor shall accurately transfer the survey control information to the points of application and maintain in good order survey control points that may be required for the completion of the Work subject as to their location, sufficiency and adequacy. The Contractor shall furnish skilled labor, instrument platforms, ladders and such other temporary structures as may be necessary for making and maintaining points and lines in connection with the surveys required.

B. The City may draw the Contractor's attention to errors or omissions in lines or grades, but the failure to point out such errors or omissions shall not give the Contractor any right or claim nor shall in any way relieve the Contractor of his obligations according to the terms of this contract.

C. The Contractor's instruments and other survey equipment shall be accurate, suitable for the surveys required in accordance with recognized professional standards and in proper condition and adjustment at all times. Surveys shall be performed under the direct supervision of a Colorado licensed surveyor.

LAYOUT OF WORK AND SURVEYS 01 0500 - 1

FIT Roof Replacement Technical Specifications

3.2 AS-BUILT MEASUREMENTS

A. As-built measurement for items that will be hidden or visible including all civil, mechanical, electrical, control work and all utilities that are placed in concrete, earth or behind walls shall be made. Items located within five feet beyond a building shall be referenced to building column lines and finish floor elevations. Special attention shall be paid to items requiring service, sensors, items with moving parts, access points and locations of junctions, elevation changes and directional changes.

END OF SECTION 01 0500

LAYOUT OF WORK AND SURVEYS 01 0500 - 2

FIT Roof Replacement Technical Specifications

SECTION 01 0600

REGULATORY REQUIREMENTS

PART 1 - GENERAL

1.1 SUMMARY

A. This Section identifies primary compliance with the State, City and County of Denver’s regu- latory requirements outlined in Special Contract conditions SC-1 Construction Specifica- tions and SC-13 Construction Inspection by the City. B. Reference: City and County of Denver Standard Specifications for Construction General Contract Conditions 2011 Edition ( the yellow book) Contract General Conditions, GC 205 Building Inspection and GC 317 Permits and Licenses

1.2 BUILDING AND FIRE CODES

A. All design and construction work shall be governed by the Building Code for the City and County of Denver, latest edition. This is based upon the International Building Code of the International Code Council with Denver Amendments to this code. See Special Contract Conditions, Construction Specifications.

1.3 DENVER BUILDING DEPARTMENT

A. For review and approval of all construction documents for compliance to the International Building Code 2006 and City and County and Denver Amendments 2006 or later approved editions.

B. City and County of Denver Community Planning and Development Building Inspection Division 201 West Colfax Avenue, Dept 205 Denver, Colorado 80202 Telephone 720-865-2720 Fax 720-865-2880

1.4 DENVER FIRE DEPARTMENT

A. For review and approval of plans for compliance with the Denver Fire Department's re- quirements as they apply to projects for the Department of Public Works:

B. Denver Fire Department 745 W. Colfax Ave. Denver, Colorado 80204Telephone: 720-913-3474, or E-mail: [email protected] Fax 720-865-2833

C. The Contractor is advised that the Denver Fire Department – Fire Prevention Bureau re- quires permitting for the following activities as they apply to the scope of work. The Con- tractor is responsible for obtaining the appropriate permits necessary to complete the work. All costs associated with this permitting and policy compliance shall be the responsibility of the Contractor. The policies all reference the International Fire Code (IFC).

REGULATORY REQUIREMENTS 01 0600 - 1

FIT Roof Replacement Technical Specifications

1. “Hot work”, which is defined as the operation of any equipment or tool that creates sparks, hot slag, or radiant or convective heat as a result of the work. This includes, but is not limited to, welding, cutting, brazing, or soldering. 2. Use and storage of compressed gas for both temporary storage and permanent facili- ty installation. This includes, but is not limited to, flammable gas (excluding propane- LPG), oxidizer (including oxygen), and inert and/or simple asphyxiates. 3. Tank installation, which includes above-ground storage tanks (AST) and underground storage tanks (UST) for both temporary tanks and permanent facility installations.

D. In addition to the above permits, the Denver Fire Department may require other permits that are associated with the specific work in the Contract Documents. Policies provided by the Denver Fire Department are meant to provide basic information for the most common con- ditions and situations. In any given occupancy, many other International Fire Code (IFC) requirements may be enforced. These should be addressed with the Denver Fire Depart- ment before construction begins and during construction with premise inspection(s). Any questions can be addressed to the Fire Prevention Bureau between 6:30 AM and 9:00 AM Monday-Friday at 720-913-8242 or -8237.

PART 2 - PRODUCTS (NOT USED)

PART 3 - EXECUTION

3.1 PERMITS AND CERTIFICATIONS

A. The Contractor shall maintain records on site of all permits acquired by federal, state, and local agencies. Posting of permits shall conform to requirements of the respective agen- cies.

B. At the time of Substantial Completion and Final Acceptance, the Contractor shall forward to the Project Manager a copy of the Temporary Certificate of Occupancy and the final Certifi- cate of Occupancy.

END OF SECTION 01 0600

REGULATORY REQUIREMENTS 01 0600 - 2 FIT Roof Replacement Technical Specifications

SECTION 01 1100

CONSTRUCTION SAFETY

PART 1 - GENERAL

1.1 WORK INCLUDED

A. Work specified in this Section includes construction safety precautions and programs by the Contractor

B. Reference Contract General Conditions, GC 801 Safety of Persons, GC 802 Protective De- vices and Safety, GC 803 Protection of Property and Work in Progress.

1.2 RESPONSIBILITY

A. The General Conditions make it clear in section 801 that all safety precautions during the construction process are the responsibility of the Contractor. The Contractor is responsible for the health and safety of his employees, agents, subcontractors and their employees, and other persons on the worksite; for the protection and preservation of the work and all materials and equipment to be incorporated therein; and for the worksite and the area sur- rounding the worksite. The Contractor shall take all necessary and reasonable precautions and actions to protect all such persons and property.

1.3 SUBMITTAL

A. Refer to Technical Specifications 01 3000 for submittal requirements. A safety plan shall be submitted by the General Contract prior to commencing any work. PART 2 - PRODUCTS

2.1 CONTRACTOR'S SAFETY PLAN

A. Provide a Contractor's Safety Program that as a minimum meets all applicable federal, state and local government requirements. PART 3 - EXECUTION

3.1 IMPLEMENT CONTRACTOR'S SAFETY PLAN

A. Implement the approved Contractor's Operational Safety Plan as described in this Technical Specifications

END OF SECTION 01 1100

CONSTRUCTION SAFETY 01 1100 - 1

FIT Roof Replacement Technical Specifications

THIS PAGE INTENTIONALLY LEFT BLANK

CONSTRUCTION SAFETY 01 1100 - 2

FIT Roof Replacement Technical Specifications

SECTION 01 2000

PROJECT MEETINGS

PART 1 - GENERAL

1.1 DESCRIPTION

A. The Work specified in this Section requires the Contractor's Project Manager, Superinten- dent and Quality Control representative to attend meetings scheduled by the City for the collection and dissemination of information related to the subject contract.

B. The Contractor will prepare the minutes of each construction meeting and distribute them to each of the participants.

1.2 OTHER MEETINGS

A. The Contractor will be advised of times, dates and places of City initiated meetings. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION

3.1 PRECONSTRUCTION MEETING

A. A Preconstruction Meeting will be scheduled by the City after the Contract has been signed by all parties. The purpose of this meeting is to introduce the City's representatives to their counterparts in the Contractor's organization and to establish lines of communication be- tween these representatives and outline some contract requirements. The Contractor's Su- perintendent and Quality Control Representative(s) shall attend this meeting.

B. The Project Manager will distribute a notice of this meeting, along with an agenda of the subjects to be addressed.

C. The Project Manager will explain and discuss the responsibilities and authorities of the City, the Designer, and the Project Manager's organization.

D. The City will provide highlights of the following information at this meeting: 1. Minority Business Enterprise (MBE) and Women Business Enterprise (WBE) or Small Business Enterprise (SBE) if such was a specifically designated requirement. 2. Insurance and permit requirements. 3. Procedures for processing change orders. 4. Procedures for submitting shop and working drawings, product data and samples. 5. Monthly pay estimate cutoff dates. 6. Payment procedures. 7. Request for information procedures. 8. Communication procedures. 9. Contractor-required Daily Report 10. Scheduling and coordination requirements including utility outage notifications 11. Site and building access, staging areas, and parking for contractors

PROJECT MEETINGS 01 2000 - 1

FIT Roof Replacement Technical Specifications

12. Any concerns for public interface during the execution of the work 13. Quality control/assurance procedures. 14. Environmental requirements regarding finding potentially contaminated materials dur- ing the execution of the work.. 15. As-built documents. 16. Project closeout requirements.

E. The Contractor will introduce the Contractor's representatives and briefly describe each person's responsibilities. The Contractor will provide the following: 1. A list of all subcontractors. 2. Office, storage areas and construction area layouts, along with temporary easements. 3. Safety, first aid, emergency actions and security procedures including the name of the Contractor's insurance company. 4. 60 day preliminary milestone schedule. 5. Sequence of work. 6. Construction worksite waste stream sorting and haul plan. 7. Housekeeping procedures. 8. The Contractor‘s general erosion and sedimentation control plans, noise, hazardous material, air and water pollution control plans. 9. Coordination and notification for utility work and utility outages 10. Deliveries and priorities of major equipment. 11. Submittal Schedule

F. Explanations provided by the City will not amend, supersede or alter the terms or meaning of any contract document and the Contractor shall not claim reliance on such explanations as a defense to any breach or failure by the Contractor to perform as specified in the con- tract.

3.2 CONSTRUCTION PROGRESS MEETINGS

A. Progress meetings will be scheduled weekly. The meetings will be held at the worksite or at a location selected by the Team. Meetings will be chaired by the Contractor.

B. The Contractor's personnel shall attend and the Contractor will be responsible for publishing minutes of the meetings.

C. At a minimum, the following items will be addressed at each meeting. The items addressed in the meeting do not waive notification or submittal requirements as required elsewhere in the contract. 1. Safety: Contractor shall report any safety issues 2. Quality Control a. The Contractor's Quality Control Representative shall report on inspections by other agencies and any follow-up activity required. b. The Project Manager and/or the Designer will present and discuss issues regard- ing quality control. 3. Quality Assurance

PROJECT MEETINGS 01 2000 - 2

FIT Roof Replacement Technical Specifications

a. The Contractor will present and discuss issues regarding quality assurance. 4. Design activities: open discussion 5. Shop drawings/submittals/material procurement a. The Contractor shall provide and review the Contractor's submittal schedule and provide any updated information and/or changes to the schedule. b. The Contractor shall provide information on the status of submittals requiring re- submittal. c. The Contractor shall review any accepted submittals that the Contractor plans to re-submit with changes. d. Contract shall provide the status of material procurement for long-lead items All long-lead items shall be identified with a separate activity on the approved CPM project schedule. 6. Construction activities: Open discussion to include coordination items with other Contractors and or agencies. 7. Schedule a. The Contractor shall provide the attendees with the Contractor's three week look- ahead schedule and review the items on the schedule. The schedule shall be in bar chart format and coordinated with the approved CPM.

END OF SECTION 01 2000

PROJECT MEETINGS 01 2000 - 3

FIT Roof Replacement Technical Specifications

THIS PAGE INTENTIONALLY LEFT BLANK

PROJECT MEETINGS 01 2000 - 4 FIT Roof Replacement Technical Specifications

SECTION 012300

ALTERNATES

1.01 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Technical Specification Sections, apply to this Section.

1.02 SUMMARY

A. Section includes administrative and procedural requirements for alternates.

1.03 DEFINITIONS

A. Alternate: An amount proposed by bidders and stated on the Bid Form for certain work defined in the bidding requirements that may be added to or deducted from the base bid amount if City decides to accept a corresponding change either in the amount of construction to be completed or in the products, materials, equipment, systems, or installation methods described in the Contract Documents.

1. Alternates described in this Section are part of the Work only if enumerated in the Agreement.

2. The cost or credit for each alternate is the net addition to or deduction from the Contract Sum to incorporate alternate into the Work. No other adjustments are made to the Contract Sum.

1.04 PROCEDURES

A. Coordination: Revise or adjust affected adjacent work as necessary to completely integrate work of the alternate into Project.

1. Include as part of each alternate, miscellaneous devices, accessory objects, and similar items incidental to or required for a complete installation whether or not indicated as part of alternate.

B. Notification: Immediately following award of the Contract, notify each party involved, in writing, of the status of each alternate. Indicate if alternates have been accepted, rejected, or deferred for later consideration. Include a complete description of negotiated revisions to alternates.

C. Execute accepted alternates under the same conditions as other work of the Contract.

D. Schedule: A schedule of alternates is included at the end of this Section. Specification Sections referenced in schedule contain requirements for materials necessary to achieve the work described under each alternate.

ALTERNATES 012300-1 FIT Roof Replacement Technical Specifications

1.05 SCHEDULE OF ALTERNATES

A. Alternate No. 1: Include the installation of a new insulated TPO roof system on Deck 4 of the Mile-High Montessori Early Childhood Center.

1. Base Bid: Roof replacement not included in the base bid. 2. Alternate: Remove existing insulated modified bitumen roof to the surface of the wood deck. Install a new insulated TPO roof system per the project drawings and specification section 07 5423.

END OF SECTION

ALTERNATES 012300-2

FIT Roof Replacement Technical Specifications

SECTION 01 3000

SUBMITTALS

PART 1 - GENERAL

1.1 DESCRIPTION

A. The Work specified in this Section summarizes the requirements for the submittal of docu- ments to the City that are defined in these Specifications. It also describes the procedures for "supplemental" submittals.

B. Reference Contract General Conditions, GC 309 and GC 405. PART 2 - PRODUCTS

2.1 SUBMITTAL SCHEDULE

A. The Contractor shall provide a submittal schedule within 14 days after Notice to Proceed. The Submittal Schedule shall be directly related to the CPM schedule, shall identify all the submittals, and shall include the following information for each submittal item: 1. Specification section, contract article, or special condition 2. Specification Subparagraph 3. Item description 4. Date the submittal shall be submitted 5. Name of subcontractor or supplier

B. The submittal schedule shall be updated every two weeks by the Contractor and reviewed with the Project Manager at the regular project meetings.

2.2 ELECTRONIC SUBMITTALS

A. All submittals shall be delivered to the Project Manger and Designer in electronic format, whenever possible see Technical Specifications Section 01 3400 for additional information. 1. Acceptable electronic formats a. Adobe Acrobat 90 or newer. All files shall be fully compatible with Adobe Acrobat 9.0. File shall have no security and bookmark every applicable submittal. 2. Formats are acceptable only with written permission of the project manager or re- quired by individual spec sections: a. Microsoft Office 2007 or newer. All files shall be fully compatible with Microsoft Office 2007. b. AutoDesk AutoCAD 2007 or newer. All files shall be fully compatible with Auto- Desk AutoCAD 2007. 1) AutoCAD files shall be self contained with no external x-references. c. Other files pre-approved by the Project Manager. 3. Electronic file names: Each electronic document shall have a unique file name. File name convention shall be as follows unless otherwise agreed to by Project Manager: - AAA-BBBBB-CCC-RZ a. AAA = sequential submittal number starting at 001. b. BBBBB = specification section containing submittal requirements

SUBMITTALS 01 3000 - 1

FIT Roof Replacement Technical Specifications

c. CCC = sequential specification submittal number starting at 001. d. RZ = sequential revision number. RZ not required on initial submittals. e. Example A:005-013700-002”, five submittals have been logged overall with two submittals made to specification section 013700. f. Example B: 009-013700-002-R3, nine submittals made overall and three revi- sions to submittal 013700-002.

2.3 INITIAL SUBMITTAL

A. Each submittal document shall include a title block showing the following information: 1. Date of submittal and revision dates. 2. Contract title and number. 3. The names of Contractor, subcontractor, supplier, manufacturer and when applicable, the seal and signature of an engineer registered in the State of Colorado, for the in- volved discipline. 4. Identification of product by either description, model number, style number or lot num- ber. 5. Subject identification by contract drawing or specification reference.

B. On each submitted drawing, include a blank space on each sheet, three inches by four inches, in the lower right corner, just above the title block, the Designer of Record may indi- cate the action taken.

C. Make submissions sufficiently in advance so that the Designer review may be completed before any material procurement or Work represented by those submittals is scheduled to be performed.

D. Allow a minimum cycle of 10 working days for review of each submittal by the Designer of Record.

E. The Contractor shall at the time of submission describe variations from the contract docu- ments in writing, separate from the submittal document. If the Project Manager approves any such variations, an appropriate contract change order shall be issued except that, if the variation is minor and does not involve a change in price or in time of performance, a modi- fication need not be issued. If a submission contains variations and the variation column is not marked on the transmittal form, it will not be considered for review and acceptance. Along with marking the transmittal as a variation, a description must be included which out- lines all the differences including maintenance and utility services along with any cost sav- ings from an item not containing the variation.

F. Changes in accepted submittal documents will not be permitted unless those changes have been accepted, in writing, by the City.

G. The form and quality of submittal documents shall comply with Technical Specifications Section 013400.

2.4 SUPPLEMENTAL SUBMITTALS

A. Supplemental submittal documents initiated by the Contractor for consideration of corrective procedures shall contain sufficient data for review. Make supplemental submittals in the same manner as initial submittals with the appropriate primary transmittal referenced. PART 3 - EXECUTION

SUBMITTALS 01 3000 - 2

FIT Roof Replacement Technical Specifications

3.1 CONTRACTOR'S REVIEW

A. The Contractor shall review submittal documents, stamp and sign as reviewed and ap- proved as complying with contract documents prior to submission to the Designer of Rec- ord.

3.2 CITY REVIEW

A. Submittal documents will be reviewed by the Designer for conformance to requirements of the contract drawings and specifications. Review of a separate item will not constitute re- view of an assembly in which the item functions. The Designer or the Project Manager will withhold approval of submittals that depend on other submittals not yet submitted. Review and acceptance will not relieve the Contractor from his responsibility for accuracy of submit- tals, for conformity of submittal document to requirements of contract drawings and specifi- cations, for compatibility of described product with contiguous products and the rest of the system, or for protection and completion of the contract in accordance with the contract drawings and specifications.

B. The Designer, will review the submittal documents for general conformance with the con- tract documents and mark the Action Code, sign and date the transmittal.

C. The Action Codes have the following meanings: 1. A - ACCEPTED is an approval, and means that the illustration and description ap- pears to conform to the respective requirements of the contract documents. 2. B - ACCEPTED AS NOTED is an approval, and means that the illustration and de- scription will conform to the respective requirements of the contract documents after changes in recognition of the reviewer's comments. Submittals so marked need not be resubmitted. 3. C - REVISE AND RESUBMIT means that the submittal is unacceptable and must be revised and resubmitted. 4. E - NOT ACCEPTED means that the submittal is not approved and that a new submit- tal in accordance with the contract documents shall be made. 5. F - RECEIPT ACKNOWLEDGED, means an item is received by the Designer but no review was made. This mark is for use in resubmitting items that were previously Ac- cepted as Noted and the Contractor has incorporated the notes and wants the Project Managers' staff to have the same material that the Contractor's field staff is using.

3.3 CONTRACTOR'S RESPONSIBILITIES

A. Coordinate each submittal document with the requirements of the Work; place particular emphasis upon ensuring that each submittal of one trade is compatible with other submit- tals of that trade and submittals of other trades including producing as needed drawings showing the relationship of the work of different trades.

B. Contractor's responsibility for errors and omissions in submittal documents and associated calculations is not relieved by the City's review, correction and acceptance of submittals.

C. Contractor's liability to the City, in case of variations in the submittal document from the re- quirements of the contract documents, is not relieved by the City's review and acceptance of submittals containing variations unless the City expressly approves the deviation in writ- ing, in which the City describes the variation.

D. The Contractor shall maintain a file of all approved submittal documents at the worksite.

SUBMITTALS 01 3000 - 3

FIT Roof Replacement Technical Specifications

The complete file of approved submittal documents shall be turned over to the City with the as-built documents at the end of the job.

E. Schedule impact due to resubmittal requirements is the responsibility of the Contractor.

END OF SECTION 01 3000

SUBMITTALS 01 3000 - 4

FIT Roof Replacement Technical Specifications

SECTION 01 3100

SCHEDULE

PART 1 - GENERAL

1.1 DESCRIPTION

A. This Section specifies the preparation of a preliminary schedule, construction schedule, re- lated narratives and monthly progress reports, all encompassing complete performance of contract requirements.

B. The Contractor shall schedule and coordinate the work of all of its subcontractors and sup- pliers including their use of the worksite. The Contractor shall keep the subcontractors and suppliers informed of the project construction schedule to enable the subcontractors and suppliers to plan and perform their work properly.

C. The Contractor shall, in accordance with the requirements of the technical specifications, submit a construction schedule that shall provide for the expeditious and practicable execu- tion of the Work within the Contract Time

D. The construction schedule for the performance of the Work shall be a Critical Path Method (CPM) system in bar chart format, unless an alternate system is specifically identified in the technical specifications, with reasonable detail.

E. Float or slack is defined as the amount of time between the early start date and the late start date or the early finish date and the late finish date of any activities in the schedule. Float or slack is not time for the exclusive use or benefit of either the Contractor or the City.

F. The Contractor shall submit a monthly progress report and schedule update.

G. The Contractor shall complete the Work within the Contract Time and in accordance with the most recent schedule submittal that has been reviewed and approved by the Project Manager during regular project meetings.

H. Reference Special Contract Conditions, Liquidated Damages, and Contract General Condi- tions, GC 306, GC 603, GC 909, GC 1103, GC 1202, GC704

1.2 PLANNING

A. The schedule shall show total contract time, including project milestones as follow or as es- tablished elsewhere in the contract documents: a. [Insert list of milestones]

B. The Contractor shall prepare a work plan to complete the work within the contract time and complete those portions of work relating to each milestone date and other contract require- ments. The Schedule shall be submitted electronically to the Project Manager in a dynamic format which will allow review and manipulation of any part of the schedule, and in PDF format. Upon the request of the Project Manager, the schedule activities shall be resource loaded showing labor man hours by crafts, major construction equipment by type and value of the work.

SCHEDULE 01 3100 - 1

FIT Roof Replacement Technical Specifications

C. In addition to the construction activities the schedule shall include activities for furnishing materials and equipment and vendor shop drawing preparation. The construction schedule, a supporting narrative, and the overall progress curve shall be submitted for approval within 30 days after Notice to Proceed. Within 30 days the City will respond with approval or di- rection to revise and resubmit within ten days. Failure of the Contractor to have a construc- tion schedule approved by the City will be considered cause for withholding progress pay- ment(s).

D. To the extent that the construction schedule or any revisions thereof contains anything not jointly agreed upon in writing, or fails to show anything jointly agreed upon in writing, it shall not be considered to have the approval of the City. Failure to include any work item re- quired for performance of this contract shall not excuse the Contractor from completing all work within applicable completion dates, regardless of the City's approval of the schedule.

E. Failure of the Contractor to comply with this Section will be considered cause for withhold- ing progress payment(s) or termination for default.

1.3 SUBMITTALS

A. Refer to Technical Specifications Section 01 3000 for submittal procedures. Submit the fol- lowing as indicated: a. Preliminary schedule Construction schedule data and work plan Monthly pro- gress report b. As built construction schedule. PART 2 - PRODUCT (NOT USED) PART 3 - EXECUTION

3.1 PRELIMINARY SCHEDULE

A. The Contractor shall prepare a preliminary schedule covering the first 90 calendar days of the contract. This preliminary schedule shall be submitted at the Preconstruction Meeting and shall be accompanied by a narrative description of the work plan. The preliminary schedule shall show all significant work tasks that occur in the first 90 days, including plan- ning, mobilization, shop submittals and approvals, procurement, fabrication and construc- tion. It shall identify work items or milestones that affect or are affected by the City, other Contractor's work, utilities and other third parties, and it shall list major data submittals re- quired by the contract.

3.2 CONSTRUCTION SCHEDULE

A. The construction schedule shall be a computerized CPM schedule that includes: a. The order, sequence and interdependence of all significant work items including construction, procurement, fabrication, testing, startup and inspection and deliv- ery of critical or special materials and equipment, submittals and approvals of critical samples, shop drawings, procedures, or other documents that could have a schedule impact. b. Work items by the City, other Contractors, utilities and other third parties that may affect or be affected by Contractor's activities. c. Proper referencing of all work items to identify applicable subcontractors or other performing parties. d. The construction schedule shall be prepared to include the data for the total con- tract duration, and the critical path shall be identified, including critical paths for interim completion dates. Scheduled start or completion dates imposed on the

SCHEDULE 01 3100 - 2

FIT Roof Replacement Technical Specifications

schedule by the Contractor shall be consistent with contract milestone dates. Milestone events shall be the schedule dates specified in the Special Conditions and shall be prominently identified and connected to the appropriate work item, denoting its start or completion. Work items related to any interim milestones shall be coded for that milestone.

3.3 PROGRESS REPORTING

A. The Contractor shall submit a monthly progress report at the end of each month following the Notice to Proceed. At the end of each month, the Contractor and Project Manager shall agree on the progress of the work and the Contractor shall update the construction sched- ule accordingly. The updated construction schedule is a prerequisite to the submittal of the Contractor's application for progress payment. The schedule shall be made in accordance with Technical Specifications Section 013100-3.02. This review does not constitute an ap- proval of the construction schedule and shall not be used for the purposes of modifying the initially approved construction schedule.

B. The latest completion time for any work item does not fall within the time allowed by the construction schedule, the sequence of work and/or duration shall be revised by the Con- tractor through concurrent operations, additional manpower, additional shifts or overtime, additional equipment or alternative construction methods until the schedule produced indi- cates that all significant contract completion dates, occupancy dates and milestones will be met.

3.4 SCHEDULE CHANGES

A. The Contractor's request for construction schedule changes shall be made on the latest ap- proved construction schedule and shall be accompanied by a narrative description and jus- tification for the change, and shall be submitted in accordance with the General Conditions Title 1105 on changes in time. Minor revisions submitted at monthly progress review meet- ings are not considered as changes in this context.

B. The construction schedule may be changed when one or more of the following occur: a. When a change order significantly affects the contract completion date or se- quence of work items. b. When the Contractor elects to change the sequence or duration of work items af- fecting the critical path. c. When the City directs a change that affects a milestone date(s) specified in the Special Conditions or alters the length of a critical path.

3.5 CONTRACT EXTENSIONS

A. If the Contractor is granted an extension of time for completion of any milestone or contract completion date under the provisions of the contract, the determination of the total number of extended days will be based upon the current analysis of the schedule and upon all data relevant to the extension. Such data shall be incorporated in the next monthly update of the schedule.

B. The Contractor acknowledges and agrees that delays in work items which, according to schedule analysis do not affect any milestone dates or contract completion date shown on the CPM network at the time of the delay will not be the basis for a contract extension.

SCHEDULE 01 3100 - 3

FIT Roof Replacement Technical Specifications

3.6 AS-BUILT CONSTRUCTION SCHEDULE

A. After all contract work items are complete, the Contractor shall submit an as built construc- tion schedule showing actual start and finish dates for all work items and milestones.

END OF SECTION 01 3100

SCHEDULE 01 3100 - 4

FIT Roof Replacement Technical Specifications

SECTION 01 3400

SHOP DRAWINGS, PRODUCT DATA AND SAMPLES

PART 1 - GENERAL

1.1 DESCRIPTION

A. The Work specified in this Section consists of preparing and submitting shop and working drawings, product data, samples and record documents required by other technical specifi- cations sections. 1. The Contractor shall submit all shop drawings, working drawings, product data and samples, as defined in Title 1 of the General Conditions, to the Designer and Project Manager, if requested, in accordance with the requirements in the technical specifica- tions. The Designer will return one copy of the shop drawings, working drawings and product data to the Contractor with a written transmittal within the time periods noted in the technical specifications.

B. Reference Contract General Conditions, GC 110, GC 116, GC 117, GC 303, GC 324, GC 401, GC 402, and GC 405.

1.2 SUBMITTALS

A. Refer to Technical Specifications Section 01 3000 for submittal procedures.

B. Submittals shall be delivered to the Designer and Project Manager in electronic format, whenever possible. All submittals must be of a consistent format (all Acrobat or all Word, etc). No combination of electronic file types will be allowed unless required by a specific specification section. 1. Acceptable electronic formats a. Adobe Acrobat 9.0or newer. All files shall be fully compatible with Adobe Acrobat 9.0 b. Formats are acceptable only with written permission of the Project Manager or required by individual spec sections: 1) Microsoft Office 2007 or newer. All files shall be fully compatible with Mi- crosoft Office 2007. 2) AutoDesk AutoCAD 2007 or newer. All files shall be fully compatible with AutoDesk AutoCAD 2007. a) AutoCAD files shall be self contained with no external x-references. 3) Other files pre-approved by the Project Manager 2. Adobe Acrobat Requirements: a. Drawings shall have security set to “No Security”. Commenting, printing, adding photos, form fields and document signing must be allowed. b. PDF submittals shall be one continuous file. No external links are allowed. c. All individual components of submittals shall be bookmarked inside the PDF file. d. All original documents shall be directly converted from the original electronic for- mat to PDF. Failure to comply with these requirements will result in a return of file to the Contractor for immediate revision. 1. Electronic file names: Each electronic document shall have a unique file name. File name convention shall be as follows unless otherwise agreed to by Project Manager: -

SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 01 3400 - 1

FIT Roof Replacement Technical Specifications

AAA-BBBBB-CCC-RZ a. AAA = sequential submittal number starting at 001. b. BBBBB = specification section containing submittal requirements c. CCC = sequential specification submittal number starting at 001. d. RZ = sequential revision number. RZ not required on initial submittals. e. Example A:005-013700-002”, five submittals have been logged overall with two submittals made to specification section 013700. f. Example B: 009-013700-002-R3, nine submittals made overall and three revi- sions to submittal 013700-002.

C. Quantities 1. Post electronic submittals as PDF electronic files directly to Designer’s FTP, Contrac- tors FTP site or a site specifically established for the Project. a. The Contractor should send an email for each submittal posted to all parties noti- fying them the submittal is available for review. b. The Project Manager or Designer will send an email to the Contractor when the submittal review is complete. 2. Contractor can submit electronic submittals via email as PDF electronic files if ap- proved by the Project Manager. 3. Three samples of each item specified in the various specification sections, unless otherwise specified. 4. Note: If manufacturer’s printed information is in color, all copies of submittals must be in color. a. Printed information is only allowed when electronic copies are not possible.

D. Review 1. Submittal review comments by the Designer will be in electronic form and incorpo- rated into the electronic submittal file. 2. Resubmittals of electronic documents shall modify the original electronic file with new information and include the Designer’s comments with appropriate responses and ad- ditional information.

1.3 CHANGES

A. Changes in products for which shop or working drawings, product data or samples have been submitted will not be permitted unless those changes have been accepted and ap- proved in writing by the City and County of Denver. PART 2 - PRODUCTS

2.1 SHOP AND WORKING DRAWINGS

A. Include the following as they apply to the subject: 1. Contract title, work order and number. 2. Respective contract drawing numbers. 3. Applicable specification section numbers. 4. Relation to adjacent structure or materials. 5. Field dimensions clearly identified as such.

SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 01 3400 - 2

FIT Roof Replacement Technical Specifications

6. Applicable standards such as ASTM or Federal Specification number, and pertinent authority specifications or standards. 7. Identification of deviations from the contract drawings and specifications. 8. Drawing name, number and revision. 9. Contractor's stamp, initialed or signed, certifying: a. Verification of field measurements. b. Review of submittals for compliance with contract requirements. c. Compatibility of the Work shown thereon with that of affected trades. 10. Blank space on each sheet per Technical Specifications Section 01300, paragraph 2.02.B.

B. Drawings of equipment and other items that contain multiple parts shall include exploded views showing the relationship of parts and the description of the parts into the smallest units that may be purchased or serviced.

2.2 PRODUCT DATA

A. Modify manufacturer's standard and/or schematic drawings to delete information which is not applicable to the contract. Supplement standard information with additional information applicable to this contract.

B. Modify manufacturer's standard(s), diagrams, schedules, performance charts, illustrations, calculations and other descriptive data to delete information which is not applicable to the contract. Indicate dimensions, clearances, performance characteristics and capacities. In- clude with the submittal electrical, plumbing, HVAC and any other diagrams, as applicable.

C. Modify erection, application and placing instructions to delete information that is not appli- cable to the contract or work order.

D. Include the following: 1. Contract title, work order and number 2. Respective contract drawing numbers 3. Applicable contract technical specification section numbers 4. Applicable standards such as ASTM or Federal Specification number, and pertinent authority specification or standards 5. Identification of deviations from the contract drawings and specifications 6. Contractor's stamp, initialed or signed, certifying: a. Dimensional compatibility of the product with the space in which it is intended to be used b. Review of submittals for compliance with contract requirements c. Compatibility of the product with other products with which it is to perform or which will be next to it. d. The products electrical, plumbing, control and HVAC requirements conform to contract documents and the necessary utilities are provided for in the contract documents.

E. Certificates of compliance shall be submitted for all products. The certificates shall: 1. State that the product complies with the respective specification and contract drawing

SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 01 3400 - 3

FIT Roof Replacement Technical Specifications

requirements 2. Be accompanied by a certified copy of test results pertaining to the product 3. Show the submittals date, Contractor's name and address, contract title and number, product represented and its location in the contract, producer's name, product trade name and catalog number, place of product origin, test date, testing organization's name and address, quantity of the product to be furnished and related contract draw- ing and specification section numbers 4. Be signed by an officer or another authorized representative of the producer and nota- rized 5. Submit one electronic copy. 6. Be received by the City not later than 30 days before the acceptance is needed of the products for ordering.

2.3 SAMPLES

A. Submit samples of sizes and quantities to clearly illustrate full color range and functional characteristics of products and materials including attachment devices.

B. Erect field samples and mock ups at the worksite as specified in the several technical speci- fications sections and at locations acceptable to the Project Manager. All field samples shall be erected in a location that will be readily visible throughout the life of the contract to allow comparison of the work as it progresses to the field sample.

C. The Contractor shall verify, through appropriate inspections and tests, that the samples submitted meet the specifications and shall provide inspection and test data with the sam- ples. The review and comments on the sample shall not relieve the Contractor of his re- sponsibility for completion of the contract.

D. Show the following information: 1. Contract title and number 2. Respective contract drawing numbers 3. Applicable technical specification section numbers 4. Applicable standards such as ASTM or Federal Specification number 5. Identification of deviations from the contract drawings and specifications 6. Contractor's stamp, initialed or signed, certifying: a. Dimensional compatibility of the product with the space in which it is intended to be used b. Review of submittals for compliance with contract requirements c. Compatibility of the product with other products with which it is to perform or which will be next to it 7. If multiple samples are submitted and the Designer is requested to make a choice, each sample shall have a unique identification number attached to it so the returned transmittal can state the identification number of the accepted sample and the Con- tractor will know which one it is. PART 3 - EXECUTION

3.1 CONTRACTOR RESPONSIBILITIES

SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 01 3400 - 4

FIT Roof Replacement Technical Specifications

A. Verify field measurements, catalog numbers and similar data.

B. The Contractor shall not start work for which submittals are required until a transmittal has been received by the Contractor showing acceptance or acceptance as noted by the De- signer Before making submittals ensure that products will be available in the quantities and at the times required by the contract.

C. Submit final, corrected, electronic drawings of contract and shop and working drawings showing the Work as actually installed, placed, erected and applied. Refer to Technical Specification Section 017000, Contract Closeout.

3.2 REVIEW BY THE CITY

A. One electronic copy of the marked-up shop and working drawing and one electronic copy of the product data will be returned to the Contractor by the Designer. Only the transmittal form, appropriately marked, and two samples will be returned on sample submittals. Con- tractor shall maintain one approved sample onsite for the duration of the project.

B. Contractor's responsibility for errors and omissions in submittals for compatibility will not be reduced, waived or otherwise limited by the review and acceptance of submittals by the City’s Designer of Record.

END OF SECTION 01 3400

SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 01 3400 - 5

FIT Roof Replacement Technical Specifications

THIS PAGE INTENTIONALLY LEFT BLANK

SHOP DRAWINGS, PRODUCT DATA AND SAMPLES 01 3400 - 6

FIT Roof Replacement Technical Specifications

SECTION 01 3700

SCHEDULE OF VALUES

PART 1 - GENERAL

1.1 DESCRIPTION

A. The Work specified in this Section consists of preparing and submitting the Schedule of Values as referenced in the General Conditions. The Schedule of Values will be built upon a breakdown of the Work using specification sections and milestones. The Work also in- cludes the preparing and submitting of updated copies of the Schedule of Values if the Schedule of Values is affected by change orders. The Project Manager may require addi- tional breakdowns of information, or separate Schedules of Values for portions of work based upon project’s funding requirements.

B. A Schedule of Stored Material is a detailed cost breakdown for permanent materials that will be temporarily stored prior to their being installed and for which the Contractor seeks partial payments. The Schedule of Stored Material will be incorporated as a part of the Schedule of Values.

C. Within 14 calendar days of issuance of the Notice to Proceed, the Contractor shall submit the Schedule of Values including the Schedule of Stored Material if applicable. The Sched- ule of Values and Schedule of Stored Material used to prepare the work/cost breakdown for the Schedule will be used for the Contractor's billings.

D. Any contract allowances shall be included in the Schedule of Values. Expenditure of allow- ances shall be done through the use of the Allowance Authorization form. Use of this form does not increase or decrease the contract value.

E. Reference Special Contract Conditions, Payment to Contractors, plus Contract General Conditions, GC 902, GC 903, and GC 906.

1.2 RELATED DOCUMENTS

A. Technical Specifications Section 01 3000 Submittals

1.3 SUBMITTAL

A. The Schedule of Values shall be submitted in a format approved by the Project Manager.

B. Upon request by the City, the Contractor shall support values given with the data which will substantiate the correctness of the values.

C. The Schedule of Values will be utilized as a basis for review of the Contractor's application for progress payment.

1.4 REVIEW AND RESUBMITTAL

A. If review by the City indicates that changes to the Schedule of Values are required, the Contractor shall revise and resubmit the Schedule of Values. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED)

SCHEDULE OF VALUES 01 3700 - 1

FIT Roof Replacement Technical Specifications

3.1 ALLOWANCE AUTHORIZATION AND PAYMENT

A. Contractor shall request written approval for expenditure of any contract allowances PRIOR TO performing the Work involved. List work to be performed and estimated cost in the re- questing correspondence.

B. Using the format provided by the City, the Contractor’s request for payment of all contract allowances shall be included in the Schedule of Values.

END OF SECTION 01 3700

SCHEDULE OF VALUES 01 3700 - 2

FIT Roof Replacement Technical Specifications

SECTION 01 4000

CONTRACTOR QUALITY CONTROL

PART 1 - GENERAL

1.1 DESCRIPTION

A. This Section identifies the Quality Control activities to be performed during all phases of the contract by the Contractor.

B. The Contractor shall have in place his Quality Control Program as necessary to ensure that all materials and work are completed in compliance with contract documents. The Contrac- tor is solely responsible for Quality Control with the exception of those tests and/or audits that will be conducted by the City as defined in the contract documents.

C. Test schedules and/or testing requirements for materials used on this project are included in the technical specifications. Laboratory and field testing identified in the technical speci- fications shall be conducted by an Independent Testing Agency (ITA) retained by the City unless stated otherwise.

D. Reference General Contract Conditions GC 316, GC 702, GC 1801, GC 1902, and GC 2002

1.2 LEVEL OF CONTROL

A. The intent of this section is to enable the Contractor to establish a necessary level of control that will: 1. Adequately provide for the production of acceptable quality materials 2. Provide sufficient information to ensure both the Contractor and the Designer of Rec- ord that the specification requirements are being met 3. Allow the Contractor as much latitude as possible to develop his or her own standards of control.

1.3 SUBMITTALS

A. Refer to Technical Specification Section 01 3000 and013400 for submittal requirements.

B. Quality Control Plan: Within 14 days after Notice to Proceed, the Contractor shall submit a Quality Control Plan for review and acceptance. Acceptance by the Project Manager does not relieve the Contractor of compliance with the contract requirements. The Contractor Quality Control Plan shall address the following as a minimum: 1. Provide a general description of Quality Control monitoring to be performed until final acceptance by the City. Include securing of project site and staging areas and moni- toring of the worksite during times no construction activity is scheduled to take place. 2. The Contractor shall designate an employee as the Quality Control Manager qualified to perform quality control monitoring of the Work. The designated individual shall have the authority to direct work changes required to bring the Work into conformance with contract requirements including stopping non-conforming work in progress. 3. Provide methodology of monitoring, testing and exercising of all equipment, valves and/or assemblies to ensure the Work installed is in proper working order.

CONTRACTOR QUALITY CONTROL 01 4000 - 1

FIT Roof Replacement Technical Specifications

4. The Contractor shall submit a list of suppliers and subcontractors. This list shall in- clude items to be supplied by each supplier and/or subcontractor and shall identify work to be performed by each subcontractor. The list shall be updated and resubmit- ted as required. 5. Provide emergency contact information including name, company, title, work phone number, cell phone number and other means of contact. The Emergency Contact list shall include at least four individuals. In the event there is any change in any of the in- formation, the Contractor shall forward the updated list to the Project Manager. The Emergency Contact list shall include the project address, project title and date of is- sue.

C. Daily Quality Control Report: 1. The Daily Quality Control Report shall be submitted daily in the format detailed in Technical Specifications Section 01999. The report shall address as a minimum the following: identify number of workers on site each day by trade, identify notifications and discussions with/by Quality Assurance Inspectors and other agency inspectors, identify quality of work placed that day and any deviations and/or corrections required to bring the Work into conformance with the contract. Daily reporting may be comput- erized or typed, but must contain a legible signature. Scanned copies of daily reports are acceptable. 2. Submit one electronic copy of the Daily Quality Control Report to the Project Manager the day following the work. The report shall be signed by the Contractor's Quality Con- trol Representative and the Contractor's Superintendent.

D. Corrective Action Report (CAR) 1. Conditions adverse to quality will be reviewed by the Contractor to determine the cause and to recommend a corrective action that will preclude recurrence. The condi- tion, its cause and the corrective action planned shall be reported to the Project Man- ager prior to implementation. Follow-up action shall be taken to verify implementation of the corrective action. The Contractor will document the corrective action and a copy of the Corrective Action Report (CAR) will be transmitted to the Project Manager.

1.4 DOCUMENTATION

A. The Contractor shall not change or alter approved submittals, procedures, specifications, drawings or other pertinent documentation without the Project Manager's written authori- zation.

B. All records and documents that are quality related shall be prepared, identified and main- tained by the Contractor and shall be made available to the City upon request. Records shall be protected from damage, deterioration or loss.

C. The Contractor shall maintain records at the actual worksite and at Contractor's office to show the inspection status of materials and items installed in order to ensure that the re- quired inspections and tests have been performed in a timely and correct manner.

1.5 INSPECTIONS AND TESTS

A. Inspections, tests and system shut down requests, conducted by persons or agencies other than the Contractor, shall not in any way relieve the Contractor of his responsibility and ob- ligation to meet all specifications and the referenced standards. The Contractor's designat- ed Quality Control Representative shall inspect the work and shall ensure the work com- plies with the contract requirements prior to any requests for inspection or testing.

CONTRACTOR QUALITY CONTROL 01 4000 - 2

FIT Roof Replacement Technical Specifications

B. When the specifications, laws, ordinances, rules, regulations or orders of any public agency having jurisdiction require the ITA’s surveillance of inspections or tests, the Contractor shall notify the ITA of the place, date and time 48 hours prior to the inspection and/or test. The Contractor shall be responsible for notifying and requesting inspection by other agencies in- cluding but not limited to the Denver Building Inspection Division, Denver Fire Department and Denver Water Department. Prior to request for other agency inspections, the Contrac- tor shall meet and plan inspection times with the Project Manager and or the Project Man- ager’s designated representative.

C. Special inspections or tests may be required by the technical specifications, City, State and/or Federal Agencies in addition to those tests already performed. The Contractor shall notify the Project Manager at least 48 hours in advance of the additional inspections or tests.

1.6 INSPECTION PLAN

A. The Contractor shall utilize the following six-point inspection plan to ensure the conform- ance of the Work performed by the Contractor meets the requirements of the contract draw- ings and specifications, the referenced codes and standards and the approved submittals: 1. Prework Coordination: Prior to the start of construction work on the contract and prior to the start of work under each separate specification section and prior to the start of work where a change in a construction operation is contemplated by the Contractor and prior to a new subcontractor starting work, a coordination meeting will be held with the Contractor's superintendent, Quality Control and Safety representative(s). Some portions of the work may require coordination with the Project Manager, facility operator, Designer of Record, ITA and/or commissioning agent; this would be includ- ed as an activity in the regularly updated schedules and specific invitations will be is- sued by the Contractor. The Contractor's Quality Control Representative shall chair, prepare and distribute minutes of Quality Control meetings. Meeting minutes shall be electronically distributed within 48 hours of the meeting. 2. The purpose of the meeting is to ensure that the Contractor’s personnel and sub- contractors have no misunderstandings regarding their safety and quality procedures as well as the technical requirements of the contract. 3. Initial Inspection: Upon completion of a representative sample of a given feature of the Work and no later than two weeks after the start of a new or changed operation, the Project Manager's designated representatives will meet with the Contractor's Quality Control representative and applicable subcontractor's supervisor and their Quality Control representatives to check the following items, as a minimum: a. Workmanship to established quality standards b. Conformance to contract drawings, specifications and the accepted shop draw- ings c. Adequacy of materials and articles utilized d. Results of inspection and testing methods e. Adequacy of as-built drawings maintained daily. 4. Once accepted, the representative sample will become the physical baseline by which ongoing work is compared for quality and acceptability. To the maximum practical ex- tent, approved representative samples of work elements shall remain visible until all work in the appropriate category is complete. Acceptance of a sample does not waive or alter any contract requirements or show acceptance of any deviation from the con- tract not approved in writing by a fully executed change order. 5. Follow-up Inspection: The Contractor's Quality Control representative will monitor the work to review the continuing conformance of the work to the workmanship standards

CONTRACTOR QUALITY CONTROL 01 4000 - 3

FIT Roof Replacement Technical Specifications

established during the preparatory and initial inspections. 6. Pre-Final Acceptance Inspection: Prior to requesting a Pre-Final Acceptance Inspec- tion by the City, all work and operational systems to be inspected shall be satisfactori- ly completed and tested by the Contractor. The Contractor's written request for this inspection shall be made 72 hours in advance. With the request shall come a list of any known deficiencies and when they will be corrected. If the list is too large or con- tains too many significant items, in the opinion of the Project Manager, no inspection will be held because of the incompleteness of the work. 7. The Project Manager will schedule the Pre-Final Acceptance Inspection and will pre- pare a list of deficient items (punch list) discovered during the inspection. If during the inspection the list becomes too large or too many significant items are on the list, the inspection will be canceled. After the inspection is completed, the Deficiency List will be transmitted to the Contractor for correction of the deficient items. 8. Final Acceptance Inspection: After the Contractor has completed all items on the De- ficiency List (generated from the Pre-Final Acceptance Inspection) he shall request a Final Acceptance Inspection. The request shall be made in writing at least 72 hours in advance of the inspection. All areas must be cleaned and ready for turnover prior to this inspection. The Project Manager, the design consultant, the facility operator, a representative of the funding agency (if applicable) and other interested parties will in- spect the subject Work to ensure that all deficiencies have been satisfactorily attend- ed to and that no new deficiencies have appeared and that all systems are completely functional. Any outstanding or additional deficient items will be noted and handled per the requirements of the Pre-Final Acceptance Inspection noted above until the Work is acceptable to the Project Manager.

1.7 SAMPLES

A. The Contractor shall maintain at the worksite a copy of all samples submitted and accepted by the City. Samples shall be made available to the designer or the Project Manager's des- ignated representatives for review and comparison in the field. The Project Manager prior to use on the project must accept all items and materials.

B. The installed work will be compared to the samples and if any of the work is not of the same quality, material, finish, color, texture or appearance as the sample, that portion that is not the same will be considered defective and in nonconformance.

C. Contractor selection of samples will only be considered if taken at random. The Contractor shall permit representatives of the City to witness the selection of samples. Inspection or tests of items or materials that fail shall be sufficient cause to terminate further inspec- tions/tests of the same brand, make or source of that product.

D. The Contractor is obligated to correct any item deemed deficient. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION

3.1 REQUIREMENTS

A. All materials required for the contract shall be new except where specified otherwise. In- spections and tests performed by the City shall not relieve the Contractor from the respon- sibility to meet the specifications, nor shall such inspections/tests be considered a guaran- tee for acceptance of materials that will be delivered at a later time.

B. The Contractor is obligated to correct or remove non-conforming materials, whether in place

CONTRACTOR QUALITY CONTROL 01 4000 - 4

FIT Roof Replacement Technical Specifications

or not. If necessary, the Project Manager will send written notification to the Contractor to correct or remove the defective materials from the project. If the Contractor fails to re- spond, the Project Manager may order correction, removal and/or replacement of defective materials by others, in which case the Contractor shall bear all costs incurred by such ac- tions.

C. Materials accepted on the basis of a Certificate of Compliance may be sampled and in- spected/tested by the City Project Manager or its Designer at any time. The fact that the materials were accepted on the basis of such certification shall not relieve the Contractor of his responsibility to use materials that conform to the specifications.

D. The Contractor shall impose upon his suppliers the same quality control requirements, in- cluding inspection and test procedures, as imposed upon him by the specifications and ref- erenced standards. The Contractor shall apply appropriate controls, designed to ensure that all materials supplied meet the requirements and specifications.

END OF SECTION 01 4000

CONTRACTOR QUALITY CONTROL 01 4000 - 5

FIT Roof Replacement Technical Specifications

THIS PAGE INTENTIONALLY LEFT BLANK

CONTRACTOR QUALITY CONTROL 01 4000 - 6

FIT Roof Replacement Technical Specifications

SECTION 01 4020

QUALITY ASSURANCE

PART 1 - GENERAL

1.1 DESCRIPTION

A. This Section identifies inspection activities to be performed by inspectors employed by the City and/or working under the direction of the City Project Manager.

B. Inspection and tests, conducted by persons or agencies other than the Contractor, shall not in any way relieve the Contractor of his responsibility and obligation to meet all specifica- tions and the referenced standards.

C. The inspection and approval of work by other agencies above does not constitute inspec- tion or acceptance of work required by the City. Technical specifications may contain re- quirements more stringent than Building Inspection Division or other code agency require- ments.

D. Reference Contract General Conditions, GC 1701, GC 1702, GC 1703, GC 1704, GC 1705, GC 1706

1.2 RELATED DOCUMENTS

A. Technical Specifications Section 01 4000 – “Contractor Quality Control”

B. Technical Specifications Section 01 3000 – “Submittals”

C. Technical Specifications Section 01 3400 – “Shop and Working Drawings, Product Data and Samples” PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION

3.1 CONTRACTOR'S QUALITY CONTROL SYSTEM

A. The Contractor is responsible for quality control of the Construction. All acquisition of mate- rials, sequence of construction (except as otherwise indicated), and means and methods of construction shall be the responsibility of the Contractor. Establish system to perform suffi- cient inspection and tests of all items of work, including that of subcontractors, to ensure conformance to Contract Documents for materials, workmanship, construction, finish, func- tional performance and identification. 1. Control System: Establish for all construction except where Contract Documents pro- vide for specific compliance tests by testing laboratories and engineers employed by the City. 2. Control System: Specifically include all testing required by various sections of Specifi- cations. 3. Quality Control System: Means by which Contractor assures himself that construction complies with requirements of Contract Documents. a. Controls: Adequate to cover all construction operations and keyed to proposed

QUALITY ASSURANCE 01 4020 - 1

FIT Roof Replacement Technical Specifications

construction schedule.

B. The Contractor shall be responsible for assuring compliance with the quality standards as indicated in the Contract Documents. In addition, the Contractor shall be responsible for: 1. Review of submittals prior to their being forwarded to the Designer for review. The Contractor shall mark submittals with comments and shall indicate the date and party conducting the Contractor's review of each submittal. 2. Final inspection of the project prior to calling for the City to conduct a final inspection. The Contractor shall provide his inspection comments to the Designer and City prior to the scheduled final inspection. 3. Verification of completion of punch-list items prior to calling for verification inspection by the Designer and the City.

C. Records: Maintain correct records on appropriate form for all inspections and tests performed, instructions received from the Designer or Independent Testing Agency (ITA) and actions taken as result of those instructions. 1. Records: Include evidence that required inspections or tests have been performed (including type and number of inspections or tests, nature of defects, causes for rejec- tion, etc.) proposed or directed remedial action, and corrective action taken. 2. Document inspections and tests as required by each section of Specifications.

D. The Contractor is responsible for complying with the requirements of the Contract Docu- ments. Testing performed by the City's Agents shall not be relied upon by the Contractor as sufficient to assure compliance with the Contract Documents. The Contractor shall procure and pay for testing necessary to assure that the construction is in compliance with the Con- tract Documents.

3.2 STANDARDS

A. Generally accepted Construction Industry standards for materials, products, quality, and workmanship shall supplement the Specifications. 1. Where industry standards are less than the Specifications and Drawings require, the Contract Documents shall govern. 2. The Contractor shall provide materials and products which conform to industry stand- ards of quality.

B. Construction tasks shall be performed by craftsmen skilled and experienced in the trades required. Work shall be subject to review by the City and the Designer.

C. Work and/or materials which fail to meet accepted industry standards of performance, quali- ty, and/or appearance will be rejected and shall be brought into compliance or replaced by the Contractor at no additional cost to the City.

3.3 MATERIAL AND WORKMANSHIP

A. Unless otherwise specified, or indicated on the Drawings, material shall be new, of best quality, and without flaws, and delivered upon completion in an undamaged condition.

B. Workmanship shall be the best of its respective kind. Labor shall be performed in a thor- ough workmanlike manner by qualified, efficient, and skilled mechanics, acceptable to the City, Designer and other trades involved on the job requiring acceptable substrate for the performance of their work.

QUALITY ASSURANCE 01 4020 - 2

FIT Roof Replacement Technical Specifications

3.4 TESTING – GENERAL

A. Testing Laboratory and/or Engineering services are required for quality control in portions of the work identified in other sections of these specifications.

B. Tests required by these Specifications shall be performed in strict accordance with refer- enced testing methods, procedures, and conditions. Pertinent data shall be included in clear, comprehensive written forms according to the Designer's or Engineer's requirements.

C. Contractor: Provide equipment and facilities as required for testing at no additional cost, subject to City’s review, for conducting field tests and for collecting and forwarding samples. 1. Do not use materials or equipment represented by samples until tests, if required, have been made and materials or equipment found to be acceptable. 2. Do not incorporate any product into work which becomes unfit for use after ac- ceptance thereof.

D. Testing: Materials or equipment proposed to be used may be tested at any time during their preparation or use. Furnish required samples without charge and give sufficient notice of placing of orders to permit testing. Products may be sampled either prior to shipment or af- ter being received at site of work.

E. Tests: Made by accredited testing laboratory selected by City. Except as otherwise provid- ed, sampling and testing of materials and laboratory methods and testing equipment shall be in accordance with latest standards and tentative methods of ASTM.

3.5 COST OF TESTING

A. Unless indicated otherwise, City's testing shall be performed by the City's authorized agents, at the City's expense.

B. Costs for re-testing of non-complying work shall be borne by the Contractor.

C. According to the judgment of the City and/or Designer, ANY portion of the work in this con- tract may be tested at any time for any reason. Costs for such testing shall be borne by the Contractor only if such tests indicate that work does not meet Contract Document require- ments.

3.6 OTHER TESTING

A. Following Testing: Performed at expense of Contractor: 1. Any additional tests required because of any tests that fail subject to following condi- tions: a. Quantity and Nature of Tests: Determined by the Designer. b. Tests: Taken in presence of the City and/or the Designer. c. Proof of Noncompliance: Contractor liable for corrective action which the City and/or the Designer feel is required including complete removal and replacement of defective material. 2. Material Substitution: Any tests of material or equipment offered as substitute for specified item on which test may be required in order to prove its compliance with Specifications.

B. Contractor: May have tests performed on material and equipment for his own information and job control so long as the City does not assume responsibility for costs or for giving

QUALITY ASSURANCE 01 4020 - 3

FIT Roof Replacement Technical Specifications

them consideration when appraising quality of materials.

3.7 EQUIPMENT TESTING

A. Equipment testing shall be as determined appropriate by the City to assure proper perfor- mance according to the manufacturer's specifications for each equipment item.

B. After all utility connections to equipment are completed, the Contractor shall conduct final tests of equipment in presence of the City and the Designer.

C. Unless waived in writing by the City, the requirements of this section shall apply to all in- stalled equipment items having utility connections.

3.8 NOTIFICATION

A. The Contractor shall be responsible for notifying the City and Designer at least three (3) working days prior to commencing work which is identified as requiring testing in their pres- ence.

B. The Contractor shall be responsible for scheduling and coordinating all required testing with the City and the City’s Independent Testing Agency.

3.9 TEST REPORTS

A. Test reports, whether performed for the City or the Contractor, shall be submitted to the City, the Designer, and Contractor as soon as results are available. Reports shall be clear, concise, comprehensive written forms containing required test results.

B. Reports of tests made by testing laboratories shall be distributed via e-mail by testing labor- atory as follows: to – City Project Manager, – Contractor, - Applicable Supplier or Subcon- tractor; – Designer and Applicable Engineer;

3.10 MANUFACTURING AND FABRICATION INSPECTIONS

A. The Project Manager may elect to perform additional inspections and/or tests at the place of the manufacture, the shipping point or at the destination to verify conformance to applicable specifications. Inspections and tests performed by the City shall not relieve the Contractor from the responsibility to meet the specifications, nor shall such inspections/tests be con- sidered to be a guarantee for acceptance of materials that will be delivered at a later time.

B. The Project Manager or his authorized representative may inspect at its source any material or assembly to be used in the Work. Manufacturing plants may be inspected from time to time for the purpose of determining compliance with specified manufacturing methods or materials to be used in the Work and to obtain samples for testing and further inspection.

C. Should the Project Manager conduct plant inspections the following conditions shall exist: 1. The Project Manager shall have the cooperation and assistance of the Contractor and the producer with whom the Contractor has contracted for materials.

D. It is understood and agreed that the City shall have the right to re-test at the City’s expense any materials that have been tested and accepted at the source of supply after it has been delivered to the site.

END OF SECTION 01 4020

QUALITY ASSURANCE 01 4020 - 4

FIT Roof Replacement Technical Specifications

SECTION 01 5000

TEMPORARY FACILITIES

PART 1 - GENERAL

1.1 DESCRIPTION

A. The Work specified in this Section consists of furnishing, installing, operating, maintaining and removing temporary construction barriers, enclosures and field facilities including the Contractor's construction offices, staging areas, yards, storage areas, electrical power, tele- phone, water, fire protection and sanitary service.

B. Construction Office, Yards and Storage Areas 1. Temporary facilities which the Contractor desires to locate in staging areas adjacent to the Work or within the project limits are subject to approval by the Project Manager. 2. Contractor Field Office may be required based upon size and complexity of project, if required: a. The Contractor shall acquire all necessary permits for installation and construc- tion work related to the Contractor’s field office and fencing. b. The Contractor shall provide, as part of his on-site field office, a conference room for weekly meetings. The conference room shall have one available telephone with a speaker phone option. c. Jack the mobile office unit off its wheels and provide support. d. Install tie downs in compliance with code. e. Provide access to the field office and easily accessible space for parking six full size passenger automobiles at a minimum. Grade the field office site, access roadway and parking area for drainage, and surface with gravel paving or crushed stone. f. Water and sewer lines to the field office, if installed, shall be installed so they will not freeze.

C. Electrical Service 1. Reference Contract General Conditions, GC 327 2. Provide lighting and power for field offices, storage facilities and other construction fa- cilities and areas. 3. Provide power centers for electrically operated and controlled construction facilities including tools, equipment, testing equipment, interior construction lighting, heating, cooling and ventilation equipment. 4. Provide night security lighting at secured areas within construction limits at offices, storage facilities, temporary facilities and excavated areas. 5. Provide battery operated or equivalent emergency lighting facilities at construction ar- eas where normal light failures would cause employees to be subjected to hazardous conditions. Bear all costs of temporary electric and water service permits, fees and deposits required by the governing authorities, and connection charges and temporary easements including installation, maintenance and removal of equipment.

D. Telephone Service 1. The Contractor shall furnish, field staff cell phones

TEMPORARY FACILITIES 01 5000 - 1

FIT Roof Replacement Technical Specifications

E. Internet Service 1. The Contractor shall furnish, install and maintain at least one computer with email in his main field office. This computer should be able to access all email and FTP as part of project submittal process.

F. Water Service 1. Reference Contract General Conditions, GC 327 2. The Contractor shall make all connections and extensions required and shall make use of water in direct support of the Work. The Contractor shall install an approved Water Department tap at the City's water source prior to obtaining any water. The Contractor shall arrange and pay for its supply/distribution system from the City's point of connection. The location and alignment of the Contractor's temporary sup- ply/distribution system must be approved by the Project Manager prior to its installa- tion. The Contractor shall leave in place all above ground and underground water dis- tribution facilities unless otherwise directed by the Project Manager. 3. The Contractor shall not use in place fire hydrants or standpipes as sources for con- struction water or potable water.

G. Fire Protection 1. Furnish, install and maintain temporary portable fire protection equipment throughout the construction period at all buildings (including the project site), maintenance shops, and fuel storage on all large construction equipment and at the location of any flam- mable materials or construction materials.

H. Sanitary Service 1. Reference Contract General Conditions, GC 326 2. Furnish, install and maintain temporary sanitary facilities and services throughout the construction period. 3. Ensure that separate or single user toilets shall be provided to ensure privacy be- tween the sexes. 4. Provide general washing facilities adequate for the number of employees. 5. Provide special washing facilities adequate for the number of employees engaged in the application of , coating and other volatile or hazardous materials.

1.2 QUALITY CONTROL

A. Provide products for, and the execution of, the Work of this Section that will satisfy the re- quirements of the NEC, OSHA and local codes. Provide products that satisfy requirements of NEMA and are UL listed.

1.3 SUBMITTALS

A. Refer to Technical Specifications Sections 01 3000 and 01 3400 for submittal procedures. 1. Details and layout of temporary installations including fences, roads, parking, build- ings, storage areas and drainage plans. 2. Lighting plan showing temporary lighting facilities, electrical service panel location, electrical circuit diagram and anticipated light level on the working roadway, pathway or construction surface. PART 2 - PRODUCTS

TEMPORARY FACILITIES 01 5000 - 2

FIT Roof Replacement Technical Specifications

2.1 ELECTRICAL SERVICE

A. Provide temporary power and lighting equipment consisting of fixtures, transformers, panel boards, groundings, lamps, switches, poles, conduits and wiring sized and capable of con- tinuous service and having adequate capacity to ensure a complete operating system. Comply with NEMA.

B. Provide temporary extension cords to supply tools not longer than 200 feet, except that ad- ditional length may be used if equipment will be grounded within 200 feet of tool or power.

C. Portable power generators shall be grounded.

2.2 DRINKING WATER SERVICE

A. Provide sanitary materials and equipment that satisfies the requirements of codes and regu- lations pertaining to temporary water systems. Bottled products may be used if those prod- ucts comply with codes. Clearly label portable containers having a dispensing tap and used only for drinking water. Provide single service disposable cups and a sanitary container for dispensing cups. A trash receptacle shall be provided and maintained beside each portable water supply.

2.3 FIRE PROTECTION

A. Fire extinguishers shall be UL rated and shall comply with the current City fire code.

2.4 SANITARY SERVICE

A. Provide materials and equipment adequate for the intended purposes, which will neither create unsanitary conditions nor violate the codes applicable to temporary sanitary facilities. Enclosures for toilet and washing facilities shall be weatherproof, sight proof, ventilated and sturdy.

B. Provide portable type toilet facilities that satisfy the requirements of OSHA.

C. Provide washing facilities as needed. Furnish soap, single-service paper towels, towel dis- penser and towel receptacle. If paints, coatings and other volatile or hazardous materials injurious to humans will be applied as part of the contract, provide washing facilities with warm water of approximately 120 degrees F. PART 3 - EXECUTION

3.1 ELECTRICAL SERVICE

A. The approximate location of primary power lines is shown on the Construction Drawings. The Contractor shall locate electrical service where it will not interfere with equipment, stor- age spaces, traffic, and prosecution of the Work or the work of others. Installation shall present a neat and orderly appearance and shall be structurally sound. Maintain service in a manner that will ensure continuous electrical service and safe working conditions.

3.2 TELEPHONE SERVICE

A. Install temporary telephone service in a neat and orderly manner and make structurally and electrically sound to ensure continuous service. Modify, relocate and extend as work pro- gress requires. Place conduit and cable where those products will not interfere with traffic, work areas, materials, handling equipment, storage areas and the work of other contractors. Service lines may be aerial.

TEMPORARY FACILITIES 01 5000 - 3

FIT Roof Replacement Technical Specifications

3.3 WATER SERVICE

A. Install the systems in a neat and orderly manner. Make them structurally and mechanically sound. Provide continuous service. Modify, relocate and extend the systems as the work progresses.

B. Locate systems where they will be convenient to work stations, sanitary facilities and first aid station but will not interfere with traffic, work areas, materials handling equipment, stor- age areas or the work of other contractors.

C. Install vacuum breakers, backflow preventers and similar devices in a manner and location which will prevent temporary water from returning to the water mains.

D. Do not incorporate any part of temporary water distribution system into the permanent water distribution system.

3.4 FIRE PROTECTION

A. Install products in conformance with the requirements of the applicable Denver Fire De- partment and OSHA regulations. 1. Provide functional fire extinguishers that are clearly identified for fire and an accessi- ble supply of water during the period of construction. These fire extinguishers shall remain in place until permanent fire protection systems are functional. 2. Furnish not less than one 20-pound fire extinguisher, type 2A-20ABC within ten feet of cutting and welding operations. 3. Provide 20-pound fire extinguishers, type 2A-20ABC no further then 100 feet apart in buildings. 4. Provide not less than one 20-pound fire extinguisher, type 2A-20ABC on any equip- ment of 75 horsepower or more.

B. Instruct construction personnel as to location and use of temporary fire protection equip- ment.

C. Fire extinguishers shall be located for easy access. Their location shall be clearly marked so that they can be seen at least 75 feet away.

3.5 SANITARY SERVICE

A. Place temporary sanitary (and washing) facilities in a neat and orderly manner within the limits of the work and convenient to the work stations. Make these facilities structurally and mechanically sound. Modify, relocate and extend the facilities as required by progress of the work.

B. Service toilets at those time intervals which will minimize the accumulation of wastes and prevent creation of unsanitary conditions, but not less than once a week.

C. The waste from the sanitary and wash facilities shall be disposed of in accordance with all applicable rules, regulations and laws and with the least environmental impact.

3.6 FENCING

A. Contact all utility service companies prior to planning location and post locations for certification of current utilities. Locate pothole posts planned within 5 feet of known utilities.

TEMPORARY FACILITIES 01 5000 - 4

FIT Roof Replacement Technical Specifications

Submit fencing plan and typical details to Project Manager at least seven days before planned execution for review and acceptance.

3.7 SIGNAGE

A. Contractor shall not provide any signage for temporary facilities without prior approval from the Project Manager.

3.8 REMOVAL

A. The Contractor shall locate all temporary facilities including the underground utilities so they can be completely removed without damaging permanent work or the worksite of other con- tractors.

B. The Contractor shall remove all temporary facilities, including all underground utilities, and restore the site to the condition in which the City initially provided it to the Contractor.

END OF SECTION 01 5000

TEMPORARY FACILITIES 01 5000 - 5

FIT Roof Replacement Technical Specifications

THIS PAGE INTENTIONALLY LEFT BLANK

TEMPORARY FACILITIES 01 5000 - 6

FIT Roof Replacement Technical Specifications

SECTION 01 6200

STORAGE AND PROTECTION

PART 1 - GENERAL

1.1 DESCRIPTION

A. The Work specified in this Section consists of providing storage and protection of the mate- rials, products and supplies which are to be incorporated into the construction and indicat- ing such storage areas on the working drawings with the location and dates when such are- as will be available for each purpose.

B. Reference Contract General Conditions, GC 803

1.2 SUBMITTALS

A. Refer to Technical Specifications Sections 01 3000 and 01 3400 for submittal procedures. Submit concurrently with submittals required in Section 01 0500.

B. Submit working drawings showing locations of storage areas not indicated on the Contract Drawings.

C. Submit descriptions of proposed methods and locations for storing and protecting products. PART 2 - PRODUCTS

2.1 MATERIALS

A. Materials required for the storage and protection of the items specified shall be durable, weatherproof and either factory finished or painted to present an appearance acceptable to the City. Storage facilities shall be uniform in appearance with similar materials used to the maximum extent possible. PART 3 - EXECUTION

3.1 GENERAL REQUIREMENTS OF EXECUTION

A. Palletize materials, products and supplies which are to be incorporated into the construction and stored off the ground. Store these items in a manner which will prevent damage and which will facilitate inspection. Leave seals, tags and labels intact and legible. Maintain ac- cess to products to allow inspection. Protect products that would be affected by adverse environmental conditions.

B. Periodically inspect stored products to ensure that products are being stored as stipulated and that they are free from damage and deterioration.

C. Do not remove items from storage until they are to be incorporated into the Work.

D. The Contractor shall ensure that all protective wrappings and coverings are secure and bal- lasted to prevent any items from deterioration and/or subsequent dislodgment. All items on the worksite that are subject to becoming windborne shall be ballasted or anchored.

3.2 HANDLING AND TRANSPORTATION

A. Handling

STORAGE AND PROTECTION 01 6200 - 1

FIT Roof Replacement Technical Specifications

1. Avoid bending, scraping or overstressing products. Protect projecting parts by block- ing with wood, by providing bracing or by other approved methods. 2. Protect products from soiling and moisture by wrapping or by other approved means. 3. Package small parts in containers such as boxes, crates or barrels to avoid dispersal and loss. Firmly secure an itemized list and description of contents to each container

B. Transportation 1. Conduct the loading, transporting, unloading and storage of products so that they are kept clean and free from damage.

3.3 STORAGE

A. Store items in a manner that shall prevent damage to the owner's property. Do not store hydraulic fluids, gasoline, liquid petroleum, gases, explosives, diesel fuel and other flamma- bles in excavations, except one day's supply of diesel fuel may be stored in open excava- tions.

B. Provide sheltered weather-tight or heated weather-tight storage as required for products subject to weather damage.

C. Provide blocking, platforms or skids for products subject to damage by contact with the ground.

D. All material shall be stored according to the manufacturer’s recommendations. Any material that has to be stored within specified temperature or humidity ranges shall have a 24-hour continuously written recording made of the applicable condition. Should the recording show that the material was not stored within the recommended ranges the material shall be con- sidered defective and in nonconformance. If a certification from the manufacturer's engi- neering design representative is provided stating that the actual variations are acceptable and will in no way harm the material or affect warranties, then the deficiency will be consid- ered corrected.

E. Store hazardous material separately, with all material marked with a label showing the haz- ard and how to treat exposure to the material.

3.4 LABELS

A. Storage cabinets and sheds that will contain flammable substances and explosive sub- stances shall be labeled FLAMMABLE--KEEP FIRE AWAY and NO SMOKING with con- spicuous lettering and conforming to OSHA requirements.

END OF SECTION 01 6200

STORAGE AND PROTECTION 01 6200 - 2

FIT Roof Replacement Technical Specifications

SECTION 01 6300

SUBSTITUTIONS

PART 1 - GENERAL

1.1 DESCRIPTION

A. The Work specified in this Section consists of submitting for the approval of a different ma- terial, equipment or process then is described in the Contract Documents.

B. If the substitution changes the scope of work, contract cost or contract time, a change order is required. As-built drawings and specifications must include all substitutions even if a change order is not issued.

C. Reference Contract General Conditions, GC 406.

1.2 QUALITY CONTROL

A. The substitution must provide the same quality as what it is replacing. The level of quality is defined by: 1. Maintenance and operating cost 2. Reliability 3. Durability 4. Life expectancy 5. Ease of cleaning 6. Ability to be upgraded as needed 7. Ease of interacting with other systems or components 8. Ability to be repaired 9. Availability of replacement parts 10. Established history of use in similar environments 11. Performance equal or superior to that which it is replacing.

1.3 SUBMITTAL

A. Refer to Technical Specifications Sections 01 3000 and 01 3400 for submittal procedures.

B. A complete request for substitution must be made at least 60 days prior to when an order needs to be placed or a method needs to be changed.

C. The submittal shall contain, as appropriate, detailed product data sheets for the specified items and the substitution. Samples and shop drawings shall also be submitted of the sub- stitution as applicable. The submittal shall contain all the data required to be submitted for acceptance of the originally specified item or process.

D. The submittal shall contain all the applicable information required in Technical Specifica- tions Section 01 6300, paragraph 2.01 below.

E. A signed statement as outlined in Technical Specifications Section 01 6300, paragraph

SUBSTITUTIONS 01 6300 - 1

FIT Roof Replacement Technical Specifications

2.03.B below must accompany the Request for Substitution. PART 2 - EXECUTION

2.1 INFORMATION

A. Provide the following information as applicable with the Request for Substitution on the item or process that is being requested to be substituted: 1. A complete description of the item or process 2. Utility connections including electrical, plumbing, HVAC, fire protection and controls 3. The physical dimensions and clearances 4. A parts list with prices 5. Samples of color and texture 6. Detailed cost comparisons of the substitution and the contract specified item or pro- cess 7. Manufacturer warranties 8. Energy consumption over a one-year period 9. What local organization is certified to maintain the item 10. Performance characteristics and production rates 11. A list of any license fees or royalties that must be paid 12. A list of all variations for the item or method specified 13. A list of at least three other projects of similar nature to this contract where the prod- ucts or methods have been in use for at least one year including telephone number and name of the person to contact at these other projects 14. An analysis of the effect of the substitution on the schedule and contract cost and on the overall project as it relates to adjoining work.

2.2 SUBSTITUTION REQUEST

A. The formal Request for Substitution will be evaluated by the Project Manager and the De- signer of Record based on the following criteria: 1. Compatibility with the rest of the project 2. Reliability, ease of use and maintenance 3. Both initial and long term cost 4. Schedule impact 5. The willingness of the Contractor to share equally in any cost savings 6. The ability of the item or process to meet all applicable governing regulations, rules and laws along with funding agency requirements 7. The cost of evaluating the substitution.

B. Based upon the above evaluation the Project Manager will make a final determination of what is in the best interest of the City and either approve, disapprove or approve as noted the requested substitution.

2.3 CONDITIONS

SUBSTITUTIONS 01 6300 - 2

FIT Roof Replacement Technical Specifications

A. As a condition for submitting a Request for Substitution the Contractor waives all rights to claim for extra cost or change in contract time other than those outlined in the request and approved by the Project Manager. The Contractor, by submitting a Request for Substitu- tion, also accepts all liability for cost and scheduling impact on other contractors or the City due to the substitution.

B. Included with the Request for Substitution shall be the following statement: 1. "The substitution being submitted is equal to or superior in all respects to the contract- required item or process. All differences between the substitution and the contract- required item or process are described in this request along with all cost and schedul- ing data."

C. The statement shall be signed and dated by the Contractor's Superintendent. PART 3 - EXECUTION (NOT USED)

END OF SECTION 01 6300

SUBSTITUTIONS 01 6300 - 3

FIT Roof Replacement Technical Specifications

THIS PAGE INTENTIONALLY LEFT BLANK

SUBSTITUTIONS 01 6300 - 4

FIT Roof Replacement Technical Specifications

SECTION 01 7000

CONTRACT CLOSEOUT

PART 1 - GENERAL

1.1 DESCRIPTION

A. Work specified in this Section includes procedures required prior to Final Acceptance of the Work in addition to those specified in General Conditions Title 20 and Technical Specifications Section 01 7200.

B. Reference Special Contract Conditions, Liquidated Damages, and Contract General Conditions, GC 602, GC906, GC 909, GC 910, GC 2003.

1.2 PREPARATION FOR FINAL INSPECTION

A. Before requesting inspection for Final Acceptance of the Work by the City, inspect, clean and repair the Work as required.

1.3 FINAL INSPECTION

A. When the Contractor considers that the Work is complete, he shall submit written certification that: 1. All punch list items have been completed. 2. All clean up at the project site has been accomplished. 3. Work has been inspected by the Contractor for compliance with contract documents. 4. Work has been completed in accordance with contract documents. 5. Work is ready for final inspection by the City. 6. All as-built required documents have been submitted and accepted. 7. All damaged or destroyed real, personal, public or private property has been repaired or replaced. 8. All operation and maintenance manuals have been submitted and accepted and all training has been completed.

B. The Project Manager and/or the Designer of Record will inspect to verify the status of completion with reasonable promptness after receipt of such certifications. If the Project Manager and/or the Designer of Record finds incomplete or defective work: 1. The Project Manager may, at the Project Manager's sole discretion, either terminate the inspection or prepare a punch list and notify the Contractor in writing, listing in- complete or defective work. 2. The Contractor shall take immediate steps to remedy stated deficiencies and send a second written certification to the Project Manager that Work is complete. 3. The Project Manager and the Designer of Record will then re-inspect the Work.

1.4 REINSPECTION FEES

A. Should the Project Manager perform re-inspection due to failure of the Work to comply with the claims of status of completion made by the Contractor: 1. The Contractor shall compensate the City for such additional services at the rate iden-

CONTRACT CLOSEOUT 01 7000 - 1

FIT Roof Replacement Technical Specifications

tified in the Special Contract Conditions, Liquidated Damages, 2. The City shall deduct the amount of such compensation from the final payment to the Contractor.

1.5 FINAL CHANGE ORDER

A. If required, the Project Manager will prepare a final change order, reflecting approved adjustments to the Contract sum which were not previously made by change orders including the following: 1. . Additions and deductions resulting from: a. Allowances. b. Final quantities for unit price items. Along with this statement shall be detailed backup for the quantities. c. Deductions or corrected work. d. Penalties. e. Deductions for liquidated damages. f. Deductions for re-inspection payments. g. City resurveys required due to the Contractor. h. Other adjustments.

1.6 FINAL APPLICATION FOR PAYMENT

A. The Contractor shall submit the final application for payment in accordance with the procedures and requirements stated in the General Conditions Title 20. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION (NOT USED)

END OF SECTION 01 7000

CONTRACT CLOSEOUT 01 7000 - 2

FIT Roof Replacement Technical Specifications

SECTION 01 7100

CLEANING

PART 1 - GENERAL

1.1 DESCRIPTION

A. The Work specified in this section consists of maintaining a clean, orderly, hazard free worksite during construction, and final cleaning for the City's Final Acceptance. Failure to maintain the worksite will be grounds for withholding monthly payments until corrected to the satisfaction of the Project Manager and/or. the Project Inspector.

B. Reference Contract General Conditions, GC 325, GC 803, GC 2001

1.2 JOB CONDITIONS

A. Safety Requirements 1. Maintain the worksite in a neat, orderly and hazard-free manner in conformance with all federal, state and local rules, codes, regulations and orders, including all OSHA re- quirements, until Final Acceptance of the Work. Keep catwalks, underground struc- tures, worksite walks, sidewalks, roadways and streets, along with public and private walkways adjacent to the worksite, free from hazards caused by construction activi- ties. Inspect those facilities regularly for hazardous conditions caused by construction activities.

B. Hazards Control 1. Store volatile wastes in covered metal containers and remove those wastes from worksite daily. 2. Do not accumulate wastes which create hazardous conditions. 3. If volatile and noxious substances are being used in spaces that are not naturally ven- tilated, provide artificial ventilation. 4. Hazard controls shall conform to the applicable federal, state and local rules and regu- lations. 5. Provide appropriate waste receptacles in all areas in which employees are working. Waste receptacles shall be kept covered at all times. All materials on site shall be an- chored and covered to prevent any objects from becoming wind-borne. 6. Should an incident involving a spill or other encounter of a non-contained hazardous material occur on site, the Contractor shall immediately call 311 and ask to have Envi- ronmental Health notified of the event and also immediately notify the City Project Manager.

C. Access 1. Maintain the worksite to permit access by other City contractors as required and to al- low access by emergency personnel.

1.3 SUBMITTALS PART 2 - PRODUCTS

CLEANING 01 7100 - 1

FIT Roof Replacement Technical Specifications

2.1 CLEANING MATERIALS

A. Utilize the type of cleaning materials recommended by the manufacturer for the surfaces to be cleaned.

B. Maintain current Material Safety Data Sheets (MSDS) on site for all chemicals.

C. Ensure proper disposal of all wastes generated from the use of these materials. Must en- sure compliance with all environmental regulations. PART 3 - EXECUTION

3.1 INTERIM CLEANING

A. Clean the worksite every shift/workday for the duration of the construction contract. Main- tain structures, grounds, storage areas and other areas of worksite, including public and private properties immediately adjacent to worksite, free from accumulations of waste mate- rials caused by construction operations. Place waste materials in covered metal containers. All hard concrete, steel, wood and finished walking surfaces shall be swept clean daily.

B. Remove or secure loose material on open decks and on other exposed surfaces at the end of each workday or more often in a manner that will maintain the worksite hazard free. Se- cure material in a manner that will prevent dislodgment by wind and other forces.

C. Sprinkle waste materials with water or acceptable chemical palliative to prevent blowing of dust.

D. Promptly empty waste containers when they become full and legally dispose of the contents at dumping areas off the City's property.

E. Control the handling of waste materials. Do not permit materials to be dropped or thrown from structures.

F. Immediately remove spillage of construction related materials from haul routes, work site, private property or public rights of way.

G. Clean only when dust and other contaminants will not precipitate upon newly painted sur- faces.

H. Cleaning shall be done in accordance with manufacturer's recommendation.

I. Cleaning shall be done in a manner and using such materials as to not damage the Work.

J. Clean areas prior to painting or applying adhesive.

K. Clean all heating and cooling systems prior to operations. If the contractor is allowed to use the heating and cooling system it shall be cleaned prior to testing.

L. Clean all areas that will be concealed prior to concealment.

3.2 FINAL CLEANING

A. Inspect interior and exterior surfaces, including concealed spaces, in preparation for com- pletion and acceptance.

CLEANING 01 7100 - 2

FIT Roof Replacement Technical Specifications

B. Remove dirt, dust, litter, corrosion, solvents, discursive paint, stains and extraneous mark- ings.

C. Remove surplus materials, except those materials intended for maintenance.

D. Remove all tools, appliances, equipment and temporary facilities used in the construction.

E. Remove detachable labels and tags. File them with the manufacturer's specifications for that specific material for the City's records.

F. Repair damaged materials to the specified finish or remove and replace.

G. After all trades have completed their work and just before Final Acceptance, all catch ba- sins, manholes, drains, strainers and filters shall be cleaned; roadway, driveways, floors, steps and walks shall be swept. Interior building areas shall be vacuum cleaned and mopped.

H. Final cleanup applies to all areas within and adjacent to the site.

END OF SECTION 01 700

CLEANING 01 7100 - 3

FIT Roof Replacement Technical Specifications

THIS PAGE INTENTIONALLY LEFT BLANK

CLEANING 01 7100 - 4

FIT Roof Replacement Technical Specifications

SECTION 01 7200

CONTRACT RECORD DOCUMENTS

PART 1 - GENERAL

1.1 DESCRIPTION

A. The Work specified in this Section consists of maintaining, marking, recording and submit- ting contract record documents which include shop drawings, warranties, contract docu- ments and contractor records.

B. Reference Contract General Conditions, GC 324

1.2 RELATED DOCUMENTS

A. Technical Specifications Section 01 4000 – “Contractor Quality Control”

B. Technical Specifications Section 01 4200 – “Quality Assurance”

1.3 SUBMITTALS

A. Each submittal of record documents shall contain the following information: 1. Date 2. Project title, address and numbers 3. Contractor's name and address 4. Title and number of each record document 5. Certification that each document as submitted is complete and accurate 6. Signature of the Contractor or his authorized representative.

B. At the completion of this contract, deliver all record documents including the following: 1. As-built shop drawings, diagrams, illustrations, schedules, charts, brochures and other similar data 2. Warranties, guarantees and bonds 3. Contract documents 4. Contractor records.

1.4 QUALITY CONTROL PART 2 - RECORD DOCUMENTS SHALL BE PREPARED TO A HIGH STANDARD OF QUALITYPRODUCTS (NOT USED) PART 3 - EXECUTION

3.1 MAINTENANCE OF DOCUMENTS

A. The Contractor shall maintain at the worksite on a current basis one record copy of all draw- ings, specifications, addenda, change orders, approved shop drawings, working drawings, product data and samples in good order and marked currently to record all changes made during construction.

CONTRACT RECORD DOCUMENTS 01 7200 - 1

FIT Roof Replacement Technical Specifications

B. Maintain at the field office one copy of the following record documents: 1. Contract Documents a. Contract drawings with all clarifications, requests for information, directives, changes and as-built conditions clearly posted. b. Contract specifications with all clarifications, requests for information, changes, directives and record of manufacturer actually used along with product trade name.. c. One set of drawings to record the following: 1) Horizontal and vertical location of underground utilities affected by the Work. 2) Location of internal utilities; include valves, controls, conduit, duct work, switches, pressure reducers, size reducers, transitions, crosses, tees, filters, motors, heaters, dampers, regulators, safety devices, sensors, access doors and appurtenances that are concealed in the construction shall be shown with dimensions given from a visible and recognizable reference to the item being located in all three dimensions. The drawing shall also reference the applicable submittal for the item being located. 3) Field changes of dimensions and details including as-built elevations and lo- cation (station and offset). 4) Details not on original contract drawings but obtained through requests for information or by other communications with the City or Designer of Record. 2. Contractor Records

a. Daily QC Reports b. Certificates of compliance for materials used in construction c. Nonconformance Reports (NCRs) d. Remedial Action Requests (RARs) e. Completed inspection list f. Inspection and test reports g. Test procedures h. Approved submittals i. Material and equipment storage records j. Erosion, sediment, hazardous and quality plans k. Hazardous material records l. First report of injuries

3.02 RECORDING

A. Keep record documents current daily.

B. Legibly mark copies of the contract drawings to record actual construction.

C. Legibly mark up each Section of the technical specifications and contract drawings to rec- ord: 1. Changes made by change orders, requests for information, substitutions and varia- tions approved by submittals.

3.3 DOCUMENT MAINTENANCE

A. Maintain Documents in a clean, dry and legible condition, which shall be turned over to the City prior to final acceptance.

B. Do not use record documents for construction purposes.

CONTRACT RECORD DOCUMENTS 01 7200 - 2

FIT Roof Replacement Technical Specifications

C. Make documents available for inspection by the Project Manager and any others having ju- risdiction.

3.4 MONTHLY REVIEW

A. The Project Manager or his designated representative can inspect the record documents to ensure that they are being maintained and contain the most current correct data with partic- ular attention to as-built drawings.

B. If, the Project Manager determines that the documents are not being maintained and kept current as to as-built conditions, an amount may be withheld from the payment request and deducted from the contract value to cover the City's cost of collecting and recording the as- built contract data. This cost will be determined on the basis of $75.00 per man-hour of ef- fort.

END OF SECTION 01 7200

CONTRACT RECORD DOCUMENTS 01 7200 - 3

FIT Roof Replacement Technical Specifications

THIS PAGE INTENTIONALLY LEFT BLANK

CONTRACT RECORD DOCUMENTS 01 7200 - 4

FIT Roof Replacement Technical Specifications

SECTION 01 7300

OPERATION AND MAINTENANCE DATA

PART 1 - GENERAL

1.1 DESCRIPTION

A. The Work specified in this Section consists of preparing and submitting operation and maintenance data for mechanical, electrical and other specified equipment.

1.2 SUBMITTALS

A. Refer to Technical Specifications Section 01 3000 and 01 3400 for submittal procedures.

B. Submit one (1) electronic copy and two (2) bound hard copy of the proposed Operation and Maintenance Data Manual format including a table of contents not less than 30 days prior to acceptance tests and final inspection.

C. Submit one (1) electronic copy and two (2) bound hard copy of Operation and Maintenance Data Manual prior to final payment These copies shall incorporate any comments made on the previous submittals, along with final readings on all settings and gauges taken while the system is in fully satisfactory operation, final test and balance reports, and final sequence of operations standards.

1.3 CONTINUOUS UPDATING PROGRAM

A. Furnish one electronic copy of the Contractor’s letter indicating that suppliers have been no- tified to provide updated operation and maintenance data, service bulletins and other infor- mation pertinent to the equipment, as it becomes available. 1. Contractor to verify with Project Manager to which Facility Operator these notices are to be sent. All updates after Final Acceptance are to be sent to a Facility Operator with only a copy of the transmittal to the Project Manger. PART 2 - PRODUCTS

A. The following products are the requirements of hard copies:

B. PAPER SIZE 8-½ inches x 11 inches.

C. PAPER White bond, at least 20 pound weight.

D. TEXT typewritten.

E. PRINTED DATA Manufacturer's catalog cuts, brochures, operation and maintenance data. Clear reproductions thereof will be acceptable. If this data is in color, all final manuals must contain color data.

F. DRAWINGS 8-½ inches x 11inches, bound with the text. Larger drawings are acceptable provided they are folded to fit into a pocket inside the rear cover of the manual. Reinforce edges of large drawings.

G. PRINTS OF DRAWINGS black ink on white paper, sharp in detail and suitable for making reproductions.

OPERATION AND MAINTENANCE DATA 01 7300 - 1

FIT Roof Replacement Technical Specifications

H. FLYSHEETS Separate each portion of the manual with colored, neatly prepared flysheets briefly describing the contents of the ensuing portion.

I. COVERS Provide 40 to 50 mil, clear plastic, front and plain back covers for each manual. The front covers shall contain the information required in paragraph 3.02 below.

J. BINDINGS Conceal the binding mechanism inside the manual; lockable 3 ring binders shall be provided. PART 3 - EXECUTION

3.1 COVER

A. Include the following information on the front cover and on the inside cover sheet: 1. OPERATION AND MAINTENANCE INSTRUCTIONS 2. (TITLE OF STRUCTURE OR FACILITY AND ADDRESS) 3. (TITLE AND NUMBER OF CONTRACT) 4. (CONTRACTOR’S NAME AND ADDRESS) 5. (GENERAL SUBJECT OF THE MANUAL) 6. (Leave spaces for signatures of the City representatives and acceptance date)

3.2 CONTENTS OF THE MANUAL

A. An index of all volumes in each volume of multiple volume systems.

B. An index in front of each volume. List and combine the literature for each system in the se- quence of operation.

C. Name, address and telephone numbers of Contractor, suppliers and installers along with the manufacturer's order number and description of the order.

D. Name, address and telephone numbers of manufacturer's nearest service representatives.

E. Name, address and telephone number of nearest parts vendor and service agency.

F. Copy of guaranties and warranties issued to, and executed in the name of, the City.

G. Anticipated date City assumes responsibility for maintenance.

H. Description of system and component parts including theory of operation.

I. Pre operation check or inspection list.

J. Procedures for starting, operating and stopping equipment.

K. Post operation check or shutdown list.

L. Inspection and adjustment procedures.

M. Troubleshooting and fault isolation procedures for on-site level of repair.

N. Emergency operating instructions.

OPERATION AND MAINTENANCE DATA 01 7300 - 2

FIT Roof Replacement Technical Specifications

O. Accepted test data.

P. Maintenance schedules and procedures.

Q. Test procedures to verify the adequacy of repairs.

R. One copy of each wiring diagram.

S. One copy of each piping diagram.

T. Location where all measurements are to be made.

U. One copy of each duct diagram.

V. One copy of control diagram.

W. One copy of each accepted shop drawing.

X. One copy of software programs imputable or changeable on site.

Y. Manufacturer's parts list with catalog names, numbers and illustrations.

Z. A list of components which are replaceable by the City.

AA. An exploded view of each piece of the equipment with part designations.

BB. List of manufacturer's recommended spare parts, current prices and recommended quanti- ties for two years of operation.

CC. List of special tools and test equipment required for the operation, maintenance, adjust- ment, testing and repair of the equipment, instruments and components.

DD. Scale and corrosion control procedures.

EE. Disassembly and re-assembly instructions.

FF. Troubleshooting and repair instructions.

GG. Calibration procedures.

HH. Ordering information.

II. Training course material used to train City staff, including DVD, slides and other presenta- tion material.

JJ. Inventory of all attic stock provided per the Technical Specifications and the specific loca- tion to which this was delivered.

END OF SECTION 01 7300

OPERATION AND MAINTENANCE DATA 01 7300 - 3

FIT Roof Replacement Technical Specifications

THIS PAGE INTENTIONALLY LEFT BLANK

OPERATION AND MAINTENANCE DATA 01 7300 - 4

FIT Roof Replacement Technical Specifications

SECTION 01 7320

CUTTING AND PATCHING

PART 1 GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and other Technical Specification Sections, apply to this Section.

1.2 SUMMARY

A. This Section specifies administrative and procedural requirements for cutting and patching.

B. Cutting and patching includes cutting existing construction to provide for installation or performance of other Work, and subsequent fitting and patching required to restore surfaces to original conditions.

C. Demolition of selected portions of the building for alterations is included in Technical Specification Section 017360, "Selective Demolition."

1.3 SUBMITTALS

A. Cutting and Patching Proposal: Where approval of procedures for cutting and patching is required before proceeding, submit a description of proposed procedures well in advance of the time cutting and patching will be performed and request approval to proceed from Project Manager and/or Designer. Include the following information, as applicable, in the proposal:

(1) Describe the extent of cutting and patching required and how it is to be performed; indicate why it cannot be avoided.

(2) Describe anticipated results in terms of changes to existing construction; include changes to structural elements and operating components as well as changes in the building's appearance and other significant visual elements.

(3) List products to be used and firms or entities that will perform Work.

(4) List utilities that will be disturbed or affected, including those that will be relocated and those that will be temporarily out-of-service. Indicate how long service will be disrupted.

(5) Approval by the Project Manager and/or Designer to proceed with cutting and patching does not waive the Designer's right to later require complete removal and replacement of a part of the Work found to be unsatisfactory.

1.4 QUALITY ASSURANCE

A. Requirements for Structural Work: Do not cut and patch structural elements in a manner that would reduce their load-carrying capacity or load-deflection ratio.

(1) Obtain approval of the cutting and patching proposal before cutting and patching the following structural elements:

CUTTING AND PATCHING 01 7320 - 1

FIT Roof Replacement Technical Specifications

(a) Foundation construction.

(b) Bearing walls.

(c) Wood beams.

(2) Refer to General Contract Conditions Section 316 Cutting and Patching the Work.

B. Operational and Safety Limitations: Do not cut and patch operating elements or safety related components in a manner that would result in reducing their capacity to perform as intended, or result in increased maintenance, or decreased operational life or safety.

(1) Obtain approval from the Project Manager and/or Designer of the cutting and patching proposal before cutting and patching the following operating elements or safety related systems:

(a) Primary operational systems and equipment.

(b) Water, moisture, or vapor barriers.

(c) Roofing and flashings.

(d) Control systems.

(e) Electrical wiring systems.

C. Visual Requirements: Do not cut and patch construction exposed on the exterior or in occupied spaces, in a manner that would, in the Designer's opinion, reduce the building's aesthetic qualities, or result in visual evidence of cutting and patching. Remove and replace Work cut and patched in a visually unsatisfactory manner.

PART 2 PRODUCTS

2.1 MATERIALS

A. Use materials that are identical to existing materials. If identical materials are not available or cannot be used where exposed surfaces are involved, use materials that match existing adjacent surfaces to the fullest extent possible with regard to visual effect. Use materials whose installed performance will equal or surpass that of existing materials.

PART 3 EXECUTION

3.1 INSPECTION

A. Before cutting existing surfaces, examine surfaces to be cut and patched and conditions under which cutting and patching is to be performed. Take corrective action before proceeding, if unsafe or unsatisfactory conditions are encountered.

3.2 PREPARATION

A. Temporary Support: Provide temporary support of Work to be cut.

B. Protection: Protect existing construction during cutting and patching to prevent damage.

CUTTING AND PATCHING 01 7320 - 2

FIT Roof Replacement Technical Specifications

C. Avoid interference with use of adjoining areas or interruption of free passage to adjoining areas.

D. Take all precautions necessary to avoid cutting existing pipe, conduit or ductwork serving the building, but scheduled to be removed or relocated until provisions have been made to bypass them.

3.3 PERFORMANCE

A. General: Employ skilled workmen to perform cutting and patching. Proceed with cutting and patching at the earliest feasible time and complete without delay.

(1) Cut existing construction to provide for installation of other components or performance of other construction activities and the subsequent fitting and patching required to restore surfaces to their original condition.

B. Cutting: Cut existing construction using methods least likely to damage elements to be retained or adjoining construction. Where possible review proposed procedures with the original installer; comply with the original installer's recommendations.

(1) In general, where cutting is required use hand or small power tools designed for sawing or grinding, not hammering and chopping. Cut holes and slots neatly to size required with minimum disturbance of adjacent surfaces. Do not cut holes larger than necessary. Temporarily cover openings when not in use.

(2) To avoid marring existing finished surfaces, cut or from the exposed or finished side into concealed surfaces.

(3) Cut through concrete and masonry using a cutting machine such as a carborundum or diamond core drill.

(4) Comply with requirements of applicable Technical Specification Sections of Division-2 where cutting and patching requires excavating and backfilling.

(5) By-pass utility services such as pipe or conduit, before cutting, where services are shown or required to be removed, relocated or abandoned. Cut-off pipe or conduit in walls or partitions to be removed. Cap, valve or plug and seal the remaining portion of pipe or conduit to prevent entrance of moisture or other foreign matter after by-passing and cutting.

C. Perform all patching with durable seams that are not discernable from normal viewing distances. Comply with specified tolerances.

(1) Where feasible, inspect and test patched areas to demonstrate integrity of the installation.

(2) Restore exposed finishes of patched areas and extend finish restoration into retained adjoining construction in a manner that will eliminate evidence of patching and refinishing.

3.4 CLEANING

CUTTING AND PATCHING 01 7320 - 3

FIT Roof Replacement Technical Specifications

A. Thoroughly clean areas and spaces where cutting and patching is performed or used as access. Remove completely paint, mortar, oils, putty and items of similar nature. Thoroughly clean piping, conduit and similar features before painting or other finishing is applied. Restore damaged pipe covering to its original condition.

END OF SECTION 01 7320

CUTTING AND PATCHING 01 7320 - 4

FIT Roof Replacement Technical Specifications

SECTION 01 7360

SELECTIVE DEMOLITION

1.1 GENERAL

1.2 RELATED DOCUMENTS

A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Technical Specification Sections, apply to this Section.

1.3 SUMMARY

A. This Section requires the selective removal and subsequent offsite disposal of the following:

(1) Portions of existing building indicated on drawings and as required to accommodate the restoration and rehabilitation of the building.

(2) Removal of items indicated "remove."

(3) Removal and protection of items indicated "remove," "salvage" or "relocate."

B. Removal work specified elsewhere:

(1) Cutting and patching is specified in Technical Specification 017320.

C. Related work specified elsewhere:

(1) Remodeling construction work and patching are included within the respective sections of specifications, including removal of materials for reuse and incorporation into remodeling.

1.4 SUBMITTALS

A. Schedule indicating proposed sequence of operations for selective demolition work to Project Manager for review prior to start of work. Include coordination for shutoff, capping, and continuation of utility services as required, together with details for dust and noise control protection.

B. Photograph existing conditions of structure surfaces, equipment, and adjacent improvements that might be misconstrued as damage related to removal operations. File with Project Manager prior to start of work.

1.5 JOB CONDITIONS

A. Condition of Structures: City assumes no responsibility for actual condition of items to be removed.

(1) Conditions existing at time of inspection for bidding purposes will be maintained by City insofar as practicable. However, minor variations within structure may occur by City's removal and salvage operations prior to start of selective demolition work.

SELECTIVE DEMOLITION 01 7360 - 1

FIT Roof Replacement Technical Specifications

B. Partial Demolition and Removal: Items indicated to be removed but of salvageable value to Contractor may be removed from structure as work progresses. Transport salvaged items from site as they are removed.

(1) Storage or sale of removed items on site will not be permitted.

C. Protections: Provide temporary barricades and other forms of protection to protect City's personnel and general public from injury due to selective demolition work.

(1) Provide interior and exterior shoring, bracing, or support to prevent movement, settlement, or collapse of structure or element to be demolished and adjacent facilities or work to remain.

(2) Protect from damage existing finish work that is to remain in place and becomes exposed during demolition operations.

(3) Protect floors with suitable coverings when necessary.

(4) Construct temporary dustproof partitions where required to separate areas where extensive dirt or dust operations are performed.

(5) Provide temporary weather protection during interval between demolition and removal of existing construction on exterior surfaces and installation of new construction to ensure that no water leakage or damage occurs to structure or interior areas of existing building.

(6) Remove protections at completion of work.

D. Damages: Promptly repair damages caused to adjacent facilities by demolition work.

E. Flame Cutting: Do not use cutting torches without obtaining prior permission from the Project Manager and/or Designer.

(1) Where permission is granted, do not proceed until work area is cleared of flammable materials. At concealed spaces, such as interior of ducts and pipe spaces, verify condition of hidden space before starting flame-cutting operations. Maintain portable fire suppression devices during flame-cutting operations.

F. Utility Services: Maintain existing utilities indicated to remain in service and protect them against damage during demolition operations.

(1) Maintain fire protection services during selective demolition operations.

G. Environmental Controls: Use necessary and appropriate methods to limit dust and dirt migration. Comply with governing regulations pertaining to environmental protection.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 INSPECTION

A. Prior to commencing with selective demolition work, inspect areas in which work will be performed. Photograph existing conditions of structure surfaces, equipment or surrounding

SELECTIVE DEMOLITION 01 7360 - 2

FIT Roof Replacement Technical Specifications

properties which could be misconstrued as damage resulting from selective demolition work; file with Designer prior to starting work.

3.2 PREPARATION

A. General: Provide interior and exterior shoring, bracing, or support to prevent movement, settlement, or collapse of areas to be demolished and adjacent facilities to remain.

(1) Cover and protect City's property from soilage or damage when demolition work is performed in areas where such items have not been removed.

(2) Locate, identify, stub off, and disconnect utility services that are not indicated to remain.

(a) Provide bypass connections as necessary to maintain continuity of service to occupied areas of building. Provide minimum of 72 hours advance notice to Project Manager if shutdown of service is necessary during changeover.

3.3 DEMOLITION

A. General: Perform selective demolition work in a systematic manner. Use such methods as required to complete work indicated on Drawings in accordance with demolition schedule and governing regulations.

(1) Remove concrete and masonry in small sections. Cut concrete and masonry at junctures with construction to remain using power-driven masonry saw or hand tools; do not use power-driven impact tools.

(2) Promptly remove debris to avoid imposing excessive loads on supporting walls, floors, or framing.

(3) Provide services for effective dust control.

B. If unanticipated mechanical, electrical, or structural elements that conflict with intended function or design are encountered, investigate and measure both nature and extent of the conflict. Submit report to Designer in written, accurate detail. Pending receipt of directive from Designer, rearrange selective demolition schedule as necessary to continue overall job progress without undue delay.

3.4 DISPOSAL OF DEMOLISHED MATERIALS

A. Remove from building site debris, rubbish, and other materials resulting from demolition operations. Transport and legally dispose off site. Coordinate with City all building materials removed from the building for on-site disposal.

(1) If hazardous materials are encountered during demolition operations, comply with applicable regulations, laws, and ordinances concerning removal, handling, and protection against exposure or environmental pollution. Notify Project Manager and obtain specific direction regarding the suspected hazardous material from the City’s Environmental Health Division.

(2) Burning of removed materials is not permitted on project site or elsewhere within the City and County of Denver.

SELECTIVE DEMOLITION 01 7360 - 3

FIT Roof Replacement Technical Specifications

3.5 CLEANUP AND REPAIR

A. General: Upon completion of demolition work, remove tools, equipment, and demolished materials from site. Remove protections and leave interior areas broom clean.

(1) Repair demolition performed in excess of that required. Return elements of construction and surfaces to remain to condition existing prior to start of demolition operations. Repair and clean adjacent construction or surfaces soiled or damaged by selective demolition work.

END OF SECTION 01 7360

SELECTIVE DEMOLITION 01 7360 - 4 FIT Roof Replacement Technical Specifications

SECTION 01 7400

WARRANTIES AND BONDS

PART 1 - GENERAL

1.1 DESCRIPTION

A. The Work specified in this Section consists of preparing and submitting warranties and bonds required by these specifications.

B. Reference Contract General Conditions: GC 111, GC 1501, GC 1502, GC 1503, GC 1801, GC 1802.

1.2 SUBMITTALS

A. Refer to Technical Specifications Section 01 3000 for submittal procedures.

B. Submit executed warranties and bonds. PART 2 - PRODUCTS (NOT USED) PART 3 - EXECUTION

3.1 WARRANTIES AND BONDS

A. Execute the warranties and bonds required by the Contract Documents. Prepare and sub- mit all bonds on the forms provided by the City. Deliver the executed warranties in electron- ic and hard copy format.

B. Provide warranties or bonds for the materials, labor and time period set forth in the sections of these specifications requiring such documents. All warranties shall be in accordance with the Contract General Conditions. Refer to the Technical Specifications for all specific items requiring longer warranty periods.

C. Provide all warranties and bonds that the manufacturer or supplier furnishes at no additional cost in regular commercial trade. END OF SECTION 01 7400

WARRANTIES AND BONDS 01 7400 - 1

FIT Roof Replacement Technical Specifications

THIS PAGE INTENTIONALLY LEFT BLANK

WARRANTIES AND BONDS 01 7400 - 2

FIT Roof Replacement Technical Specifications

SECTION 01 7419

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and other Technical Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for the following:

1. Salvaging nonhazardous demolition waste. 2. Recycling nonhazardous demolition and construction waste. 3. Disposing of nonhazardous demolition and construction waste.

B. Related Requirements, if applicable:

1. Division 02 Section "Selective Structure Demolition" for disposition of waste resulting from partial demolition of buildings, structures, and site improvements. 2. Division 31 Section "Site Clearing" for disposition of waste resulting from site clearing and removal of above- and below-grade improvements.

1.3 DEFINITIONS

A. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.

B. Demolition Waste: Building and site improvement materials resulting from demolition or selective demolition operations.

C. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction.

D. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.

E. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility.

F. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work.

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-1

FIT Roof Replacement Technical Specifications

1.4 PERFORMANCE REQUIREMENTS

A. General: Achieve end-of-Project rates for salvage/recycling of 75 percent by weight of total non-hazardous solid waste generated by the Work. Practice efficient waste management in the use of materials in the course of the Work. Use all reasonable means to divert construction and demolition waste from landfills and incinerators. Facilitate recycling and salvage of materials, including the following:

1. Demolition Waste:

a. Asphalt paving. b. Concrete. c. Concrete reinforcing steel. d. Terra cotta/plaster walls. e. Structural and miscellaneous steel. f. Rough hardware. g. Insulation. h. Doors and frames. i. Door hardware. j. Windows. k. Glazing. l. Gypsum board. m. Equipment. n. Cabinets. o. Piping. p. Supports and hangers. q. Valves. r. Mechanical equipment. s. Refrigerants. t. Electrical conduit. u. Copper wiring. v. Lighting fixtures. w. Lamps. x. Ballasts. y. Electrical devices.

2. Construction Waste:

a. . b. Wood sheet materials. c. Metals. d. Insulation. e. Carpet. f. Metal studs. g. Gypsum board. h. Piping. i. Electrical conduit. j. Packaging: Regardless of salvage/recycle goal indicated in "General" Paragraph above, salvage or recycle 100 percent of the following uncontaminated packaging materials:

1) Paper. 2) Cardboard. 3) Boxes. 4) Plastic sheet and film. 5) Polystyrene packaging.

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-2

FIT Roof Replacement Technical Specifications

6) Wood crates. 7) Plastic pails.

1.5 ACTION SUBMITTALS

A. Waste Management Plan: Submit plan within 7 days of date established for the Notice to Proceed.

1.6 INFORMATIONAL SUBMITTALS

A. Waste Reduction Progress Reports: Concurrent with each Application for Payment, submit report. Include the following information:

1. Material category. 2. Generation point of waste. 3. Total quantity of waste in tons. 4. Quantity of waste salvaged, both estimated and actual in tons. 5. Quantity of waste recycled, both estimated and actual in tons. 6. Total quantity of waste recovered (salvaged plus recycled) in tons. 7. Total quantity of waste recovered (salvaged plus recycled) as a percentage of total waste.

B. Waste Reduction Calculations: Before request for Substantial Completion, submit calculated end-of-Project rates for salvage, recycling, and disposal as a percentage of total waste generated by the Work.

C. Records of Donations: Indicate receipt and acceptance of salvageable waste donated to individuals and organizations. Indicate whether organization is tax exempt.

D. Records of Sales: Indicate receipt and acceptance of salvageable waste sold to individuals and organizations. Indicate whether organization is tax exempt.

E. Recycling and Processing Facility Records: Indicate receipt and acceptance of recyclable waste by recycling and processing facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.

F. Landfill and Incinerator Disposal Records: Indicate receipt and acceptance of waste by landfills and incinerator facilities licensed to accept them. Include manifests, weight tickets, receipts, and invoices.

G. LEED Submittal: (Not applicable)

H. Qualification Data: For refrigerant recovery technician.

I. Statement of Refrigerant Recovery: Signed by refrigerant recovery technician responsible for recovering refrigerant, stating that all refrigerant that was present was recovered and that recovery was performed according to EPA regulations. Include name and address of technician and date refrigerant was recovered.

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-3

FIT Roof Replacement Technical Specifications

1.7 QUALITY ASSURANCE

A. Waste Management Coordinator Qualifications: General Contractor with a record of successful waste management coordination of projects with similar requirements.

B. Refrigerant Recovery Technician Qualifications: Certified by EPA-approved certification program.

C. Regulatory Requirements: Comply with hauling and disposal regulations of authorities having jurisdiction. 1. Disposal Procedures: a. Location: Denver Arapahoe Disposal Site – DADS. All debris must be disposed of at this location. b. Removal and Hauling: All Debris removal and hauling cost shall be part of base bid. c. The Owner will set up an account with DADS that will cover the dump volumes cost only. All other fees to be included in base bid by General Contractor.

D. Waste Management Conference: Conduct conference at Project site to comply with requirements in Technical Specification Section 012000 "Project Meetings." Meeting shall include contractors affected by the Waste Management Plan. Review methods and procedures related to waste management including, but not limited to, the following:

1. Review and discuss waste management plan including responsibilities of Waste Management Coordinator. 2. Review requirements for documenting quantities of each type of waste and its disposition. 3. Review and finalize procedures for materials separation and verify availability of containers and bins needed to avoid delays. 4. Review procedures for periodic waste collection and transportation to recycling and disposal facilities. 5. Review waste management requirements for each trade.

1.8 WASTE MANAGEMENT PLAN

A. General: Develop plan consisting of waste identification. Include separate sections in plan to distinguish between demolition and construction waste. Indicate quantities by weight or volume, but use same units of measure throughout waste management plan.

B. Waste Identification: Indicate anticipated types and quantities of demolition, site-clearing, and construction waste generated by the Work. Include estimated quantities and assumptions for estimates.

C. Waste Reduction Work Plan: (Not applicable)

D. Cost/Revenue Analysis: (Not applicable)

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-4

FIT Roof Replacement Technical Specifications

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 PLAN IMPLEMENTATION

A. General: Implement approved waste management plan. Provide handling, containers, storage, signage, transportation, and other items as required to implement waste management plan during the entire duration of the Contract.

B. General Contractor’s Waste Management Coordinator: Engage a waste management coordinator to be responsible for implementing, monitoring, and reporting status of waste management work plan. Coordinator shall be present at Project site full time for duration of Project.

C. Training: Train workers, subcontractors, and suppliers on appropriate separation, handling, and recycling to be used by all parties and proper waste management procedures, as appropriate for the Work occurring at Project site.

1. Distribute waste management plan to everyone concerned within three days of submittal return. 2. Distribute waste management plan to entities when they first begin work on-site. Review plan procedures and locations established for salvage, recycling, and disposal.

D. Site Access and Temporary Controls: Conduct waste management operations to ensure minimum interference with roads, streets, walks, walkways, and other adjacent occupied and used facilities.

1. Designate and label specific areas on Project site necessary for separating materials that are to be salvaged, recycled, reused, donated, and sold. 2. Comply with Technical Specification Section 01500 "Temporary Facilities”" for controlling dust and dirt, environmental protection, and noise control.

E. Waste Management in Historic Zones or Areas: Hauling equipment and other materials shall be of sizes that clear surfaces within historic spaces, areas, rooms, and openings, by 12 inches or more.

3.2 SALVAGING DEMOLITION WASTE

A. Salvaged Items for Reuse in the Work: Salvage items for reuse and handle as follows:

1. Clean salvaged items. 2. Pack or crate items after cleaning. Identify contents of containers with label indicating elements, date of removal, quantity, and location where removed. 3. Store items in a secure area until installation. 4. Protect items from damage during transport and storage. 5. Install salvaged items to comply with installation requirements for new materials and equipment. Provide connections, supports, and miscellaneous materials necessary to make items functional for use indicated.

B. Salvaged Items for Sale and Donation: Not permitted on Project site.

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-5

FIT Roof Replacement Technical Specifications

C. Salvaged Items for Owner's Use: (Not applicable)

D. Doors and Hardware: Brace open end of door frames. Except for removing door closers, leave door hardware attached to doors.

E. Lighting Fixtures: Separate lamps by type and protect from breakage.

F. Electrical Devices: Separate switches, receptacles, switchgear, transformers, meters, panelboards, circuit breakers, and other devices by type.

3.3 RECYCLING DEMOLITION AND CONSTRUCTION WASTE, GENERAL

A. General: Recycle paper and beverage containers used by on-site workers.

B. Recycling Receivers and Processors: List below is provided for information only; available recycling receivers and processors include, but are not limited to, the following:

C. RECYCLING RECEIVERS AND PROCESSORS

D. CO Resource F. 400 Marriel H. (970) I. George Avenue 963- MacDonal E. Management 8900 d G. Carbondale, CO 81623

J. Oxford K. 2400 W. M. (303) N. John Kent Recycling Oxford Avenue 762- 1160 L. Englewood, CO 80110

O. Allied Waste P. 10303 E. Dry R. (720) S. Bill Kich Creek Rd 895- #250 1500

Q. Englewood, CO 80112

T. Waste-Not U. 1065 Poplar W. (970 X. Gary Street 669- Gettman 9912 V. Loveland, CO 80534

Y. Bunting Z. 3315 State BB. (970) CC. Bryan Disposal Street 339- Bunting 3023 AA. Evans, CO 80620

DD. Phoenix EE. 2501 Delwood GG. (970) HH. Mark Recycling Avenue 375- Thompso 1300 n FF. Durango, CO

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-6

FIT Roof Replacement Technical Specifications

81301

II. Waste Chasers JJ. 19 Oak LL. (970) MM. Jason Avenue 454- Hawk 2497 KK. Eaton, CO 80615

NN. Colorado All OO. 7247 E. QQ. (303) RR. Majori Waste County Line 702- McDonald Rd 9955

PP. Longmont, CO 80504

SS. Patch TT. 12655 State VV. (719) WW. David Construction Hwy 67 784- Patch Jr. 6236 UU. Florence, CO 81226

XX. Pueblo YY. 28900 E. Hwy AAA. (719) BBB. Disposal 96 948- 0047 ZZ. Pueblo, CO 81001

CCC. Construction DDD. 2255 E. Las FFF. (303) GGG. Endeavors Vegas Rd 375- 0785 EEE. Colorado Springs, CO

HHH. Preparation of Waste: Prepare and maintain recyclable waste materials according to recycling or reuse facility requirements. Maintain materials free of dirt, adhesives, solvents, petroleum contamination, and other substances deleterious to the recycling process.

III. Procedures: Separate recyclable waste from other waste materials, trash, and debris. Separate recyclable waste by type at Project site to the maximum extent practical according to approved construction waste management plan.

1. Provide appropriately marked containers or bins for controlling recyclable waste until removed from Project site. Include list of acceptable and unacceptable materials at each container and bin.

a. Inspect containers and bins for contamination and remove contaminated materials if found.

2. Stockpile processed materials on-site without intermixing with other materials. Place, grade, and shape stockpiles to drain surface water. Cover to prevent windblown dust. 3. Stockpile materials away from construction area. Do not store within drip line of remaining trees. 4. Store components off the ground and protect from the weather. 5. Remove recyclable waste from Owner's property and transport to recycling receiver or processor.

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-7

FIT Roof Replacement Technical Specifications

3.4 RECYCLING DEMOLITION WASTE

A. Asphalt Paving: Break up and transport paving to asphalt-recycling facility.

B. Concrete: Remove reinforcement and other metals from concrete and sort with other metals.

1. Pulverize concrete to maximum 4-inch size.

C. Masonry (Terra Cotta): Remove anchors and ties from masonry and sort with other metals.

1. Pulverize masonry to maximum 4-inch size.

D. Wood Materials: Sort and stack members according to size, type, and length. Separate lumber, panel products, and treated wood materials.

E. Metals: Separate metals by type.

1. Remove and dispose of bolts, nuts, washers, and other rough hardware.

F. Gypsum Board: Stack large clean pieces on wood pallets or in container and store in a dry location. Remove edge trim and sort with other metals. Remove and dispose of fasteners.

G. Piping: Reduce piping to straight lengths and store by type and size. Separate supports, hangers, valves, sprinklers, and other components by type and size.

H. Conduit: Reduce conduit to straight lengths and store by type and size.

3.5 RECYCLING CONSTRUCTION WASTE

A. Packaging:

1. Cardboard and Boxes: Break down packaging into flat sheets. Bundle and store in a dry location. 2. Polystyrene Packaging: Separate and bag materials. 3. Pallets: As much as possible, require deliveries using pallets to remove pallets from Project site. For pallets that remain on-site, break down pallets into component wood pieces and comply with requirements for recycling wood. 4. Crates: Break down crates into component wood pieces and comply with requirements for recycling wood.

B. Site-Clearing Wastes: Chip brush, branches, and trees on-site.

1. Comply with requirements in Division 32 Section “Plants” for use of chipped organic waste as organic mulch.

C. Wood Materials:

1. Clean Cut-Offs of Lumber: Grind or chip into small pieces. 2. Clean : Bag sawdust that does not contain painted or treated wood.

a. Comply with requirements in Division 32 Section "Plants." for use of clean sawdust as organic mulch.

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-8

FIT Roof Replacement Technical Specifications

D. Gypsum Board: Stack large clean pieces on wood pallets or in container and store in a dry location.

1. Clean Gypsum Board: Grind scraps of clean gypsum board using small mobile chipper or hammer mill. Screen out paper after grinding.

3.6 DISPOSAL OF WASTE

A. General: Except for items or materials to be salvaged, recycled, or otherwise reused, remove waste materials from Project site and legally dispose of them in a landfill or incinerator acceptable to authorities having jurisdiction.

1. Except as otherwise specified, do not allow waste materials that are to be disposed of accumulate on-site. 2. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

B. Burning: Do not burn waste materials.

C. Disposal: Remove waste materials and dispose of at designated spoil areas on Owner's property.

D. Disposal: Remove waste materials from Owner's property and legally dispose of them.

END OF SECTION 01 7419

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419-9

FIT Roof Replacement Technical Specifications

THIS PAGE INTENTIONALLY LEFT BLANK

CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL 017419- FIT Roof Replacement Technical Specifications

SECTION 02 4100 DEMOLITION

PART 1 GENERAL 1.1 SECTION INCLUDES

A. Building demolition excluding removal of hazardous materials and toxic substances. B. Selective demolition of built site elements. 1.2 RELATED REQUIREMENTS A. Section 01 1000 - Summary: Limitations on Contractor's use of site and premises. B. Section 01 1000 - Summary: Description of items to be salvaged or removed for re-use by Contractor. C. Section 01 5000 - Temporary Facilities and Controls: Site fences, security, protective barriers, and waste removal. D. Section 01 6000 - Product Requirements: Handling and storage of items removed for salvage and relocation. E. Section 01 7000 - Execution and Closeout Requirements: Project conditions; protection of bench marks, survey control points, and existing construction to remain; reinstallation of removed products; temporary bracing and shoring. PART 3 EXECUTION 2.1 SCOPE A. Remove paving and curbs as required to accomplish new work. B. Remove other items indicated, for salvage, relocation, and recycling. 2.2 GENERAL PROCEDURES AND PROJECT CONDITIONS A. Comply with applicable codes and regulations for demolition operations and safety of adjacent structures and the public. 1. Obtain required permits. 2. Take precautions to prevent catastrophic or uncontrolled collapse of structures to be removed; do not allow worker or public access within range of potential collapse of unstable structures. 3. Provide, erect, and maintain temporary barriers and security devices. 4. Conduct operations to minimize effects on and interference with adjacent structures and occupants. 5. Do not close or obstruct roadways or sidewalks without permit. 6. Conduct operations to minimize obstruction of public and private entrances and exits; do not obstruct required exits at any time; protect persons using entrances and exits from removal operations. 7. Obtain written permission from owners of adjacent properties when demolition equipment will traverse, infringe upon or limit access to their property. B. Do not begin removal until receipt of notification to proceed from Owner. C. Protect existing structures and other elements that are not to be removed.

02 4100 - 1 DEMOLITION FIT Roof Replacement Technical Specifications

1. Provide bracing and shoring. 2. Prevent movement or settlement of adjacent structures. 3. Stop work immediately if adjacent structures appear to be in danger. D. If hazardous materials are discovered during removal operations, stop work and notify Architect and Owner; hazardous materials include regulated asbestos containing materials, lead, PCB's, and mercury. E. Perform demolition in a manner that maximizes salvage and recycling of materials. 1. Dismantle existing construction and separate materials. 2. Set aside reusable, recyclable, and salvageable materials; store and deliver to collection point or point of reuse. F. Partial Removal of Paving and Curbs: Neatly saw cut at right angle to surface. 2.3 EXISTING UTILITIES A. Coordinate work with utility companies; notify before starting work and comply with their requirements; obtain required permits. B. Protect existing utilities to remain from damage. C. Do not disrupt public utilities without permit from authority having jurisdiction. D. Do not close, shut off, or disrupt existing life safety systems that are in use without at least 7 days prior written notification to Owner. E. Do not close, shut off, or disrupt existing utility branches or take-offs that are in use without at least 3 days prior written notification to Owner. F. Locate and mark utilities to remain; mark using highly visible tags or flags, with identification of utility type; protect from damage due to subsequent construction, using substantial barricades if necessary. G. Remove exposed piping, valves, meters, equipment, supports, and foundations of disconnected and abandoned utilities. 2.4 SELECTIVE DEMOLITION FOR ALTERATIONS A. Drawings showing existing construction and utilities are based on casual field observation and existing record documents only. 1. Verify that construction and utility arrangements are as shown. 2. Report discrepancies to Architect before disturbing existing installation. 3. Beginning of demolition work constitutes acceptance of existing conditions that would be apparent upon examination prior to starting demolition. B. Remove existing work as indicated and as required to accomplish new work. 1. Remove items indicated on drawings. C. Protect existing work to remain. 1. Prevent movement of structure; provide shoring and bracing if necessary.

02 4100 - 2 DEMOLITION FIT Roof Replacement Technical Specifications

2. Perform cutting to accomplish removals neatly and as specified for cutting new work. 3. Repair adjacent construction and finishes damaged during removal work. 4. Patch as specified for patching new work. 2.5 DEBRIS AND WASTE REMOVAL A. Remove debris, junk, and trash from site. B. Leave site in clean condition, ready for subsequent work. C. Clean up spillage and wind-blown debris from public and private lands. END OF SECTION

02 4100 - 3 DEMOLITION FIT Roof Replacement Technical Specifications

SECTION 03 1000 CONCRETE FORMWORK

PART 1 - GENERAL

1.1 SUMMARY A. Section Includes 1. Formwork for cast-in-place concrete. 2. Form accessories. B. Related Sections 1. Section Division 32 Section – Concrete Paving 2. Section 03 3000 - Cast-In-Place Concrete 1.2 REFERENCES A. ACI 301: Specifications for Structural Concrete for Buildings B. ACI 347: Recommended Practice for Concrete Formwork C. PS 1: Construction and Industrial

PART 2 - PRODUCTS

2.1 MATERIALS A. Form Materials 1. Plywood: a. Douglas species; select sheathing-tight face grade; sound, undamaged sheets with straight edges. b. "B-B Medium Density Overlayed Concrete Form", Class I as defined by PS-1. c. Use new plywood for the project for exposed surfaces. Do not reuse plywood more than four times. Do not use patched forms or plywood previously used on another job for exposed concrete. 2. Glass Fiber Fabric Reinforced Plastic Forms: Matched, tight fitting, stiffened to support weight of concrete without deflection detrimental to structural tolerances and appearance of finished concrete surface. 3. Tubular Column: Round, of spirally wound, seamless, laminated fiber type; surface treated with release agent. B. Formwork Accessories 1. Form Ties: Snap-off metal of fixed length; cone type; 1-1/2 inch break back dimension; free of defects that will leave holes no larger than 1 inch diameter in concrete surface, with waterproofing washer. 2. Fillets for Chamfered Corners: Wood strips or rigid plastic, 45 degrees, 3/4 inch wing size; maximum possible lengths. 3. Dovetail Anchor Slots: Galvanized steel at brick and concrete block and stainless steel at stone work; 24 gage; foam filled; release tape sealed slots; bent tab anchors; securable to concrete formwork.

03 1000 - 1 CONCRETE FORMWORK FIT Roof Replacement Technical Specifications

4. Flashing Reglets: Galvanized steel; 24 gage; longest possible lengths; release tape sealed slots; with alignment splines for joints; securable to concrete formwork. 5. Form Liners: Fabricated from fiberglass, elastomeric material, or urethane.

PART 3 - EXECUTION

3.1 ERECTION INSTALLATION APPLICATION A. Construct formwork to maintain tolerances in accordance with ACI 301. B. Strips (ACI 301 4.2.4): Install 45-degree chamfer strips at exposed outside j corners, beams, joists and columns. C. Forms shall be substantial, designed to resist the pressure to which they will be subjected, free from surface defects and sufficiently tight to prevent leakage of mortar with as few and as inconspicuous joints as possible. Earth forms may be used where approved by Owner. Form for joints and reveals as shown on drawings. shall have 3/4" maximum sides. D. Provide openings in concrete to accommodate work of other trades. Accurately place and securely support items built into forms. All trades affected shall be notified at least 24 hours before any pouring so that those trades may insure that proper blocking, sleeves, pockets, etc. are in their proper place. E. Forms for Exposed Concrete: 1. Drill forms to suit ties used and to prevent leakage of concrete mortar around tie holes. Do not splinter forms by driving ties through improperly prepared holes. 2. Do not use metal cover plates for patching holes or defects in forms. 3. Use extra studs, walers and bracing to prevent bowing of forms between studs and to avoid bowed appearance in concrete. Do not use narrow strips of form material, which will produce bow. 4. Assemble forms so they may be readily removed without damage to exposed concrete surfaces. 5. Form shapes, recesses and projections with smooth-finish materials, and install in forms with sealed joints to prevent displacement. F. Clean and adjust forms prior to concrete placement. Apply form release agents or wet forms, as required. Retighten forms during and after concrete placement, if required, to eliminate mortar leaks. G. OWNER shall be notified at least 48 hours before filling of any forms. No concrete shall be place until OWNER has given approval. H. Installation of Embedded Items 1. Set and build into the work anchorage devices and other embedded items required for other work that is attached to or supported by cast-in-place concrete. 2. Use setting diagrams, templates and instructions provided by others for locating and setting. I. Forms and shoring shall not be removed until concrete attains strength to support its own weight and loads imposed thereon. J. Approval of OWNER shall be obtained prior to early removal of forms and shoring. Exercise care in the removal of all forms to insure against surface and corner damage.

END OF SECTION

03 1000 - 2 CONCRETE FORMWORK FIT Roof Replacement Technical Specifications SECTION 03 2000 CONCRETE REINFORCING

PART 1 - GENERAL

1.1 SUMMARY A. Section Includes 1. Reinforcing steel bars, welded steel wire fabric, fabricated steel bar or rod mats for cast-in-place concrete. 2. Support chairs, bolsters, bar supports, and spacers for supporting reinforcement. B. Related Sections 1. Section 03 1000 - Concrete Formwork 2. Section 03 3000 - Cast-in-Place Concrete 1.2 REFERENCES A. ACI 301 - Specifications for Structural Concrete for Buildings B. ACI 318 - Building Code Requirements for Structural Concrete C. ASTM A82 - Steel Wire, Plain, for Concrete Reinforcement D. ASTM A185 - Welded Wire Reinforcement, Plain, for Concrete E. ASTM A615 - Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement F. ASTM A706 - Low-Alloy Steel Deformed Bars for Concrete Reinforcement G. CRSI - Manual of Standard Practice 1.3 SUBMITTALS A. Submit shop drawings of reinforcing steel in accordance with ACI 301. Copies of the contract drawings shall not be marked and submitted as shop drawings. 1.4 QUALITY ASSURANCE A. Perform concrete reinforcement work in accordance with CRSI Manual of Standard Practice. B. Conform to ACI 301.

PART 2 - PRODUCTS

2.1 MATERIALS A. Reinforcing Bars 1. ASTM A615 plus S1, Grade 60, deformed. 2. Ties, stirrups, and field bent bars may be ASTM A615, Grade 40. B. Welded Wire Fabric 1. Conform to ASTM A185. 2. Adjacent sheets of wire mesh shall be lapped at least 6" and securely wired. 3. Welded wire fabric shall be set on wire chairs or "hooked" during placement of concrete to maintain 3/4" cover. C. Accessories 1. Tie Wire: Minimum 16 gage annealed type. Acceptable patented system.

03 2000-1 CONCRETE REINFORCING

FIT Roof Replacement Technical Specifications

2. Chairs, Bolsters, Bar Supports, Spacers: Sized and shaped for strength and support of reinforcement during installation and placement of concrete.

PART 3 - EXECUTION

3.1 ERECTION INSTALLATION APPLICATION A. Reinforcement 1. Position, support and secure reinforcements against displacement. Locate and support with metal chairs, runners, bolsters, spacers and hangers, as required. 2. Install welded wire fabric in as long lengths as practicable, lapping at least one mesh. 3. Welding of bar reinforcement will not be permitted. B. Detailing, fabrication, and placement of reinforcing steel shall be in accordance with ACI 315, Standard Practice for Detailing Reinforced Concrete Structure. C. Except as noted on the Drawings, concrete protection for reinforcement shall be in accordance with ACI 318 and as follows: 1. Concrete not exposed to earth or weather = slabs. 3.2 FIELD QUALITY CONTROL A. Metal reinforcing, at the time concrete is placed, shall be free from rust, scale, or other coatings, which will destroy or reduce the bond.

END OF SECTION

03 2000-2 CONCRETE REINFORCING FIT Roof Replacement Technical Specifications

SECTION 03 3000 CAST-IN-PLACE CONCRETE

PART 1 - GENERAL

1.1 SUMMARY A. Section Includes 1. Cast-in-place concrete quality control. 2. Concrete installation methods. 3. Concrete finishing standards. B. Related Sections 1. Section 03 2000 - Concrete Reinforcing 2. Section 03 2600 - Concrete Accessories 1.2 REFERENCES A. American Concrete Institute - ACI B. American Society for Testing and Materials - ASTM C. Concrete Reinforcing Steel Institute - CRSI D. National Fire Protection Association - NFPA 1.3 DEFINITIONS 1.4 SYSTEM DESCRIPTION 1.5 SUBMITTALS A. Submit concrete mix designs a minimum of 15 days prior to first concrete placement. B. Submit complete concrete mix designs which shall include the following: 1. Mix identification. 2. Intended use. 3. Mix proportions, including admixtures. 4. Manufacturer's data and certifications for mix materials. 5. Wet and dry unit weight. 6. Entrained air content. 7. Design slump. 8. Required average strength qualification data per ACI 301 3.9.1 and 3.9.2. 9. Average strength qualification data (trial mix data or field test data per ACI 301 3.9.3). 10. Field test data shall include copies of the Concrete Testing Agency's report. C. Do not begin concrete production until mixes have been reviewed and are acceptable to Owner. D. Mix designs may be adjusted when material characteristics, job conditions, weather, test results or other circumstances warrant. Do not use revised concrete mixes until submitted to and accepted by Architect. E. Submit manufacturer's specifications with installation instructions for proprietary materials including reinforcement and forming accessories, admixtures, joint materials, hardeners, curing materials, and others as requested by Owner.

Xcel Energy Lipan Distribution 03 3000-1 CAST-IN-PLACE CONCRETE Center 2nd Floor Renovation- 100%

FIT Roof Replacement Technical Specifications

1.6 QUALITY ASSURANCE A. Owner will retain a testing agency under a separate contract in accordance with Section 01400, Quality Control. The independent testing agency, including any branch office used, referred to in this Section and Chapter 16 of ACI 301 shall meet the requirements of ASTM E329 and shall have been inspected within the past 3 years by the Cement and Concrete Reference Laboratory of the National Institute for Standards and Testing (NIST) and shall have corrected any deficiencies noted. Testing laboratory will perform materials evaluation, testing and evaluation of concrete mixes. Perform sampling and testing during placement as follows: 1. Sampling: ASTM C172 2. Slump: ASTM C143, one test for each load at point of discharge. 3. Air Content: ASTM C231, one for each set of compressive strength specimens. 4. Compressive Strength: ASTM C399, one set for each 50 cu. yds. Or fraction thereof of each class of concrete; 2 specimens tested at 7 days, 1 specimen tested at 28 days. If second specimen meets specified 28-day strength, test the third specimen. If second specimen does not meet 28-day strength, test the third specimen at 45 days. 5. When the total quantity of a given class of concrete is less than 50 cu. yds., the strength tests may be waived by the Owner if field experience indicates evidence of satisfactory strength. Not less than one test will be made of each type of building components. 6. Measure and record air temperature. 7. Required references to be kept in the project field office shall include the following: a. ACI 301, current edition. b. CRSI "Placing Reinforcing Bars"

PART 2 - PRODUCTS

2.1 MATERIALS A. Concrete work shall meet applicable requirements of ACI 301 "Specification for Structural Concrete for Buildings", except as modified by the supplemental requirements specified in this Section. For numbers in parenthesis, refer to ACI 301 paragraphs. 1. Portland Cement: ASTM C 150, Type II (2.2.1.3). a. Fly ash may be substituted for Portland Cement on a weight-by-weight basis up to a maximum of 20 percent of the total cement content of the mix. b. Fly ash shall meet the requirements of ASTM C 618, except loss on ignition shall not exceed 3 percent. c. Use of fly ash shall be indicated on the mix design submittal. 2. Aggregates: ASTM C 33, local aggregates of proven durability may be used when acceptable to Owner. Maximum aggregate size: 3/4". 3. Water: Clean, drinkable and free of deleterious matter. B. All formed concrete, which will be exposed to public view, shall receive light broom finish for flatwork, and rubbed finish for other exposed surfaces. C. Membrane-Forming Curing Compound: ASTM C 309, Type I. (12.2.1.7). 1. Begin initial curing as soon as free water has disappeared from exposed surfaces. Where possible, keep continuously moist for not less than 72 hours. Continue curing by use of

03 3000-2 CAST-IN-PLACE CONCRETE

FIT Roof Replacement Technical Specifications

moisture-retaining cover or membrane-forming curing compound. Provide protections as required to prevent damage to exposed concrete surfaces. 2. Cure all appropriate slab areas by a method compatible with the adhesives normally used for adhesive applied floor finishes. D. Liquid chemical floor sealer, densifier, hardener: 1. "Seal Hard" as manufactured by L&M Construction Chemicals, Inc. Omaha, Nebraska; (402) 453-6600. 2. Or approved equal. 3. Apply in accordance with manufacturers instructions. E. The recommendations of ACI 305 "hot weather concreting" is made a part of this specification. F. Proportion mixes to obtain compressive strengths indicated on the Drawings. Where compressive strength is not indicated, assume a minimum of 4000 psi, 28 day strength. All concrete shall have a minimum cement content of 5 1/2 sacks per yard. G. Concrete shall be air-entrained. Air entraining admixture: 1. ASTM C 260, shall provide not less than 2% nor more than 4% entrained air for concrete. H. Air entraining or water reducing admixtures or both will be permitted. 1. Water-reducing Admixture: ASTM C 494. 2. Only use admixtures, which have been tested and accepted by Owner. 3. Admixtures shall be submitted for approval before submitting the mix designs and shall not be used without written approval from Owner. 4. Admixtures shall not be used for covered floors where they are not recommended by the floor covering or floor adhesive manufacturer. I. All admixtures shall be compatible. J. Calcium chloride shall not be used. Chloride ions in admixtures shall not exceed 0.1% by weight of cement content. K. Proportioning of concrete shall be in accordance with Section 3.99 of ACI 301. Proportioning by Section 3.10 of ACI 301 will not be accepted. L. Bonding agent shall be 100% solids, moisture insensitive epoxy equal to: 1. Sikadur Hi-Mood by Sika Chemical Corp. 2. FX-762 Hydro-Ester by Fox Industries, Inc. 3. Euco-Epoxi 460 MV by Euclid Chemical Company. M. Expansion joint material shall be self-expanding cork and shall meet the requirements of ASTM D1752. N. Isolation joint material shall be the thickness shown and shall meet requirements of ASTM D1751. O. Reinforcing Support 1. For support of reinforcing at surfaces to be exposed, plastic protected bar supports or concrete block shall be provided. Concrete masonry block, concrete masonry brick, or clay brick will not be acceptable. P. Joint Sealant

03 3000-3 CAST-IN-PLACE CONCRETE

FIT Roof Replacement Technical Specifications

1. Joint sealant, where called for, shall be one of the following: a. Sikaflex sealant by Sika Chemical Corp. b. Vertiseal by W.R. Grace & Co. c. Euco Polysulfide Sealant by Euclid Chemical Company.

PART 3 - EXECUTION

3.1 PREPARATION A. Refer to applicable Sections of ACI 301 and ACI 304, "Recommended Practice for Measuring, Mining, Transporting and Placing Concrete", except as modified by the supplemental requirements specified in this Section. For numbers in parenthesis, refer to ACI 301 paragraphs. 1. (8.2) Aluminum pipes, chutes, or other aluminum devices shall not be used to convey concrete. 2. Notify Owner 48 hours prior to any concrete pour. 3. Record and submit to OWNER, date, time, quantity, location and site weather conditions for all concrete pours. 3.2 ERECTION INSTALLATION APPLICATION A. Concrete Placement 1. Comply with ACI 304 placing concrete in a continuous operation within planned joints or sections. 2. Do not begin placement until work of other trades affecting concrete is completed. 3. Place concrete within 45 minutes after mixing water has been added. 4. Consolidate placed concrete using mechanical vibrating equipment with hand rodding and tamping, so that concrete is worked around reinforcement and other embedded items and into all parts of the form. 5. Protect concrete from physical damage or reduced strength due to weather extremes during mixing, placement and curing. a. In cold weather comply with ACI 306. b. In hot weather comply with ACI 305. B. Loading and use of all new concrete work shall be in accordance with standards set forth by the ACI.

END OF SECTION

03 3000-4 CAST-IN-PLACE CONCRETE FIT Roof Replacement Technical Specifications

SECTION 04 0100 MAINTENANCE OF MASONRY

PART 1 GENERAL 1.1 SECTION INCLUDES A. Water and Chemical cleaning of existing and new masonry surfaces. B. Replacement of brick masonry units. C. Repointing mortar joints. D. Repair of damaged masonry. 1.2 RELATED REQUIREMENTS A. Section 04 0511 - Mortar and Masonry Grout. 1.3 PRICE AND PAYMENT PROCEDURES A. See Section 01 2200 - Unit Prices, for additional unit price requirements. B. Repointing: By the linear foot. Includes a 12” section of mortar joint. 1.4 REFERENCE STANDARDS A. ACI 530/530.1/ERTA - Building Code Requirements and Specification for Masonry Structures and Related Commentaries; 2011. B. NPS - Standards for Preservation and Guidelines for Preserving Historic Buildings 1. Exterior Materials: Masonry 1.5 ADMINISTRATIVE REQUIREMENTS A. Preinstallation Meeting: Convene one week prior to commencing work of this section. 1. Require attendance of parties directly affecting work of this section. 2. Review conditions of installation, installation procedures, and coordination with related work. 1.6 SUBMITTALS A. See Section 01 3000 - Administrative Requirements, for submittal procedures. B. Product Data: Provide data on cleaning compounds. C. Samples: Submit four samples of decorative block, face brick, and terra cotta replacement units to illustrate matching color, texture and extremes of color range. D. Manufacturer's Instructions: For cleaning materials, indicate special procedures, conditions requiring special attention. 1.7 QUALITY ASSURANCE A. Comply with provisions of ACI 530/530.1/ERTA, except where exceeded by requirements of the contract documents. B. Restorer: Company specializing in masonry restoration with minimum five years of documented experience. 1.8 MOCK-UP A. Restore and repoint an existing masonry wall area sized 8 feet long by 6 feet high; include in mock-up area instances of mortar, accessories, wall openings, and flashings. B. Clean a 10 ft by 10 ft panel of wall to determine extent of cleaning. C. Locate where directed. D. Acceptable panel and procedures employed will become the standard for work of this section. E. Mock-up may remain as part of the Work. 1.9 DELIVERY, STORAGE, AND HANDLING A. Deliver masonry neatly stacked and tied on pallets. Store clear of ground with adequate

04 0100 - 1 MAINTENANCE OF MASONRY FIT Roof Replacement Technical Specifications

waterproof covering. 1.10 FIELD CONDITIONS A. Cold and Hot Weather Requirements: Comply with requirements of ACI 530/530.1/ERTA or applicable building code, whichever is more stringent. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Restoration and Cleaning Chemicals: 1. Substitutions: See Section 01 6000 - Product Requirements. 2.2 CLEANING MATERIALS A. Cleaning Agent: Detergent and Restoration Cleaner type.

1. Enviro Klean Restoration Cleaner (pH 5.5 in concentrate) or Equal 2.3 MORTAR MATERIALS A. Conform to requirements of Section 04 0511. 2.4 MASONRY MATERIALS A. Brick: Section 04 2000. B. Block: Section 04 2000. PART 3 EXECUTION 3.1 EXAMINATION A. Verify that surfaces to be cleaned are ready for work of this section. 3.2 PREPARATION A. Protect surrounding elements from damage due to restoration procedures. B. Carefully remove and store removable items located in areas to be restored, including fixtures, fittings, finish hardware, and accessories; reinstall upon completion. C. Separate areas to be protected from restoration areas using means adequate to prevent damage. D. Cover existing landscaping with tarpaulins or similar covers. E. Mask immediately adjacent surfaces with material that will withstand cleaning and restoration procedures. F. Protect roof membrane and flashings from damage with 1/2 inch plywood laid on roof surfaces over full extent of work area and traffic route. G. When using cleaning methods that involve water or other liquids, install drainage devices to prevent runoff over adjacent surfaces unless those surfaces are impervious to damage from runoff. H. Do not allow cleaning runoff to drain into sanitary or storm sewers. 3.3 REBUILDING A. Cut out damaged and deteriorated masonry with care in a manner to prevent damage to any adjacent sound remaining materials. B. Support structure as necessary in advance of cutting out portions of units. C. Cut away loose or unsound adjoining masonry as directed. D. Build in new units • COLD AND HOT WEATHER REQUIREMENTS • Comply with requirements of ACI 530/530.1/ERTA or applicable building code, whichever is more stringent. • COURSING • Establish lines, levels, and coursing indicated. Protect from displacement. • Maintain masonry courses to uniform dimension. Form vertical and horizontal joints of uniform

04 0100 - 1 MAINTENANCE OF MASONRY FIT Roof Replacement Technical Specifications

thickness. • Brick Units: • Bond: Running (typ) and various decorative styles. Match adjacent existing. • Coursing: Three units and 2 mortar joints to equal 8 inches. • 3. Mortar Joints: Match existing. • PLACING AND BONDING • Lay solid masonry units in full bed of mortar, with full head joints, uniformly jointed with other work. • Lay hollow masonry units with face shell bedding on head and bed joints. • Buttering corners of joints or excessive furrowing of mortar joints is not permitted. • Remove excess mortar and mortar smears as work progresses. • Interlock intersections and external corners. • Do not shift or tap masonry units after mortar has achieved initial set. Where adjustment must be made, remove mortar and replace. • Perform job site cutting of masonry units with proper tools to provide straight, clean, unchipped edges. Prevent broken masonry unit corners or edges. • REINFORCEMENT AND ANCHORAGE - GENERAL • Unless otherwise indicated on drawings or specified under specific wall type, install horizontal joint reinforcement 16 inches on center. • Place continuous joint reinforcement in first and second joint below top of walls. • reinforcement ends minimum 6 inches. • Reinforce joint corners and intersections with strap anchors 16 inches on center. • Fasten anchors to structural framing and embed in masonry joints as masonry is laid. Unless otherwise indicated on drawings or closer spacing is indicated under specific wall type, space anchors at maximum of 36 inches horizontally and 24 inches vertically. • REINFORCEMENT AND ANCHORAGE - SINGLE WYTHE MASONRY • Install horizontal joint reinforcement 8 inches on center. • Place continuous joint reinforcement in first and second joint below top of walls. • Lap joint reinforcement ends minimum 6 inches. • Reinforce joint corners and intersections with strap anchors 16 inches on center. E. Mortar Mix: Colored and proportioned to match existing work. F. Ensure that anchors are correctly located and built in. G. Install built in masonry work to match and align with existing, with joints and coursing true and level, faces plumb and in line. Build in all openings, accessories and fittings. 3.4 REPOINTING A. Perform repointing prior to cleaning masonry surfaces. B. Cut out loose or disintegrated mortar in joints to minimum 1/2 inch depth or until sound mortar is reached. C. Use power tools only after test cuts determine no damage to masonry units will result. D. Do not damage masonry units. E. When cutting is complete, remove dust and loose material by brushing. F. Premoisten joint and apply mortar. Pack tightly in maximum 1/4 inch layers. Form a smooth, compact concave joint to match existing. Remove excess mortar immediately from the sides of the brick and terra cotta using a damp sponge. G. Moist cure for 72 hours. Mortar should cure at least 21 days prior to masonry cleaning 3.5 CLEANING EXISTING MASONRY A. Cleaning Detergent: Brush clean brick type masonry surfaces at indicated locations with restoration type cleaning agent in accordance with the manufacturer's instructions. Thoroughly rinse masonry with clean water and flush loose mortar and dirt. Never use metal brushes on historic masonry. 3.6 CLEANING REPAIRED MASONRY

04 0100 - 1 MAINTENANCE OF MASONRY FIT Roof Replacement Technical Specifications

A. Verify mortar is fully set and cured. B. Clean surfaces and remove large particles with wood scrapersor nylon bristle brushes. Never use metal brushes on historic masonry. C. Scrub walls with detergent type cleaning agent solution using stiff brush. Thoroughly rinse and wash off cleaning solution, dirt and mortar crumbs using clean, pressurized water. 3.7 RESTORATION CLEANING A. Clean surfaces and remove large particles with wood scrapers or natural- or nylon-bristlebrush. B. Brush coat brick type masonry with premixed solvent restoration cleaner, mixed into solution in accordance with manufacturer's instructions. C. Provide a second application if required to match mock-up area. D. Allow sufficient time for solution to remain on masonry and agitate with soft fiber brush or sponge. E. Rinse from the bottom up with potable water applied at a maximum of 400 psi and at a rate of 4 gal/min. 3.8 CLEANING A. Immediately remove stains, efflorescence, or other excess resulting from the work of this section. B. Remove excess mortar, smears, and droppings as work proceeds and upon completion. C. Clean surrounding surfaces. END OF SECTION

04 0100 - 1 MAINTENANCE OF MASONRY FIT Roof Replacement Technical Specifications

SECTION 04 0101 REPAIR OF BRICK AND TERRA COTTA

Part 1 – GENERAL

1.1 SUMMARY OF WORK

A. For repairing brick, terra cotta and marble.

1.2 SUBMITTAL

A. Submit the following items in time to prevent delay of the work and to allow adequate time for review and resubmittals, if needed; do not order materials or start work before receiving the written approval:

1. Certificates should be submitted stating that all Installers of the repair mortar have successfully completed the training workshop for installation of the mortar.

2. Samples of all specified materials and Material Safety Data Sheets (MSDS) as appropriate.

3. Install mortar samples on masonry—preferably on the building. Do not make samples in cups or apply to plywood or other non-masonry surfaces.

4. Written verification from the Contractor that all specified items will be used. Provide purchase orders, shipping tickets, receipts, etc. to prove that the specified materials were ordered and received.

1.3 QUALITY ASSURANCE/TEST REQUIREMENTS

A. Installer certification: All repairs should be performed by a trained installer holding a Training Workshop Certificate. Contractor shall maintain proof of this credential for each installer at the site at all times.

B. Mortar Samples: Prepare a sample of each type of repair listed below, using masonry removed from the building where designated by the Owner. Prepare, install, and finish each sample repair according to the specifications. All samples must be applied to masonry. Prepare samples in an area where they will be exposed to the same conditions as will be present on the building during curing. Allow samples to cure at least three days (or longer, if possible) before obtaining Owner’s approval for color match. Mortar colors will continue to lighten as they cure and are exposed to the weather, so samples should be installed as far in advance as possible. A slightly darker color will give better long term results. Samples should be viewed from a minimum distance of 18-22 feet.

1.4 DELIVERY, STORAGE, AND HANDLING

A. Materials are to be delivered, stored, and handled to protect them from damage, extreme temperature, and moisture in accordance with Manufacturer’s written instructions.

B. Deliver and store material in Manufacturer’s original, unopened containers with the production date shown on the container or packaging.

C. Comply with the Manufacturer’s written specifications and recommendations for mixing, application, and curing of mortars.

04 0101 - 2 REPAIR OF BRICK AND TERRA COTTA FIT Roof Replacement Technical Specifications

1.5 PROTECTION/SITE CONDITIONS

A. Cold Weather Requirements: Do not work in temperatures below 40° F, when the substrate is colder than 40° F, or when the temperature is expected to fall below 40° F for 48 hours after installation of repair mortars. Building an enclosure and heating areas to maintain this temperature may only be done with the written approval of the Specifier.

B. Hot Weather Requirements: Protect repair mortar from direct sunlight and wind. Do not use or prepare mortar when ambient air temperature is above 90° F.

Part 2 – PRODUCTS .1 MASONRY REPAIR A. Jahn M100 Restoration Mortar for Terra Cotta & Brick a. Jahn Restoration Mortars are distributed by Cathedral® Stone Products, Inc., 7266 Park Circle Drive,Hanover, MD 21076; tel. (410) 782-9150; fax. (410) 782-9155; website: www.cathedralstone.com email: [email protected]. b. Jahn Mortars are premixed cementitious repair materials formulated to match the color and texture of the existing masonry, and do not contain any acrylic, latex, or other synthetic polymer additives. Mix the mortar with clean, potable water. B. or proposed equal. Must submit lab test to establish equivalent performance levels. Use an independent testing laboratory, as determined by the Specifier, and paid for by the submitting party.

C. Setting anchors in existing masonry: Jahn Anchor Setting Mortar (M80).

D. Mechanical anchors and dowels: Stainless steel threaded rod (ASTM F593) with a diameter as indicated on Contract Drawings, bent and cut to lengths required to achieve embedments shown on the Contract Drawings.

E. Approved alternate masonry repair products.

Part 3 – EXECUTION 3.1 WORKMANSHIP

A. Do not use any additives, such as bonding agents, accelerators, or retardants in the mortar.

3.2 PREPARATION FOR REPAIRS A. Remove all loose mortar and masonry prior to installation of the repair mortar. “Sound” masonry with a hammer to verify its integrity. If necessary, cut away an additional 1/2” of the substrate to ensure the surface to be repaired is solid and stable. Remove any sealant residue.

B. Where cramp anchors, threaded rod anchors, or dowels have been cut and pieces remain embedded in the substrate: Anchors that are free of rust, solidly embedded, and do not project beyond the surface of the masonry unit may remain. All others should be removed.

C. Cut the edges of the repair area to provide a minimum depth of 1/4”. The edges of the repair should be square cut. Do not allow any feathered edges in the repair area.

G. For very dry or porous surfaces, pre-wet the substrate ahead of time to prevent the substrate from drawing moisture out of the repair too quickly. Re-wet the surface immediately before applying the repair material.

3.3 MIXING MORTAR FOR REPAIR

A. It is recommended that a dust mask be worn during mixing. Do not mix more material than can be used within 30 minutes. Discard any mixed material that has been unused for 30

04 0101 - 2 REPAIR OF BRICK AND TERRA COTTA FIT Roof Replacement Technical Specifications

minutes or more.

B. Mixing ratios for limestone, sandstone, granite, marble, brick, terra cotta, precast concrete, and structural concrete are as follows:

1. Approximately 4 ½ to 5 parts dry material to 1 part water: M100 - Brick and Terra Cotta

C. Add water to dry ingredients and mix well. Adjust amount of water according to the weather and the porosity of the substrate.

3.4 APPLICATION OF REPAIR MATERIAL

A. Apply the mortar mix using a trowel in a series 1“ lifts allowing mortar to dry approximately 10-20 minuets between lifts. If applied in layers, scrape off any cement skin that has formed and continue application. Dampen the surface before applying the next layer. Work mortar firmly into the surface of the masonry, including the corners, and under and around all mechanical anchors. B. Build up repair material so that it is slightly above the adjacent masonry surface. Allow mortar 15 to 30 minutes to set slightly (wait time will vary with temperature and humidity–longer in cool weather), and then scrape off excess material using a straight edge (a plasterer’s miter rod is good for this). Do not press down or “float” the repair. Where repairs occur at panel edges or corners, form mortar to match the profile of the surrounding masonry. In all cases, finish and texture repair so that it is as indistinguishable as possible from the adjacent masonry.

3.5 FINISHING TECHNIQUES

A. To obtain a smooth finish to match terra cotta, marble, or brick, the finished repair can be troweled to leave a smooth surface. This may cause the repair to lighten and may need to be stained or painted to match. Glazed surfaces can be matched using Cathedral Stone’s masonry Mineral Coating and masonry Terra Coat. (see data sheet)

B. Clean any mortar residues from area surrounding the repair by sponging as many times as necessary with clean water. This should be done before repair material sets.

C. Patching mortar can be textured to match rough surfaces using a variety of finishing tools.

D. After the repair has been cured and allowed to dry for at least one week, if the appearance of a repair does not meet the specifications of the job, the surface color of the repair may be enhanced by applying a vapor permeable, mineral based pigmented stain.

3.6 CURING PROCEDURE

A. Lightly mist the repair with water to wet the entire surface of the finished repair approximately 30 minutes to 1 hour after completion on hot sunny days, and approximately 2 hours or longer, on cool or cloudy days. Time will vary with temperature and humidity. Mist several times a day during the 72 hours following the repair installation. Should access to the repairs be impossible for a period of time, plastic may be used to cover them temporarily. The application of plastic, however, does not remove the need for normal curing techniques. Never cover repairs with plastic immediately after finishing— the water in the repair will be trapped on the surface, causing it to lighten.

3.7 CLEAN UP

A. Remove uncured mortar from the perimeter of the repair before it dries using clean water and a rubber sponge. Repeat several times with clean water to prevent a halo effect (staining of

04 0101 - 2 REPAIR OF BRICK AND TERRA COTTA FIT Roof Replacement Technical Specifications

adjacent masonry). Cured mortar may only be removed chemically or mechanically.

B. Remove uncured mortar from tools and equipment with water as soon as possible. Cured material may only be removed chemically or mechanically.

END OF SECTION

04 0101 - 2 REPAIR OF BRICK AND TERRA COTTA FIT Roof Replacement Technical Specifications

SECTION 04 0511 MORTAR AND MASONRY GROUT

PART 1 GENERAL SECTION INCLUDES Mortar for masonry. 1.1 RELATED REQUIREMENTS A. Section 04 0100 - Maintenance of Masonry: Bedding and pointing mortar for masonry restoration work. 1.2 REFERENCE STANDARDS A. ACI 530/530.1/ERTA - Building Code Requirements and Specification for Masonry Structures and Related Commentaries; 011. B. ASTM C5 - Standard Specification for Quicklime for Structural Purposes; 2010. C. ASTM C91/C91M - Standard Specification for Masonry Cement; 2012. D. ASTM C94/C94M - Standard Specification for Ready-Mixed Concrete; 2015. E. ASTM C144 - Standard Specification for Aggregate for Masonry Mortar; 2011. F. ASTM C150/C150M - Standard Specification for Portland Cement; 2015. G. ASTM C207 - Standard Specification for Hydrated Lime for Masonry Purposes; 2006 (Reapproved 2011). H. ASTM C270 - Standard Specification for Mortar for Unit Masonry; 2014a. I. ASTM C387/C387M - Standard Specification for Packaged, Dry, Combined Materials for Concrete and High Strength Mortar; 2011b. J. ASTM C404 - Standard Specification for Aggregates for Masonry Grout; 2011. K. ASTM C476 - Standard Specification for Grout for Masonry; 2010. 1.3 SUBMITTALS A. See Section 01 3000 - Administrative Requirements, for submittal procedures. B. Product Data: Include design mix and indicate whether the Proportion or Property specification of ASTM C270 is to be used. Also include required environmental conditions and admixture limitations. C. Samples: Submit two samples of mortar, illustrating mortar color and color range. 1.4 QUALITY ASSURANCE A. Comply with provisions of ACI 530/530.1/ERTA, except where exceeded by requirements of the contract documents. 1.5 DELIVERY, STORAGE, AND HANDLING A. Maintain packaged materials clean, dry, and protected gainst dampness, freezing, and foreign matter. 1.6 FIELD CONDITIONS A. Cold and Hot Weather Requirements: Comply with requirements of ACI 530/530.1/ERTA or applicable building code, whichever is more stringent.

PART 2 PRODUCTS

04 0511 - 4 MORTAR AND MASONRY GROUT FIT Roof Replacement Technical Specifications

2.1 MORTAR AND GROUT APPLICATIONS A. At Contractor's option, mortar and grout may be field-mixed from packaged dry materials, made from factory premixed dry materials with addition of water only, or ready-mixed. B. Mortar Color: Color to match existing historic mortar. C. Mortar Mix Designs: ASTM C270, Property Specification. 1. Historic Exterior Masonry Pointing Mortar: Type O; color to match existing. 2. Exterior, Non-loadbearing Masonry: Type N. 2.2 MATERIALS A. Packaged Dry Material for Mortar for Unit Masonry: Premixed Portland cement, hydrated lime, and sand; complying with ASTM C387/C387M and capable of producing mortar of the specified strength in accordance with ASTM C270 with the addition of water only. 1. Color: Standard gray. B. Packaged Dry Material for Mortar for Repointing: Premixed Portland cement, hydrated lime, and graded sand; capable of producing Type O mortar in accordance with ASTM C270 with the addition of water only. 1. Color: to match existing mortar. C. Packaged Dry Material for Grout for Masonry: Premixed cementitious materials and dried aggregates; capable of producing grout of the specified strength in accordance with ASTM C476 with the addition of water only. D. Portland Cement: ASTM C150/C150M. 1. Type: Type I - Normal; ASTM C150/C150M. 2. Color: gray or white, match existing E. Hydrated Lime: ASTM C207, Type S. F. Quicklime: ASTM C5, non-hydraulic type. G. Mortar Aggregate: ASTM C144. H. Grout Aggregate: ASTM C404. I. Water: Clean and potable. 2.3 MORTAR MIXING A. Thoroughly mix mortar ingredients using mechanical batch mixer, in accordance with ASTM C270 and in quantities needed for immediate use. B. Maintain sand uniformly damp immediately before the mixing process. C. Do not use anti-freeze compounds to lower the freezing point of mortar. D. If water is lost by evaporation, re-temper only within two hours of mixing. 2.4 GROUT MIXING A. Mix grout in accordance with ASTM C94/C94M. B. Thoroughly mix grout ingredients in quantities needed for immediate use in accordance with ASTM C476 for fine and coarse grout. PART 3 EXECUTION 3.01 INSTALLATION: Not Used END OF SECTION

04 0511 - 4 MORTAR AND MASONRY GROUT FIT Roof Replacement Technical Specifications

DIVISION 04900 MASONRY RESTORATION AND CLEANING

Part 1 – GENERAL

1.1 RELATED DOCUMENTS

A. The Contract Documents shall govern work of this section. Provide materials, labor, equipment, and services necessary to furnish, deliver, and install all work of this section as shown on the drawings, as specified herein, and/or as required by job conditions.

1.2 SUMMARY OF WORK

A. This section includes, but is not limited to, the following:

a. Removal of stains from biological growth by chemicals from all architectural surfaces including, but not limited to: masonry, concrete, cast stone, limestone, marble, granite, brownstone, travertine, wood and canvas. Mock- ups will determine the best appropriate method.

B. Visual Requirements:

a. Maintain aesthetic or historic qualities of Project by protecting work designated to remain.

1.3 REFERENCES

A. Manufacturer’s specifications and instructions.

1.4 SUBMITTAL

A. Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections.

B. Product Data: Submit manufacturer’s specifications and installation instructions for products used including finishing materials and methods.

C. Submit manufacturer’s technical data sheet for product indicated including recommendations for their application and use.

D. Submit a work plan describing capture, storage, and disposal as required and/or governed by any and all local, state, and/or federal laws, codes, and regulations.

04 900 Masonry Restoration and Cleaning FIT Roof Replacement Technical Specifications

E. Samples: Provide sample installation of product. Locations per the owner or owner’s representative’s directions.

1.5 QUALITY ASSURANCE

A. Mock-ups: Prepare sample of D/2 Biological Solution on the appropriate substrate indicated. See 1.6 Test Panels.

B. Provide at least one person who shall be present at all times during the execution of the work of this section, who shall be thoroughly familiar with the specified requirements, and the materials and methods needed for their execution, and who shall direct all work performed under this section.

C. Provide adequate numbers of workers skilled in the necessary crafts and properly informed of the specialized methods and materials to be used in this work.

1.6 TEST PANELS

A. The Contractor shall arrange for providing test panels. Minimum size of test panels shall be a 5 ft. by 5 ft. area. Manufacturer’s application instructions shall be followed. Allow a minimum of 7 days drying time before inspection or longer if possible. Some forms of biological staining will continue to diminish for as long as three to four weeks or longer. Test panel shall serve as the performance standard and remain available for comparison during the cleaning process.

B. Contractor shall prepare a written report detailing results of testing including description of methods employed, materials, concentration of cleaner, dwell times and other elements of test procedures as defined above.

C. Each test panel must be carefully labeled, charted, and photographed. Approved test panels will become a part of the Work, and serve as the quality standard for similar type work on this project.

D. Notify the owner’s representative seven (7) days in advance of the dates and time when the test panels will be installed.

1.7 PROJECT/SITE CONDITIONS

A. Contractor shall be responsible for protecting all existing adjacent materials such as doors, windows, flashings, roofing, and other existing materials that are not intended to be treated.in order to prevent product from entering building.

B. Contractor shall be responsible for the repair of all damaged adjacent materials due to the execution of the work at no additional expense to the owner. Repairs shall be made by qualified mechanics skilled in the type of repairs required, to the satisfaction of the owner’s representative.

04 900 Masonry Restoration and Cleaning FIT Roof Replacement Technical Specifications

C. Protect adjacent areas and surfaces not being treated with barriers suitable for the product being used. Appropriate care should be taken at air intakes, air conditioning vents and similar openings that may come in contact with the product.

D. Contractor to wash down all adjacent materials not being treated with D/2 using potable water, after each specific area has been cleaned. If using pressure washer, do not exceed 600 psi.

D. Take appropriate precautions to avoid harm to building occupants, pedestrians and nearby property.

E. Safety: For any number of reasons it is essential to maintain a high degree of worker and occupant safety while working with biological solution.

PART 2 – PRODUCTS

2.1 MATERIALS

A. Cleaning Solution

a. D/2 Biological Solution shall be used. D/2 is biodegradable, pH neutral, and contains no chlorine or acids. Products containing chlorine or acids shall not be used. D/2 Biological Solution is available nationwide; for a distributor in your region see the D/2 website www.d2bio.com or call (917) 693-7441.

b. Approved alternate.

B. Miscellaneous Equipment

a. Natural bristle brushes

b. Soft clean rags

c. Clean, potable water

d. Rubber gloves

e. Eye and skin protection

f. Low-pressure applicator, such as pump sprayer or electric/battery powered sprayer.

g. Pressure washers using 600 psi or less.

PART 3 – EXECUTION

04 900 Masonry Restoration and Cleaning FIT Roof Replacement Technical Specifications

3.1 GENERAL APPLICATION OF INITIAL CHEMICAL TREATMENT D/2 is most effective when surface and air temperature is 45°F or above.

A. Follow manufacturer’s instructions (see Data Sheet) and as follows:

a. Apply undiluted D/2 Biological Solution with a brush, roller, hand pump sprayer (garden style pump sprayer) or low pressure power sprayer.

b. Allow undiluted D/2 to remain on the substrate for a minimum of 10-15 minutes and a maximum of 24 hours depending on site conditions.

c. Reapplication of D/2 is required if more than 24 hours has elapsed since initial application.

d. Apply additional D/2 as necessary to maintain a wet surface.

e. Scrub with soft nylon or natural bristle brush and potable water. DO NOT USE METAL BRUSH.

f. Lightly mist with water and continue scrubbing.

fg Rinse thoroughly with clean, potable water.

B. Work sections that can easily be applied in one shift.

C. Clearly mark or identify time of application and dwell time.

D. Wash down in the same sequence of sections in which product was applied.

E. Thoroughly rinse application areas and surrounding adjacent surfaces.

3.2 CLEAN UP

A. Thoroughly rinse application areas and surrounding adjacent surfaces.

PART 4 – CONTRACTOR QUALITY CONTROL

4.1 QUALITY CONTROL

A. The implementation of a Contractor Quality Control Program does not relieve the Contractor from the responsibility to provide work in accordance with the Contract Documents, applicable codes, regulations, and governing authorities. The Contractor Quality Control Program shall include, but not be limited to, the elements herein. These elements are provided only as a minimum starting point for the Contractor to use to generate the complete Contractor’s Quality Control Program.

END OF SECTION

04 900 Masonry Restoration and Cleaning FIT Roof Replacement Technical Specifications

SECTION 05 7000 DECORATIVE METAL PART 1 GENERAL

A. SECTION INCLUDES Railing and guardrail assemblies. Wall-mounted handrails. Free-standing railings at steps.

1.2 REFERENCE STANDARDS

A. ADA Standards - Americans with Disabilities Act (ADA) Standards for Accessible Design; 2010.

B. ASTM A36/A36M - Standard Specification for Carbon Structural Steel; 2014.

C. ASTM A53/A53M - Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless; 2012.

D. ASTM A153/A153M - Standard Specification for Zinc Coating (Hot-Dip) on Iron and Steel Hardware; 2009.

E. ASTM A307 - Standard Specification for Carbon Steel Bolts, Studs, and Threaded Rod 60 000 PSI Tensile Strength; 2014.

F. ASTM A325 - Standard Specification for Structural Bolts, Steel, Heat Treated, 120/105 ksi Minimum Tensile Strength; 2014.

G. ASTM A325M - Standard Specification for Structural Bolts, Steel, Heat Treated 830 MPa Minimum Tensile Strength (Metric); 2014.

H. ASTM A501/A501M - Standard Specification for Hot-Formed Welded and Seamless Carbon Steel Structural Tubing; 2014.

I. ASTM A780/A780M - Standard Practice for Repair of Damaged and Uncoated Areas of Hot-Dip Galvanized Coatings; 2009 (Reapproved 2015).

J. ASTM E935 - Standard Test Methods for Performance of Permanent Metal Railing Systems and Rails for Buildings; 2013.

K. AWS C3.4/C3.4M - Specification for Torch Brazing; 2007.

L. AWS C3.5M/C3.5 - Specification for Induction Brazing; 2007.

M. AWS C3.9M/C3.9 - Specification for Resistance Brazing; 2009.

N. AWS C3.5/C 3.5M - Specification for Induction Brazing; American Welding Society; 2007.

O. AWS C3.9/C 3.9M - Specification for Resistance Brazing; American Welding Society; 2009.

P. AWS D1.1/D1.1M - Structural Welding Code - Steel; 2015.

Q. AWS D1.6/D1.6M - Structural Welding Code - Stainless Steel; 2007.

1.3 SUBMITTALS

A. See Section 01 3000 - Administrative Requirements, for submittal procedures.

B. Test Reports: Submit test reports from an independent testing agency showing compliance with specified design and performance requirements.

1.4 QUALITY ASSURANCE

A. Installer Qualifications: Company specializing in installing decorative railing systems and acceptable to manufacturer.

05 7000 ‐ 1 DECORATIVE METAL FIT Roof Replacement Technical Specifications

1.5 DELIVERY, STORAGE, AND HANDLING

A. Deliver materials in factory-provided protective coverings and packaging.

B. Protect materials against damage during transit, delivery, storage, and installation at site.

C. Inspect materials upon delivery for damage. Repair damage to be indistinguishable from undamaged areas; if damage cannot be repaired to be indistinguishable from undamaged parts and finishes, replace damaged items.

D. Prior to installation, store materials and components under cover, in a dry location.

1.6 FIELD CONDITIONS

A. Maintain ambient temperature of space at minimum 65 degrees F and maximum 95 degrees F for 24 hours before, during, and after railing installation. PART 2 PRODUCTS

2.1 RAILING SYSTEMS

A. Railing Systems - General: Factory- or shop-fabricated in design indicated, to suit specific project conditions, and for proper connection to building structure, and in largest practical sizes for delivery to site.

1. Design Criteria: Design and fabricate railings and anchorages to resist the following loads without failure, damage, or permanent set; loads do not need to be applied simultaneously.

a. Lateral Force: 75 lb minimum, at any point, when tested in accordance with ASTM E935.

b. Distributed Load: 50 lb/ft minimum, applied in any direction at the top of the handrail, when tested in accordance with ASTM E935.

c. Concentrated Loads on Intermediate Rails: 50 psf, minimum.

d. Concentrated Load: 200 lbs minimum, applied in any direction at any point along the handrail system, when tested in accordance with ASTM E935.

e. Handrails: Comply with applicable accessibility requirements of ADA Standards.

2. Assembly: Join lengths, seal open ends, and conceal exposed mounting bolts and nuts using slip-on non-weld mechanical fittings, flanges, escutcheons, and wall brackets.

3. Joints: Tightly fitted and secured, machined smooth with hairline seams.

4. Field Connections: Provide sleeves to accommodate site assembly and installation. All connections into substrates shall use either stainless steel sleeves and/or stainless steel fasteners.

5. Welded and Brazed Joints: Make exposed joints butt tight, flush, and hairline; use methods that avoid discoloration and damage of finish; grind smooth, polish, and restore to required finish.

a. Ease exposed edges to small uniform radius.

b. Welded Joints:

1) Carbon Steel: Perform welding in accordance with AWS D1.1/D1.1M.

2) Stainless Steel: Perform welding in accordance with AWS D1.6/D1.6M.

c. Brass/Bronze Brazed Joints:

1) Perform torch brazing in accordance with AWS C3.4/C3.4M.

2) Perform induction brazing in accordance with AWS C3.5M/C3.5.

05 7000 ‐ 1 DECORATIVE METAL FIT Roof Replacement Technical Specifications

3) Perform resistance brazing in accordance with AWS C3.9M/C3.9.

B. Metal Tube Railing: Engineered, post supported railing system with metal infill.

1. Configuration: Guardrail only.

2. Top Rail: 1-1/2-inch round pipe or tube.

3. Decorative Flanges for Embedded Posts: Circular, collared cover plate without screw holes.

4. Wall Mounted Components: Components necessary to support railing with 1-1/2-inch clearance from wall, and as follows:

5. Fasteners: Concealed.

6. Infill at Pipe Railings: Pipe or tube rails sloped parallel to stair.

a. Outside Diameter: 1-1/2 inch.

b. Material: Steel pipe or tube, round.

c. Vertical Spacing: Maximum 4 inches on center at guardrail. Re: Drawing for stair railing.

d. Jointing: Welded and ground smooth and flush.

7. End and Intermediate Posts: Same material and size as top rails.

a. Horizontal Spacing: As indicated on drawings.

b. Mounting: Welded.

C. Wall-Mounted Handrail:

1. 1-1/2-inch Pipe or tube rails sloped parallel to stairs

2. Comply with ADA Standards.

2.2 MATERIALS

A. Steel Components:

1. Sections, Shapes, Plate and Bar: ASTM A36/A36M.

2. Tubing: ASTM A501/A501M structural tubing, round and shapes as indicated.

3. Pipe: ASTM A53/A53M, Grade B Schedule 40, black finish.

4. Bolts, Nuts, and Washers: ASTM A325 (ASTM A325M), Type 1, and galvanized to ASTM A153/A153M where connecting galvanized components.

2.3 ACCESSORIES

A. Welding Fittings: Factory- or shop-welded from matching pipe or tube; joints and seams ground smooth.

B. Anchors and Fasteners: Provide anchors and other materials as required to attach to structure, made of same materials as railing components unless otherwise indicated; where exposed fasteners are unavoidable provide flush countersunk fasteners.

1. For anchorage to concrete, provide inserts to be cast into concrete for bolting anchors.

2. For anchorage to masonry, provide brackets to be embedded in masonry for bolting anchors.

3. For anchorage to stud walls, provide backing plates for bolting anchors.

4. Exposed Fasteners: No exposed bolts or screws.

05 7000 ‐ 1 DECORATIVE METAL FIT Roof Replacement Technical Specifications

C. Carbon Steel Bolts and Nuts: ASTM A307. PART 3 EXECUTION

3.1 EXAMINATION

A. Verify that substrate and site conditions are acceptable and ready to receive work.

B. Verify field dimensions of locations and areas to receive work.

C. Notify Architect immediately of conditions that would prevent satisfactory installation.

D. Do not proceed with work until detrimental conditions have been corrected.

E. Furnish components to be installed in other work to installer of that other work, including but not limited to blocking, sleeves, inserts, anchor bolts, embedded plates and supports for attachment of anchors.

3.2 PREPARATION

A. Review installation drawings before beginning installation. Coordinate diagrams, templates, instructions, and directions for installation of anchorages and fasteners.

B. Clean surfaces to receive units. Remove materials and substances detrimental to the installation.

3.3 INSTALLATION

A. Comply with manufacturer's drawings and written instructions.

B. Install components plumb and level, accurately fitted, free from distortion or defects and with tight joints, except where necessary for expansion.

C. Anchor securely to structure.

D. Conceal anchor bolts and screws whenever possible. Where not concealed, use flush countersunk fastenings.

E. Weld connections that cannot be shop welded due to size limitations.

1. Weld in accordance with AWS D1.1/D1.1M.

2. Match shop welding and bolting.

3. Clean welds, bolted connections, and abraded areas.

4. Touch up shop primer and factory applied finishes.

5. Repair galvanizing with galvanizing repair paint per ASTM A780/A780M.

F. Isolate dissimilar materials with bituminous coating, bushings, grommets, or washers to prevent electrolytic corrosion.

3.4 TOLERANCES

A. Maximum Variation from Plumb: 1/4 inch per floor level, non-cumulative.

B. Maximum Offset from True Alignment: 1/4 inch.

C. Maximum Out-of-Position: 1/4 inch.

3.5 CLEANING

A. Remove protective film from exposed metal surfaces.

B. Metal: Clean exposed metal finishes with potable water and mild detergent, in accordance with manufacturer recommendations; do not use materials or chemicals, detergents or o t h e r substances that may damage the material or finish.

3.6 PROTECTION

05 7000 ‐ 1 DECORATIVE METAL FIT Roof Replacement Technical Specifications

A. Protect installed components and finishes from damage after installation.

B. Repair damage to exposed finishes to be indistinguishable from undamaged areas.

1. If damage to finishes and components cannot be repaired to be indistinguishable from undamaged finishes and components, replace damaged items.

END OF SECTION

05 7000 ‐ 1 DECORATIVE METAL City & County of Denver Replace Roofing Woodbury Branch Library

SECTION 06 10 00 – ROUGH CARPENTRY

PART 1 - GENERAL

1.1 DESCRIPTION

A. Work Included: Provide wood, nails, bolts, screws, framing anchors and other rough hardware, and other items needed and perform rough carpentry for the construction shown on the Drawings, as specified herein, and as needed for the complete and proper installation. B. Related Work: Documents affecting work in this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications. C. The work is primarily associated with the installation of new wood nailers and curbs. All wood shall be compliant with AWPA U1, Use Category 3B and fire preservative treated (Non-Com).

1.2 QUALITY ASSURANCE

A. Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the crafts and who are completely familiar with the specified requirements and the methods needed for the proper performance of the work of this Section. B. Codes and Standards: In addition to complying with the pertinent codes and regulations of governmental agencies having jurisdiction unless otherwise specifically directed or permitted by the Architect comply with:

1) "Product Use Manual" of the Western Wood Products Association for the selection and use of products included in that manual. 2) "Plywood Specification and Grade Guide" of the American Plywood Association.

1.3 PRODUCT HANDLING

A. Comply with pertinent provisions of Section 01 34 00. B. Deliver the materials to the job site, in a safe manner, out of the way of traffic, and shored up off the ground surface. C. Identify framing lumber as to grades, and store each grade separately from other grades. D. Protect materials with adequate waterproof wrapping. E. Use extreme care in off loading of lumber to prevent damage, splitting, and breaking of materials.

PART 2 - PRODUCTS

ROUGH CARPENTRY 06 10 00 - 1 City & County of Denver Replace Roofing Woodbury Branch Library

2.1 GRADE STAMPS

A. Identify framing lumber by the stamp of the Western Inspection Bureau, or such other grade stamp as is approved in advance by the Architect. B. Identify plywood as to species, grade, and glue type by the stamp of the American Plywood Association. C. Identify other materials of the Section by the appropriate stamp of the agency approved in advance by the Roofing Consultant.

2.2 MATERIALS

A. Provide materials in quantities needed for Work as shown on the Drawings, and meeting or exceeding the following standards of quality:

1) Horizontal framing members: -Hemlock, Pine, construction grade. 2) Plywood Sheathing: Structural II, CDX, exterior; or standard sheathing with exterior glue. 3) Steel Items: Comply with ASTM A7 or ASTM A36. Use galvanized steel in exterior locations. 4) Machines Bolts: Comply with ASTM A307. 5) Lag Bolts: Comply with Fed Spec FF-B-561. 6) Nails: Use common except as otherwise noted. Comply with Fed Spec FF-N-1. Use galvanized at exterior locations.

2.3 OTHER MATERIALS

A. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the Contractor subject to the approval of the Architect.

PART 3 - EXECUTION

3.1 SURFACE CONDITIONS

A. Examine the areas and conditions under which work of this Section will be performed. Correct conditions detrimental to timely and proper completion of the Work. Do not proceed until unsatisfactory conditions are corrected.

3.2 DELIVERIES

A. Stockpile materials sufficiently in advance of need to assure their availability in a timely manner for this work. B. Make as many trips to the job site as are needed to deliver materials of this Section in a timely manner to ensure orderly progress of the Work.

ROUGH CARPENTRY 06 10 00 - 2 City & County of Denver Replace Roofing Woodbury Branch Library

3.3 COMPLIANCE

A. Do not permit materials not complying with provisions of this Section to be brought onto or stored at the job site. B. Promptly remove non-complying materials and replace with materials meeting the requirements of this Section.

3.4 WORKMANSHIP

A. Produce joints which are tight, true, and well nailed, with members assembled in accordance with the Drawings and with pertinent codes and regulations. B. Carefully select members. Select individual pieces so that knots and obvious defects will not interfere with placing bolts or proper nailing, and will allow making of proper connections. Cut out and discard defects which render a piece unable to serve its intended function. Lumber may be rejected by the Architect, whether or not it has been installed, for excessive warp, twist, bow, crook, mildew, fungus, or mold, as well as for improper cutting and fitting. C. Do not shim any component.

3.5 GENERAL FRAMING

A. In addition to framing operation normal to the fabrication and erection as indicated on the Drawings, install wood blocking and backing required for the work of other trades. B. Set horizontal and sloped members with crown up. C. Do not notch, cut, or bore members for pipes, ducts, or conduits or for other reasons except as shown on the Drawings or as specifically approved in advance by the Architect. D. Make bearings full unless otherwise indicated on the Drawings. E. Finish bearing surfaces on which structural members are to rest so as to give sure and even support. F. Where framing members slope, cut or notch the ends as required to give uniform bearing surface.

3.6 BLOCKING AND BRIDGING

A. Install blocking as required to support items of finish and to cut off concealed draft openings, both vertical and horizontal, between ceiling and floor areas. B. Install solid block between joists at points of support and wherever sheathing is discontinuous. Blocking may be omitted where joists are supported on metal hangers.

3.7 ALIGNMENT

A. Nailing:

ROUGH CARPENTRY 06 10 00 - 3 City & County of Denver Replace Roofing Woodbury Branch Library

1) Use only common wire nails or spikes, except where otherwise specifically noted on the Drawings. 2) Provide penetration into the piece receiving the point of not less than 1/2 the length of the nail or spike, provided, however, that 16d nails may be used to connect two pieces of 2" (nominal) thickness. 3) Nail without splitting wood. 4) Pre-bore as required. 5) Remove split members and replace with members complying with the specified requirements.

B. Bolting:

1) Drill holes 1/16" larger in diameter than the bolts being used. 2) Drill straight and true from one side only. 3) Do not bear bolt threads on wood, but use washers under head and nut where both bear on wood, and use washers under all nuts.

C. Screws:

1) For lag screws and wood screws, pre-bore holes same diameter as roof of threads, enlarging holes to shank diameter for length of shank.

END OF SECTION 06 10 00

ROUGH CARPENTRY 06 10 00 - 4 FIT Roof Replacement Technical Specifications

SECTION 06 2000 FINISH CARPENTRY

PART 1 GENERAL 1.1 SECTION INCLUDES A. Finish carpentry items. 1.2 REFERENCE STANDARDS AWI/AWMAC/WI (AWS) - Architectural Woodwork Standards; 2014.

1.3 QUALITY ASSURANCE A. Fabricator Qualifications: Company specializing in fabricating the products specified in this section with minimum five years of documented experience. 1.4 DELIVERY, STORAGE, AND HANDLING A. Protect work from moisture damage. PART 2 PRODUCTS 2.1 FINISH CARPENTRY ITEMS A. Quality Grade: Unless otherwise indicated provide products of quality specified by AWI/AWMAC/WI (AWS) for Custom Grade. B. Exterior Woodwork Items: 1. Window Casings and Moldings: ; prepare for paint finish. 2. Soffits and Fascias: Prepare for paint finish. 2.2 WOOD-BASED COMPONENTS A. Wood fabricated from old growth timber is not permitted. 2.3 FABRICATION A. Shop assemble work for delivery to site, permitting passage through building openings. B. When necessary to cut and fit on site, provide materials with ample allowance for cutting. Provide trim for scribing and site cutting. PART 3 EXECUTION 3.1 INSTALLATION A. Install work in accordance with AWI/AWMAC/WI (AWS) requirements for grade indicated. B. Set and secure materials and components in place, plumb and level. C. Carefully scribe work abutting other components, with maximum gaps of 1/32 inch. Do not use additional overlay trim to conceal larger gaps. 3.2 TOLERANCES A. Maximum Variation from True Position: 1/16 inch. B. Maximum Offset from True Alignment with Abutting Materials: 1/32 inch.

END OF SECTION

06 2000 - 1 FINISH CARPENTRY

City & County of Denver Replace Roofing Woodbury Branch Library

SECTION 07 32 13 CLAY ROOF TILES

PART 1 - GENERAL

1.1 SYSTEM DESCRIPTION:

A. Furnish the labor, administration, materials and equipment to integrate the work into the overall building system so as to provide a leak free, clay tile roof system. The system is an assembly of components including the underlayment system, clay tile roofing, metal flashings, and all related parts necessary to complete the assembly.

1.2 DESCRIPTION OF WORK: A brief description of the major base bid work items follows:

A. Remove the existing clay tile roof system, underlayment, flashings and any other related items not designated to remain. B. Set the specified underlayment ply directly over the wood decking. C. Install the clay tile roofing system over the new underlayment ply. Install all clay tile accessories. D. At the eaves where shown on the roof plan, install new snow guards. E. Apply the detailed sheet metal flashings, gutters, downspouts and counterflashing. F. Provide a two year contractor’s written warranty.

1.3 This section includes:

A. Underlayment B. Clay Roofing Tile C. Tile Accessories D. Snow Guards

1.4 PRE-CONSTRUCTION CONFERENCE

A. Prior to the start of work hold a pre-construction conference covering all aspects of the new roof installation. The meeting attendees shall include the manufacturer’s representative along with the roofing subcontractor’s foreman and superintendent. At a minimum, the following items must be addressed:

1) Mobilization and staging. 2) Protection of the public. 3) Storage location for materials. 4) Environmental installation requirements. 5) Protection of new roofing. 6) Tie-in to existing roofing. 7) Construction of new drain sumps.

CLAY ROOF TILES 07 32 13 - 1 City & County of Denver Replace Roofing Woodbury Branch Library

8) Fume control. 9) Manufacturer’s inspections. 10) Warranty.

1.5 QUALITY ASSURANCE

A. A roofing consultant has been engaged to provide part time inspection of materials and workmanship. The Contractor shall provide a minimum of one week’s notice to the Contracting Officer prior to the start of roofing operations so that such services can be scheduled. B. Except as modified and supplemented herein, follow the published requirements and written recommendations of the clay tile and other material manufacturers. Concerning methods of application industry standards apply only when this contract does not address the matter. Industry Standards shall be pre-defined in the "NRCA (National Roofing Contractors Association) Manual of Roofing and Waterproofing". C. Qualifications:

1) Qualifications of Contractor: Contractor shall be approved by the roofing manufacturer to install the specified roof system and shall be eligible to receive the specified warranty upon completion of the work. Such approval shall have been issued and in effect for not less than two years prior to the bid opening date. 2) Qualifications of Installers: Use adequate number of skilled workers who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and methods needed for proper performance of the work in this section. In acceptance or rejection of the work, no allowance will be made for lack of skill on the part of the workers. Technicians working on the project shall have received training by the roof membrane manufacturer for the procedures necessary to perform the specified work. 3) Supervisor Qualifications: Supervisor shall be certified by the membrane manufacturer. Certification shall have been issued at least 2 years prior to bid date. 4) Manufacturer Representation: Roofing manufacturer shall be represented by a full time individual or firm based in Colorado. Products represented by part time or regional entity will not qualify.

D. U.L. Listing: Provide materials bearing Underwriters Laboratories (U.L.) marking on bundle, package or container indicating that materials have been produced under U.L.'s classification and follow-up service.

1.6 REFERENCES

A. Factory Mutual Research Approval Guide – Factory Mutual Research

CLAY ROOF TILES 07 32 13 - 2

City & County of Denver Replace Roofing Woodbury Branch Library

Corporation, An FM Global Affiliate. B. Roofing Materials and Systems Directory and Fire Resistance Directory – Underwriters Laboratories Inc.

1.7 SUBMITTALS

A. When submitting manufacturer’s literature, highlight all items pertaining to this project. See Division 1 for other items. B. Submit to the Contracting Officer the items listed in the Submittal Register found in Division 1, and any other pertinent items not listed but necessary to complete the construction. C. Submit current manufacturer’s literature for all items shown above. Also submit literature for any other items which may have a direct bearing on the quality of the finished roofing. D. Provide certification that materials meet the ASTM and Federal Specifications.

1.8 MATERIAL STORAGE AND HANDLING

A. Where applicable, the Contractor shall store material in accordance with the material manufacturer's recommendation as to temperature. B. All insulation and water sensitive products shall be protected from the elements at all times. Such materials are to be stored in an enclosure or securely covered with a waterproof tarp; the plastic wrappers on the insulation products shall not be used as a means of weather protection. C. All materials shall be labeled for ready identification. Labels shall include the name of the manufacturer and product description. D. The Contractor shall store only that material on the roof that can be used in one day. Material stored on the roof shall be scattered so as not to apply a concentrated load to the roofing system (greater than 20 psf). No materials shall be stored on new roofing unless a protective layer of plywood with a foam insulation base is used. E. The Contractor shall use extreme care when transporting materials to the roof surface. Damaged materials shall not be installed and must be removed from the job site. F. The Contractor shall provide all required storage enclosures and safeguards. G. Materials shall be delivered in their original, unopened containers, clearly labeled. No materials shall be stored below 40 degrees F. Should any materials be stored below this temperature, they may not be installed until they are restored to a temperature greater than this. H. No materials shall be stored on surfaces with slopes greater than ½” per foot. I. Extreme caution must be used to properly secure the materials from wind.

1.9 ENVIRONMENTAL REQUIREMENTS

A. Roofing materials shall not be installed in rain or snow. Roofing materials shall

CLAY ROOF TILES 07 32 13 - 3

City & County of Denver Replace Roofing Woodbury Branch Library

not be applied when there is heavy dew or frost on the roofing area. Application will not be allowed when the forecasted daily high temperature is less than 40 degrees or the wind speed is greater than 15 MPH. B. Do not heat the solvent based materials with an open flame in order to bring to a proper application temperature. Store materials in a heated location overnight if necessary.

1.10 PROTECTION

A. Adjacent surfaces shall be protected from stain and disfigurement during the demolition and application of roofing materials. B. The Contractor shall keep the building interior protected from the elements at all times. Representatives from the Contractor shall be available in one hours notice should an emergency occur.

1.11 SCHEDULE

A. Work is to be performed on a daily basis with each section completed before progressing to the next section of roofing unless specifically directed otherwise by the A/E. B. Completion of work will be defined as the installation of all specified roof preparation, insulation, field membrane, flashings, termination bars, and caulking.

1.12 DEFECTS

A. Conditions which may be detrimental to the completion or performance of the specified work shall be reported in writing to the Architect/Engineer prior to commencing such work. Such work shall not start until defects have been corrected.

PART 2 - PRODUCTS

2.1 ABBREVIATIONS

A. ASTM American Society for Testing and Materials B. FM Factory Mutual C. FS Federal Specification or Federal Standard D. SMACNA Sheet Metal and Air Conditioning Contractors National Assoc., Inc. E. UL Underwriters Laboratories

2.2 ROOF SYSTEM COMPONENTS

A. Underlayment: Ludowici UltraStick HT or high temperature modified bitumen

CLAY ROOF TILES 07 32 13 - 4

City & County of Denver Replace Roofing Woodbury Branch Library

underlayment sheet meeting ASTM D1970 and approved by the tile manufacturer. B. Clay Roofing Tile: Provide Ludowici Clay Tile – Spanish 13 with the following color blend.

1) 75% Historic Red 2) 15% Aged Oak 3) 10% Aged Cedar

C. Clay Tile Accessories:

1) Ridge & Hip Tile: Provide Ludowici tile pieces to be used with Spanish 13 tile roofs. 2) Rake Edge Tile: Provide Ludowici tile pieces to be used with Spanish 13 tile roofs. 3) Eave/Ridge Closures: Provide clay tile eave and ridge closures. 4) Snow Guards: Provide Ludowici copper snow guards designed for Spanish tile roofs. 5) Fasteners: Use tile manufacturer’s recommended fasteners as required for stated warranty.

D. Accessories: Supply manufacturer required accessory products in order to fully construct tile roof system.

PART 3 - EXECUTION

3.1 GENERAL

A. Deliver all materials to the site in a dry condition with labels intact. Either enclose materials in a trailer or cover with a waterproof tarpaulin to protect from the weather and moisture. B. For materials delivery in quantity to the site, obtain and submit a certification that the materials meet the required specification. C. Ensure that fasteners do not penetrate conduit or other miscellaneous items located on the underside of the roof deck. D. The workers will not have access to the interior of the building unless it is related to associated interior work.

3.2 PREPARATION

A. Prepare all surfaces according to applicable specification sections. B. Perform any and all measures necessary to protect the work of other trades from damage due to performance of work specified under this section. Contractor shall restore to original condition any damage caused during performance of such work.

CLAY ROOF TILES 07 32 13 - 5

City & County of Denver Replace Roofing Woodbury Branch Library

C. Surfaces scheduled to receive roofing are to be free of any standing water, frost, snow, or loose debris. D. Substrate is to be smooth, free of sharp projections, and free of obvious depressions. E. All metal fittings shall be in place before roofing. F. All nailers shall be securely installed prior to roofing.

3.3 OPERATIONAL PROCEDURES

A. Install temporary tie-ins and water cut-offs at the end of each workday. Remove all temporary tie-ins at the beginning of each workday. B. Except for expedient temporary work, do not roof during inclement weather as defined in the General Section of the Specification. Remove all temporary work prior to installing permanent components and materials. C. Confine equipment, storage of materials, debris, operations and movement of workers within the limits established for access at the pre-construction conference. D. Protect the building, all contents, and surrounding areas from damage, and building occupants from injury during the work. Do not affect the normal conduct of operations of the personnel in the building. Repairs must be made to all damage caused by lack of such protection to the Owner's satisfaction. If they determine that the repairs are beyond the Contractor's ability, then they will have the repairs performed by others and may charge the Contractor for these repairs. E. Remove daily all debris from the demolition and installation of the roof.

3.4 DEMOLITION

A. Remove the existing roofing system to the surface of the decking and wall substrates. B. Roof deck should be free of nails and other items that may cause irregularities that may damage the new underlayment. C. If conditions are uncovered that would be detrimental to the application of the specified work, immediately notify the Contracting Officer.

3.5 UNDERLAYMENT INSTALLATION

A. Broom the wood deck free of debris. B. Set the new underlayment sheet over the wood deck with the manufacturer specified side and end laps. C. Turn underlayment up walls as detailed on the drawings. Turn the underlayment down as detailed at rake and eave edges. D. Underlayment must be completely adhered to the deck and wall substrates. E. Patch over any wrinkles or fishmouths that run into laps.

CLAY ROOF TILES 07 32 13 - 6

City & County of Denver Replace Roofing Woodbury Branch Library

3.6 CLAY TILE INSTALLATION

A. Except as modified and supplemented herein, apply the clay tile to meet the requirements and recommendations of the membrane manufacturer. B. Surfaces which have been contaminated by products which are not compatible with the underlayment, flashings, or adhesives shall be cleaned or covered with plywood prior to the application of any roofing materials. C. Where multiple tile colors are used or there is a variation in tile color shades, the tile should be blended on the ground in batch that covers 100 sf. Blend in the colors randomly in the stated proportions before taking the tile to the roof. D. After installing the first 75 to 100 tile, halt installation and inspect the roof at ground level to insure blend is randomly presented. E. Install portions of sheet metal flashings that need to be in place before the tile roofing is installed. F. As tile roofing is installed continuously check the integrity of the underlayment system. Make repairs as needed to insure underlayment system is watertight. G. Install eave edge batten strips and hip/ridge wood stringers. H. Install four rows of snow guards at the eave edges in the pattern indicated on the Drawings. I. Fasten each tile with two nails. Don’t overdrive nails or leave raised nail heads. J. Set eave closure tile pieces prior to installing field tile. K. Lay tile on gable faces from right to left. Set tile on chalked lines at every row. Set tile columns on lines chalked every third tile. L. Close valley tile end openings with Type M mortar. Dampen tile surface before setting mortar. M. Orient ridge tile with the butt ends of the pieces exposed to the east and south.

3.7 FLASHING INSTALLATION

A. Clean all surfaces to be flashed prior to the application of any new materials. B. Bond the specified flashing materials to the substrate in such a manner as to avoid loose spots, sags, and wrinkles. Flash all items in the configuration shown on the Drawings. C. Flashings shall be constructed and terminated as indicated. Care shall be taken when drilling into brick or terra cotta surfaces. D. All base flashings shall be totally bonded to the substrate. Loose, wrinkled or poorly bonded flashings will not be accepted.

3.8 SEALANT

A. Clean the substrate as best possible so no contaminants such as bitumen and dust remain. B. If required, prime the surface with the primer recommended by the manufacturer. Also, use sealant backing if required by manufacturer. END OF SECTION 07 32 13

CLAY ROOF TILES 07 32 13 - 7

City & County of Denver Replace Roofing Woodbury Branch Library

SECTION 07 60 00 – SHEET METAL FLASHING AND TRIM

PART 1 - GENERAL

1.1 DESCRIPTION

A. Work included: Provide flashings and sheet metal not specifically described in other Sections of these Specifications but required to prevent penetration of water through the exterior shell of the building. B. This Section covers sheet metal accessories needed for the project but are not sold by the roof system manufacturer. C. Related work: Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications.

1.2 QUALITY ASSURANCE

A. Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the Work of this Section. B. In addition to complying with pertinent codes and regulations, comply with pertinent recommendations contained in current edition of "Architectural Sheet Metal Manual" published by the Sheet Metal and Air Conditioning Contractors National Association (SMACNA). C. Standard commercial items may be used for flashing, trim, reglets, and similar purposes provided such items meet or exceed the quality standards specified.

1.3 SUBMITTALS

A. When submitting manufacturer's literature, highlight all items pertaining to this project. B. Submit to the Roofing Consultant the manufacturer's latest published materials and samples along with any other items necessary for construction. C. Submit current manufacturer's literature for all items proposed to be provided under this Section. D. Provide certification that materials meet the state ASTM and Federal specifications. E. Shop Drawings in sufficient detail to show fabrication, installation, anchorage, and interface of the work of this Section with the work of adjacent trades. F. Manufacturer's recommended installation procedures which, when approved by the Roofing Consultant, will become the basis for accepting or rejecting actual installation procedures used on the Work.

SHEET METAL FLASHING AND TRIM 07 60 00 - 1 City & County of Denver Replace Roofing Woodbury Branch Library

1.4 PRODUCT HANDLING

A. Comply with pertinent sections of Division 7.

PART 2 - PRODUCTS

2.1 MATERIALS AND GAGES

A. Where sheet metal is required, and no material or gage is indicated on the Drawings, provide the highest quality and gage commensurate with the referenced standards.

2.2 GALVANIZED IRON

A. Provide sheet metal or sheet iron of a standard brand of open-hearth copper- bearing steel, copper-molybdenum iron, or pure iron sheets. B. Zinc coating:

1) Where galvanizing is required, provide zinc coating by hot-dip galvanize to all surfaces.

C. Weight:

1) Provide not less than 1-1/4 oz. per sq. ft., nor more than 1-1/2 oz. per sq. ft., to surfaces required to be galvanized. 2) Comply with ASTM A93.

2.3 PRE-FINISHED SHEET METAL

A. Provide factory applied Kynar 500 or equal finish.

2.4 NAILS, RIVETS AND FASTENERS

A. Use only soft iron rivets having rust-resistive coating, galvanized nails, and cadmium plated screws and washers in connection with galvanized iron and steel.

2.5 ALUMINUM

A. Where aluminum is shown, use flat stock of 6063-T5 alloy in thicknesses indicated. Use appropriate fasteners so as not to create galvanic action.

SHEET METAL FLASHING AND TRIM 07 60 00 - 2

City & County of Denver Replace Roofing Woodbury Branch Library

2.6 FLUX

A. Where flux is required, use raw muriatic acid.

2.7 SOLDER

A. Where solder is required, comply with ASTM B32.

2.8 SCREWS

A. Provide new stainless steel screw fasteners at wall panels where existing screws are to be removed for installation of new flashings and counterflashings. Screw shall be of same type and size and shall integral washer flanges with neoprene washers. B. At all other locations where new fasteners are called out, provide fastener of same type of material as that to be fastened. Do not use screws smaller than #10.

2.9 OTHER MATERIALS

A. Provide other materials, not specifically described but required for a complete and proper installation, as selected by the Contractor subject to the approval of the Roofing Consultant.

PART 3 - EXECUTION

3.1 SURFACE CONDITIONS

A. Examine the areas and conditions under which work of this Section will be performed. Correct conditions detrimental to timely and proper completion of the Work. Do not proceed until unsatisfactory conditions are corrected.

3.2 WORKMANSHIP

A. General:

1) Form sheet metal accurately and to the dimensions and shapes required, finishing molded and broken surfaces with true, sharp, and straight lines and angles and, where intercepting other members, to an accurate fit and soldering securely. 2) Unless otherwise specifically permitted by Architect, turn exposed edges back with 1/2" hem. 3) Form, fabricate, and install sheet metal to adequately provide for expansion and contraction in the finished Work.

SHEET METAL FLASHING AND TRIM 07 60 00 - 3

City & County of Denver Replace Roofing Woodbury Branch Library

B. Weatherproofing:

1) Finish watertight and weathertight where so required. 2) Make lock seam work flat and true to line, sweating full of solder. 3) Make lock seams and lap seams, when soldered, at least 1/2" wide. 4) Where lap seams are not soldered, lap according to pitch, but in no case less than 3". 5) Make flat and lap seams in the direction of flow.

C. Joints:

1) Provide 3” at perimeter trim metal and at counterflashings. Set lap in 2 beads of sealant. Secure with ½” splice into hem and two pop rivets of same type of metal as flashing material. 2) Join other parts with rivets or sheet metal screws where necessary for strength and stiffness. 3) Provide suitable watertight expansion joints for runs of more than 40'-0", except where closer spacing is indicated on the Drawings or required for proper installation.

D. Fastening:

1) For fastening into brick or concrete use soft metal jacketed pre-drilled drive-pins, 1/4" in diameter.

3.3 EMBEDMENT

A. Embed metal in connection with roofs in a solid bed of sealant, using materials and methods which may be described in sections of Division 7.

3.4 TESTS

A. Upon request of the Roofing Consultant, demonstrate by hose or standing water that the flashing and sheet metal are completely watertight.

END OF SECTION 07 60 00

SHEET METAL FLASHING AND TRIM 07 60 00 - 4

City & County of Denver Replace Roofing Woodbury Branch Library

SECTION 07 92 00 – SEALANT AND CAULKING

PART 1 - GENERAL

1.1 DESCRIPTION

A. Section covers sealant and caulking material and application.

1.2 QUALITY CONTROL

A. Installer Qualifications: An experienced installer who has specialized in installing joint sealants similar in material, design, and extent to those indicated for this Project and whose work has resulted in joint-sealant installations with a record of successful in-service performance.

1.3 SUBMITTALS

A. Submit in accordance with Section 01 33 00, SUBMITTALS. B. Manufacturer's installation instructions for each product used. C. Cured samples of exposed sealants for each color where required to match adjacent material. D. Manufacturer's Literature and Data:

1) Caulking compound 2) Primers 3) Sealing compound, each type, including compatibility when different sealants are in contact with each other.

1.4 PROJECT CONDITIONS

A. Environmental Limitations:

1) Do not proceed with installation of joint sealants under following conditions:

a) When ambient and substrate temperature conditions are outside limits permitted by joint sealant manufacturer or are below 4.4 °C (40 °F). b) When joint substrates are wet.

B. Joint-Width Conditions:

1) Do not proceed with installation of joint sealants where joint widths are less than those allowed by joint sealant manufacturer for applications indicated.

SEALANT AND CAULKING 07 92 00 - 1

City & County of Denver Replace Roofing Woodbury Branch Library

C. Joint-Substrate Conditions:

1) Do not proceed with installation of joint sealants until contaminants capable of interfering with adhesion are removed from joint substrates.

1.5 DELIVERY, HANDLING, AND STORAGE:

A. Deliver materials in manufacturers' original unopened containers, with brand names, date of manufacture, shelf life, and material designation clearly marked thereon. B. Carefully handle and store to prevent inclusion of foreign materials. C. Do not subject to sustained temperatures exceeding 5 °C (90 °F) or less than 32 °C (40 °F).

PART 2 - PRODUCTS

2.1 SEALANTS:

A. S-1:

1) ASTM C920, polyurethane. 2) Type M. 3) Class 25. 4) Grade NS. 5) Shore A hardness of 20-40

2.2 COLOR:

A. Sealants used with exposed masonry shall match color of mortar joints. B. Sealants used with unpainted concrete shall match color of adjacent concrete. C. Color of sealants for other locations shall be light gray or aluminum, unless specified otherwise.

2.3 JOINT SEALANT BACKING:

A. General: Provide sealant backings of material and type that are nonstaining; are compatible with joint substrates, sealants, primers, and other joint fillers; and are approved for applications indicated by sealant manufacturer based on field experience and laboratory testing. B. Cylindrical Sealant Backings: ASTM C1330, of type indicated below and of size and density to control sealant depth and otherwise contribute to producing optimum sealant performance:

1) Type C: Closed-cell material with a surface skin.

SEALANT AND CAULKING 07 92 00 - 2 City & County of Denver Replace Roofing Woodbury Branch Library

2.4 PRIMER:

A. As recommended by manufacturer of caulking or sealant material. B. Stain free type.

PART 3 - EXECUTION

3.1 INSPECTION:

A. Inspect substrate surface for bond breaker contamination and unsound materials at adherent faces of sealant. B. Coordinate for repair and resolution of unsound substrate materials. C. Inspect for uniform joint widths and that dimensions are within tolerance established by sealant manufacturer.

3.2 PREPARATIONS:

A. Prepare joints in accordance with manufacturer's instructions and SWRI. B. Clean surfaces of joint to receive caulking or sealants leaving joint dry to the touch, free from frost, moisture, grease, oil, wax, lacquer paint, or other foreign matter that would tend to destroy or impair adhesion.

1) Clean porous joint substrate surfaces by brushing, grinding, blast cleaning, mechanical abrading, or a combination of these methods to produce a clean, sound substrate capable of developing optimum bond with joint sealants. 2) Remove loose particles remaining from above cleaning operations by vacuuming or blowing out joints with oil-free compressed air. Porous joint surfaces include the following:

a) Concrete. b) Masonry. c) Unglazed surfaces of ceramic tile.

3) Remove laitance and form-release agents from concrete. 4) Clean nonporous surfaces with chemical cleaners or other means that do not stain, harm substrates, or leave residues capable of interfering with adhesion of joint sealants.

a) Metal. b) Glass. c) Porcelain enamel. d) Glazed surfaces of ceramic tile.

C. Do not cut or damage joint edges.

SEALANT AND CAULKING 07 92 00 - 3 City & County of Denver Replace Roofing Woodbury Branch Library

D. Apply masking tape to face of surfaces adjacent to joints before applying primers, caulking, or sealing compounds.

1) Do not leave gaps between ends of sealant backings. 2) Do not stretch, twist, puncture, or tear sealant backings. 3) Remove absorbent sealant backings that have become wet before sealant application and replace them with dry materials.

E. Apply primer to sides of joints wherever required by compound manufacturer's printer instructions.

1) Apply primer prior to installation of back-up rod or bond breaker tape. 2) Use brush or other approved means that will reach all parts of joints.

F. Take all necessary steps to prevent three sided adhesion of sealants.

3.3 SEALANT DEPTHS AND GEOMETRY:

A. At widths up to 6 mm (1/4 inch), sealant depth equal to width. B. At widths over 6 mm (1/4 inch), sealant depth 1/2 of width up to 13 mm (1/2 inch) maximum depth at center of joint with sealant thickness at center of joint approximately 1/2 of depth at adhesion surface.

3.4 INSTALLATION:

A. General:

1) Apply sealants and caulking only when ambient temperature is between 5 degrees C and 38 degrees C (40 and 100 degrees F). 2) Do not use polysulfide base sealants where sealant may be exposed to fumes from bituminous materials, or where water vapor in continuous contact with cementitious materials may be present. 3) Do not use sealant type listed by manufacture as not suitable for use in locations specified. 4) Apply caulking and sealing compound in accordance with manufacturer's printer instructions. 5) Avoid dropping or smearing compound on adjacent surfaces. 6) Fill joints solidly with compound and finish compound smooth. 7) Tool joints to concave surface unless shown or specified otherwise. 8) Finish paving or floor joints flush unless joint is otherwise detailed. 9) Apply compounds with nozzle size to fit joint width. 10) Test sealants for compatibility with each other and substrate. Use only compatible sealant.

B. For application of sealants, follow requirements of ASTM C1193 unless specified otherwise.

SEALANT AND CAULKING 07 92 00 - 4 City & County of Denver Replace Roofing Woodbury Branch Library

3.5 CLEANING:

A. Fresh compound accidentally smeared on adjoining surfaces: Scrape off immediately and rub clean with a solvent as recommended by the caulking or sealant manufacturer. B. After filling and finishing joints, remove masking tape. C. Leave adjacent surfaces in a clean and unstained condition.

END OF SECTION 07 92 00

SEALANT AND CAULKING 07 92 00 - 5 FIT Roof Replacement Technical Specifications

SECTION 08 5900 – 12 WOOD WINDOW RESTORATION

PART 1 GENERAL 1.1 REFERENCE STANDARDS 1.2 SECTION 08 5900 WOOD WINDOW RESTORATION NPS - Standards for Preservation and Guidelines for Preserving Historic Buildings 1. Exterior Features: Windows 1.3 DESCRIPTION OF WORK A. See Window Schedule in Drawings for scope of work for each window. 1. Repair in place: window to be repaired and restored per this specification section. B. General: Provide all labor, materials, equipment, and services required to complete wood window restoration as specified herein, and required by existing conditions and authorities having jurisdiction. C. Wood window restoration may include, but is not limited to, the following: 1. Restore damaged and inoperable wood window sash while maintaining current profiles. 2. Restore existing and provide new window balance hardware at all operable sash to accommodate use. 3. Replace all broken and unsound sash cord. 4. Restore existing window hardware and provide new in-kind window hardware where existing hardware is missing or is too damaged or deteriorated to be restorable. 5. Restore all window trim disturbed for work of this Section to sound condition and existing appearance. 6. Paint and finish all wood elements as necessary to match original finishes. 7. Replace cracked, broken or missing glass. 8. Remove all deteriorated putty and replace with new. 9. Consolidate and repair deteriorated wood sills, framing members and sash rails and stiles. 10. Replace all broken or deteriorated parting strips. 11. Reinstall repaired window sash. 12. Clean all glass. D. Intent: It is the specific intent of this Section that repairs will maximize the retention of historic fabric while making the windows weather resistant for long-term use and serviceable for cyclical maintenance. 1.4 SUBMITTALS A. See Section 01 3000 - Administrative Requirements, for submittal procedures. B. Product Literature: Manufacturer’s published technical data for each product to be used in work of this Section including recommendations for application and use, test reports and certificates verifying that product complies with specified requirements, and Material Safety Data Sheets (MSDS). C. Wood Treatment Data: Chemical treatment manufacturer’s instructions for handling, storage, installation, and finishing treated materials if applicable. 1.5 QUALITY ASSURANCE A. Craftspeople: Wood window restoration shall be carried out by a steady crew of skilled craftspeople who are thoroughly experienced with materials and methods specified. B. Laws, Codes, and Regulations: All work of this Section shall comply with all applicable federal, state, and local laws, codes, and regulations. C. Comply with relevant ASTM standards for all materials.

08 5900 ‐ 12 WOOD WINDOW RESTORATION FIT Roof Replacement Technical Specifications

1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver, store, and handle all products and materials to prevent damage, deterioration, or degradation and intrusion of foreign material. B. Discard and remove from site deteriorated or contaminated materials and products that have exceeded their expiration dates. Replace with fresh materials. 1.7 FIELD CONDITIONS A. General: Perform work only when temperature of products being used, temperatures of existing and new materials, and air temperature and humidity comply with product manufacturer’s requirements and requirements of this Section. In case of conflict, the most stringent requirements shall govern. B. Use of Epoxy Resins: Mix and apply epoxy resins only when temperatures are between 50 deg F and 80 deg F C. Protection of Persons: Take all necessary precautions to protect all persons, whether engaged in work of this Section or not, from all hazards of any kind associated with the work of this Section. D. Protection of Window Opening: After removal of the sash, all window openings shall be closed with plywood or acrylic panels fitted to each individual window and secured by non-destructive anchoring system. The panel shall be adequately weathertight and not permit any moisture to enter the building. E. Protection of Building: Protect building elements and finishes from damage or deterioration caused by work of this Section. Repair any damage to materials or finishes to Owner’s satisfaction at no additional cost. 1. Take all necessary precautions to prevent fire and spread of fire. 2. Take all necessary precautions to protect building elements and finishes from damage by precipitation during work of this Section. Protect openings at all times. Repair or replace to Owner’s satisfaction all building elements and materials damaged by weather resulting from window openings that did not sufficiently exclude weather at no additional cost. F. Coordination: Coordinate work of this Section with work specified in other sections to ensure proper completion of the Work. Every effort shall be made to accommodate the needs of Historic New England staff in relation to scheduling. 1.8 1.11 LEAD-CONTAINING PAINT (LCP) A. General: Perform all work that disturbs lead-containing paint (LCP), handle all material that involves lead-containing paint, and transport and dispose of all lead-containing paint and residue in compliance with all applicable federal, state, and local laws and regulations for identification, removal, labeling, handling, containerization, transportation, and disposal of lead- containing material including, but not limited to, those referenced herein. B. U.S. Department of Labor OSHA Regulations: Including but not limited to: Title 29, Code of Federal Regulations (CFR) Section 1926.62: “Lead Exposure in Construction” and Title 29, CFR Section 1910.1200: “Hazard Communication Standard.” C. U.S. Environmental Protection Agency (USEPA) Regulations: Including but not limited to: Title 40 CFR Part 262: “Standards Applicable to Generators of Hazardous Waste” and Part 263: “Standards Applicable to Transporters of Hazardous Waste.” D. U.S. Department of Transportation (USDOT) Regulations: Including but not limited to: 49 CFR Parts 172, 173, 174, 175, 177, 178, 179, and 180. PART 2 PRODUCTS 2.1 MATERIALS A. Grade and Quality: Materials shall conform to requirements of this Section and shall be new, free from defects, and of recent manufacture.

B. Manufacturer’s Instructions: Comply with material manufacturers’ instructions for use of

08 5900 ‐ 12 WOOD WINDOW RESTORATION FIT Roof Replacement Technical Specifications

products (including surface preparation, mixing, applying, drying, etc.). In case of conflict with requirements of this Section, the more stringent requirements shall govern. 2.2 WOOD A. Lumber shall be of sound stock, solid wood without finger joints or other joints within members, thoroughly seasoned, and kiln-dried to a moisture content not exceeding 8 percent. B. Wood shall be free from defects or blemishes on surfaces exposed to view that will show after paints and finishes have been applied. Materials that do not comply with specifications for quality and grade, are in any way defective, or are otherwise not in proper condition will be rejected. C. Wood for New Sash as necessary, Other New Elements, and Repairs of Existing Elements shall match profile and grade of existing windows in species, quality, cut, and grain pattern in kind. D. Preservative treatment shall be used for new wood after machining. 2.3 ADHESIVES A. Adhesive for Dutchman Repairs, Member Replacement, and Fabrication of New Sash: Epoxy resin glue designed for use with wood. Provide West System as manufactured by Gougeon Brothers, Inc., 706 Martin Street, Bay City, Michigan 48706 or approved equivalent. Provide the following materials: 105 Resin and 206 Slow Hardener or approved equivalent. 2.4 FASTENERS FOR CONSTRUCTION OF WOOD SASH A. General: All fasteners for construction of new sash shall be stainless steel or nonferrous metal of appropriate size and configuration for use intended. 2.5 HARDWARE AND ACCESSORIES A. General: Provide each restored window with full complement of hardware and fasteners matching that on original windows. Use salvaged, restored existing hardware insofar as possible and new hardware to match existing hardware where hardware is missing or existing hardware is damaged or deteriorated so as to be unrestorable. 1. Restored Existing Hardware: Restore all existing hardware to be reused following requirements of Article 3.11 “Restoration of Existing Historic Hardware,” below. 2. New Hardware: Provide new hardware and fasteners to match existing hardware and fasteners in all respects. B. Sash Lifts: Restore any existing sash lifts insofar as possible and new sash lifts to match existing sash lifts in material, configuration, size, and finish where existing sash lifts are missing or damaged so as to be non-restorable. C. Sash Locks: Restore any existing sash locks insofar as possible and new sash locks to match existing sash locks in material, configuration, size, and finish where existing sash locks are missing or damaged so as to be non-restorable. D. Sash Pulleys: Clean, lubricate and reuse sash pulleys. Replace sash pulleys if necessary to operate the windows with sash chains. E. Sash Cord: Replace all sash cords with minimum breaking strain capacity of 350 kg. F. Sash Weights: Ensure that sash weights allow full operation of each sash and allow sash to be balanced at any position in which it is placed. Add weights to existing sash weights or replace existing sash weights with new heavier weights to balance heavier sash if necessary. G. Screws for Attaching Restored Existing Hardware: Clean, salvage existing screws insofar as possible. Where screws are missing or damaged so as to be unsalvageable, provide new screws to match existing screws in material, size, and configuration. 2.6 PAINTING AND FINISHING MATERIALS A. General: Paint shall be of premium quality and match existing color exactly unless otherwise specified. B. Glazing Putty: Putty is to be best quality pure linseed or soybean oil from manufacturer. 2.7 HARDWARE RESTORATION MATERIALS

08 5900 ‐ 12 WOOD WINDOW RESTORATION FIT Roof Replacement Technical Specifications

A. Non-metallic Cleaning Pads: Scotch-Brite pads, extra fine, manufactured by 3M Co., or equal. B. Wadding Cloth: “Never-Dull Magic Wadding Polish,” manufactured by The George Basch Co., Inc., 19 Hanse Avenue, P.O. Box 188, Freeport, NY 11520, or equal. C. Paste Wax for Cold Application: White or clear paste wax, mixtures of microcrystalline wax, carnuba wax, and mild solvent, in paste form, such as Trewax clear, or Butcher’s Bowling Alley Paste Wax available from White Diamond Co., Marlboro, MA. Do not use emulsion-type waxes or amber-tinted waxes. D. Thinner: Mineral spirits or turpentine. 2.8 FABRICATION OF NEW SASH A. Coordinate dimensions with actual measurements of window openings and adjacent construction to match in kind. B. Fabricate components to match originals in kind. C. Join moldings to match construction of original sash exactly. D. Machine sash elements to receive glazing panels. Machine sash elements of movable sash to receive weatherstripping, if appropriate, and hardware. PART 3 EXECUTION 3.1 SAFETY A. Protection: Protect people, adjoining building surfaces, collections and landscape elements, et al from injury resulting from window restoration work. Use drop cloths or other coverings as necessary to protect interior finishes, floor and collections and exterior landscape material from dust and debris, etc. 1. Erect temporary protection over pedestrian walkways and at those points of entry and exit that must remain operational during restoration. 3.2 EXAMINATION A. Examine the areas and conditions where window restoration is to be executed. Take all necessary field measurements. Notify the Architect of conditions detrimental to the proper and timely completion of Work. Do not proceed until unsatisfactory conditions are corrected. 3.3 REMOVALS A. General: Remove all window components that require removal for restoration or for proper installation. 1. To minimize breakage, paint lines at the edges of window stops and parting strips must be cut/scribed first with a sharp knife before moldings are removed. 2. All nails will be removed by pulling them through the back of the moldings only. 3. Identify and label each component that is to be removed and repaired for reinstallation with window opening designator and location in jamb. Record numbers and locations of components. 4. Remove adjacent elements as required to modify or replace elements of window jambs, heads, and sills that must be altered to accommodate new window sash. Use all care necessary to prevent damage or deterioration of elements removed and elements remaining in place. Restore or replace all elements damaged during work of this Section to Owner’s satisfaction at no additional cost. 5. Store removed elements in a secure location safe from theft, damage, and deterioration. 6. Protect window openings to prevent water entry or human intrusion. B. Glass Removal: All glass will be removed to accommodate sash restoration. 1. Label each pane of glass with location and orientation within the sash so that the historic glass can be returned to its original location and orientation. Use painters tape to labelglass and consistently label on either interior or exterior to avoid confusion at reinstallation. 2. Remove all face glazing compound from each window sash using steam, infrared heat or other approved method.

08 5900 ‐ 12 WOOD WINDOW RESTORATION FIT Roof Replacement Technical Specifications

C. Paint Removal: All paint will be removed from sash as needed in order to insure successful adhesion of new paint. 1. All paint removal shall be executed in compliance with all applicable federal, state, and local regulations. 2. Steam or heat will be used to carefully remove the paint while limiting the damage to the wood substrate. 3. As possible, depending on the technique used for paint removal, a two-inch band of undisturbed paint will be left on the interior and exterior of each pair of sash. Lightly feather the edges of each paint band. These bands will be used if future chromo- chronology is ever executed. D. Hardware Removal: All hardware will be removed as needed in order to restore sash and hardware. 1. Scribe paint around hardware so that removal of hardware does not splinter adjacent wood. 3. Tag and retain all hardware and screws. 3.4 DUTCHMAN REPAIRS A. General: Provide dutchman repairs where wood is structurally compromised. Wood repairs will not be made for aesthetic purposes. Dutchman repairs shall provide continuous smooth surfaces matching planes and profiles of wood members being repaired. Dutchman shall match wood being repaired in specie and cut. In wood for clear finish, grain pattern of dutchman shall match grain pattern of wood into which it is inserted. B. Preparation: Neatly cut out existing opening as required to provide a prismatic void. Wherever possible create voids that will provide mechanical attachments as in dovetails. The amount of wood removed should be minimized but the amount should include all damaged wood and extend just past damaged wood to prevent spread of any fungus contained therein. Cut away area shall provide ample glue surface. C. Dutchman: Cut dutchman to exactly fit void, with exposed portion matching original profile of woodwork and just slightly proud of original surface. Orient grain of dutchman parallel to grain of element being patched. Where deterioration or loss at end of component requires dutchman repair, use a diagonal for end-to-end joint between dutchman and remaining portion of component. D. Installation: Clean glue surfaces with acetone or denatured alcohol. Insert dutchman using specified adhesive and in place until glue is set. Where clamping is not feasible, use small brads; remove brads and fill holes after adhesive has set. E. Surfacing: Plane or scrape dutchman to provide smooth continuous surface coplanar with adjacent wood. Do not damage or alter profile or finish of adjacent wood. 3.5 COMPONENT REPLACEMENT A. General: Fabricate new components for any components which are deteriorated in entirety and cannot be repaired with Dutchmen and epoxy. B. In kind replacement: Except as specifically indicated otherwise, provide replacement elements of same specie with configurations, profiles, dimensions and joinery et al exactly matching those of existing elements. 1. Profiles: Remove coatings from profiles of existing elements before recording profiles to produce molding cutters to match existing profiles. 2. Molding Cutters: Cut custom blades as required to match original profiles and label knifes with project code.

C. Machining and Surfacing: Machine and surface all new and replacement wood elements to provide smooth even surfaces without saw marks or plane marks. Wood with surface irregularities, including but not limited to scratches, saw marks, and plane knife marks, visible after finish has been applied will be rejected and shall be replaced with properly finished wood

08 5900 ‐ 12 WOOD WINDOW RESTORATION FIT Roof Replacement Technical Specifications

elements at no additional cost. 3.6 SASH INSTALLATION A. General: Install new and restored sash as per contract. At completion of installation, windows shall be complete with all components and with unblemished paint and finish coats. All operating sash shall operate smoothly over entire height, and weatherstripping, if specified, shall provide weatherproof seal. B. Sash Balances: If specified install sash with sash chains/cords and weights properly adjusted to allow sash to close securely, open completely to top of track, and remain stationary at any position in track. C. Sash Hardware: Install any hardware, including sash lifts and sash locks, on restored sash in the same locations as originally. Adjust sash locks for smooth easy operation and firm, secure locking. D. Wax: Treat unpainted sides of stiles and frame with wax for ease of window operation and wood protection. E. Weatherstripping: If specified, install weatherstripping following manufacturer’s requirements to ensure smooth operation and weathertight closure. 3.7 ADJUSTING A. General: Adjust operating sash and hardware to provide a tight fit at contact points and weatherstripping, if specified, and to provide smooth operation and a weathertight closure. Lubricate hardware and moving parts. 3.8 GLAZING A. General: Re-glaze all window lites using approved pure linseed oil or soybean oil glazing putty. Glazing points shall be used to set glass. B. Clean glass prior to glazing with non-ammoniated formula before reinstallation. C. Panes with multiple fractures will be replaced in kind and the date will be etched date in corner beneath where new glazing will cover. 3.9 CLEANING A. Clean interior and exterior surfaces promptly after installation. Take care to avoid damage to historic and protective coatings and finishes. B. Use only cleaners which do not contain ammonia. Windex, 409 and like products are not acceptable as they accelerate paint film deterioration. 3.10 PAINTING A. General: Paint and finish new and restored elements of frames and trim to match original finishes. Prime and paint sash in controlled environment according to manufacturers instructions. B. Prepare substrates for repairs by hand sanding with 100grit paper. The sides of the stiles (unpainted edges) of double hung windows do not need to be sanded unless special conditions require it. C. After substrate is sanded, vacuum all surfaces and remove remaining dust with barely damp dust-free cloth. Allow surfaces to dry completely before priming. D. Apply water repellant wood preservative to all surfaces of the sash. E. Apply one coat of alkyd or 100% acrylic primer to all surfaces of the sash including putty beds (shellac based paint cannot be applied over glazing). On all window sash, extend primer and paint 1/16” onto glass to seal glazing. If sash is operable, it is important to paint bottom edge to prevent water intrusion.

F. Lightly sand surfaces after the primer has dried and clean of all dust. G. Apply two topcoats of premium quality 100% acrylic paint to all surfaces. Color to match

08 5900 ‐ 12 WOOD WINDOW RESTORATION FIT Roof Replacement Technical Specifications

existing exactly unless otherwise specified. H. Immediately after installation touch-up any disturbed areas of paint. 3.11 RESTORATION OF EXISTING HARDWARE A. General: Remove historic sash hardware from existing sash to be replaced and remove sash pulleys from jambs. Store hardware in plastic bags or containers identified with sash number to ensure that each unit of hardware is reinstalled in its original location. B. Remove lacquer coatings with acetone or lacquer thinner. C. Strip paint coatings by dipping in chemical . D. After removal of paint and other coatings, thoroughly rinse in appropriate solvent and wipe dry with soft cloths. E. Replacement Parts: Provide replacement parts, including operating parts and fasteners, matching original parts in metal and alloy, configuration, size, and finish for all missing and damaged parts. F. Remove scratches and buff surfaces using like metal cleaning and polishing pads and polishing compound as necessary. Do not scratch finish with abrasive pads or wire brushes. G. Provide lacquer finish on all copper alloy elements. 1. Preparation a. Clean and degrease metal using solvent and burnishing with handheld bronze wool to provide surface free of dirt, dust, grease, oil, and other contaminants. Do not damage metal finish. If a surface is handled or contaminated, repeat cleaning and degreasing process. b. Drying: Ensure that metal surface is completely dry. c. Environment: Ensure that environment is dust-free before applying lacquer. 2. Lacquer Application: Build up coatings to produce 2-mil dry film thickness. Spray lacquer using “hot spray,” “airless spray,” or “electrostatic spray” methods. 3. Curing: Cure lacquer coatings by “baking” in shop at elevated temperatures following manufacturer’s recommendations. 4. Waxing: Protect baked lacquer coatings by hand application of two coats of hard paste wax. H. Lubricate operating parts. I. Store units in protective packaging. J. Provide all missing fasteners for hardware. Fasteners must match all visual aspects of existing fasteners. 3.12 PROTECTION A. Protect windows from damage or deterioration until time of substantial completion. END OF SECTION

08 5900 ‐ 12 WOOD WINDOW RESTORATION FIT Roof Replacement Technical Specifications

SECTION 09 9113 EXTERIOR PAINTING

PART 1 GENERAL 1.1 SECTION INCLUDES A. Surface preparation. B. Field application of paints.

C. Scope: Finish exterior surfaces exposed to view, unless fully factory-finished and unless otherwise indicated, including the following: 1. Exposed surfaces of steel lintels and ledge angles. D. Do Not Paint or Finish the Following Items: 1. Items factory-finished unless otherwise indicated; materials and products having factory- applied primers are not considered factory finished. 2. Items indicated to receive other finishes. 3. Items indicated to remain unfinished. 4. Fire rating labels, equipment serial number and capacity labels, and operating parts of equipment. 5. Non-metallic roofing and flashing. 6. Marble, granite, slate, and other natural stones. 7. Floors, unless specifically indicated. 8. Brick, glass unit masonry, architectural concrete, cast stone, integrally colored plaster and stucco. 9. Glass. 10. Concealed pipes, ducts, and conduits. 1.2 RELATED REQUIREMENTS A. Section 05 7000 - Decorative Metal B. Section 09 9123 - Interior Painting. C. Section 32 1723.13 - Painted Pavement Markings: Painted pavement markings. 1.3 REFERENCE STANDARDS A. 40 CFR 59, Subpart D - National Volatile Organic Compound Emission Standards for Architectural Coatings; U.S. Environmental Protection Agency; current edition. B. ASTM D4442 - Standard Test Methods for Direct Moisture Content Measurement of Wood and Wood-Base Materials; 2007. C. MPI (APSM) - Master Painters Institute Architectural Painting Specification Manual; Current Edition, www.paintinfo.com. 1.4 SUBMITTALS A. See Section 01 3000 - Administrative Requirements, for submittal procedures. B. Product Data: Provide complete list of products to be used, with the following information for each: 1. Manufacturer's name, product name and/or catalog number, and general product category (e.g. "alkyd enamel"). 2. MPI product number (e.g. MPI #47). 3. Cross-reference to specified paint system(s) product is to be used in; include description of each system. C. Samples: Submit three paper "draw down" samples, 8-1/2 by 11 inches in size, illustrating range of colors available for each finishing product specified. 1. Where sheen is specified, submit samples in only that sheen. 1.5 MOCK-UP A. See Section 01 4000 - Quality Requirements, for general requirements for mock-up.

09 9113 ‐ 19 EXTERIOR PAINTING FIT Roof Replacement Technical Specifications

B. Locate where directed by Architect. C. Mock-up may remain as part of the work. 1.6 DELIVERY, STORAGE, AND HANDLING A. Deliver products to site in sealed and labeled containers; inspect to verify acceptability. B. Container Label: Include manufacturer's name, type of paint, brand name, lot number, brand code, coverage, surface preparation, drying time, cleanup requirements, color designation, and instructions for mixing and reducing. C. Paint Materials: Store at minimum ambient temperature of 45 degrees F and a maximum of 90 degrees F, in ventilated area, and as required by manufacturer's instructions. 1.7 FIELD CONDITIONS A. Do not apply materials when surface and ambient temperatures are outside the temperature ranges required by the paint product manufacturer. B. Follow manufacturer's recommended procedures for producing best results, including testing of substrates, moisture in substrates, and humidity and temperature limitations. C. Do not apply exterior paint and finishes during rain or snow, or when relative humidity is outside the humidity ranges required by the paint product manufacturer. D. Minimum Application Temperatures for Latex Paints: 50 degrees F for exterior; unless required otherwise by manufacturer's instructions. E. Provide lighting level of 80 ft candles measured mid-height at substrate surface. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Provide paints and finishes from the same manufacturer to the greatest extent possible. 1. In the event that a single manufacturer cannot provide specified products, minor exceptions will be permitted provided approval by Architect is obtained using the specified procedures for substitutions. 2. Substitution of other products by the same manufacturer is preferred over substitution of products by a different manufacturer. B. Paints: 1. Behr Process Corporation: www.behr.com. 3. Benjamin Moore & Co: www.benjaminmoore.com. 4. Diamond Vogel Paints: www.diamondvogel.com. 5. Duron, Inc: www.duron.com. 6. PPG Paints: www.ppgpaints.com. 7. Pratt & Lambert Paints: www.prattandlambert.com. 8. Sherwin-Williams Company: www.sherwin-williams.com. 9. Valspar Corporation: www.valsparpaint.com. C. Primer Sealers: Same manufacturer as top coats. D. Substitutions: See Section 01 6000 - Product Requirements. 2.2 PAINTS AND FINISHES - GENERAL A. Paints and Finishes: Ready mixed, unless required to be a field-catalyzed paint. 1. Provide paints and finishes of a soft paste consistency, capable of being readily and uniformly dispersed to a homogeneous coating, with good flow and brushing properties, and capable of drying or curing free of streaks or sags. 2. Supply each paint material in quantity required to complete entire project's work from a single production run. 3. Do not reduce, thin, or dilute paint or finishes or add materials unless such procedure is specifically described in manufacturer's product instructions. B. Volatile Organic Compound (VOC) Content:

09 9113 ‐ 19 EXTERIOR PAINTING FIT Roof Replacement Technical Specifications

1. Provide paints and finishes that comply with the most stringent requirements specified in the following: a. 40 CFR 59, Subpart D--National Volatile Organic Compound Emission Standards for Architectural Coatings. b. Architectural coatings VOC limits of the State in which the Project is located. 2. Determination of VOC Content: Testing and calculation in accordance with 40 CFR 59, Subpart D (EPA Method 24), exclusive of colorants added to a tint base and water added at project site; or other method acceptable to authorities having jurisdiction. C. Flammability: Comply with applicable code for surface burning characteristics. D. Sheens: Provide the sheens specified; where sheen is not specified, sheen will be selected later by Architect from the manufacturer's full line. E. Colors: Per drawings 1. Extend colors to surface edges; colors may change at any edge as directed by Architect. 2.3 PAINT SYSTEMS - EXTERIOR A. Paint E-OP - Exterior Surfaces to be Painted, Unless Otherwise Indicated: Including primed wood and primed metal. 1. Two top coats and one coat primer. 2. Top Coat(s): Exterior Latex. 3. Top Coat Sheen: a. Gloss: MPI gloss level 6; use this sheen at all locations. 2.4 ACCESSORY MATERIALS A. Accessory Materials: Provide primers, sealers, cleaning agents, cleaning cloths, sanding materials, and clean-up materials as required for final completion of painted surfaces. B. Patching Material: Latex filler. C. Fastener Head Cover Material: Latex filler. PART 3 EXECUTION 3.1 EXAMINATION A. Verify that surfaces are ready to receive work as instructed by the product manufacturer. B. Examine surfaces scheduled to be finished prior to commencement of work. Report any condition that may potentially effect proper application. C. Test shop-applied primer for compatibility with subsequent cover materials. D. Measure moisture content of surfaces using an electronic moisture meter. Do not apply finishes unless moisture content of surfaces are below the following maximums: 1. Exterior Wood: 15 percent, measured in accordance with ASTM D4442. 3.2 PREPARATION A. Clean surfaces thoroughly and correct defects prior to application. B. Prepare surfaces using the methods recommended by the manufacturer for achieving the best result for the substrate under the project conditions. C. Remove or mask surface appurtenances, including electrical plates, hardware, light fixture trim, escutcheons, and fittings, prior to preparing surfaces for finishing. D. Seal surfaces that might cause bleed through or staining of topcoat. E. Remove mildew from impervious surfaces by scrubbing with solution of tetra-sodium phosphate and bleach. Rinse with clean water and allow surface to dry. F. Exterior Wood Surfaces to Receive Opaque Finish: Remove dust, grit, and foreign matter. Seal knots, pitch streaks, and sappy sections. Fill nail holes with tinted exterior calking compound after prime coat has been applied. Back prime concealed surfaces before installation.

09 9113 ‐ 19 EXTERIOR PAINTING FIT Roof Replacement Technical Specifications

3.3 APPLICATION A. Exterior Wood to Receive Opaque Finish: If final painting must be delayed more than 2 weeks after installation of woodwork, apply primer within 2 weeks and final coating within 4 weeks. B. Apply products in accordance with manufacturer's written instructions and recommendations in "MPI Architectural Painting Specification Manual". C. Do not apply finishes to surfaces that are not dry. Allow applied coats to dry before next coat is applied. D. Apply each coat to uniform appearance. E. Vacuum clean surfaces of loose particles. Use tack cloth to remove dust and particles just prior to applying next coat. F. Reinstall electrical cover plates, hardware, light fixture trim, escutcheons, and fittings removed prior to finishing. 3.4 CLEANING A. Collect waste material that could constitute a fire hazard, place in closed metal containers, and remove daily from site. 3.5 PROTECTION A. Protect finishes until completion of project. B. Touch-up damaged finishes after Substantial Completion. END OF SECTION

09 9113 ‐ 19 EXTERIOR PAINTING City & County of Denver Replace Roofing Woodbury Branch Library

SECTION 09 96 53 – ELASTOMERIC COATINGS

PART 1 - GENERAL

1.1 DESCRIPTION

A. Paint the exterior surfaces as indicated on the Details in the Drawings and as set forth below. B. Documents affecting work of this Section include, but are not necessarily limited to, General Conditions, Supplementary Conditions and other Sections of these Specifications. C. "Paint", as used herein, means coating systems materials including primers, emulsions, epoxy, enamels, sealers, fillers, and other applied materials whether used as prime, intermediate, or finish coats. D. The Work shall take place as part of the roof replacement project on the Woodbury Branch Library. The existing EPDM roofs at Decks 1, 2 and 3 shall be coated with new elastomeric roof coating. Coating color shall be white.

1) Using a broom and mild detergent, wash and clean the existing EPDM roof system as designated on the Drawings. Completely rinse all detergent and debris from roof membrane.

2) Install two new coats of acrylic elastomeric waterproof coating on the existing prepared roof membranes and exposed flashings.

1.2 QUALITY ASSURANCE

A. Use adequate numbers of skilled workmen who are thoroughly trained and experienced in the necessary crafts and who are completely familiar with the specified requirements and the methods needed for proper performance of the Work in this Section. B. Paint Coordination:

1) Provide finish coats which are compatible with the prime coats actually used.

2) Upon request, furnish information on the characteristics of the specific materials to assure that compatible prime coats are used.

3) Provide barrier coats over non-compatible primers, or remove the primer and re-prime as required.

4) Notify the Architect/Engineer in writing of any anticipated problems in using the specified coating systems over any of the new or existing sheet metal or wood to be finished.

ELASTOMERIC COATINGS 09 96 53 - 1

City & County of Denver Replace Roofing Woodbury Branch Library

1.3 SUBMITTALS

A. Provide literature on the following items:

1) prewash;

2) finish coats;

3) application techniques and,

4) other accessories

1.4 PRODUCT HANDLING

A. Do not apply solvent-thinned coatings when the temperature of surfaces to be painted and the surrounding air temperatures are below 40 degrees F. B. Do not install materials in snow, rain, fog or mist; or when the relative humidity exceeds 85%; or to damp or wet surfaces. C. Upon completion of the Work of this Section, deliver to the Owner one unopened gallon container of each color, type, and gloss of paint used in the Work, tightly sealed and clearly labeled as to the location where used.

PART 2 - PRODUCTS

2.1 PAINT MATERIALS

A. Base Coating: Use Karnak 407 EPDM & SPF or equialent. Apply coatng to obtain 1 coat with 20 mils of dry film thickness. B. Top Coat: Use Karnak 501 Elasto Brite top coat applied in one coat to obtain a 10 mil minimum dry thickness.

2.2 COLOR SCHEDULE

A. The color shall be white.

2.3 APPLICATION EQUIPMENT

A. For application of the approved coating, use only such equipment as is recommended for application of the particular coating by the manufacturer of the particular coating. B. Prior to the application of the approved coating, use only such equipment as is recommended for application of the particular coating by the manufacturer of the particular coating. C. Prior to the use of application equipment, verify that the proposed equipment is

ELASTOMERIC COATINGS 09 96 53 - 2

City & County of Denver Replace Roofing Woodbury Branch Library

actually compatible with the material to be applied, and that the integrity of the finish will not be jeopardized by the use of the proposed equipment.

2.4 OTHER MATERIALS

A. Provide other materials, not specifically described but required for complete and proper installation, as selected by the Contractor, but subject to approval by the Architect/Engineer.

PART 3 - EXECUTION

3.1 SURFACE CONDITIONS

A. Examine the areas and conditions under which Work of this Section will be performed. Correct conditions detrimental to timely and proper completion of the Work. Do not proceed until unsatisfactory conditions are corrected.

3.2 MATERIALS PREPARATION

A. Mix and prepare coating materials in strict accordance with the manufacturer's recommendations as approved by the Architect. When materials are not in use, store in tightly covered containers. Maintain containers used on storage, mixing, and application of coating in a clean condition, free from foreign materials and residue. B. Stir materials before application, producing a mixture of uniform density. Do not stir into the material any film which may form on the surface, but remove the film and, if necessary, strain the material before using.

3.3 SURFACE PREPARATION

A. Wash: Wash clean the existing roof surfaces until free from dirt, oil, and grease. B. Use recommended prewash if applicable.

3.4 PAINT APPLICATION

A. Mask painted areas as necessary to insure that no paint will be applied to brick, wood, or metal surfaces which are not designated to receive paint. Work in a clean organized manner so as to avoid damage from paint spillage on this project. B. Allow sufficient drying time between coats, modifying the period as recommended by the material manufacturer to suit adverse weather conditions. C. Spray equipment shall not be used unless specifically approved by the Architect/Engineer. D. Brush out and work the brushcoats onto the surface in an even film. Cloudiness, spotting, holidays, laps, brush marks, runs, sags, ropiness, and other surface

ELASTOMERIC COATINGS 09 96 53 - 3

City & County of Denver Replace Roofing Woodbury Branch Library

imperfections will not be acceptable. E. For completed work, match the approved Samples as to the texture, color and coverage. Remove, refinish, or re-paint work not in compliance with the specified requirements.

END OF SECTION 09 90 00