Tamil Nadu Government Gazette
Total Page:16
File Type:pdf, Size:1020Kb
© [Regd. No. TN/CCN/467/2012-14. GOVERNMENT OF TAMIL NADU [R. Dis. No. 197/2009. 2017 [Price: Rs. 4.00 Paise. TAMIL NADU GOVERNMENT GAZETTE PUBLISHED BY AUTHORITY No. 26] CHENNAI, WEDNESDAY, JUNE 28, 2017 Aani 14, Hevilambi, Thiruvalluvar Aandu–2048 Part VI—Section 3(b) Notifications issued by Quasi-Government bodies and Public Sector Undertakings. NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC. CONTENTS Pages. TAMIL NADU TRANSMISSION CORPORATION General Construction Circle, Trichy – Establishment of New Transmission Lines and Sub Stations .. .. .. .. .. .. 60-68 DTP—VI-3(b) (26 )—1 [ 59 ] 60 TAMIL NADU GOVERNMENT GAZETTE [Part VI—Sec. 3(b) NOTIFICATIONS BY HEADS OF DEPARTMENTS, ETC. ______ TAMIL NADU TRANSMISSION CORPORATION GENERAL CONSTRUCTION CIRCLE, TRICHY Establishment of New Transmission Lines and Sub Stations (Lr. No. SE/GCC/TRY/AEE/GL/DB/F. Press/D. 491/17.) No. VI-3(b)/17/2017. The Tamil Nadu Electricity Board has sanctioned the following Transmission lines and Sub Stations to transit and distribute power to various load centres and the works are to be taken up shortly under T&D Scheme. Discription of work I SUB-STATIONS: Sl. No Name of the Line Route length in km (1) (2) (3) 1 Ariyalur / Kallakurichi 756 2 Vellalaviduthi / Pudukkottai 400 3 Thuvakudi (BHEL) / Trichy 230 4 Narimanam / Nagapattinam 230 5 Neyveli / Cuddalore 230 6 Sankarapuram / Kallakurichi 230 7 Valavanthankottai / Trichy 110 8 Naduvalure / Perambalur 110 9 Andimadam / Ariyalur 110 10 Thenoor / Perambalur 110 11 Vellakkarai / Cuddalore 110 12 Narimanam / Nagapattinam 110 II. TRANSMISSION LINES :- Sl. No Name of the Line Route length in km (1) (2) (3) 1 110 KV SC line on DC tower from Poiyur 230 KV SS to Koothur 110 KV 16.64 Substation with LL Conductor 2 Erection of 230 KV DC Line on DC tower with LL conductor for making 22.6 LILO of existing 230 KV Thiruvarur- Kadalangudi line at the proposed Kumbakonam substation. 3 Erection of 110 KV SC Line on DC tower with Panther conductor from 12.50 Kumbakonam 230 KV substation to Thirupurambiyam 110 KV SS June 28, 2017] TAMIL NADU GOVERNMENT GAZETTE 61 Sl. No Name of the Line Route length in km (1) (2) (3) 4 Erection of 110 KV SC Line on DC towers with LL conductor from the 5.90 proposed 230 KV Kumbakonam SS to the existing Kumbakkonam 110 KV substation. 5 Erection of four circuits of 110 KV line with Panther conductor on multi 3.00 circuit towers from the proposed Mondipatti 230 KV SS to common point (Loc. B) 6 Erection of 110 KV DC line on DC towers with Panther conductor from the 25.57 common point (Loc. B) to LILO the existing 110 KV Trichy - Erode feeder at the proposed Mondipatti 230 KV SS. 7 Erection of 110 KV DC line on DC towers with Panther conductor from the 6.35 common point (Loc. B) to LILO the existing 110 KV Alundur - Sembatty feeder at the proposed Mondipatti 230 KV SS. 8 Erection of 110 KV SC line on DC towers with Panther conductor from the 40.8 proposed Mondipatti 230 KV SS to Thuvarankurichi 110 KV SS. 9 Erection of 110 KV SC line on DC towers with Panther conductor from the 16.9 proposed Mondipatti 230 KV SS to Vadugapatty 110 KV SS. 10 Erection of 230 KV DC line on MC towers from 230 KV SS to Common 3.00 point (Loc A) at the proposed Thuvakudy 230 / 110 KV SS 11 Erection 230 KV DC line on DC towers with Zebra conductor from common 14.5 point (Loc. A) to LILO the existing 230 KV Alundur - Thanjavur feeder -I at the proposed Thuvakudy 230/110 KV SS. 12 230 KV DC line on DC towers with Zebra conductor from common point Loc.A 14.50 to LILO the existing 230 KV Alundur - Thanjavur feeder -II at the proposed Thuvakudy 230/110 KV SS. 13 Erection of four circuits of 110 KV line on multi circuit towers with Panther 1.92 conductor upto common point (Loc. B) from Thuvakudy 230 KV SS. 14 Erection 110 KV DC line on DC towers with Panther conductor from common 1.92 point (Loc. B) to LILO the existing 110 KV Trichy - Thanjavur feeder at the proposed Thuvakudy 230/110 KV SS. 15 Erection of 110 KV DC line on DC towers with Panther conductor from common 1.92 point (Loc. B) to LILO the existing 110 KV Alundur - Thanjavur feeder at the proposed Thuvakudy 230/110 KV SS. 16 Erection of 110 KV SC line on 110 KV multi circuit towers upto common point 5.00 ( Loc. C) from the proposed Thuvakudy 230 KV SS. 17 Erection of 110 KV SC line on DC towers from common point (Loc. C) 27.00 to K.Sathanur 110 KV SS. 18 Erection of 110 KV SC line on DC circuit towers from Thuvakudy 230 KV 3.10 SS to BHEL 110 KV SS 62 TAMIL NADU GOVERNMENT GAZETTE [Part VI—Sec. 3(b) Sl. No Name of the Line Route length in km (1) (2) (3) 19 Erection of 110 KV DC line on DC towers with Panther conductor by making 0.6 LILO of the existing 110 KV Cuddalore-Chitharasur-Sornavor feeder at the proposed Keezhkavarapattu SS. 20 Erection of 230 KV DC line on DC towers with Twin Moose conductor including 3 OPGW cable from NNTPS to the proposed Neyveli 230/110 KV SS. 21 Erection of 230 KV DC line on DC towers with Twin Moose conductor including 1 OPGW cable from Neyveli - TS-II to the proposed Neyveli 230/110 KV SS. 22 Erection of 230 KV DC line on DC towers with Zebra conductor from the 4.5 proposed Neyveli 230/110 KV SS to the existing Thiruvannamalai and Cuddalore feeders. 23 Erection of 230 KV SC line on DC towers with Zebra conductor from the 1 proposed Neyveli 230/110 KV SS to the existing Eachangadu 230 KV SS. 24 Erection of 110 KV three circuit line on MC towers with Panther conductor from 1.5 the proposed Neyveli 230/110 KV SS to connect the existing Aduthurai feeder and Deviakurichi feeder - I & II 25 Erection of 110 KV four circuit line on MC towers with Panther conductor from the 4 proposed Neyveli 230/110 KV SS to connect the existing Panruti feeder, Vadakuthu feeder and Villupuram feeder - I & II 26 Erection of 110 KV DC line on DC towers with Panther Conductor to make LILO 11.5 of the existing 110 KV Trichy- Punalkulam-Thanjavur feeder at the proposed Valavanthankottai 110 KV SS. 11.5 27 Erection of 230 KV DC line on DC towers with Zebra Conductor to LILO the existing 15.40 230 KV P.P.Nallur - Thanjavur feeder at the proposed Narimanam 230 KV SS. 28 Erection of 230 KV DC line on DC towers with Zebra Conductor to LILO the existing 15.20 230 KV P.P.Nallur - Thanjavur feeder at the proposed Narimanam 230 KV SS. 29 Erection of 110 KV DC line with panther conductor to Narimanam 110 KV Switch yard 0.20 from Narimanam 230 KV SS. 30 Erection of 110 KV SC line on DC towers with Panther conductor to Peralam 26.20 110 KV SS from Narimanam 230 KV SS. 31 Replacement of 110 KV DC line on DC tower with Leopard conductor by Panther 13.77 conductor in Villupuram-Neyveli feeder (Villupuram-Arasur) (Loc-1-52) 32 Stringing of 110 KV SC line with Panther conductor on the free arm of the 110 KV 12.00 DC towers Veeramarsanpetti 110 KV SS to Thirukattupalli 110 KV SS 33 Strengthening of existing 110 KV SC line on SC tower in between Ulundurpet 110 KV 23.35 SS and Thiagadurgam 110 KV SS with Leopard conductor by 110 KV SC line on DC tower with panther conductor 34 Erection of 110 KV SC line on DC towers with Panther conductor from Loc.13 near 15.16 Thanjavur 230 KV SS to Mariammankoil 110 KV SS with provision of breakers at Mariammankoil 110 KV SS. 35 Strengthening of 110 KV Kallakudi - Thuraiyur - T pet-Musiri feeder existing with 90 leopard conductor by 110 KV SC line on DC towers with panther conductor and LILO the 110 KV existing Kallakudi - Perambalur feeder to at Siruganur 110 KV SS (86+ 4) June 28, 2017] TAMIL NADU GOVERNMENT GAZETTE 63 Sl. No Name of the Line Route length in km (1) (2) (3) 36 Strengthening of 110 KV Thatchankurichi - Kallakudi feeder I existing with leopard 13.52 conductor by 110 KV SC line on DC tower with panther conductor 37 Strengthening of 110 KV Perambalur - Kallakudy feeder I existing with leopard 32.46 conductor by 110 KV SC line on DC towers with panther conductor 38 Strengthening of 110 KV Perambalur - Krishnapuram feeder existing with Leopard 22.5 Conductor by 110 KV SC line on DC towers with Panther conductor 39 Strengthening of 110 KV Ariyalur - Sathamangalam - CCCL - Kallakudi feeder existing 27 Leopard conductor by 110 KV SC line on DC towers with Panther conductor. 40 Strengthening of the existing 230 KV Neyveli - Karaikudi SC line on SC tower with 270 Kundha conductor by 230 KV SC line on DC tower with zebra conductor (upto Aliyanilai 110 KV SS.) 41 Erection of 230 KV SC line on DC line from Cuddalore 230 KV SS to S.P.Koil 180 (Veerapuram) 42 Strengthening of LILO portion to Manmangalam 110 KV SS by repalcing the 8.1 existing Leopard conductor with Panther conductor in the existing DC towers 43 Strengthening of LILO portion to Malaikovilur 110 KV SS by repalcing the existing 2.8 Leopard conductor with Panther conductor in the existing DC towers 44 Stringing of 110 KV SC line with panther conductor on the free arm of the already 7 sanctioned DC towers of newly converted 110 KV Pugalur-Erode feeder from Noyyal to Pugalur 230 KV SS 45 Strengthening of 110 KV Pugalur - Andichettypalayam feeder by replacing the 21.87 existing leopard conductor by Panther conductor 46 Erection of 110 KV SC line DC towers from the sanctioned Poyyur 230 KV SS 23 to the proposed Naduvalur 110/33 KV SS 47 Erection of 110 KV DC line on DC towers with Panther conductor to LILO the 10 existing 110 KV Cuddlaore - Chitharasur- Sornavur feeder at the proposed Vellakarai SS.