You can expect a partnership based on trust and certainty of delivery

Claremont Quarter, OVER FIVE DECADES OF Multiplex is a leading global contractor We think like owners and make our responsible for creating complex clients’ goals our goals, enabling long CONTRACTING HERITAGE landmark buildings and infrastructure term, cost-effective outcomes that add 7 COUNTRIES projects in Australia and around the real value to projects. Global OF OPERATION world. Intent on leaving a tangible legacy Established in 1962, we have with every project we deliver, we work delivered in excess of 1000 projects hard to create sustainable outcomes 6,700 with a combined value of more than for ourselves, our clients and the Contractor EMPLOYEES AU$85 billion, and the financial stability communities we operate in. We have and global relationships of our parent built a strong track record in financial, company Brookfield continues to drive environmental and social sustainability. ONE TEAM our growth today. Our award-winning team has a Our innovative thinking and ‘can-do’ reputation for delivering ahead of time approach, coupled with the way we and on budget. engage with our stakeholders, drives us to outperform.

3 Experts in Residential Multiplex has significant residential As such, clients benefit from the very construction and development led best expertise and innovation and our experience ranging from low and in-depth understanding of residential medium rise mixed use developments drivers and how to add value. to inner city high rise apartment towers and residential wharf developments. We deliver superior results through aligning ourselves with our clients – Residential projects have formed a high making their goals our goals. percentage of the global construction work undertaken by Multiplex over the Our team of experts are highly skilled decades with 200 residential projects and enthusiastic individuals with a completed or underway. wealth of residential experience to bring to projects. The average tenure Through our depth of experience of our Executive Team and Project in design, development and Managers is 12 years. In many construction we have established instances, clients choose Multiplex industry leadership – evident in our because they know the team. achievement of over 600 industry awards and repeat business from many of our clients.

• 300 RESIDENTIAL PROJECTS • 50,000+ APARTMENTS • OVER $33.6 BILLION WORK Our specialists have built 50,000+ apartments

Raffles, Perth 5 A Unique Capability We share our understanding, knowledge and expertise with clients and work with them to achieve the best possible outcomes.

SECTOR-SPECIFIC We have a track record in creating UNDERSTANDING environments that: The requirements for residential • Enhance residents’ experience construction and development differ through product/design greatly from those of other buildings. recommendations Multiplex undertakes a high level of • Drive space efficiency to optimise client liaison, team coordination, detailed investment programming, scheduling, attention • Provide flexible planning, IT and to detail and robust construction services frameworks to facilitate techniques to identify and mitigate client future change risk and successfully deliver challenging • Activate and integrate facilities with projects. the surrounding community or precinct We have experience implementing • Lead in the implementation of the latest technologies into residential sustainable building methodologies buildings, procuring materials both • Provide distinctive buildings that locally and offshore and have attract buyers strong relationships with specialist • Are low maintenance, serviceable subcontractors to complete the most and durable unique or complicated tasks. We create exceptional living environments

Duo Central Park, 7 End-to-End Solutions With a modular offering, clients can choose to combine a range of different services and skills to fit their needs.

Multiplex can provide added value residential projects. As a contractor approvals – all with the shared goal for clients through the provision of an of choice with financiers, we can also of delivering a superior residential end-to-end service across the entire assist with debt and equity options development. project lifecycle by leveraging in-house through major banks or our global experience and capabilities. Our long parent company subsidiary Brookfield If required, Multiplex can also engage established systems and processes Financial. experts that offer complementary ensure success from project inception services to support the delivery of the to project delivery. Our development management project such as Sales, Marketing and services include land negotiations, Customer Relations. Partnering with clients from the outset financial modelling, feasibility studies, we can help to identify, source, develop cost planning advice, market research, manage, design, construct, market, design development and management, sell and facilitate the settlement of technical advice and development

MODULAR RESIDENTIAL SERVICES FOR TAILORED SOLUTIONS

RESEARCH & FEASIBILITY ANALYSIS

DESIGN MANAGEMENT DEVELOPMENT MANAGEMENT

PROJECT FINANCE TIER 1 CONTRACTOR

PROGRAMMING COST PLANNING

MARKETING & SALES

Hilton Surfers Paradise Hotel & Residences 9 Unlocking ARTSLAB ART COMPETITION FEB 2020 (2ND AND THIRD PRIZE) Value Our goal on every project is to achieve the highest quality results for the best value by unlocking potential and maximising returns for clients and their customers. We have identified that the greatest dust, access, noise and vibrations opportunity to influence project through well managed site logistics. Our approach to quality goes beyond outcomes is through early planning and This considered delivery approach basic certification and is underpinned decision making. So we focus a great helps to minimise loss of revenue from by a process of continuous deal of time and resources on the any surrounding ongoing operations. improvement. We learn from our pre-planning phase of a project. experiences in other regions and A LONG TERM OUTLOOK translate that knowledge to every CRITICAL LIFECYCLE THINKING We engage with our consultants, project. Rather than simply implementing plans, stakeholders, and our affiliated we examine clients’ desired outcomes companies such as parent company Prototypes are often used by Brookfield at the beginning of a project in order to Brookfield (asset management) and Multiplex and are an effective way of maximise expected results. sister company Brookfield Johnson giving clients certainty on design and Controls (property management) to detailing, providing an opportunity We pay particular attention to the brief, develop a project design with whole for input, resolving buildability issues safety, logistics, resources, the emerging of life appreciation. By doing so we and establishing the quality of finish. design, materials selection and strive to ensure the evolving design procurement as well as the sales and minimises ongoing operational costs, Prototypes allow user groups and marketing of the development. while the lifespan of the building and operations to touch and feel the product the changing needs of its residents are rather than just visualise the finished Our aim is to improve value – from its catered for. design. broader integration within the precinct and its internal flow and feel, through PROJECT QUALITY MANAGEMENT As part of our quality delivery process to the detailed elements such as PROGRAM we also invest in building mock ups to IT, services, acoustics, architectural Through our extensive experience in visualise key elements of the design. features and livability. residential projects we have identified We capture and demonstrate industry critical areas to focus on in order to best practice with these models We also evaluate and develop the provide the highest quality product. and use them to train our people, best way to deliver the building whilst Our clients benefit from systems and our subcontractors, our consultants and minimising impact on our client, their processes that have been developed occasionally our clients. stakeholders and the community from and refined over 50 years.

DESIGN Review of design brief and critical design elements

CONSTRUCTION Focus on design documentation, procurement, supplier inspections, prototyping and installation COMPLETION Completion reviews with a focus on commissioning and handovers

PROJECT PROGRAM

PROJECT QUALITY MANAGEMENT PROCESS Westmead Connectivity Centre opening 1113 Our clients are part of our team

Multiplex believes collaboration with all stakeholders is the key to achieving exceptional results.

STAKEHOLDER ENGAGEMENT LONG TERM RELATIONSHIPS Our strength is working with multiple Collaborating From the outset, we engage with our Our longevity and integrated capabilities departments, facilities and stakeholders clients, scheduling regular meetings and have enabled us to make many and applying a rigorous approach undertaking advanced risk identification important contacts along the way. to ensure all views and options are to pre-emptively identify and resolve surfaced, discussed and decisions potential issues. Working with the We link our clients with important made for the best project outcome. to Achieve architects, our design management governmental and private bodies, team harmoniously develops a financiers, agents and consultants We recognise the need to capture input design which achieves the quality to ensure that each development from all user and stakeholder groups, and functionality required by users, opportunity has the greatest chance of and we achieve this through structured within the assigned budget. Our highly success. meetings and providing prototypes that Outcomes cohesive approach encourages input both keep our stakeholders informed throughout the process and aligns USER GROUP PROCESS and generate invaluable feedback. goals to ensure ultimate client and team We know that operating efficiencies and buy-in to the final solution. Along the functionality are largely bi-products of way we provide regular financial reports, successful user group processes that understanding the rigorous internal draw on the expertise and value that validation required by our clients. resides within the user group.

We have extensive cross cultural We engage specialist professionals and experience, having been engaged by skilled design managers to rigorously a number of international clients over assess and balance the requirements more than 50 years. of the user groups, ensuring alignment to the project objectives, including deliverability within time and cost parameters.

13 The Benefits of Early Involvement The best way for clients to capitalise on the collective planning of one team working together is to undertake Early Contractor Involvement (ECI). At Multiplex we embrace ECI as an resultant cost and time impacts. ECI is sub-contractor cost savings transferred alternative contracting method and also designed to reduce and correctly to our client. Having collaboratively the ultimate way to create a ‘one apportion risk through joint assessment agreed the scope, the client will be less team’ approach between the client, and the development of mitigation likely to be exposed to additional costs consultants, user groups, stakeholders strategies. during delivery, providing assurance on and the Multiplex project team. We budget and making the project easier to jointly develop the scope and design Typically the ECI period is also used to finance. in alignment with the budget, program, commence early works on the project brief and principal project requirements which normally involves services Once the ECI and early works phase in the first stage of a two stage process. diversions, site set up, demolition and is complete and the assumed project excavation. costs and conditions are accepted by ECI benefits the client in several our client, a contract is entered into for ways, orders with long lead times can This early commencement of the delivery of Stage Two with the works be placed as well as allowing early work provides significant program able to commence on site immediately consideration and adoption of value advantages. Competitive market tension and seamlessly. engineering opportunities, thereby is also maintained with cost plans decreasing redundant works and the developed in a transparent manner and

Ability to influence cost, design, safety and sustainability FOCUS ON UPFRONT COLLABORATION Accrued cost

TIPPING POINT IN TERMS OF ABILITY TO INFLUENCE PROJECT OUTCOME

ECI saves time and TIPPING POINT IN TERMS OF PROJECT COST ACCRUAL

costs and provides

VISION TENDERING ECI PHASE CONSTRUCTION COMPLETION & POST greater certainty. IDENTIFIED VISION REALISED COMPLETION Stage 1 Stage 2 The Tipping Point in Early Contractor Involvement

Wonderland Central Park, Sydney 15 A Considered Approach We respect and protect our clients, people and the communities we operate in.

PLANNING FOR A LIVE Detailed plans are produced for eliminate critical risks on our sites OPERATIONAL ENVIRONMENT continuity, dust, vibration, noise by establishing safety controls in the Residential projects located in live monitoring and suppression to ensure, planning phase of projects, rather than We adeptly manage environments such as mixed use where possible, minimal impact on the adding them on during construction. For precincts bring unique challenges. We surrounding area, and are developed in clients, this translates to a safer worksite appreciate the higher level of interface close and continual consultation with and greater certainty of delivery. the client, users and members of the all aspects of the required to mitigate impact to ongoing local community. activity and neighbouring sites. A TAILORED AND FLEXIBLE APPROACH TO INDUSTRIAL Through active community liaison For example on a mixed use site, we RELATIONS site including its we connect with stakeholders and liaise with clients and their stakeholders the surrounding community regularly Our five decades of industrial relations to program works that minimise regarding the project’s delivery. All experience is built on our reputation, disruption during the normal course of trust and long term relationships. We impact on people community relations consultation is the precinct’s activity. coordinated by the project team, who respectfully acknowledge the interests have broad experience in working of our clients and workforce and believe Staging elements of a project can also within operational environments and effective relationships lead to stability bring significant benefits for the client. attempt to meet the varying personal and certainty. For example, certain phases can be and business needs of stakeholders programmed in accordance with the and neighbours. rate of apartment sales or settlements. AN INTEGRATED OPERATING SYSTEM SAFETY IS FOREMOST As standard practice, Multiplex Our business is underpinned by produces phased plans incorporating Multiplex is proud of its track record in our fully integrated management requirements such as the maintenance safety, and we have a strong tradition system – with the key platforms of pedestrian and vehicular access to of advocating continual improvement in of quality management (AS 9001), the site and critical services including our industry. occupational health and safety gas, electricity and water. (AS 4801) and environmental Safety is paramount on all of our sites management (ISO 14001) systems. and we continuously deliver projects that maintain our exemplary safety record. Our safety philosophy is to

17 A Lasting Legacy Collaborating with clients and the community, Multiplex aims to leave tangible, lasting legacies for every project it delivers.

Multiplex is intent on leaving a lasting Literacy for Life legacy in the communities in which we partnership between National Health work. We favour a partnership approach Research Institute – The Lowitja with clients that share concurring Institute, indigenous campaigner Jack ethics and goals, particularly around Beetson and Multiplex, which aims to philanthropic values address the issue of very low literacy levels in Aboriginal adults. Multiplex is a strong advocate in ‘giving back’ and plays a large role Over six million people are now in supporting the community. Whilst literate as a result of implementation active in donations and charity work, in 29 countries in the past 15 years. we have also established avenues The Literacy for Life Foundation is the to nurture future leaders, not only via first ever implementation in Australia. training and development programs, but assisting underprivileged groups to obtain education opportunities and support. ‘Multiplex Connections’ is our approach to community engagement. It gives expression to our values and commitment to leave a positive legacy in the areas in which we operate.

To support this approach, Multiplex has developed management and mitigation strategies based on five broad impact categories, namely: • Employment and training • Local labour market and business development • Social welfare, community services, infrastructure and wellbeing • Workforce health and wellbeing Literacy for Life Foundation Graduation Ceremony, Bourke, NSW • Stakeholder and local engagement. Photo: Edwina Pickles/Good Weekend

19 We have an Structured for enviable track Success record for delivery Clients choose us because of our commitment to add value, capacity and certainty, backed by the resources and depth of experience to deliver even the most complex projects. on time and within CENTRAL COORDINATION COST CONTROL PROCURING SUB-CONTRACTORS budget We assist in coordinating all Our detailed reviews of project AND MATERIALS construction services including complexities enable us to identify key Multiplex recognises the important role architectural, structural, interior design project ‘pinch points’ ahead of time and our sub-contractors play in helping and upfront cost planning/estimating plan to avoid any impact they might us to exceed the expectations of our management. By adeptly managing cause. clients. the site construction teams and sub- contractors, and with long term and We understand the need to balance Through our significant history we have daily management of all services and consider cost constraints and established long term relationships consultants, we direct installation the importance of minimising ongoing with some of the best operators in the and administer sequencing, quality operational costs to our clients. With this market who consistently produce high assurance and documentation, while aim we focus on: quality work and who share our core managing regulatory and authority • Meeting budgets and project values. approvals. Our superior upfront planning milestones and ongoing coordination results in • Balancing capital and lifecycle costs Our global network facilitates the the delivery of a quality product, often • Ensuring optimal functionality procurement of quality building ahead of program. • Achieving a superior standard of materials from around the world to sustainability support the creation of world-class Whilst our project teams are set up • Prioritising long term flexibility education and research projects. with highly experienced personnel, they This allows us to provide clients with value and draw from an even greater Engagement with Facilities certainty of quality and project delivery. pool of experience in our global subject Management operators early in design matter experts. phase is also key, to ensure safest and LEVERAGING OUR NETWORK best value decisions are made for the We cultivate a global network of industry design life of the asset. leading professionals, based on long standing relationships, with architects, engineers, project managers and suppliers and combine our skills with theirs to deliver major projects.

33 Mackenzie Street, 21 CASE STUDY Lumiere Residences

PROJECT DETAILS Location: Sydney, NSW Value: $225 million Contract: Design & Construct Client: Frasers Pty Ltd

The ultra high-quality Lumiere For example a curtain wall façade was Residences is located in the heart of designed to protect residents from the the Sydney CBD overlooking historic weather while at the same time create a St Andrews Cathedral and Sydney sleek exterior finish. Multiplex amended Town Hall. the typical curtain wall design to incorporate awning windows and huge The statuesque 56-level tower was two metre sliding sashes, meaning the final stage in the Regent Plaza residents have access to natural development, which also includes ventilation as well as indoor balcony the luxury hotel Frasers Suites linked space in inclement weather. by a sandstone-wrapped retail and commercial podium.

Designed by renowned UK architects Foster and Partners, Lumiere Residences comprises 450 luxury studio, one, two and three-bedroom AWARDS • 2009 National Professional Excellence apartments as well as four multi-million Award for Residential Construction over dollar three-level penthouses and $100M - Australian Institute of Building extensive recreation facilities. • 2008 Development of the Year - Urban Taskforce Australia Multiplex delivered the project with the • 2008 Winner, High Density Housing Award end user in mind. - Urban Development Institute of Australia

25 CASE STUDY Duo Central Park Blocks 1 & 4N

PROJECT DETAILS Location: Sydney, NSW Value: $293 million Contract: Design & Construct Client: Central Park JV No. 2 – Frasers Property Australia and Sekisui House Australia

Central Park is the visionary Block 4N is an 18 storey mixed use redevelopment of the old Carlton building positioned on the west half of and United Brewery site, located the Duo site. The total GFA of the Block in the southern Sydney CBD, in 4N building is 25,707m2 and comprises: Chippendale. • 297 hotel rooms, conference facilities, gym and swimming pool The Central Park site occupies nearly across13,842m2 six hectares bordered by Broadway, • 48 residential apartments across O’Connor, Wellington and Abercrombie Levels 11-16 (3,552m2) Streets. The site allows for the • Commercial office space across development of 255,500m2 GFA of Levels 5-10 (6,184m2) residential, commercial and retail space. • Child care facility across Levels 3-4 to accommodate 90 children The Duo Development is located (1,095m2 including external terraces) at the south western corner of the • Refurbishment of the existing Central Park site and comprises two heritage Abercrombie Pub and towers known as Blocks 1 & 4N. This Abercrombie Street terraces site is bounded by Broadway to the (789m2). north, Abercrombie Street to the west, • Retail tenancies on Ground Floor Chippendale Way to the east and the (245m2) future ‘Central Park Ave’ to the south. The two towers are positioned over a Block 1 is an 18 storey residential mixed 4-level combined basement, comprising use building on the eastern half of the carparking, bicycle parking, end of Duo site. The total GFA of the Block 1 journey facilities and back-of-house building is 24,454m2 and comprises: hotel facilities. • 281 residential apartments plus residential facilities including a gym and 25m swimming pool on Level 2 (23,167m2 in total) • Retail tenancies on Ground Floor (1,100m2) 23 CASE STUDY Wonderland, Central Park Block 11

PROJECT DETAILS Location: Sydney, NSW Value: $141 million Contract: Design and Construct Client: Frasers Broadway Pty Ltd

Wonderland is a high quality mixed- Located in Chippendale on the southern As a result, Multiplex provided exterior use residential apartment building edge of the Sydney Central Business remediation and refurbishment of the and the final chapter in the Central District, Wonderland is bounded by heritage-listed Castle Connell Hotel and Park Development, a site owned and Wellington, O’Connor, Kensington and completed works associated with the developed by Frasers Property over Balfour Streets. existing heritage tank in the northeast the past 10 years. corner of the site, as part of the project. A carefully planned and intricate Designed by fjmt, the 14 level construction process was required Wonderland is Multiplex’s second Wonderland houses 296 apartments, throughout the construction period project within the Central Park precinct. 5 street-level retail units and a 90-place given the building’s location within We recently completed Duo (Blocks 1 childcare facility. The 5 Star Green Star a busy area of the city and in a and 4N) which comprises two 18 storey building is surrounded by landscaped demanding operational precinct that mixed-use residential towers. public open space with its levels included not only owner-occupied varying from 9 to 13 floors to align with areas, but also a number of zones still Having won dozens of local and surrounding urban fabric, matching under construction by other contractors. international awards, the Central Park scale and integrating with local heritage Development is regarded as one of items. In addition to the site’s operational Australia’s exemplar projects in master challenges there were heritage- planning for a mixed-use precinct as The apartment building includes a significant structures to consider. Many well as urban renewal and revitalisation. luxurious entry lobby and communal of the older buildings were demolished facilities such as a cardio gym, as part of the development but the residents’ lounge, roof top terrace heritage buildings and structures that and basement car park. Outside, remained had to be retained and landscaped gardens and public domain protected. areas provide a beautiful welcome.

23 “What’s unique about Multiplex is their ability to completely engage with the operator, in this instance Hilton Hotels. It’s enabled a great partnership to form CASE STUDY and I think that partnership will probably continue for many years to come.”

David Kelly, General Manager, Hilton Surfers Paradise - Hotel and Residences The Hilton Surfers Paradise Hotel and Residences

PROJECT DETAILS Location: Surfers Paradise, QLD Value: $700 million Contract: Design and Construct Client: ANZ

The Hilton Surfers Paradise Hotel of works had an immediate effect on The Multiplex project team worked and Residences was the first the surrounding community with the closely to coordinate the huge amount development of its kind on the Gold injection of $2.2 billion in to the Gold of activity and ensure it had no negative Coast in over a decade and almost Coast economy and the resurrection impact on surrounding people or didn’t make it to fruition – it was of 3000 jobs during construction and businesses. salvaged by Multiplex at the onset of beyond. the GFC. The project was delivered ahead of Careful planning and innovative schedule. Distinctive dual towers combine luxury construction methods were integral to private residences with the comfort and the project’s quick turnaround within the amenity of a world-renowned hotel. The busy Surfers Paradise precinct. Boulevard Tower and Orchard Tower AWARDS contains a 169-room Hilton Hotel as well Construction was undertaken using a • MBA Award for National High Rise as 410 residences. challenging top down method where Apartment Building of the Year 2012 the basement was excavated and • MBA Regional Award for Residential Building over $20M 2012 In 2008, construction of the project had structurally built whilst towers 1 and 2 • MBA State Award for Residential Building stalled. The ANZ Bank approached proceeded simultaneously. This required over $20M 2012 Multiplex for assistance and we Multiplex to construct tower decks in a • MBA Regional Civil Contractor of the Year responded with a fixed time and regular four-day cycle while at the same 2012 3 fixed cost wrap, giving people the time remove 800 to 1,000 m of sand • MBA Regional Project of the Year 2012 assurance they needed - the job each day. • MBA State Project of the Year 2012 would be completed and experienced • AIB Award for QLD Professional employees from the NSW and QLD During peak activity, construction was Excellence 2012 Multiplex offices would be mobilised being undertaken on three fronts with a • Urban Taskforce Development of the Year and relocated to the Gold Coast to see truck entering and exiting the site every 2012 the job through. Recommencement four minutes for 10 hours a day. • ACAA Award Finalist 2012

27 CASE STUDY Claremont Quarter was a joint Multiplex’s management of traffic issues, venture development by Multiplex and consideration of the ongoing AWARDS • Planning Institute Australia Award for Living and the Hawaiian Group. operation of the existing shopping Urban Development 2012 It offered luxury apartments and centre while building and respecting the Claremont Quarter penthouses above mixed use retail day-to-day business interests of traders frontage right in the heart of the was handled with precision. PROJECT DETAILS prestigious Perth suburb, Claremont. Location: Perth, WA Spacious layouts in the living areas Value: $253 million The complete redevelopment of the and sophisticated detailing extends Contract: Design & Construct existing Claremont Arcade Shopping throughout the apartments. Quality Client: JV between SPB (Australia) & Multiplex Developments Centre site was undertaken in two fixtures and fittings and subtle lighting stages. The 29,000m2 shopping centre feature throughout the external includes the major tenancies of Coles balconies with their sun shading and David Jones plus approximately devices, through to the kitchens and 150 specialty tenancies. Construction bathrooms with their sharp clean commenced in 2006 (demolition site designs. works) with handover of Stage One in 2009 and Stage Two in 2011. Multiplex was successful in its aim to create a world-class retail shop frontage “We are delighted to have worked in partnership with Multiplex to develop and The four-storey apartment building to St Quentin Avenue, while delivering deliver Claremont Quarter. We believe the success of this development is down to its sits above and well back from the a sense of harmonious diversity by mixed use make-up, offering Claremont’s local residents an active urban centre with hustle and bustle of the modern village retaining the existing retail environment living spaces, a shopping experience, entertainment and a range of services.” style streets below, complementing of Claremont’s main street. the character of the Claremont area. Russell Gibbs - Hawaiian Group CEO Residences offer versatile floor spaces, elegant finishes and a true sense of style. Large balconies and spacious outdoor entertaining areas make the most of parkland and river views. 29 CASE STUDY “FEC has enjoyed a professional, non-litigious and flexible relationship with BM. No challenge has been too large and their design and construction teams have handled purchaser changes and a range of other issues typically encountered on residential projects, with a flexible and responsive approach. The team has excelled on FEC projects and Upper West Side, proven BM to be a client focused builder and partner of choice for FEC.” Rob Cooke, General Manager, Far East Consortium Stages 1- 4 PROJECT DETAILS Location: Melbourne, VIC Value: $548 million (combined) Contract: Design & Construct Client: Far East Consortium

Successful delivery of Far East Star ratings respectively. difficult with the team having to navigate Consortium’s flagship project in old tunnels, chambers and voids which Australia, The Royal Domain Tower, Tower Three (the final stage) is a 53 serviced the old power station. was the beginning of a strong level tower atop a 6 level podium, that relationship that has led to the provides a total of 641 apartments. Multiplex engaged in a major re-design appointment of Multiplex for the first It includes a communal pool and to strategically position the location of four stages at the Upper West Side gymnasium, and incorporates 11 retail piles around a number of underground development in Melbourne. tenancies at street level. Following the high voltage power conduits. The success of the previous towers, it will entire site was encircled by live power Located on a vast corner block in also target a 4 Star Green Star Design substations providing electricity to over Melbourne’s CBD and bordered by Rating (Multi Unit Residential V1 rating half of Melbourne and with the location Spencer, Lonsdale and Little Bourke tool). of chambers and voids scattered about Streets, Upper West Side is one unpredictably it was paramount that of the largest inner city residential A podium green roof design extensive precautions were taken. developments in Australia. The overall incorporates outdoor communal and development, which comprises four recreational facilities. Once all stages To work around this, Multiplex towers, will provide a total of 2,200 are complete it will be the largest green implemented an innovative construction apartments. roof in the southern hemisphere. technique that involved the insertion of a steel sleeve between the high voltage Multiplex constructed Stage One, a During site works on Stage One, cable conduits before piling within 48 level tower with 700 apartments, hazardous material (including the sleeve, with high voltage cables above a six level podium which includes contaminated soil) was encountered. adjacent to the piles. a large retail arcade that will link all BM collectively managed this four towers. Stage One achieved the project risk for the client, with the The site team also collaborated with first ever 4 Star Green Star Multi-Unit subcontractors and consultants on engineers to ensure the adaptive Residential V1 Design Rating. site, to ensure successful mitigation re-use of heritage buildings located on strategies were in place to achieve Spencer Street, carefully retaining and Stage Two consists of a 49 level tower project delivery. refurbishing the façade and comprising a total of 584 apartments heritage-listed water tank. while the third stage (known as Tower The project’s location on an inner-city Four) includes 282 apartments across a site meant there were a number of 30 level tower. Both towers are targeting imminent construction challenges and 4 Star Green Star and 5 Star Green the demolition and excavation proved

31 CASE STUDY Multiplex won the design ventilation, bore water re-use and University Terraces will play a pivotal competition for this facility by tenancy controls to minimise energy role in the ongoing expansion of UNSW placing the student experience at the usage for unoccupied spaces. Situated by fostering a sense of community and centre of the design. adjacent to a row of mature fig trees on providing an environment conducive to the north side, residents benefit from academic, social and personal growth. University The University Terraces student the shading provided by the trees which accommodation complex at the will help moderate temperatures and Multiplex collaborated with the University of New South Wales includes reduce the need for air-conditioning. University to create high quality student two separate seven level buildings with accommodation, reinforcing the 399 bed rooms, more than 371 kitchens Extending the concept of quality living University’s core values while enhancing Terraces and bathrooms and a basement beyond the individual apartments, there a vibrant campus life and encouraging level car-park. The development also is an abundance of social meeting student engagement. comprises lower ground retail space spaces throughout with study areas PROJECT DETAILS which has attracted tenants such as offering students fixed and flexible Completed in just 13 months, the Location: Sydney, NSW Value: $54 million IGA to cater for campus users. spaces, individual work zones and defect-free handover of the Terraces Contract: Design & Construct catering for small gatherings. Residents to the client was a significant Client: University of NSW Designed by Francis-Jones Morehen can also enjoy a designated student demonstration of the capacity of Thorp (FJMT) the complex meets the lounge, communal kitchen and laundry Multiplex to deliver premium projects requirements for a 5 Star Green Star facilities, games room, IT lab and that meet the needs of their clients and rating. University Terraces comprises landscaped areas. end users. a host of ESD features that boost its green credentials including natural

33 CASE STUDY The Quays

PROJECT DETAILS Location: Melbourne, VIC Value: $179 million Contract: Design & Construct Client: MAB Corporation

Following the successful completion water heater and gas cooking, water- The monorail system (for cleaning inside of the neighbouring Harbour One efficient fittings and a high-performance the atrium) was replaced by a much project in the Docklands, the curved glass façade. Rain gardens and safer alternative, a permanent on site relationship with MAB Corporation tree pits have been constructed instead boom. This eliminated the requirement has been further strengthened by the of traditional drainage systems to feed of working from heights on ropes whilst delivery of The Quays, on time and the stormwater management and allow also providing the client with greater within budget. more rainfall to be accepted into the flexibility by being able to clean external system by reducing the heat island areas of the podium and save on future The Quays project comprised two effect of urban developments. operating costs. The access equipment residential towers with shared podium was fitted with non marking tracks to incorporating 617 apartments and 535 The stormwater management system assist with indoor use. car-parks. relies on the retention and treatment provided by the rain gardens at ground Multiplex also undertook extensive A Resident’s Club features a library, level. A harvesting system will be utilised design development with MAB to business centre, boardroom, private on the rooftop and will supply water to develop a retractable display system for dining room, kitchen and cinema lounge common area toilets, pool, cleaning and the Atrium Glass ball artwork to assist while a range of resort-like amenities irrigation demand. with maintenance. included a rooftop tennis court, clubhouse facility, rooftop garden with Multiplex introduced the installation of The lift motor room was deleted and the outdoor dining and barbecue areas. Building Maintenance Units to both use of machine room lifts used instead. towers as a variation to the contract This system provided program gains The two towers feature a striking light instead of the traditional rope access and costs savings due to the reduced reflecting façade of grey, pink and system. This ensured the highest level height in the lift shaft required for a purple tinted high performance glass. of safety in accordance with the OH&S motor room. Act with regard to façade and building The project comprised many ESD maintenance. features including solar central gas

35 CASE STUDY The Esplanade project comprised removal of the acid sulphate soil and was built using in-situ post-tensioned 37 residential apartments in two low dewatering to be set up in the project’s concrete. rise buildings joined by a pool and Environmental Management Plan and landscaping, located on the Swan strictly followed. Swift approvals and Internal finishes of The Esplanade River foreshore on the site of the old good stakeholder relationships with reflect high-end boutique apartment The Esplanade Steve’s Hotel in Nedlands. council, government environmental living, with Caesar Stone bench tops protection agencies and consultants and premium quality fittings and fixtures The ground floor offers a fully equipped were essential to keep the project on used throughout. gymnasium and change facilities, track. PROJECT DETAILS and a podium deck that boasts a The Esplanade development heralded Location: Perth, WA Value: $41 million swimming pool with an infinity edge An on-site water treatment system was a new style of luxury apartment living in Contract: Design & Construct that runs into a separate pond below. installed to process groundwater prior a suburb that traditionally coveted the Client: Multiplex Developments Extensive landscaping and in-situ to its discharge into the stormwater quarter acre block. exposed aggregate paving finish off the system during construction. This was communal areas. The development is the first clean water tank used in topped by five penthouse apartments, Australia, turning contaminated water each containing extensive balconies into drinking quality water. AWARDS with views over the river and city. • Master Builders Australia Multi-unit Cost efficient high quality materials Residential Award 2010 As is often the case, a tight program and assembly made for a smooth was a major challenge for the construction process. The buildings construction team. Time-consuming were constructed using formed basement works in difficult soil in-situ concrete slabs and columns with conditions, required procedures for brick infill walls, while the podium deck

37 CASE STUDY Sydney Wharf

PROJECT DETAILS Location: Sydney, NSW Value: $165 million Contract: Design & Construct Client: Sydney Wharf

The luxurious Sydney Wharf project a hydrostatic structure system provides at Wharves 8 and 9 demonstrates 200 resident car spaces. Its position AWARDS • Urban Taskforce Australia High Multiplex’s ability to deliver top-end under the mean water mark for Sydney Commendation Development residential developments in complex Harbour created several challenges for Excellence 2009 environments. Multiplex, with piling and excavation only • AIB High Commendation for Residential able to be carried out once a complex Construction over $100M 2009 • AIB Professional Excellence Award for Located across the water from King temporary cut-off steel sheet pile wall Residential Construction over $100M Street Wharf and on the northern had been installed at the perimeter of 2009 end of Darling Harbour, Sydney Wharf the site. • Urban Taskforce Australia Winner comprises 104 apartments and state- Excellence in Urban Renewal 2009 of-the-art leisure facilities spread over The façade design was an additional two buildings – Wharf 8 to the east challenge. To protect against the with 45 apartments and Wharf 9 to the unforgiving marine environment, west with 59 apartments. Averaging 200 Multiplex applied extensive coating to m2, the apartments feature the highest the façade along with glazed aluminium quality finishes and are designed to sections and operable doors, windows take in panoramic views of Sydney and louvers. Harbour and the CBD.

A 54-berth marina with café and office space as well as 11,000 m2 of structural steel and timber boardwalks provide connectivity for residents and the public to easily access the harbour. A basement car-park contained within

“This has been an incredibly complex project with the combination of highly technical marine construction and high quality residential and interior design challenges. We are delighted with the end result and are extremely grateful to your team for their unfailing commitment, energy, expertise and attention to detail. Without their efforts, this project would not have been possible.”

Mark Jacobs, Development Director, Charter Hall

39 CASE STUDY The Wave

PROJECT DETAILS Location: Gold Coast, QLD Value: $80 million Contract: Design & Construct Client: Eastview Australia for Ninaford Pty Ltd and Framwelgate Investment Pty Ltd

The Wave is an iconic residential One of the challenges considered tower set amongst a densely during this process was how to populated tourist strip in the heart build ’s signature balconies. of vibrant Broadbeach. The 37 level Multiplex decided to use precast tower is defined by its wave curved concrete to form the curved balustrades balconies with its east-facing aspect and worked with the structural taking in a stunning panorama of contractor to develop formwork and the Gold Coast and Broadbeach safety systems that achieved better than regions. forecast turnaround for completion of the structural works. It comprises 29 residential levels with one, two and three bedroom apartments featuring state-of-the- art gourmet kitchens and quality furnishings. One retail level, two commercial levels, a podium level and three levels of basement car-parking make up the remainder of the space.

A rigorous six-month pre-construction planning phase was fundamental to its AWARDS successful delivery two months ahead • Emporis Silver Award Best New Skyscraper for Design and of program. Functionality 2007

41 Residential Development and Construction Experience

AUSTRALIA - ACT Colonnades, Sydney Summit Apartments, Melbourne Directors’ Suites, Main Beach, NEW ZEALAND EUROPE - UNITED KINGDOM Sky Plaza, Griffith, Canberra Kendall Inlet, Cabarita, Sydney Clarendon Towers, Melbourne Crown Towers Resort, Surfers Paradise The Statesman, The Tower - One St George Wharf, National Apartments, Canberra Moore Park Gardens - Stages 1, 2, 3, 4, Menzies Malvern Aged Care, Melbourne Cathedral Place, Brisbane Eden Apartments, Auckland Sydney Philadelphia Building, Melbourne Brisbane Campus Apartments, North @ Lighter Quay, Auckland 199 Knightsbridge, London AUSTRALIA - NSW Chelsea Apartments, Sydney Red Tulip, Melbourne Brisbane Stratis @ Lighter Quay, Auckland Mansrea Rd, London UNSW University Terraces, Sydney Excelsior Apartments, Sydney Victoria Gardens Stages 1 & 2, Neptune Apartments, Gold Coast Century on Anzac, Auckland Lateral Luxury Apartments, London The Chancellor, Double Bay, Sydney Stamford Plaza, Sydney Melbourne Panama on Spence Street, Brisbane Viaduct Point Apartments, Auckland Strata SE 1, London Cotton Beach, Casuarina Pinnacle, Sydney Boulevarde Apartments, Melbourne 435 Coronation Drive, Brisbane Unilodge, Auckland Thames Edge, London Darling Island, Pyrmont, Sydney Wondakiah, Sydney Southbank Towers, Melbourne Great Sandy Straits Marina, Stage 1, Sanctum Apartments, Wellington Eaton Place, London East Quarter, Hurstville, Sydney Rushcutters Bay Harbourside, Sydney 51 Spring Street, Melbourne Hervey Bay Spencer on Byron, Auckland UPP Reading Campus Student Fusion, Ultimo, Sydney The Aston, Sydney Paramount Apartments, Melbourne Rivage Royale, Gold Coast Bacchus, Auckland Accommodation, Reading 3 Kings Lane, Sydney Kent St Apartments, Sydney Rockmans Regency Towers, Melbourne Enderley Apartments, Surfers Paradise Sentinel Apartments, Auckland UPP Canterbury Campus Student King Street Wharf precinct, Sydney Georgia Apartments, Sydney St James Apartments, St Kilda, Accommodation, Canterbury Pandanus Pocket, Casuarina Glebe Gardens, Sydney Melbourne AUSTRALIA - WA CANADA The Glebe, London Proximity, Arncliffe, Sydney Sydney Campus Apartments, Sydney Sovereign Apartments, Melbourne Leighton Beach, Perth New Residences of Yorkville Plaza, The Wharf at Woolloomooloo, Sydney Crystal Views, Sydney Kings Park on Southbank, Melbourne Claremont Residences, Claremont Toronto Outrigger Beach Resort, Ettalong Kensington Mews, Sydney Domain Apartments, Melbourne Perth Trump International Tower & Hotel, Monument, Sydney Goldsborough Mort, Sydney The Esplanade, Nedlands, Perth Toronto Manhattan, Sydney The Oaks, Sydney AUSTRALIA - SA Raffles, Applecross, Perth College & Spadina Residence, Toronto Whites, Paddington, Sydney Cityview Apartments, Sydney Rowlands Apartments, Adelaide Old Swan Brewery, Perth 180 Marine Parade, Maroubra, Sydney Darling Harbour Apartments, Sydney Newport Quays, Port Adelaide Panorama Apartments, Perth SINGAPORE Sydney Wharf, Sydney Sister Anne Court, Sydney Altitude Apartments, Adelaide Shenton Park Retirement Village, Perth Tanglin View Condominiums Lumiere, Sydney Newport Quays, Stages 1& 2, Adelaide St Quentins Retirement Village Perth Cluny Hill Bungalow Units The Chancellor, Sydney AUSTRALIA - VIC Embassy Apartments, Adelaide Stamford Apartments, Perth Lincoln Modern Apartments Beau Monde, North Sydney Platinum, Melbourne Horizon Apartments, Adelaide Mounts Bay Village Apartments - Haig Court Condominium Bennelong Centre, Sydney Prima Tower, Melbourne Maxwell on the Park, Adelaide Stages 1, 2 & 3 Sydney Campus Apartments, Broadway Upper West Side Apartments, Stages 1 Mill Point Apartments, Perth MIDDLE EAST - Sydney Park Villages, Stages 1&2, 5&6 & 2, Melbourne AUSTRALIA - QLD Parklane Apartments, Perth Index Ettalong Beach Club Resort, Ettalong Mainpoint Apartments, Melbourne Portside Wharf, Brisbane Sthulls Flats, Perth Grosvenor House Proximity Apartments, Sydney 33 Mackenzie Street, Melbourne Hilton Hotel & Residences, Surfers Kingsway Flats, Perth Green Community Villas Star of the Sea, Terrigal The Quays, Melbourne Paradise Reuben’s Flats, Perth 48 Villas, Al Garhoud Zenix Apartments, Sydney Arcadia,Tarneit Ellington Apartments, Teneriffe, Brisbane Ivanhoe Flats, Perth The Tower 10-12 Boundary Street, Sydney Harbour One, Melbourne Lakelands, Gold Coast Keanes Point Apartments, Perth Dubai Maria Stages 1& 2 1-27 Princes Highway, Sydney City Tempo Apartments, Melbourne The Wave, Brisbane Stokes Flats, Perth Creekside Apartments Werrington Estate Stage 2 Southbank One, Melbourne Festival Towers, Brisbane Grove Towers Home Units, Perth Phases 1& 2 Mercure Apartments Refurbishment, Lucient Apartments, Melbourne Pivotal Point Tower, Southport Warnham Road Flats, Perth Marina Promenade Sydney Royal Domain Apartments, Melbourne Casino Towers, Brisbane Overton Gardens Stages 1 & 2, Perth The Residences - South Ridge Watermark Plaza (Stage 3) and Victoria Point, Melbourne River City Apartments, Brisbane The Address, The BLVD Watermark Terraces (Stage 4), Sydney Freshwater Place, Melbourne Tribeca Apartments, Spring Hill AUSTRALIA - NT The Opus Watermark Pavilion Stage 2, Sydney Tribeca Apartments, Melbourne Frisco Apartments, Spring Hill Nautilus Apartments, Darwin Watermark Tower Stage 1, Sydney Concept Blue, Melbourne Willahra Tower, Brisbane Tipperary Waters, Darwin Cape Cabarita, Stages 2 & 3, Sydney Melbourne and City Towers, Melbourne River Place Apartments, Brisbane Carey Street Development, Darwin Bauhaus Apartments, Sydney Victoria Towers, Melbourne Republic Apartments, Brisbane Myilly Point Apartments, Darwin Ardenbraught, Sydney Seasons Apartments, Melbourne Shaftson House International, Brisbane Luma Luma Apartments, Darwin Kallista Apartments, Sydney Flinders Wharf, Melbourne Springwood Tower 9-13, Springwood Sur Mer, Sydney Uropa Apartments, Melbourne Royal Pines Residences, Brisbane Manly Peninsula Apartments, Sydney City Point Apartments, Melbourne 570 Queen Street, Brisbane

43 Awards YEAR PROJECT REGION AWARD DESCRIPTION ORGANISATION/INSTITUTE YEAR PROJECT REGION AWARD DESCRIPTION ORGANISATION/INSTITUTE 2013 The Tower - One St George Europe Gold Award The Royal Society for the Prevention of 2009 Lumiere Residences NSW 2009 National Professional Excellence Australian Institute of Building (AIB) Wharf Accidents Award, Residential Construction over $100M 2013 The Tower - One St George Europe Gold Award National Considerate Constructors Wharf Scheme 2009 Lumiere Residences NSW Development of the Year 2008 Urban Taskforce Australia 2013 UPP Reading Europe Gold Award The Royal Society for the Prevention of 2009 Esplanade Apartments WA Best Multi Unit Development Masters Builders Association Accidents 2009 Portside Wharf QLD Urban Renewal Urban Development Institute of Australia 2012 Hilton Surfers Paradise QLD National High Rise Apartment Building of Masters Builders Association 2009 Prince Henry at Little Bay WA National Award for Masterplanned Property Council of Australia (PCA) Rider Residential the Year Communities Hunt 2012 Hilton Surfers Paradise QLD QLD Professional Excellence in Building Australian Institute of Building (AIB) 2008 Eaton Place Europe Highly Commended Small Site Award City of Westminster Considerate Builders Residential Awards Scheme 2012 Hilton Surfers Paradise QLD Residential Buildings over $20M (Regional Masters Builders Association 2008 Lumiere Residences NSW Winner - High Density Housing Award Urban Development Institute of Australia Residential - Gold Coast Housing & Construction Awards) 2008 Portside Wharf QLD Urban Renewal UDIA Suncorp Awards 2012 Hilton Surfers Paradise QLD Residential Building over $20M (State - Masters Builders Association 2007 Vale WA Best Irrigation Design - Commercial Urban Development Institute of Australia Residential Housing & Construction Awards) Installation over $30k - Design Certified 2012 Hilton Surfers Paradise QLD Finalist - Australian Construction Australian Constructors Association and 2007 Vale WA Best Overall Project - Irrigation Designer Urban Development Institute of Australia Achievement Award Engineers Australia Landscape/Perth - Open Value 2012 Hilton Surfers Paradise QLD Development of the Year - Development Urban Taskforce Australia 2007 Vale WA Project of the Year - Award of Excellence Urban Development Institute of Australia Excellence Awards 2007 Vale WA Finalist - Sustainable Urban Development Urban Development Institute of Australia 2012 Hilton Surfers Paradise QLD Project of the Year (Regional - Gold Coast Masters Builders Association Award Housing & Construction Awards) 2007 Vale WA Winner - Environmental Excellence Award Urban Development Institute of Australia 2012 Hilton Surfers Paradise QLD Civil Contractor of the Year (Regional Masters Builders Association 2007 Vale WA Finalist - Masterplan Development Award Urban Development Institute of Australia - Gold Coast Housing & Construction Awards) 2007 Sky Plaza, Griffith ACT Winner - Medium Density Apartments & Masters Builders Association Units, Project of the Year 2012 Hilton Surfers Paradise QLD Project of the Year (State - Housing & Masters Builders Association Construction Awards) 2007 Edgewater, Newport Quays SA Excellence in High Density Housing Urban Development Institute of Australia 2012 The Tower - One St George Europe Gold Award The Royal Society for the Prevention of 2007 Freshwater Place VIC Residential Construction $100M+ High Australian Institute of Building (AIB) Wharf Accidents Commendation Certificate 2012 The Tower - One St George Europe Silver Award National Considerate Constructors 2007 Victoria Point VIC Residential Construction $100M - High Australian Institute of Building (AIB) Commendation Certificate Wharf Scheme 2007 Jones Bay Wharf NSW Winner - Excellence Award for Heritage Property Council of Australia (PCA) Rider 2012 Claremont Quarter WA Urban Development Planning Institute Australia and Adaptive Re-use Hunt 2 011 Strata SE1 Europe Regeneration Runner-Up The Royal Institution of Chartered 2007 The Wave QLD Silver Award Winner - Best New Sky- Emporis Skyscraper Awards Surveyors scraper for Design and Functionality 2 011 Strata SE1 Europe Gold Award National Considerate Constructors 2007 Eaton Place Europe Site of the Year City of Westminster Considerate Builders Scheme Scheme 2010 Strata SE1 Europe Bronze Award National Considerate Constructors 2006 199 Knightsbridge Europe Winner Best Large Residential Project Built-In Quality Award Scheme 2006 199 Knightsbridge Europe Winner Residential Development of the Property Award 2010 Strata SE1 Europe 3 Bronze Awards Structural Steel Design Awards Ye a r 2010 Strata SE1 Europe Overall Winner Concrete Society Awards 2006 199 Knightsbridge Europe Best Landscaped Development Highly National Homebuilder Design Awards 2010 Vale WA Winner - Development Excellence Award Urban Taskforce Australia Commended for Masterplanned Communities 2006 Monument Apartments NSW Winner - Adaptive Re-Use over $500,00 Masters Builders Association 2010 Vale WA UDIA Award for Excellence in the Urban Development Institute of Australia Residential Development of over 250 lots 2006 The Residences - Phase 1, UAE Tower Project of the Year Construction Week Awards Dubai 2010 Vale WA Development Excellence Award for Urban Taskforce Australia Residential Development 2005 Proximity Apartments NSW Professional Excellence Award Residential Australian Institute of Building (AIB) Construction $50m - $100m 2010 Bluewater QLD Residential Subdivision Urban Development Institute of Australia 2005 Proximity Apartments NSW Shortlisted - Award for Excellence Urban Development Institute of Australia 2010 The Esplanade WA Multi Unit Residential Masters Builders Association 2005 Seasons Apartments VIC Professional Excellence Residential Australian Institute of Building (AIB) 2009 Sydney Wharf NSW National High Commendation Urban Taskforce Australia Projects $10-$50M Development Excellence Awards 2004 Uropa Apartments VIC High Commendation - Residential Australian Institute of Building (AIB) 2009 Sydney Wharf NSW Certificate of High Commendation, Australian Institute of Building (AIB) Construction $25M-$50M Residential Construction over $100M 2004 Uropa Apartments VIC Residential Construction $25-$50M (High Australian Institute of Building (AIB) 2009 Sydney Wharf NSW Professional Excellence Award, Residential Australian Institute of Building (AIB) Commendation Construction over $100M 2004 Uropa Apartments VIC National High Commendation Australian Institute of Building (AIB) 2009 Sydney Wharf NSW Winner Excellence in Urban Renewal Urban Taskforce Australia

45 Awards YEAR PROJECT REGION AWARD DESCRIPTION ORGANISATION/INSTITUTE YEAR PROJECT REGION AWARD DESCRIPTION ORGANISATION/INSTITUTE 2004 Flinders Wharf VIC High Commendation - Residential Australian Institute of Building (AIB) 1997 Glebe Gardens NSW Winner – Southcorp Appliances Top Construction $50-$100M Medium/High Density Project of the Year 2004 Flinders Wharf VIC Residential Construction $50-$100M (High 1997 Moore Park Gardens Stages NSW Winner – Apartments over $250k Commendation 1 - 4 2004 Flinders Wharf VIC National High Commendation Australian Institute of Building (AIB) 1996 Moore Park Gardens Stages NSW Excellence in housing - integrated housing Masters Builders Association 1 - 4 open category 2004 Proximity Apartments NSW Professional Excellence, Residential Australian Institute of Building (AIB) Construction $50M-$100M 1996 Kensington Mews NSW Excellence in Housing - Energy Efficiency Masters Builders Association 2003 Sydney University Student NSW Excellence in Housing Award Masters Builders Association $135k - $185k Village 1994 Goldsbrough Mort NSW Site Safety on a general project over $10M Masters Builders Association 2003 Sydney University Student NSW Merit Award - Home Units up to $250k Masters Builders Association 1986 McAlpine Residences NT MBANT House of the Year Masters Builders Association Village 1986 Forest House WA Structural Steel Development Award 2003 Sydney University Student NSW Development Excellence Award for Urban Taskforce Australia Village Residential Development 1983 Mount Street Apartments WA House & Garden Year Book Apartment of the Year 2003 Ellington Apartments QLD President’s Award Urban Development Institute of Australia 2003 Ellington Apartments QLD Urban Renewal Urban Development Institute of Australia 2003 King Street Wharf NSW Medium Density Housing Masters Builders Association 2003 Republic Apartments QLD Professional Excellence in Building Award Australian Institute of Building (AIB) - Building & Construction Projects $10 to $25M 2003 Summit Apartments VIC High Commendation - Professional Australian Institute of Building (AIB) Excellence Building & Construction Award $25M - $50M 2002 King Street Wharf NSW Excellence in Housing Home Units Masters Builders Association $250,000 - $500,000 2002 Embassy Apartments SA 2002 Excellence in a Medium Density Masters Builders Association Development over five dwellings 2001 The Wharf, Woolloomoolloo NSW Excellence in Refurbishment over $50M Masters Builders Association 2001 The Wharf Woolloomoolloo NSW Finalist - Australian Construction Australian Constructors Association and Achievement Award Engineers Australia 2001 Sur Mer Apartments QLD Excellence in Housing - Waste Masters Builders Association Management, Medium density 2000 Cathedral Place QLD Winner - Projects over $30M Australian Institute of Building (AIB) 2000 Cathedral Place QLD Residential accommodation over $30M Masters Builders Association 2000 Metropolis Apartments NZ Best International Project Masters Builders Association 1999 Cathedral Place QLD Urban renewal redevelopment site – Masters Builders Association unlimited value 1999 Crown Towers Resort QLD Professional Excellence Australian Institute of Building (AIB) 1999 Crown Towers Resort QLD Multi Unit Developments Australian Institute of Building (AIB) 1999 St James Apartments VIC Commendation over $30M Australian Institute of Building (AIB) 1999 St James Apartments VIC Professional Excellence over $30M Australian Institute of Building (AIB) 1999 Moore Park Gardens Stages NSW Presidents Award Australian Institute of Architects 1 - 4 1999 Wondakiah NSW Adaptive Re-use Open Masters Builders Association 1999 Mounts Bay Village Stage 1 WA Division 8 Winner over $10M Masters Builders Association 1998 Rockman’s Regency Towers VIC Professional Excellence in Building Australian Institute of Building (AIB) 1998 Rockman’s Regency Towers VIC Winner - Excellence in Health & Safety Masters Builders Association 1998 The Georgia Apartments NSW Excellence in Housing Home Units over Masters Builders Association $250k 1997 Sydney Campus Apartments NSW Excellence in Construction - Restoration/ Masters Builders Association Renovation of Historic Building 1997 Glebe Gardens NSW Winner – Lifestyle Estates over $150k

47 Built to Outperform. The Multiplex Commitment Beyond bricks and mortar, we believe each project is an opportunity to outperform. When we build a new residential project we not only aim to produce a property asset with long term value for end users we focus on developing a flourishing precinct that will enhance the surrounding community and leave a lasting legacy.

53 For further information please contact Multiplex on [email protected] or:

New South Wales L22, 135 King St Sydney, NSW 2000 T: +61 2 9322 2400 F: +61 2 9322 2001

Western Australia Level 1, 123 St. George’s Tce Perth, WA 6000 T: +61 8 9483 0899 F: +61 8 9483 0898

Queensland Level 11, 324 Queen St Brisbane QLD 4000 T: +61 7 3907 4000 F: +61 7 3220 1177

Victoria Level 3, 499 Swanston Street Carlton, VIC 3053 T: +61 3 9353 3500 F: +61 3 9347 0031 www.multiplex.global