Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipated (upto May’18) of Progress Cost in Approx. Rs.Crore New Lines (PH-11) 1 Amravati- Narkher (138km) 668.34 Commissioned 100% 2 Ahmednagar- Beed-Parli Vaijnath 2271.50 Work in Progress 47% (250km) 3 Baramati-Lonand(54 Kms) 736.44 Work in Progress 50% Over all 95% Lonand- phaltan 4 Puntamba- Shirdi(16.40km) 98.13 Completed 100% 5 Wardha-Nanded (285 km) 3168.00 Work in Progress 15% 6 Indore-Manmad via Malegaon 8857.98 DPR under sanction - (368km) (Transferred to IPRCL by Board) 7 Pune - Nasik (265 km) 5341.68 DPR under sanction - 8 Vaibhavwadi-(107 km) 3438.51 Work transferred to - IPRCL by Rly. Board 9 Karad – Chiplun ( 112 km) 1201.00 DPR under sanction - 10 Jeur-Ashti- 78 Km. 1560.00 DPR under finalisation - 11 Phaltan- Pandharpur 105 Km. 1149.00 DPR under sanction - 12 Hatkanangale- . 8 Km. 191.59 DPR under sanction - Doublings (PH-15) 1 Panvel - Pen (35 km) 277.00 Commissioned 100% 2 Pen - Roha (40 kms) 371.85 Commissioned 100% 3 Godhani-Kalumna chord (13.7km) 59.13 Completed 100% (6 Km C.Rly) (CR Portion) 4 -Kasara 3 rd line. 792.89 Work in Progress 18% 5 Third line between Bhusawal- 199.12 Work in progress 35% Jalgaon 6 Wardha – Sewagram NGP 3 rd line 540.02 Work in Progress 15% 7 Constn of 3rd line between 175.66 Work in Progress 30% Teegaon and chichonda 8 Wardha - Ballaharshah 3rd line 1272.19 Work in Progress 5% 9 Itarsi-Nagpur (Bal. 3rd line) 2449.91 Work started. 1% 10 Pune-- Londa 2436.57 Work in progress - 11 Daund- Manmad (236 Kms) 20.87.27 4 Tender for E/W & - Minor bridge opened 12 Manmad- Jalgaon 3rd line(160Kms) 1035.16 DPR sanctioned - &Tender process started. Work is in progress. 13 Wardha- Nagpur 4th line (76Kms) 637.95 DPR sanctioned 10% 14 Jalgaon- Bhusawal 4th line (24 Kms) 261.37 Work is in progress 10% Traffic Facility Works (PH-16) 1 Bagmar-Loop lines in both directions 11.67 Completed 100% 2 Igatpuri Extn. of PF line No. 1,2,3,4 19.01 Work in Progress 73% for 24coaches 3 Kasara – Extension of 3 R&D lines 19.99 Work in Progress 66% in UP yard & 3 R&D lines in DN Yard. 4 – Extn of R&D lines connecting 34.76 Work in Progress 60% UP yard to Karjat-PNVL line & 4 th line between KJT- Palasdari Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipated (upto May’18) of Progress Cost in Approx. Rs.Crore 5 Jalgaon yard remodeling 31.30 Completed 100% 6 Akola-Yard remodeling 6.10 Completed 100% 7 Kalamboli Yard-2 nd goods line 9.24 Completed (sundry 92% work is in progress) 8 Lokmanya Tilak Terminus - 64.10 Work in Progress 5% Augmentation of coaching facilities 9 Panvel - Kalamboli coaching terminus 154.00 Work in Progress 10% (Phase-I) (Stage-I) (1/3Rly.+2/3 CIDCO) 10 Wardha-Chidoda-2nd goods line 21.08 ESP approved. - Estimate sanctioned. 11 CSTM Exn. Of platform 60.48 Work in Progress 10% Nos.10,11,12,13 for dealing 24. 12 Itarsi- Amla-Nagpur- Wardha-BSL- 58.02 Detailed estimate - Jalgaon (713.88 Km.) Longer Loop sanctioned 13 Pune - Daund - Chord line for 29.10 Land acquisition in - connecting with progress. 14 Bhusawal - Separate up & down 49.67 Work in Progress 10% main lines 15 Pune - Extension of platform for 51.85 ESP approved. Estimate - 24/26 sanctioned. Work being taken up. 16 Hadapsar - Development as satellite 34.71 Work in progress. - terminal 17 Ajni - Development as satellite 45.33 Work in Progress - terminal 18 Kalyan-Segregation of long distance 961.25 DPR sent to MRVC - and suburban Traffic and unification of Goods Yard (Part of MUTP-III/A ) 19 -Development of coaching 194.20 New Work-2018-19. - complex for long distance tranis in ESP under approval. place of workshop area Road Saftey Works (ROB/RUBs) Latest (PH-30) Anticipated Cost (Rly’s Share) 1 Niphad Road Over Bridge 6.45 Rly. Portion completed 100% 2 ROB 10.23 Work in Progress 60% 3 Kalyan -ROB 47/B 9.29 completed 100% 4 Shegaon-Road Over Bridge 10.06 Completed 100% 5 Narkhed-Road Over Bridge 8.49 Rly. Portion 100% Completed. 6 Pulgaon-Road Over Bridge 6.07 Planning Stage 1% 7 Nagargaon – ROB in lieu of LC gate 10.08 Detailed estimate under - No.32 sanction. 8 Rajapath – ROB in lieu of LC gate 13.50 Work in Progress 28% No.S-4 9 Mhasawad ROB in lieu of LC no. 144 9.55 Rly. Portion 100% completed. 10 Nandgaon-Chalisgaon Nagar Road 11.27 Completed 100% ROB in 11 Diva-ROB in lieu of level crossing 14.24 Planning Stage. - No.29-C 12 Thakurli-ROB in lieu of level 6.96 Rly. Portion completed. 100% crossing No.38- Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipated (upto May’18) of Progress Cost in Approx. Rs.Crore 13 -Kalyan-ROB in lieu of level 10.61 Rly. Portion completed 100% crossing No.28/C(Kharegaon) 14 Itarsi-Nagpur ROB in lieu of level 7.51 State Govt. of MP has not - crossing sanctioned the work. No.247. Work to be dropped. 15 Itarsi-Nagpur ROB in lieu of level 8.30 State Govt. of MP has not - crossing No.269 sanctioned the work. Work to be dropped. 16 Jawaharlal Nehru Port Trust Jasai 11.47 Work is in progress. 20% ROB in lieu of level crossing No.2 17 Diva--ROB in lieu of level 3.205 Planning Stage - crossing No.9 18 Panvel-Roha RUB in lieu of level 3.33 Work is in progress. 65% crossing No.20 19 Panvel-Jasai RUB in lieu of level 6.86 Work is in progress. 65% crossing No.26 20 Panvel-Jasai ROB in lieu of level 3.205 Planning Stage. - crossing No.23 21 Diva-Panvel ROB in lieu of level 3.20 Work is in progress 10% crossing No.6 22 Diva-Vasai ROB in lieu of level 3.20 Work is in progress 30% crossing No.4 23 Diva-Vasai ROB in lieu of level 3.20 Planning Stage - crossing No.8 24 Jasai-JawaharLal Nehru Port Trust 3.20 Work is in progress. 20% ROB in lieu of level crossing No.3 25 Diva-Panvel ROB in lieu of level 3.20 Planning Stage. - crossing No.9/C 26 Diva-Vasai ROB in lieu of level 7.09 Planning Stage. crossing No.1 27 Diva-Panvel RUB in lieu of level 9.49 Work is in progress. 60% crossing No.10 28 Diva-Vasai ROB in lieu of level 3.20 Work is in progress 10% crossing No.6 29 Gulbarga ROB construction of 14.15 Rly. Portion completed. 100% (Afzalpur) ROB LC- 83 B 30 Jalgaon ROB in lieu of LC no. 147 17.50 Planning Stage - 31 Ahmednagar- Daund ROB in lieu of 10.25 Planning Stage - LC no. 12 with land acquisition for approaches SH no.60 32 Daund-Solapur ROB in lieu of level 11.92 Work in Progress. - crossing No.23 33 Chindwara-ROB in lieu of level 10.80 Work in Progress. crossing No.PC-18 - 34 Kalyan-Igatpuri Road over bridge in 6.49 Tendering stage - lieu of level crossing No.51 35 Pune-Miraj-ROB in lieu of level 8.02 Planning Stage crossing No.109 36 Wardha-Nagpur Road over bridge in 12.94 Planning Stage - lieu of level crossing No.111 near Butibori village 37 Daund-Solapur ROB in lieu of level 10.75 GAD Approved. Estimate - crossing No.21 sanctioned. 38 Karjat-Lonavala-Road over bridge in 7.43 Planning Stage - lieu of of level crossing No.30 39 Pune-Miraj-ROB in lieu of level 10.46 Work is in progress. 40% Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipated (upto May’18) of Progress Cost in Approx. Rs.Crore crossing No.130 40 Wadi Yard-ROB in lieu of LC No.3( 9.15 Planning Stage 2 lane) 41 Solapur-Wadi-ROB in lieu of level 9.08 Planning Stage - crossing No.66 42 Wardha-Nagpur Road over bridge in 10.86 Tendering stage. - lieu of level crossing No.103 near Sindi 43 Solapur-Wadi-ROB in lieu of LC- 10. 89 Planning Stage - 91(2Lane) 44 Solapur-Wadi-ROB in lieu of level 9.16 Planning Stage -- crossing No.82 45 Bhusaval-Badnera-Road over bridge 7.19 Planning Stage - in lieu of level crossing No.7 46 Diva-Panvel RUB in lieu of level 3.85 Planning Stage - crossing No.2 47 Babupeth-Road over bridge in lieu of 12.83 Planning Stage - level crossing No.43/A & Chanda 48 Igatpuri-Bhusaval- (near )4 10.08 Planning Stage - lane Road over bridge in lieu of level crossing No.95 49 Bhusaval-Badnera (Nandura Yard) - 9.60 Planning Stage - Road over bridge in lieu of levelcrossing No.20 50 Bhusaval-Khandwa (Nimbhora)- 9.12 Planning Stage Road over bridge in lieu of level crossing No. 162 51 Igatpuri-Bhusaval (Kajgaon) - Road 13.69 Planning Stage - over bridge in lieu of level crossing No.126 52 Bhusaval-Khandwa (Raver) - Road 8.87 Planning Stage - over bridge in lieu of level crossing No. 171 53 Bhusaval-Khandwa (Savda) - Road 17.39 Planning Stage - over bridge in lieu of level crossing No. 169 54 Pune-Daund - Road over bridge in 12.20 Planning Stage - lieu of level crossing No. 3A atManjari 55 Pune-Miraj - Road over bridge in lieu 9.13 Planning Stage - of level crossing No. 47 56 Igatpuri-Bhusaval (Asoda) - Road 10.34 Planning Stage - over bridge in lieu of level crossing No.149 57 Miraj - Kolhapur - Road over bridge 9.13 Planning Stage -- in lieu of level crossing No.20 58 Pune-Miraj - Road over bridge in lieu 9.13 Planning Stage - of level crossing No.81 59 Miraj-Hubli - Road over bridge in lieu 9.13 Planning Stage - of level crossing No. 465 60 Panvel-Jasai - Subway in lieu of level 1.88 Work is in progress 20% crossing No.21 61 Pune - Miraj - Road over bridge in 14.85 Planning Stage - lieu of level crossing No.92 62 Pune - Miraj - Road over bridge in 16.50 Planning Stage - lieu of level crossing No.96 Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipated (upto May’18) of Progress Cost in Approx. Rs.Crore 63 Pune - Lonavala - Road over bridge in 13.59 Planning Stage - lieu of level crossing No.43 64 Pune - Miraj - Road over bridge in 17.10 Planning Stage - lieu of level crossing No.112 65 Nasik Road - Devlali- Road over 10.92 Execution of work not - bridge in lieu finalised of level crossing No.90 66 Chandur Yard - Road over bridge in 14.10 Planning Stage - lieu of level crossing No.70 67 Amla-NGP-2 lane ROB in lieu of 8.25 Planning Stage - level xing No. 290 68 Amla-NGP-2 lane ROB in lieu of 8.25 Planning Stage - level xing No. 282/A 69 Amla-NGP-2 lane ROB in lieu of 8.25 Planning Stage - level xing No. 288/A 70 Amla-NGP-2 lane ROB in lieu of 8.25 Planning Stage - level xing No. 282/B 71 Amla-NGP-2 lane ROB in lieu of 8.25 Planning Stage - level xing No. 290/B 72 Wardha-Ballharshah 2 lane ROB in 8.25 Planning Stage - lieu of level Xing No. 42 73 Amla- NGP -2 lane ROB in lieu of L- 8.25 Planning Stage - Xing No. 293 74 Godhani- Kalumna 2 lane ROB in 7.44 Planning Stage - lieu of level Xing No.KRD-1 75 NGP-Wardha 2 lane ROB in lieu of 8.25 Planning Stage - level Xing no 120 76 NGP-Wardha- 2 lane ROB in lieu of 8.25 Planning Stage - level Xing No. 108 77 Wardha-Ballharshah 2 lane ROB in 8.25 Planning Stage - lieu of level Xing No. 19 78 Wardha-Ballaharshah 2 lane Road 8.25 Planning Stage - over bridge in lieu of level xing No. 27 79 Wardha-Ballaharshah 2 lane Road 8.25 Planning Stage - over bridge in lieu of level xing No. 34 80 Wardha-Ballharshah 2 lane ROB in 8.25 Planning Stage - lieu of level Xing No. 40 81 Tadali-Ghugus 2 lane ROB in lieu of 7.44 Planning Stage - level xing No. 39/G 82 NGP-Wardha- 2 lane ROB in lieu of 8.25 Planning Stage - level Xing No. 116 83 Tadali-Ghugus 2 lane ROB in lieu of 7.44 Planning Stage - level xing No. 39/A 84 Wardha-Badnera 2 lane ROB in lieu 8.25 Planning Stage - of level Xing No. 74 85 Amla -Nagpur- 2 lane ROB in lieu of 8.25 Planning Stage - level crossing No. 282 86 Bilavadi Yard Road over bridge in 18.18 Planning Stage - lieu of level xing gate No. 117 87 Bilavadi- Nandre Road over bridge 12.92 Planning Stage - in lieu of level xing gate No. 119 Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipated (upto May’18) of Progress Cost in Approx. Rs.Crore 88 Murtizapur- Yard in lieu of level xing 9.18 Planning Stage - No. 50/A 89 Panvel-Roha Road over bridge in 9.87 Planning Stage - lieu of Padma level crossing gate No. 52 90 Panvel -Roha Road over bridge in 15.83 Planning Stage - lieu of Ashtmi level crossing gate No. 57 NEW Work 2018-19 (Umbrella Work ) 91 Badnera-Amravati-Proposed 8.35 New work 2018-19 - construction of ROB in liue of existing LC No. S-1 at Kms. 664/11- 12 on BD-AMI section on cost sharing basis (WP No: 30003) 92 Badnera-Amravati-Proposed 7.89 New work 2018-19 - construction of ROB in liue of existing LC No. S-3 at Kms. 668/08- 09 on BD-AMI section on cost sharing basis (WP No: 30004) S&T Works (PH-33) - 1 Pune-LNL-track circuiting with ABS 23.65 Work in Progress 80% (122.83 km) (B route) 2 Bhusawal Goods Yard -Repl. of worn 15.33 Work in Progress 68% out level of points & signals & merger of GC-2, GC-4 with 3 C.Rly isolation & upgradation 18.98 Work completed 100% alteration of signals (9 stations) 4 Kamshet-Pune-Track equipment of 4.35 Work in Progress 10% auxillary warning system Workshops & Sheds (PH-42) 1 – Modernization of 39.88 Completed 100% workshop 2 Wadi Bunder – Four maintenance 46.06 Work in progress 35% sidings and extension of IOH shed 3 Pune(Diesel loco shed)- 9.51 Completed 100% Infrastructural maintenance 4 Pune diesel loco shed augmentation 29.45 Planning Stage of capacity by 50 HP diesel locos 5 Ajni TRS – augmentation of homing 14.95 Work in progress. 50% capacity of Electric Locoshed from 175- 200 loco. 6 Nasik Road- Setting up of shop for 52.78 New Work 2018-19 - overhauling/repairing of wheels traction machine workshop Staff Quarters (PH-51) 2 Pune – Transit Type IV-24 units 6.50 Completed 100% 5 Parel - RB I (80 units) & RB-II qrs 8.43 Contract awarded. - 24 units Work to be started. 6 Pune Divn - Type-II - 77 units 7.33 Completed 100% 7 Pune – Type V-10 units & type-Spl 5.83 Completed 100% unit 9 Mahalakshmi Chawl .Replacement 26.81 Planning stage. - of quarters K type with RB- II-151 Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipated (upto May’18) of Progress Cost in Approx. Rs.Crore units. Staff Amenities (PH-52) 1 BB/GS Repl.of AC Plant of 3.23 Completed 100% auditorium and operation theatre, post-operative & ICCU at Hospital 2 Byculla Hospital-construction of 4.16 Completed 98% patients rest house 3 PA const. of officers club for new 3.29 Completed 100% divn. Passenger Amenities (PH-53) 1 Kalyan - Remodelling & 4.65 Completed 100% improvement of station 2 LTT - New station building. 23.96 Completed 100% 3 LTT – Integration of new station 10.82 Completed 100% building by sub-way. 4 Amravati New terminal station 6.62 Completed 100% building with circulating area & new P/F 5 Amravati washable apron 2.95 Completed 100% 6 Daund: Repl. of existing FOB at 8.99 Completed 100% Solapur end by 6m wide. 7 Pune – Widening of existing centre 11.64 Work in progress 35% FOB by 12 m & provision of ramp in 2 n d FOB at MB end Other Specified Works (PH-64) 1 Pune New Division 24.51 Completed 100% 3 Thakurli – Const of 12 th battalion 56.00 Work in Progress 60% Rly Protection 4 Pune – Setting up of balance 8.76 Work completed 100% divisional office (Phase-II) 5 – Construction of G + 2 ½ 3.08 Completed 100% structures for RPF Barrack 6 CST – Construction of new 5.16 Work in Progress 50% running room 7 Nagpur setting up of Indian Rly. 21.25 Planning stage - Institute Adv. Electrical Technology. Training/HRD (PH-65) 1 New IRICEN bldg -Ph I 8.38 Completed 100% 2 Nasik Road -Shifting of RPF 6.59 Completed 100% training centre 3 New IRICEN bldg -Ph-II 16.32 Completed 100% 4 Nasik-Facilities for training of 15.70 All work completed 100% electrical supervisors except Borewell 2 Byculla-Centralised hostel building 5.26 Work in Progress 19% at S&T Workshop 5 ZRTI BSL – const. of Hostel 4.94 Completed 100% 6 Pune – Centralised training 8.59 Completed 100% Institute for

MTP Projects On cost sharing Details of Projects with Construction Organisation SN Name of work Latest Present Status Percentage Anticipated (upto May’18) of Progress Cost in Approx. Rs.Crore with CIDCO) PH-81 1 Belapur-PNVL-Doubling of 437.78 Completed 100% commuter line as part of East-West corridor 10.9Km 2 Thane----Part of 564.56 Completed 100% Corridor No.1 in New Mumbai 3 Belapur-Seawood--Electrified 1781.98 Work in Progress 48% double line MUTP(III) New work 2018-19 4 Kalyan-Asangaon 4th line 1759.16 DPR under preparation - MRVC Projects 1 EMU maintenance facilities II 95.95 Work in Progress 85 % 2 Stabling lines II 93.97 Work in Progress 80% 3 CSTM- 5 th & 6 th Line 890.89 Work in Progress 3%