26th Annual International Bridge Conference 2009
IBC 2009: Meeting Bridge Challenges in Challenging Times
Pittsburgh, Pennsylvania, USA 14-17 June 2009
ISBN: 978-1-61567-799-3
Printed from e-media with permission by:
Curran Associates, Inc. 57 Morehouse Lane Red Hook, NY 12571
Some format issues inherent in the e-media version may also appear in this print version.
Copyright© (2009) by the Engineers Society of Western Pennsylvania All rights reserved.
Printed by Curran Associates, Inc. (2010)
For permission requests, please contact the Engineers Society of Western Pennsylvania at the address below.
Engineers Society of Western Pennsylvania Pittsburgh Engineers Building 337 Fourth Avenue Pittsburgh, Pennsylvania 15222
Phone (412) 261-0710 Fax: (412) 261-1606 www.eswp.com
Additional copies of this publication are available from:
Curran Associates, Inc. 57 Morehouse Lane Red Hook, NY 12571 USA Phone: 845-758-0400 Fax: 845-758-2634 Email: [email protected] Web: www.proceedings.com TABLE OF CONTENTS
FEATURED AGENCY Chair: Tom Macioce
IBC 09-FA-01 Evolution of Bridge Inspection ...... 1 Lance Savant
IBC 09-FA-02 PennDOT’s Quality Assurance and Inspection Program for Bridge Fabrication...... 6 Robert Horwhat, Joseph Bracken III
IBC 09-FA-03 PennDOT’s 100 Year Bridge Summit - Putting the Plan into Practice...... 9 Kristin Langer
IBC 09-FA-04 Historic Bridges of Pennsylvania: An Industrial Legacy in Transit...... 13 Kara Russell
IBC 09-FA-05 PA Bridge Risk Assessment Strategy ...... 21 Anthony McCloskey
DESIGN, PART 1 Chair: Gerald Pitzer
IBC 09-01 Digitally Optimized Structural Design and Manufacturing Inspire Novel Footbridge Typologies...... 28 Sigrid Adriaenssens, Laurent Ney, Eric Bodarwe, Vincent Dister
IBC 09-02 Avenues Walk Flyover ...... 33 Samuel Spear
IBC 09-03 Design of a Four-Span Steel Bridge with Challenging Site Conditions, Numerous Geometric Constraints, Geotechnical Concerns and Three Abutments ...... 41 James Andrews, Ahmad Ahmadi, Keith Michael
IBC 09-04 Dynamic Amplifications in Bridge Pier Design Forces Under Barge-Bridge Collision Loading...... 49 Michael Davidson, Gary Consolazio
IBC 09-05 Maple-Oregon Double Leaf Rolling Lift Bascule Bridge ...... 57 Todd Ude, Ken Smorynski
DESIGN-BUILD Chair: William Rohleder Jr.
IBC 09-06 I-35W: Soaring over the Mississippi River in Eleven Months ...... 63 Alan Phipps, Kevin Western
IBC 09-07 The Christopher S. Bond Cable-Stayed Bridge ...... 66 Patrick Cassity, Tom Skinner
IBC 09-08 Design of the Indian River Inlet Cable Stayed Bridge...... 72 Kenneth Butler, Glen Allen, Douglass Robb, Peo Halvarsson
IBC 09-09 Bridge Design Along Sea-to-Sky Highway ...... 80 Schaun Valdovinos
IBC 09-10 Design/Build Collaboration: Contractor, Engineer & Steel Fabricator ...... 88 Daniel Rogers, Tom Wandzilak
BRIDGE EVALUATION Chair: Jeffrey Campbell
IBC 09-11 Emergency Gusset Plate Repair under Live Load...... 95 Michael Malloy
IBC 09-12 The Smith Street Bridge: Rehabilitation of a Cantilever Deck Truss...... 102 C. Michael Cooper, Thomas Hack
IBC 09-13 McKinley Bridge Reconstruction...... 103 Anne Zweibel, Jeffrey Routson
IBC 09-14 Rehabilitation of the Ramsdell Road Bridge...... 109 Matthew Low, Edward Weingartner
IBC 09-15 Three-Dimensional Analysis and Load Rating of the Innerbelt Bridge...... 117 Daniel Baxter, Jeff Broadwater, Toader Balan
IBC 09-16 Developing a Novel pH Buffer Methodology to Inhibit Corrosion of Steel Reinforcement in Concrete ...... 125 Michael Loy
CONSTRUCTION Chair: Calvin Boring
IBC 09-17 Post Tsunami Bridge Reconstruction in Indonesia...... 138 Robert Magliola
IBC 09-18 An Improved Link for Safety and Security, New Florida Avenue Bridge, New Orleans, Louisiana ...... 145 Kirti Pancholi
IBC 09-19 Innovative Widening Truss Erection of the Huey P. Long Bridge...... 153 John Brestin, Hans Hutton, Keith Jacobson
IBC 09-20 Wind Loads on Steel Box Girders During Construction Using Computational Fluid Dynamic Analysis ...... 159 Glenn Myers, Ali Ghalib
IBC 09-21 Design and Construction Aspects of Post-Tensioned Concrete Incrementally Launched Bridges...... 178 Teddy Theryo, Antonio Ledesma, Seungwoo Lee, Paul Towell
IBC 09-22 I-76 Allegheny River Bridge Pennsylvania's First Long Span Cast-In-Place Concrete Segmental Bridge...... 190 Garrett Hoffman, Gary Graham
IBC 09-23 Construction of the Pomeroy Mason Cable Stayed Bridge...... 192 Jorge Suarez, Don Tillis
CONTEXT SENSITIVE DESIGN Chair: Thomas Leech
IBC 09-24 Boulevard of the Allies Bridge Over Forbes Avenue...... 200 Cheryl Moon-Sirianni, Robert Pintar Jr., Patrick Hassett
IBC 09-25 Towards Green Bridges ...... 209 Scott Snelling
IBC 09-26 Design and Performance of Riveted Bridge Connections...... 229 William Vermes
IBC 09-27 Replacement of Historic Tied Through Arch Bridge ...... 237 Daniel Rogers, Quentin Rissler
IBC 09-28 Urban Planning and the Design of Bridges: A Case Study ...... 243 Thomas Piotrowski, Bruce Chamberlin
IBC 09-29 Total Integration of Architecture, Engineering and Construction Realities ...... 248 Michael Fitzpatrick, Jim Grube
IBC 09-30 Cable Stayed Bridges in City Centres...... 249 Pekka Pulkkinen, Erik Eriksson, Antti Karjalainen
LONG SPAN BRIDGES Chair: Carl Angeloff
IBC 09-31 Construction of the Kanawha River Bridge: A Record Segmental Span ...... 253 Santiago Rodriguez, Ahmed N.K. Mongi
IBC 09-32 Crossing the Han River...... 261 Radu Dragan
IBC 09-33 Performance Based Design of Long-Span Cable Stayed Bridge Towers ...... 269 Alp Caner, Cenan Ozkaya
IBC 09-34 Study on Flutter Control Measures of Long Span Bridge with Truss Girder Based on CFD Model ...... 276 Gao Liu, Tiancheng Liu
IBC 09-35 Study on Structural System of Sutong Bridge...... 277 Xigang Zhang, Hong Yuan, Minshan Pei, Liji Huang
IBC 09-36 A New Landmark Bridge to Da Nang City, Vietnam ...... 284 Esko Järvenpää, Sami Niemelä, Atte Mikkonen, Esko Leppäluoto
IBC 09-37 Structural Hardening for Cable Elements of Cable Supported Bridges...... 288 Nathan Sauer
BRIDGE MONITORING Chair: James Garrett
IBC 09-38 Monitoring System Behavior During Earthquake...... 296 Gilles Hovhanessian, Benoit Kroely, A. Vlamis-Stathopoulos
IBC 09-39 Fracture Critical Alaska Bridge Inspections Using Rope Access Techniques...... 299 Brian Leshko
IBC 09-40 Multi-Level Bridge Deck Evaluation Using Combined NDT Methods ...... 307 Kenneth Maser, B.C. Miller, D.L. Bohnsack
IBC 09-41 A Holistic Approach to Structural Health Monitoring of Bridges ...... 315 Donald Shaw, James H. Garrett Jr., Jacobo Bielak, Fernando Cerda
IBC 09-42 Fracture Damage Assessment and Monitoring of Cable Stayed Bridge Tie Down Anchorages...... 325 Adrian Ciolko, Christopher Ligozio, Joshua Derechin
IBC 09-43 Monitoring the 352 Meter Long Monaco Floating Pier...... 333 Gilles Hovhanessian, Benoit Kroely
IBC 09-44 Load Testing of Bridges at Logan International Airport...... 337 Evan Lowell
IBC 09-45 Overview of 40 Bridge Structural Health Monitoring Projects...... 343 Daniele Inaudi
IBC 09-46 Integrated Monitoring System of Bridges ...... 351 Cristian Comisu
DESIGN, PART 2 Chair: Kenneth J. Wright
IBC 09-47 Cable-Stayed Bridge across the Odra River, Czech Republic ...... 352 Jiri Strasky
IBC 09-48 Innovative Use of PC/PS Concrete for Light Rail Grade Separation...... 361 Thomas Barnard, Ahmad Abdel-Karim
IBC 09-49 Design Development and Construction of I-5 Beltline (Gateway) Pedestrian Bridge, Eugene /Springfield, Oregon ...... 369 Gary Rayor, Jiri Strasky
IBC 09-50 Utah’s First Segmental Bridge – A Bridge in Harmony with Nature ...... 377 Fred Doehring, Steve Fultz
IBC 09-51 Road Bridge Over the River Sil - Unique Design Simulations...... 382 Peter Barrett, Jorge Perez Armino
IBC 09-52 Impact of Construction Methods on Curved Post-Tensioned Concrete Box Girder Bridges ...... 389 Bo Hu, Dongzhou Huang
IBC 09-53 Effect of Skew Angles on a Simply-supported Curved Steel Plate Girder Bridge ...... 399 Jimin Huang
IBC 09-54 Design of Rail Transit Bridges Using the AASHTO LRFD Code ...... 411 Jeffery Wetmore
IBC 09-55 The Evolution of Segmental Bridge Construction in the State of Florida ...... 420 Timothy Barry
BRIDGE REHABILITATION 1 Chair: Richard Connors
IBC 09-56 Birmingham Bridge Rocker Bearing Failure & Retrofit ...... 428 Louis Ruzzi, Patrick Gaynor, Monica O'Neil, Jason Fuller
IBC 09-57 Design of Stay Cable Replacement for the Luling Bridge...... 436 Armin Mehrabi, Zac McGain
IBC 09-58 Chesapeake City Canal Bridge Back to Its Fatigue-Safe State...... 444 Ahmad Faqiri
IBC 09-59 Optimization of Isolation Bearing Parameters for Effective Mitigation of Seismic Risk for Bridges...... 448 Murat Dicleli, Memduh Karalar
IBC 09-60 Externally Bonded FRP Composites for the Rehabilitation of Reinforced Concrete T-beam Structures ...... 456 An Chen, Julio F. Davalos, Indrajit Ray, Adam Justice, Matthew Anderson, George Parish, William Sasher, Jeffrey Levan
IBC 09-61 Rehabilitation Challenges of the Route 35 Bridge Over Manasquan River ...... 466 Thomas Fisher, Rama Krishnagiri, Tam Silllick, George Kuhn
IBC 09-62 Exodermic Deck Repairs on the Kingston-Rhinecliff Bridge ...... 475 William Moreau
IBC 09-63 Managing Fatigue Cracks in Tub Girder Bridges...... 476 Henry Fix, Michael Chajes, Daniel Kucz, James Quiqley
IBC 09-64 Applying Suspension Bridge Suspender Rope Replacement Techniques to the Suspenders of a Through-Arch Bridge (Northway Twin Arch Bridges over the Mohawk River, Albany, NY)...... 484 Blaise Blabac, Barney Martin Jr.
BRIDGE MANAGEMENT/EVALUATION Chair: Donald W. Herbert
IBC 09-65 Bridge Information Modeling (BIM) and Advanced Measuring Methods - Case Laser Scanning In Renovation Design...... 492 Antti Karjalainen, Kirsi Hanninen
IBC 09-66 Comparison of Cost Effectiveness of Various Corrosion-Resistant Reinforcing Bars and Other Corrosion Protection Strategies for New Bridge Decks...... 496 John Lawler, Paul Krauss
IBC 09-67 Load Rating Bridge Substructure Units...... 513 Robert Bondi, Richard Schoedel
IBC 09-68 Comparison of Coating System Service Life Based on Type of Primer, Number of Coats and Surface Preparation Method ...... 520 Jayson Helsel
IBC 09-69 National Tunnel Inspection Standards (NTIS) ...... 528 Jesus Rohena y Correa
IBC 09-70 Data Fusion Of Bridge Inspection Data Using Learning Algorithm...... 534 Amin Hammad, Behzad M. Darban
ACCELERATED BRIDGE CONSTRUCTION Chair: Lisle E. William
IBC 09-71 A Precast Bridge System for Rapid Construction Applications ...... 535 Bruce Campbell, Martin Furrer
IBC 09-72 Riverdale Road Over I-84; Piecing it Together...... 541 Michael Arens, Fred Doehring
IBC 09-73 Design/Build of Bridge ...... 546 William Castle
IBC 09-74 Accelerated Bridge Construction Keeps Tappan Zee Bridge Open...... 551 Mohammad Shams, Kenneth Standig
IBC 09-75 Move the Bridge with Post-Tensioning Devices ...... 559 Jimin Huang
BRIDGE REHABILITATION 2 Chair: Matthew P. McTish
IBC 09-76 Structural Analysis of the Pulp Mill Covered Bridge...... 569 Sean James, Josif Bicja
IBC 09-77 Emergency Pier Repairs to the Kinney Truss Railroad Bridge, Colchester, New York...... 577 Michael Marks
IBC 09-78 Carnegie Interchange Rock Buttress Remediation...... 585 Daniel Martt, Gene Lipovich, Al Hajdarwish, William Adams Jr.
IBC 09-79 Rehabilitation of the 31st Street Bridge...... 594 Sean Hart, Donald Marburger
IBC 09-80 Rehabilitation of Route 50 Drawbridge Ocean City, MD ...... 602 Patrick O'Neill, Scott Reynolds
Author Index