Building a Premier African Gold Mining Company

Dr. John Clarke, President & CEO IPAD – DRC Mining & Infrastructure Indaba October 2014

Corporate summary

TSX, NYSE-MKT: BAA 252 million shares outstanding Debt: US$235.2 million Democratic Offices Republic of the Congo Toronto (Corporate) (Operations) Kinshasa (Government Relations)

Operations: Twangiza – Namoya – Maniema Kamituga – South Kivu Lugushwa – South Kivu

2014 gold production targets • Twangiza 90,000 to 100,000 oz • Namoya 21,000 to 22,000 oz

Twangiza – Targeting 90,000 to 100,000 ounces of gold in 2014

1 licensed Opportunity The Banro is focused 9500000 mN 9600000 mN 9700000 mN 450000 mE 3871 3876 43 Pangi

properties on the 210km Twangiza the 210km on properties

(with (with Registration Number) Prospecting Licenses (PR) Deposit Deposit location and Name Rivers (Permits (Permits For) Applied Outstanding application Track Main Roads and Towns Road under construction under Road Secondary/other roads (with (with Registration Number) Permits for Exploitation (PE) PR’s PR’s applied for; awaiting approval Lake

N

Legend

1552 500000 mE 1548

exclusively exclusively within

Kalole

Shabunda Extensive gold resource potential with 4 4 withmining potential resource gold Extensive

18

KAMITUGA

NAMOYA N2 238 Kabambare 1551

of the DRC

38 2601 600000 mE 600000 mE the South

1570 Kilembwe 1577 0 3871

LUGUSHWA 39 Kitutu

3883 37

Kilometres

36 1557

1572

1571

South Kivu South 1575 1573 Walungu

68 Lulimba Lwiko Kivu Kivu and Maniema provinces

Mwenga

44 50 1574

3872

1576

41

40

3877

3874

43

3875 3873 3876

N2

42

3878

TWANGIZA

700000 mE 700000 mE - L a k e K K a L i k e u v

Namoya Gold Belt Gold Namoya Baraka Bukavu Fizi Kamanyola

N5 N5

Uvira

9500000 mN 9600000 mN 9700000 mN

L a c T a n g a n y i k a

   along the way the along communities and Namoya both benefit to route this of maintenance ongoing to Committed route this along bridges ten of Reconstruction Uvira between roadof 420km than more upgraded Banro

and Namoya and

Twangiza Mine – oxide open pit mining

Key features & targets . Average grade – 2.7g/t Au to 2.9g/t Au for 2014 & 2015 . Target throughput rate of up to 1.7 mtpa . Target production of 9 -10,000oz/mo . Covered stockpile & ore handling area to mitigate effects of heavy rains

3 Namoya Mine – oxide open pit mining

PRE COMMERCIAL PRODUCTION

Activity . First gold pour Dec 2013 during commissioning of heap leach loaded carbon, elution and electrowinning operations . Targeting production of 9-10,000 oz/mo following plant enhancements (H2 2015)

Update . Modifications underway to enhance the plant to accommodate high fines content in Namoya ore

Community . MOU signed in October for community projects intended to improve education, health, infrastructure, sustainable economic development & employment prospects of the area

4 Exploration Projects – Kamituga & Lugushwa

Kamituga & Lugushwa potential for additional oxide resources

LUGUSHWA Resources (oxide) . Indicated: 0.73Moz; 17.03Mt @ 1.32g/t Au . Inferred: 0.4Moz; 8.86Mt @ 1.39g/t Au Resources (non-oxides) . 4.48Moz; 107Mt @ 1.34g/t

KAMITUGA Resources . Inferred: 0.92 Moz; 7.26 Mt @ 3.9g/t Au

5 Social Development: Ensuring the long term development of the belt

. The Foundation is the mechanism to deliver Banro’s commitment to corporate social responsibility throughout its communities in the DRC . Registered in the DRC as a charity with a mandate to support  Education  Health  Infrastructure  Humanitarian assistance . Planned funding formula  1% of net profits  $1/ounce of gold produced  External funding events . Full pipeline of community projects for 2014 with budget of approximately $1.58 million  Completion of women’s university residence in Kindu  Expansion of market area at Luhwindja  3 new medical facilities at Namoya, Lugushwa & Kamituga

. Engaging with civil society and NGOs

6 Infrastructure Foundation Exploration $273.9M Namoya $235.5M Invested Invested Plant & Invested Banro $5.0M

9500000 mN 9600000 mN 9700000 mN 450000 mE 3871 3876 43 Pangi

(with (with Registration Number) Prospecting Licenses (PR) Deposit Deposit location and Name Rivers (Permits (Permits For) Applied Outstanding application Track Main Roads and Towns Road under construction under Road Secondary/other roads (with (with Registration Number) Permits for Exploitation (PE) PR’s PR’s applied for; awaiting approval Lake

N

Twangiza Legend

1552 Less road and other related infrastructure projects 500000 mE 1548

Kalole

Shabunda

- 18 Namoya Gold Belt (DRC)Belt Gold Namoya Investment in the Eastern Eastern the DRC in Investment

KAMITUGA

NAMOYA N2 238 Kabambare 1551

38 2601 600000 mE 600000 mE

1570 Kilembwe 1577 0 3871

LUGUSHWA 39 Kitutu

3883 37

Kilometres

36 1557

1572

1571

South Kivu South 1575 1573 Walungu

2004 68 Lulimba Lwiko

Mwenga

44 50 1574

3872

1576

41

40

3877

3874

43

3875 3873 3876

N2

42

3878

TWANGIZA

700000 mE 700000 mE L a k e K K a L i k e u v

Baraka Bukavu – Fizi Kamanyola

N5 N5

Sept 30, 2013Sept 30,

Uvira

9500000 mN 9600000 mN 9700000 mN

L a c T a n g a n y i k a

$824.5M (to Dec 2013) Infrastructure DRC Taxes Invested Twangiza $247.9M $62.2M Invested Total Total Plant &

10 rehabilitated bridges – Uvira to Namoya road

8 Foundation Community Projects

Panzi Women’s Hospital

Luhwindja community market 9 Banro - Building a Premier African Gold Mining Company

Further information on Banro please contact: Further information on the Banro Foundation please contact: Naomi Nemeth - Investor Relations E: [email protected] Martin Jones, Chairman T: +1 416 366 2221 E: [email protected] www.banro.com T: +1 416 366 2221

10 www.banro.com