OUTDOOR PARKING SYSTEM INSTALLATION Tell Us What You Think
Total Page:16
File Type:pdf, Size:1020Kb
Customer Service 800.783.7257 sarisinfrastructure.com OUTDOOR PARKING SYSTEM INSTALLATION Tell Us What You Think sarisinfrastructure.com/feedback Register your product for updates sarisinfrastructure.com/registration Thanks for purchasing a Saris Infrastructure product! The rack you are about to install was USA born and bred. The steel came from a foundry in the Midwest and was deliv- ered to our manufacturing facility in Madison, WI. Under our watchful eye it was bent and welded. After having a finish applied locally, it has made its way to you. Bicycle racks are amazing pieces of infrastructure. A simple bent piece of steel can unlock the incredible tool the bike can become. A secure parking rack makes communities and businesses healthier and happier. They eliminate one of the major obstacles for people not choosing to travel by bike: secure bike parking at their destination. So put a smile on your face as you place this rack into position because you are making the world a better place. Please read and understand the following instructions before beginning your installation. Everyone here at Saris wants you to be happy with this product. Please contact us ([email protected], 800-783-7257) should you need anything. 3 Table of Contents I. Below Grade Mount Page 2 II. Flange Mount Page 3 A. Temporary and Temporary Secure Hardware Installation Page 4 B. Permanent Installation Page 6 III. Corral Mount Page 7 Corral Assembly Page 7 Corral Installation Page 8 A. Temporary and Temporary Secure Hardware Installation Page 9 B. Permanent Installation Page 9 C. Cement Anchor Installation Page 11 D. Earth Anchor Installation Page 11 E. Asphalt Anchor Installation Page 12 IV. Baseplate Mount Page 13 Baseplate Assembly Page 13 Baseplate Installation Page 16 4 I. Below Grade Mount I. Below Grade Mount I. Below Grade Mount 1. Determine desired location and dig mounting holes 17” below grade. 2. Fill hole 1/3 full with gravel. 3. Lower unit into holes and fill remainder of hole with cement. Verify the height of the rack to 1. Determine desired location and dig mountinggrade is correct.holes 17” below grade. 2. Fill hole 1/3 full with gravel. 4. Support unit with spacers, such as cinder 3. Lower unit into holes and fill remainderblocks, of hole until with cement cement. sets. Verify the height of the rack to grade is correct. 4. Support unit with spacers, such as cinder blocks, until cement sets. 1. Determine desired location and dig mounting holes 17” below grade. 2. Fill hole 1/3 full with gravel. 3. Lower unit into holes and fill remainder of hole with cement. Verify the height of the rack to grade is correct. 4. Support unit with spacers, such as cinder blocks, until cement sets. 5 II. Flange Mount II. Flange Mount A. Temporary Mount (P/N 28879)A . &Temporary Temporary Mount Secure (P/N 28879) & Temporary Secure Mount (P/N 26270)-Sold Separately Mount (P/N 26270)-Sold SeparatelyA. Temporary Mount (P/N 28879) & Temporary Secure Mount (P/N 26270)-Sold Separately Circle dock Temporary Mount (P/N 29164) & Temporary Secure Mount (P/N 29163)-sold separately Circle dock Temporary Mount (P/N 29164) & Temporary Secure Mount (P/N 29163)-sold separately Circle dock Temporary Mount (P/N 29163) & Temporary Tools Needed for Installation (Sold by Saris) Secure Mount (P/N 29164)-sold Toolsseparately Needed for Installation (Sold by Saris) • nchor et Tool P/N 83 Tools Needed for Installation (Sold• bynchor Saris) et Tool P/N 83 • Anchor Set Tool P/N 25683 • Penta ecurit ocet P/N 680 only needed or temporar secure installation) • Penta Security Socket P/N 27126• Penta ecurit ocet P/N 680 only needed or temporar secure installation) (only needed for temporary secure installation) Tools Needed for Installation (InstallerTools Provides) Needed for Installation (Installer Provides) • Tape Measure Tools Needed for Installation (Installer Provides) • ½” Masonry Drill Bit Drill (Hammer• drillTape recommended) easure • •Tape ½” easure Masonry Drill Bit Drill (Hammer drill recommended) • Hammer • •½” MasonryHammer Drill Bit Drill (Hammer drill recommended) • 3/8” drive ratchet • •Hammer 3/8” drive ratchet • Marker or Pencil • •3/8” arer drive ratchet or encil • arer or encil • 7/32” hex key • 7/32” he e 6 • Level • •7/32” eel he e • eel *DO NOT THROW AWAY THE PENTA SOCKET AFTER COMPLETING THE INSTALLATION. YOU WILL NEED IT TO REMOVE THE *DOEQUIPMENT NOT THROW IF AWAY THAT ISTHE NECESSARY. PENTA SOCKET AFTER COMPLETING THE INSTALLATION. YOU WILL NEED IT TO REMOVE THE EQUIPMENT IF THAT IS NECESSARY. 1. lace the rac in the desired location see setbacs document). se a marker or encil to outline the holes of the lange onto the 1. lacebase the material.rac in the e desired recommend location checing see setbacs the hole document locations). seater a eachmarker new or anchor encil tois placed.outline theEnsure holes the of holes the lange are at onto least the 6” baseawa material. rom anye recommendcracs in the checingbase material. the hole locations ater each new anchor is placed. Ensure the holes are at least 6” .awa The rom concrete any cracs anchor in the (a.k.a base “drop material. in anchor”) is a female anchor designed for use in solid concrete only and cannot be used in . The bricconcrete or bloc anchor base (a.k.a material. “drop The in anchor”) anchor sie is a isfemale designated anchor by designed the inside for diameter use in solid of the concrete anchor. only The and diameter cannot of be the used hole in to be bricdrilled or bloc is the base same material. size as The the anchor outside sie diameter is designated of the anchor by the whichinside diameteris ½”. of the anchor. The diameter of the hole to be .drilled hen is the astening same size to solidas the concrete outside withdiameter a drop of inthe anchor anchor a which hole must is ½”. first be drilled into the concrete. hammer drill should be . henused astening as it will to drill solid the concrete best quality with hole.a drop nce in anchor the bit a is hole inserted must into first the be drilledhammer into drill the the concrete. depth of thehammer hole todrill be should drilled be can usedeasily as it willbe set drill by the using best the quality depth hole. gauge nce on the drillbit is or inserted by wrapping into the the hammer bit with drilltae theat the depth reuired of the deth. hole to e be drilrecommendled can a drill easilydeth be set o by1-5/8” using deep the depthso that gauge the anchor on the just drill sets or by down wrapping flush with the bitthe with surface. tae at the reuired deth. e recommend a drill deth o 1-5/8” deep so that the anchor just sets down flush with the surface. efore starting to drill the hole, it is imortant that ee and ear protection are used. ake sure the hammer drill is in the . eforehammer starting mode to drill and the start hole, drilling it is imortantour hole. thatontinue ee and drilling ear protectionuntil the tae are onused. the ake bit or surethe drillthe hammergauge meets drill theis in base the material- hammerthis means mode thatand startthe reuired drilling our deth hole. has ontinuebeen reached. drilling until the tae on the bit or the drill gauge meets the base material- this means that the reuired deth has been reached. A. Temporary Mount (P/N 28879) & Temporary Secure Mount (P/N 26270)-Sold Separately Circle dock Temporary Mount (P/N 29164) & Temporary Secure Mount (P/N 29163)-sold separately Tools Needed for Installation (Sold by Saris) • nchor et Tool P/N 83 • Penta ecurit ocet P/N 680 only needed or temporar secure installation) Tools Needed for Installation (Installer Provides) • Tape easure • ½” Masonry Drill Bit Drill (Hammer drill recommended) • Hammer • 3/8” drive ratchet • arer or encil • 7/32” he e • eel *DO NOT THROW AWAY THE PENTA SOCKET AFTER COMPLETING THE INSTALLATION. YOU WILL NEED IT TO REMOVE THE EQUIPMENT IF THAT IS NECESSARY. *DO NOT THROW AWAY THE PENTA SOCKET AFTER COMPLETING THE INSTALLATION. YOU WILL NEED IT TO REMOVE THE EQUIPMENT1. IF PlaceTHAT ISthe NECESSARY. rack in the desired location (see setbacks document). Use a marker or pencil to outline the holes of the flange onto the base material. We recommend checking the hole locations after each new anchor is placed. Ensure 1. lace the rac in the desired location see setbacs document). se a marker or encil to outline the holes of the lange onto the base material.the holese recommend are at least checing 6” away the from hole anylocations cracks ater in eachthe base new anchormaterial. is placed. Ensure the holes are at least 6” awa rom2. Theany cracsconcrete in the anchor base material.(a.k.a “drop in anchor”) is a female anchor designed for use in solid concrete only and cannot be . The concreteused anchor in brick (a.k.a or “drop block in base anchor”) material. is a female The anchor anchor designedsize is designated for use in solid by the concrete inside only diameter and cannot of the be anchor. used in The diameter bric or blocof thebase hole material. to be Thedrilled anchor is the sie same is designated size as theby the outside inside diameter diameter of the anchor.anchor Thewhich diameter is ½”. of the hole to be drilled 3.is theWhen same fastening size as the to outside solid concrete diameter withof the a anchor drop in which anchor, is ½”. a hole must first be drilled into the concrete. A hammer drill .