M/s .Kakade Stone Crusher

PPRREEFFEEAASS IIBBIILLIITTYY

SSTTUU DDYY

FFOO RR

MM//ss KKaakkaa ddee SSttoonnee

CCrruuss hheerr

Sadekar Enviro Engineers Pvt. Ltd Page 1

M/s .Kakade Stone Crusher

Executive summary

M/s Kakade Stone Crusher. have applied for quarrying lease over an area of 1.60 Ha. In the Gut No. 148 part, Mangrul Village, Taluka - Maval, District- , , with excavation capacity of the 2502 Brass/A

The major highlights of the project are:

 The project comes under non agriculture land.

 Project site has proper road accessibility.

 No displacements of settlement are required.

 No sensitive places of notified archaeological, historical or tourist importance within or nearby the buffer zone.

Project Description

Location: The site is located at Gut No. 148 part, Village Mangrul, Taluka - maval, District- Pune, Maharashtra. The site is accessible from Ambi-Ambale Road at a distance of 630 m.

Land: The site area has other quarries in its surrounding and is devoid of any vegetation. The land provided for stone mining is 1.60 hectare to the project proponent. The elevation contour difference in the lease area is about15 metres over a distance of 100 m.

Co-ordinate: The coordinates of the plant site are as below – Sr. No. Pillar no. Latitude Longitude 1 A 18°46’58.0” 73°39’16.0” 2 B 18°46’58.9” 73°39’19.3” 3 C 18°46’55.5” 73°39’19.5” 4 D 18°46’53.21” 73°39’19.66” 5 E 18°46’53.15” 73°39’16.25” 6 F 18°46’56.40” 73°39’16.10”

Water: Water requirement of the project will be met through the water tanker. Company does not exploit any surface or ground water resources; therefore no adverse impact is anticipated on water environment. The water requirement is estimated to be maximum of 2000 lit/day.

Electric Supply: The power requirement for the project will be Nil.

Sadekar Enviro Engineers Pvt. Ltd Page 2

M/s .Kakade Stone Crusher

Project Cost: The total cost of the project including all facilities is estimated to be INR 10 Lakh

Location: The project site falls under the district of Pune. The district Pune lies in the western part of the state of Maharashtra. is located between the north latitudes of 17 degrees 54 minutes and 10 degrees 24 minutes ,and east longitudes of 73 degree 19 minutes and 75 degrees 10 minutes east longitude. Pune district is bounded by Ahmadnagar District on north-east, solapur district on south-east, Satara district on the south, Raigad district on the west and Thane Distirct on the north-west. The District has a total geographical area of 15,642 square kilometers which is 5.10 percent of the total geographical area of the site . it is the second largest district in the state of Maharashtra.

Soil Quality: The soil quality around the Pune district mainly fall into three categories ordinary soil, red soil and brownish black soil. Ordinary or regular soil which is found Pune is fertile and useful for horticulture, paddy cultivation and vegetables. The soil is slightly deep, well drained, fine calcareous.

Meteorology: Average rainfall in the district is 600 to 700 mm. This is usually during the monsoon months from July - October. Moderate temperatures are mainly observed here. The rainfall is unpredictable in tune with the Indian monsoon. Summers here begin from early March to July. Summers are dry and hot. The temperature ranges from 20°C to 38°C, though at the peak they may reach 40°C. From November to January, is the winter season. Temperatures at the peak drop to single digits but usually they hover around 9°C to 14°C sometimes lowers up to 3°C. January to March are the months with moderate temperatures.

Water: Water needed for operation requirement shall be supplied by water tankers.

Ecology: There are no ecologically sensitive receptors or endangered species within the close vicinity of the quarry area. Since no extra land will be acquired during the operation of the project there will be no adverse impact on some of the environmental aspect. In the area of the project proponent clustered green belt is found in the vicinity, hence there will not be any kind of deforestation. No rare or endangered species of flora and fauna are present in the immediate vicinity as well as the study area. Thus, there will not be any adverse impact on flora and fauna.

Socio-economic: The project will provide positive impact on the economic development of the region in terms of employment opportunities. Moreover the above unit will be operating in an authorized mining land declared by the Govt. of . Therefore no population will be displaced.

Risk assessment plan: Risks likely to pose threat to man, environment or property associated with various activities are addressed in this report. Such activities include

Sadekar Enviro Engineers Pvt. Ltd Page 3

M/s .Kakade Stone Crusher transport, storage; handling and usage of fuels. All equipments vulnerable to explosion or fire would be designed to relevant IS codes and statutory regulations. Suitable fire protection system comprising of hydrants and spray systems are provided for fire protection. Fire extinguishers shall be tested periodically and always be kept in operational mode. Surrounding population shall be made aware of safety precautions to be taken in case of any mishap in project site. Adequate provisions like emergency response, material safety data sheet, command and control, capabilities, transportation, medical facilities, mitigation measures, training, education to control any disaster situation will be made available.

Disaster management plan Disaster Management Plan is envisaged with a goal to prevent hazards and accidents at work places by careful design, operation, maintenance and inspection of the mining machineries & equipments. All safety precautions and provisions for safety will be strictly followed. Suitable control measures will be adopted to take care of hazards/disasters that may occur during mining operation. Fire fighting, first aid provisions & safety appliances will be made available to the staff and their use will be regularly checked. Regular maintenance of all haulage roads & mining machinery as per manufacturer’s guidelines will be done.

Conclusion: The minor mineral project of stone miming will not have any adverse impact on the environment. As all the necessary measures has been taken to avoid any kind of pollution. Altogether the project will have a positive impact on social environment by providing employment opportunity for the skilled and unskilled labors living in the surrounding villages. Also the infrastructure around the site will be improved due to the project. The project proponent will help in building a green environment by providing plantation around the site.

Sadekar Enviro Engineers Pvt. Ltd Page 4

M/s .Kakade Stone Crusher

PREFEASIBILITY REPORT

1. INTRODUCTION OF THE PROJECT

1.1 Identification of the project proponent

M/s Kakade Stone Crusher have applied for quarrying lease over an area of 1.60 Ha. In the Gut No. 148 part, Mangrul Village, Taluka - Maval, District- Pune, Maharashtra, with excavation capacity of the 2502 Brass/A

M/s Kakade Stone Crusher has appointed M/s. Sadekar Enviro Engg. Pvt. Ltd to carry out Prefeasibility and EMP report for the existing project of their Minor Mineral Activity of the order 2502 Brass/A .

The major highlights of the project are:

 The project comes under non agriculture land.

 No displacements of settlement are required.

 No sensitive places of notified archaeological, historical or tourist importance within or nearby the buffer zone.

1.2 Crushing Activity No crusher installed in lease area.

1.3 Need of the Project The proposed mining production is covered under the Ministry of Environment & Forests Notification 2006. This report of Prefeasibility & Environmental Management Plan is given here as a part of the information to be furnished to the SEAC, Govt of Maharashtra for obtaining Environmental Clearance as per office Memorandum No. L-11000/47/2011/IA-II (M) dated 18.05.2012 .To meet the ever-increasing local demand for Crushed stone by the building industry and Construction Company the project proponent intends to produce the following quantities of crushed stones by Manual method of quarry activity. The year wise production and development details for the five years plan period are summarized in the table below.

Sadekar Enviro Engineers Pvt. Ltd Page 5

M/s .Kakade Stone Crusher

Table No. 1: Production Plan for Five years

Year Crushed Stone I 2502 Brass II 2502 Brass III 2502 Brass IV 2502 Brass V 2502 Brass Total 12510 Brass

1.4 Demand Supply Gap

Since it is an allied industry of the construction sector, growth in construction sector may be considered as proxy for the growth in stone crushing sector, i.e. around 7-8%. Crushed stone has a very minor share among the exports of non-metallic mineral products of India. It is observed that total export volume of the crushed stone has been very low, whereas, Marble has the highest share and remained at the top.

The market scope for crushed stone is found to be encouraging in local market with the increased demand from building industry & construction fields. There is also a sufficient demand from Govt. Contractors for laying of roads and construction of industries etc. The entry in the target market is easy and there is a narrow gap in the supply and demand, which is expected to grow in the coming years. The business opportunity to fill the demand and supply gap would be quite profitable.

1.5 Employment Generation

The establishment of this project will improve the socio-economic status of the surrounding area by way of direct & indirect employment. The Employment opportunity will be created for semi -skilled and specially unskilled people.

Sadekar Enviro Engineers Pvt. Ltd Page 6

M/s .Kakade Stone Crusher

2. PROJECT DESCRIPTION

2.1 Location:

M/s Kakade Stone Crusher have applied for quarrying lease over an area of 1.60 Ha. In the Gut No. 148 part, Mangrul Village, Taluka - Maval, District- Pune, Maharashtra, with excavation capacity of the 2502 Brass/A

Table No.2 SALIENT FEATURES OF LOCATION

Gut No. 148 part, Village Mangrul, Taluka - Project Site Maval, District- Pune, Maharashtra

latitude 18°46'55.87"N and longitude Co-ordinates 73°39’16.0”E Located at a distance of 630 metres from Ambi- Nearest Highway Amble Road. Nearest City City – Talegaon – 5 km approx.

Nearest Railway station Talegaon railway station – 6 km approx Average rainfall 700 mm Average temperature 20 to 38°C Average humidity 55 % Archaeological monument Not present in the 10 km radius of the site. The nearest human settlement is of village Human settlement which is beyond 500 m away from lease area.

Sadekar Enviro Engineers Pvt. Ltd Page 7

M/s .Kakade Stone Crusher

2.2 Land Distribution around Site

The project site is having quarry area, office area and shelter provided for the workers.

2.3 Size and Magnitude of Operation

The estimated cost of the project is going to be INR 10 Lakh, including a capital expenditure of INR 80,000 on environmental matters. It is expected that the recurring costs on environmental matters would be INR 12,000. The project capacity is 2502 Brass/ A

2.4 Present mining technology

The project proponent is using Shovel dumper system and manual method for the quarrying of stones. Controlled blasting will be done to develop crackers which will later be drilled out.

2.5 Water Sources

Water is required in the project site for various purposes like spraying to control the dust generation. Water is also used during the drilling process. The water requirement will be around 2.0 CMD. The source of the water will be water tanker.

Table No. 3: Water Consumption Details

Sr. No. Activities Demand (CMD) 1 Domestic Purpose 0.5 2 Mine a. Drilling 1.0 b. Dust Suppression c. Equipment/Vehicle washing 3 Green Belt 0.5 Total 2.0 CMD

2.6 Power Sources

The power requirement of the project will be nil.

2.7 Waste Generated

Sadekar Enviro Engineers Pvt. Ltd Page 8

M/s .Kakade Stone Crusher

The possible waste generated by the mining process will be some rejection which can be used for leveling of the land. No solid or liquid waste will be generated from the mining process.

2.8 Explosive Storage

Project proponent conducts explosions at site through help of licensed practioner. Hence there is no storage of explosives on the quarry site.

2. 9 Manpower

The total manpower is 10 people at the project site. Both the skilled and the unskilled labors are included. Table 4: Organization Table

Sr. No Category Operative Phase 1 Administrative 1 2 Supervisory 1 3 Skilled Worker 5 4 Unskilled Worker 2 5 Security 1

Sadekar Enviro Engineers Pvt. Ltd Page 9