Information Classification: PUBLIC AGENDA ITEM 4.1.2

STRATEJI AN YETH KERNEWEK

TOWL OBERANSEK 2020/21

CORNISH LANGUAGE STRATEGY OPERATIONAL PLAN 2020/21

Mis Ebrel 2020 / April 2020

Tevyans ha Displegyans Erbysek / Economic Growth & Development

Page 56 Information Classification: PUBLIC

Contents

1. Introduction

2. Delivery of the Strategy 2015-2025

3. Operational Plan for 2020-21

4. Resources

Towl Oberansek an Yeth Kernewek 2020/21 Cornish Language Operational Plan 2020Page/2 157 2 Information Classification: PUBLIC

1. Introduction

The adoption of the Cornish Language Strategy 2015-25 on 20th March 2015 marked a significant change in the delivery of the Cornish language programme. The new delivery structure was put in place in 2015/16 so that Council leads the Cornish language programme and provides official status, but the language remains reliant on the voluntary sector for many areas of delivery, particularly teaching and corpus work.

Each year, publishes an Operational Plan, setting out priorities and tasks for the year ahead that work towards the longer-term achievement of the 2015 Strategy. This is the fifth annual Operational Plan, and there is a separate end of year report setting out progress against last year’s Operational Plan.

Cornwall Council continues to fund the Cornish language programme, in order to provide continuity as language planning can only be effective over the longer term. This is intended to ensure the protection of our endangered language and support its continued use and contribution to economic and social life in Cornwall today. In 2019, further funding for Cornish language was secured from the UK Government (MHCLG) and from the Erasmus+ programme and Cornwall Council will try to secure more Government funding for 2020/21 to develop use of the language, using any such funding to invest in Cornish organisations.

Cornwall Council provides strategic leadership for the programme, promotes official use of Cornish and puts in place core infrastructure to support the network of volunteers and community groups.

Towl Oberansek an Yeth Kernewek 2020/21 Cornish Language Operational Plan 2020Page/2 158 3 Information Classification: PUBLIC

2. Delivery of the Cornish Language Strategy 2015-2025

The delivery structure for Cornish language policy and planning is set out in the diagram on page 5.

The Cornish Language Lead is the Cornwall Council officer responsible for overseeing the language programme and for developing use of Cornish within the Council itself. The Cornish Language Lead also provides a central point for enquiries about the language, translation requests and other services.

The Cornish Language Lead is a member of the Culture and Creative Industries Team which promotes use of Cornish language throughout the creative sector in Cornwall, and the Language Lead provides input on Cornish language and culture to the strategies of the team and to the Cornish National Minority Working Group. The Culture and Creative Industries Team is a part of the Economic Growth Service where the creative/cultural sector is seen as an important part of Cornwall’s economy and the language is integral to modern Cornwall’s distinctiveness.

Cornwall Council will work with its partners to increase official and public use of Cornish language and its own three-year Cornish Language Plan was agreed by Cabinet in May 2019.

Akademi Kernewek is the body responsible for corpus planning – researching and publishing information about the language itself. This includes the online dictionary, place names and examples of use. The Akademi brings together research and language expertise and was approved as a Charitable Incorporated Organisation (CIO) in 2019. The Akademi has set up online databases for most areas of its work, and publishes its work on its website, including the online dictionary, and place name map and directory. The Akademi will complete migration to online databases for all its work in 2020.

Golden Tree’s work on the contract for Cornish Language Learning and Communications has established two clusters of language learning with a number of schools teaching Cornish in the and areas. A third cluster was trialled in in 2019 and a fourth was to be started in summer 2020. The priority for the contract is to extend teaching in schools and, while the cluster concept will continue, Golden Tree will also look to work with multi- academy trusts in order to maximise use of training resources. The

Towl Oberansek an Yeth Kernewek 2020/21 Cornish Language Operational Plan 2020Page/2 159 4 Information Classification: PUBLIC

GoCornish website, published early in 2019 has succeeded in raising the profile of Cornish language resources and further resources will be added in 2020/21. Grant funding from MHCLG in 2019 enabled investment in a number of new resources which will be completed for publication after the Covid19 lockdown, including resources for 6 beginner classes to support WJEC assessments, apps and games for young children, a 1-day immersion course for beginners, and a children’s video programme in Cornish.

There are also four projects aimed at encouraging use of Cornish in the community through media and social innovation projects. One project will continue Fylm K, a short film competition run in partnership with Screen Cornwall and Falmouth University School of Television and Film. The project provides more content for Cornish speakers and invests in developing local film making talent. The three other projects develop work with musicians and performers using Cornish, an online radio service and a series of community events for using Cornish.

Towl Oberansek an Yeth Kernewek 2020/21 Cornish Language Operational Plan 2020Page/2 160 5 Information Classification: PUBLIC

3. Operational Plan for 2020/21

In order to take forward the Cornish Language Strategy, priorities for 2020/21 will be: • To secure a long-term funding agreement for Cornish language and culture with MHCLG for investment in Cornish companies and organisations in the creative and culture sector • To advance strategic infrastructure for Cornish language and culture, including building the case for a public service broadcaster for Cornwall and supporting Cornwall Heritage Trust in creating a new community cultural centre in • To support the Cornish language community groups in developing skills, capacity and resilience in order to become self-sufficient delivery partners • To develop a new language learning app (Erasmus+ funded) for publication in 2021 • To develop training for Cornish translators • To further raise the profile of the language through online resources, bi-lingual signage, bi-lingual marketing and general promotion and through work with partner organisations. • To contribute to the development of the Culture and Creative Industries Team’s new cultural manifesto • To support and maximise the impact of the programme in 2020/21

The following table sets out the key tasks that make up the Operational Plan for 2020/21.

Task Outputs Who

A - Acquisition

To promote and • Maximise the impact of the Golden Tree/ maintain the GoCornish website (for CC GoCornish website promotion and education) by working with businesses and the media

Develop online • Complete and publish Say Golden Tree / learning resources Something in Cornish – online CC aural course • Complete and publish the Magi Ann 2 app for pre-school children. • Complete and publish series of app games for young

Towl Oberansek an Yeth Kernewek 2020/21 Cornish Language Operational Plan 2020Page/2 161 6 Information Classification: PUBLIC

children with S4C • Complete and publish the beginners WJEC course resources (set of 6 class and video resources)

Develop and deliver • Cornish language sessions in Golden Tree sustainable Cornish at least one pre-school language teaching in • Engage with and deliver schools Cornish language teaching in 40 primary schools • Recruit 2 pilot schools to develop Cornish language curriculum • Deliver Cornish in at least one secondary school and 10 students achieve WJEC Level 1

Facilitate intensive • Complete development of CC / GT learning opportunities intensive course and trial in at least two locations Maintain and promote • Ongoing coordination and Ros Dyski / CC the present provision promotion by Ros Dyski. / GT of Cornish for Adults. Develop a nationally • Train 5 more teachers able to CC / Ros Dyski accredited Cornish deliver WJEC Entry level language assessment Spoken Cornish for schools and adults • Enter at least 30 candidates CC/Ros Dyski to WJEC Entry level Spoken Cornish • Develop assessment material CC/Ros Dyski for Level 2 for delivery in 2020/21 academic year

B - Use of Cornish

Identify and develop • Deliver 4 participatory Cornish Golden Tree geographical hubs to Language events targeting support community young people and families and and business use of 1 business engagement Cornish initiative

Towl Oberansek an Yeth Kernewek 2020/21 Cornish Language Operational Plan 2020Page/2 162 7 Information Classification: PUBLIC

Social innovation fund • Lowender Peran – pilot - to support initiatives mentoring programme for that increase the musicians to use Cornish, Lowender number, variety and talent development Peran location of settings programme for traditional where Cornish can be Cornish music, community spoken socially events with two community orchard projects, resource development of Breton/Cornish songs for joint community events including Aberfest, and developing Kernewek element of Cornish National Music Archive.

• Rosweyth – developing online Rosweyth activities using Cornish and promotional activity for Speak Cornish Week in June 2020. Development of activities using Cornish throughout the year, capacity development of the voluntary groups and partner working with environmental charities to support conservation projects and with theatre groups as part of the Ordinalia programme.

Media and technology • Radyo an Gernewegva – Radyo an fund – to increase and continued development of Gernewegva develops the use of weekly online radio Cornish on broadcast programmes, and to work and social media with young musicians to platforms create more Cornish language music and support them in performing in Cornish.

• Film commission –open Screen competition managed by Cornwall / Screen Cornwall in Falmouth partnership with Falmouth University University for a short contemporary film in Cornish for submission to and 2021.

Towl Oberansek an Yeth Kernewek 2020/21 Cornish Language Operational Plan 2020Page/2 163 8 Information Classification: PUBLIC

C - Status

To implement the 3 • Apply CC Brand Guidelines to CC year Cornish Language new projects and update Plan for Cornwall guidance on the use of Council and increase Cornish language on streets, the use of Cornish by highways and developments. Cornwall Council and its partners • Support and encourage the use of Cornish by partners

• Provide in-house training and develop online training resources.

• Develop use of the Cornish language in publications and communications.

• Seek opportunities for interactive use of Cornish as part of digital services

To maintain a lobbying • Ongoing CC and awareness-raising function in support of the wider use of Cornish within relevant partnerships and networks To arrange external • Arrange language planning CC language planning meeting for leaders and key expertise for leaders stakeholders using a key note and stakeholders in speaker from a partner event Cornwall (either such as Skians (language through a language research), Lowender (culture planning advisory investment programme) or group or specific IndyLan app (evaluation of events and visits) language planning impact) To develop, implement • Promote the language Golden Tree / and maintain a general through the GoCornish CC marketing plan for website Cornish. • Work with Rosweyth (voluntary groups) to promote social and community opportunities to use Cornish • Work with cultural organisations in Cornwall to promote Cornish in creative new ways

Towl Oberansek an Yeth Kernewek 2020/21 Cornish Language Operational Plan 2020Page/2 164 9 Information Classification: PUBLIC

• Regular positive postings on social media. • Coverage in and about Cornish language on various media

To develop, implement • Ongoing CC and maintain a general • Continue to act as the central advisory and point for enquiries but work information service in with Akademi Kernewek to relation to Cornish. provide information about the language online, and with Rosweyth to provide information about classes and events.

D - Corpus planning

To establish Akademi • Complete governance papers Akademi Kernewek as the for Akademi Kernewek and Kernewek definitive body publish online responsible for corpus • Develop links with the higher planning for the education sector. Cornish language, • Priorities for the four Panels setting standards for will be: the language, o Dictionary: extend the developing the number of entries in the dictionary and carrying online dictionary and add out research. sound recordings for 1000 words o Terminology: publish terms for 4 specialist areas and host 2 technical talks o Place names: provide research for /Stratton, and develop street name database to enable online working o Research: agree framework for making texts searchable and publish papers from previous Skians conferences Develop digital • Publish online corpus search – Akademi strategy partner project with Bangor Kernewek University. • Identify a programme of priority texts covering different registers • Identify further tools for development of use of Cornish and ensure maximum use of

Towl Oberansek an Yeth Kernewek 2020/21 Cornish Language Operational Plan 2020Page/2 165 10 Information Classification: PUBLIC

Cornish language data

To maintain an • Provide translations to Gonis Treylya appropriate translation Cornwall Council and in service for Cornwall response to public enquiries Council and its • Provide training for existing external partners. and new translators in order to meet demand for more complex, technical translations and ensure succession for the head translator.

Towl Oberansek an Yeth Kernewek 2020/21 Cornish Language Operational Plan 2020Page/2 166 11 Information Classification: PUBLIC

4. Resources The proposed budget for the Cornish language programme in 2020/21 is as follows:

Cornish language Project/work area Budget programme 2020/21 Expenditure Cornish Language Staff, on-costs, premises, travel, Office design and publications 75,000 IndyLan app Development of app 19,260 Grants: 5,000 Corpus Akademi Kernewek Learning and 50,000 Communications Golden Tree Use of Cornish Social Innovation Fund 10,000

10,000 Media and Technology Total Gross Expenditure 169,260

Income CC 150,000 Erasmus+ 19,260

Language planning requires long term stability and annual allocations make it difficult for the Council, local business and the voluntary sector to plan ahead. Cornwall Council will therefore work with the UK Government to secure central government funding and to achieve a multi-year agreement to allow longer-term planning and investment. The Council will also continue to seek alternative funding opportunities, such as match funding through specific projects and through partnership working.

Towl Oberansek an Yeth Kernewek 2020/21 Cornish Language Operational Plan 2020Page/2 167 12 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

CORNISH CULTURE AND LANGUAGE PROJECTS - MCHLG FUNDING 2019/20

OVERVIEW OF OUTPUTS - JUNE 2020

• A summary of project deliver is set out below. Inevitably, several projects have been impacted by the Covid-19 restrictions but these are being rearranged for delivery either online or another format by September 2020. All projects are commissioned and committed. • Detail for each project is set out in Appendix A. • (Green – complete. Amber – final stage to be completed after lockdown, or commissioned and adapted to be delivered during lockdown. Red – not committed).

CORNISH LANGUAGE Delivery partner Output PROJECTS

Language 1 – Resilience and Capacity Development

These are new projects working with the voluntary sector. With no spare capacity, these projects took time to mobilise and were then impacted by the Covid19 lockdown. Each has been commissioned and adapted for delivery by the end of September 2020.

1A - Capacity Kowethas / • Kowethas (Cornish Language Partnership) development programme Rosweyth preparing application for CIO status & aiming to for community groups complete summer 2020 • Phase 2 business development workshop for voluntary groups by Counterculture in summer 2020.

1B - Community group Rosweyth • Programme of activities and events by voluntary project support groups. These have had to be reorganised for summer 2020 due to lockdown, with a focus on online activity and general development of the voluntary sector. • Event for 20 fluent Cornish speakers delivered in in February 20 , with 15 hours of activities entirely in Cornish. • The project will include work with youth theatre groups linked to the Ordinalia project to develop pop-up performances when this is possible post­ lockdown. An alternative will be worked up in case the restrictions continue..

1C - Translator training Kesva (Cornish • The Cornish Language Board commissioned to Language Board) deliver 3 online training sessions over summer / Translation 2020 and to consider how to formalise a training Service programme, possibly with Association of Welsh Translators – reporting in September 2020. • First training session on 4 July 2020.

1D – Agan Lev Rosweyth • 3 workshops and consultation arranged for March are now being reprovided online for June/July. • A fourth workshop to discuss results with the Rosweyth network of groups will then be used to

Page 68 Information Classification: CONTROLLED

AGENDA ITEM 4.2

formulate a draft project bank for publication.

Language 2: Cornish Language Education for Young People

Preparation of Cornish language content for these projects is complete, but final completion was not possible due to the lockdown preventing delivery of classes or public events, or partners in not fully functioning during the lockdown and unable to complete apps.

2A - Expansion of Go Golden Tree • Preparation completed for 4th cluster in in Cornish to fourth cluster Spring 2020, teaching in schools, running community activities and working with the main cultural event in the town – Bodmin Ridings. • The programme has been banked for delivery in 2021, with the potential for some warm up activities to take place depending when the lock down ends.

2B - New app for pre­ Golden Tree • Second series of six app books. school children – Magi • All Cornish language content translated, recorded Ann 2 and sent to the Welsh publishers. The app will be completed and published when the lockdown lifts and the company re-opens.

2C - New apps for Screen Cornwall / • App series for primary school children focussed on primary age children S4C play activities to embed learning and extend vocabulary – and extending choice for young learners. • This is the first partner project for S4C using Cornish and will be published at the end of June 2020 as part of Speak Cornish Week.

2D - Online video series Screen Cornwall • Screen Cornwall ran an open call for proposals. 6 for school-age children entries were submitted, and a collaboration between Engine House and Golden Tree won, bringing the Porth series of books to the screen. • The pilot episode – Goolan – has been completed. It is entirely in Cornish, with an English subtitled version. This has been produced to industry standards and is being offered to broadcasters with a view to commissioning a series of 12. Currently under consideration by the BBC.

Language 3: Learning resources for adults

This set of resources is largely complete but we were to deliver classes or events due to the lockdown. There are also film elements which cannot be completed until after the lockdown.

Page 69 Information Classification: CONTROLLED

AGENDA ITEM 4.2

3A - Online resources to Golden Tree • 6 stand-alone lessons – full resources to enable support teaching of WJEC less confident speakers/teachers to deliver Cornish Entry Level classes to adults or in schools. • The resources comprise a lesson plan, lesson activities, grammar notes, an introductory video (so students can hear the correct pronunciation) and a short conversation video to hear the language being used. • All resources complete except the videos which will be filmed as soon as Covid-19 restrictions allow.

3B - App for learning CLO/CC • The St.Austell Town Discovery App provides Cornish Heritage/CC guided walks around the town centre with Public Health information about the history of the town. • The app is designed to encourage people to walk more regularly and get to know the history of their town. The app is used either as a history quiz game, or by monitoring steps/calories used. This is a pilot project for other towns. • A Cornish language version of the app has been produced. An event with a target of 50 users was booked for 4 April and will be rearranged.

3C - Development of Golden Tree • A six-hour intensive/immersive course has been intensive/immersive developed. Participants have to communicate in course for adults the language in order to complete tasks. There is no writing involved – it is aimed at building confidence in spoken Cornish. • All resources are complete and the first trial of the course was booked for 4 April. This is ready to go as soon as the lockdown lifts with Golden Tree committed to delivering the course at two events.

3D - Development of Kesva an Taves • Design, illustration and proofreading to be high-quality course book Kernewek complete by end of June. (Cornish • The Kesva is responsible for arranging and paying Language Board) for printing and publication by August with a view to having the book ready for teachers before the new academic year.

3E - Bespoke training for Kesva • Kesva developing training sessions for summer community educators 2020 with Cornwall Adult Education Service with emphasis on how to teach online effectively.

Language 4: Media and Technology

These projects are all committed and will be completed during lockdown or shortly after lockdown is

Page 70 Information Classification: CONTROLLED

AGENDA ITEM 4.2 lifted.

4A - Dictionary database Bangor University • Recording facility for the Akademi Kernewek to development / Akademi add sound clips to the online dictionary. Tool Kernewek complete - first batch of recordings to be done in summer 2020.

• New online corpus search, allowing users to find examples of use, to be published by July.

4B - Development of Rosweyth/ • Ongoing production of regular news and magazine regular online TV Kowethas programmes entirely in Cornish. 4 programmes programming completed and published. Final programmes to be filmed and completed after the lockdown.

4C - Development of Rosweyth • To be taken forward by Rosweyth as part of the social media with programme of events and partner working in community and summer 2020 under project 1B. 4C will include environmental groups helping environmental/conservation groups with voluntary work – but entirely in Cornish.

CORNISH CULTURE Delivery partner Progress PROJECTS

Culture 1: Cornish CC Historic • As part of the 2015 Devolution Deal for Cornwall, Cultural Distinctiveness Environment. Cornwall Council worked with Historic and Project other partners to prepare a ‘Distinctiveness Study’ to inform planning decisions and conservation management.

• The MHCLG grant for 2019/20 contributed to making the study accessible to the public: production of a summary booklet, publication of 10 guidance notes, and workshops on applying the guidance for 70 participants.

Culture 2: Ordinalia CC Culture Team • Cornwall Council has commissioned two theatre Nessa productions to coincide with the loan return of centuries-old Cornish language plays to Cornwall for the first time.

• This funding enabled an additional research stage in the commission process whereby bidders undertook additional research into the layers of meaning of the plays, how they could be produced

Page 71 Information Classification: CONTROLLED

AGENDA ITEM 4.2

and how the productions could maximise benefits to the community. In particular, this has led to the two commissioned productions developing youth development programmes for their actors and crew.

Culture 3: Gorsedh Youth KEAP/ Gorsedh • KEAP is a creative writing organisation which for Festival Kernow this project ran workshops with 5 schools in the Camborne area, organised visits for each school to ’s exhibition about John Couch Adams and the discovery of the planet Neptune, and ran song-writing workshops with the Cornwall Music Education Service.

• This culminated in a concert performance for over 100 people at Kresen Kernow in February where the children performed their songs, partly in English, partly in Cornish about the perils of being a genius and the travails of scientific discovery. It was a moving, inspiring and impressive event that showcased a range of talents by the children and allowing some talented and inspiring adults to bring out the best in the community.

Education CC Education • Schools will be given free access to units of Service learning that meet the requirements of the English National Curriculum whilst developing a deep understanding of Cornish culture. Stage 1 in 2019/20 has seen the development of the framework, identification of existing resources and launch to recruit pilot schools. • Stage 2 in 2020/21 will develop resources (adapting existing resources as much as possible) and development with the pilot schools.

Page 72 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

Appendix A: Cornish Language and Culture – Completed Projects using MHCLG grant 2019/20

Cornish Language 1 – Resilience and Capacity Development

Most project elements will be delivered during summer 2020, namely:

• governance review of existing charities to improve capacity to deliver, • translator training programme, • training for community educators, • strategic support and project officer for the Cornish language voluntary groups • new website to schedule and coordinate classes and events • youth project a) working with young actors to perform in Cornish and do pop-up performances, and b) work with an existing youth group • environmental project (4C) to trial conservation work in Cornish • and a programme of events supporting community use of Cornish. A key event will be Speak Cornish Week from 20-28 June 2020.

These projects are being coordinated by the Rosweyth, an umbrella network of the Cornish Language groups, with part of the grant being used to fund a project officer post to coordinate the above elements.

One event was able to go ahead before the lockdown – Dydh Tregedna Illogan on 22 February 2020.

This was held in Illogan Community Centre and attended by 20 fluent Cornish speakers, with activities from 9.00am to 10.00pm. A ‘Dydh Tregedna’ is a day where only Cornish can be spoken in order to provide an environment where Cornish speakers can immerse themselves in using the language, and recharge their language batteries. Generally, Cornish speakers are called upon to teach and translate so opportunities like this are important to practice and enjoy the language. Resources prepared for the day will enable further such events to be organised by the community groups and cover their own cost.

Art class in Cornish – part of the Dydh Tregedna Illogan (Photo by )

Page 73 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

Cornish Language 2 – Cornish Language Education for Young People

This project comprised four sub-projects aiming to create new resources for young people and expand teaching in schools. 2A – Expansion of Go Cornish programme (working with schools) to 4th Cluster

Golden Tree holds the contract with Cornwall Council to support teaching of Cornish in schools and to promote learning opportunities in the community – branded Go Cornish. Golden Tree teamed up with ‘Into Bodmin’, a community partnership aiming to create a stronger sense of community in Bodmin town through cultural and community events.

Project 2A was to expand Cornish language teaching into schools in the Bodmin area, run a community event using Cornish in shops in the town centre and including Cornish language singing in Bodmin Ridings. Bodmin Ridings is an annual event and, having prepared the programming, this project will be taken forward in 2021.

2B – New app for pre-school children

This project will create a second series of the popular Magi Ann Kernewek series. Magi Ann is a fully illustrated, cartoon style app for learning Cornish with simple questions to answer and full sound recordings. It is based on an original Welsh app by Menter Iaith.

The translations and recordings of the second series have all been completed and the Welsh publishers will complete editing and publish the app online as soon as the lockdown is over.

Page 74 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

Project 2C - New apps for primary school age children.

This project is being delivered as a partnership between Screen Cornwall and S4C of Wales. This is the first time S4C has undertaken a Cornish language project so we see this as a pilot for further collaborations. Originally, this was to be 4 app-based games but will now be 6 games. This will extend choice for young learners of Cornish with resources for this age group limited to books for learning. These apps will provide interactive games for using and applying the Cornish they have learnt, and will be published in July 2020.

Below is an extract from the progress report from S4C/Screen Cornwall showing graphics and some language content from the new app.

Page 75 Information Classification: CONTROLLED

AGENDA ITEM 4.2

Page 76 Information Classification: CONTROLLED

AGENDA ITEM 4.2

PROJECT 2D – Online video series for school-age children.

Following an open call for proposals by Screen Cornwall, Golden Tree/Engine House were commissioned to produce ‘Goolan’ – a pilot episode of 12 stories to tie in with the Porth series of books which are used for teaching in schools. Many children in Cornwall already know the characters so this programme reinforces learning from the books and stretches it considerably further.

The pilot episode is complete and Screen Cornwall is currently offering the programme to the BBC with a view to commissioning a full series. If the proposal is refused, then other broadcasters will be approached with Breton and Welsh channels previously having expressed interest in Cornish content.

Below is an extract from the Screen Cornwall progress report and the character Goolan.

Goolan – the main character in the programme

Page 77 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

Cornish Language 3 – Learning Resources for Adults

Project 3A – Online resources to support teaching of WJEC Entry Level

Golden Tree were commissioned to produce a set of resources to support 6 beginner lessons. These were to be in a format that would be sufficiently stand alone for a non- trained Cornish speaker to deliver, or for a trained teacher with little or no Cornish to deliver. The lesson plans, resources and activities are to be accompanied by two short videos so students can hear the Cornish being pronounced and used in context.

All the resources have been completed except the films which will be completed after lockdown. These resources were being introduced Mounts Bay secondary school from February, to test the format and to start teaching Cornish at secondary level. It is hoped to recommence these sessions in early 2021.

Page 78 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

Project 3B – App for using Cornish: Discovery

This is a pilot project to create a town centre discover map in app form, encouraging people to discover the history of the town, but also to use the app for repeated walking or jogging. The project funding enabled a Cornish language version of the app.

Project partners are Cornwall Council Strategic Historic Environment (project lead), St. Austell Town Council, St.Austell BID and Get Active Cornwall. The Cornish version of the app was to have been launched on 4 April with target of 50 people using the app in Cornish – postponed til after the lockdown.

With the entire app, including recordings, provided in Cornish, this will provide a interactive resource for speakers and an useful activity for stretching students.

The English version of the app is shown below:

Page 79 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

Project 3C – Development of intensive/immersive course for adults

Golden Tree were commissioned to create a short course of 2 x 3 hours aimed at:

• Adults with no Cornish for intensive immersion • Adults who have studied in the past, or are currently studying but not confident about speaking

A participant with no Cornish at the start would confidently be able to complete tasks in spoken Cornish during the course, and be able to hold a simple conversation by the end of the course.

The first part was trialled at Book Festival with 16 participants and worked well with all participants talking in Cornish throughout. The whole course was due to be piloted on 4 April and this will be re-arranged for post lockdown. A trial run is required to test how complete beginners cope with a full day in a new language. Below is the session plan for part of the first session.

Towl Esedhek Session Plan

Termynyow Notennow Daffar Resources Times Notes 0-20 0. Raglavar Introduction Flipchart or (20 mins) i) Krackya Rew Icebreaker whiteboard Dydh da, … ov vy, Piw os ta? Pens Challenge: Learn as many people’s names as you can in 1 minute. (Countdown in Cornish) ii) Housekeeping iii) Session timetable and break times iv) Learning Outcomes: use Cornish to • hold a simple conversation • count to 10 • ask for things • describe people and objects 20-45 1. Keskows Sempel Simple Conversation Flipchart or (25 mins) Fatla genes? Whiteboard Lowenometer. Pens Duw genes. Worksheet W1 Challenge: have a conversation with at least 3 different people in Cornish. (2 mins, countdown in Cornish) Extension: Simple conversation in character. Handout H1 Keskows Sempel 45-60 Powes Break (15 mins) 60- 115 2. Gwra Pyskessa! Go Fish! Decks of cards (50 mins) i) Teach Numbers 1-10 Flipchart ii) Teach Suits and Picture Cards Pens Hand out H2 Kartennow Gwari Worksheet W2 iii) Name that card Extension: name cards without vocabulary sheet iv) How to Play: explain the rules v) Play Gwra Pyskessa! Extension: play without vocabulary sheet. 115-130 Powes Break (15 mins) 130-165 3. Piw yw? Guess Who Worksheet W4 (40 mins) i) Revisit learning objectives Worksheet W5 ii) Model ‘Yw’ eg ‘Den yw’ Clipboards Questions and answers using ‘Yw?’ Pencils W4 Handout H3 Yw iii) Model ‘Yma… genev’ Questions and answers using Eus, ganso, gensi Handout H4 Gans iv) Model how to Play ‘Piw yw?’ Hand out H6 Piw Yw vocabulary v) Play ‘Piw yw’ in pairs Play through a couple of times, rotate pairs

Page 80 Information Classification: CONTROLLED

AGENDA ITEM 4.2

Project 3D – New course book

The text from an existing text book written 15 years ago has been used as the base for a new text book – Bora Brav. The stories have been retained but the book has been restructured into a modern format with new illustrations, new grammar sections, and new activities. The book is on course for publication in summer 2020 ready for teachers to prepare for the new academic year in September. Two sample sections are shown below:

Page 81 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

Cornish Language 4 – Media and Technology

Project 4A – Dictionary database development

This is a partnership between the Akademi Kernewek and Bangor University’s Language Technology Unit to create two new digital tools for Kernewek.

• Using the Cornish dictionary datafiles of the Akademi, Bangor University is creating a new facility for Cornish speakers to create soundfiles in the dictionary. The recording tool is embedded in the dictionary database (Maes T) thus creating a simple function for speakers to record and file each word. Dictionary soundfiles are a normal of other main language dictionary these days and has been an ambition of the Cornish language community for some time as Cornish students often ask for this function. The tool has been completed and the first batch of 4,000 words will be recorded in summer 2020 and published by Autumn 2020. Sample page from the Cornish dictionary database showing the new soundfile tool (Maes T)

• The second tool is a new corpus search website, again a partnership between the Akademi Kernewek, Cornwall Council and Bangor University. Cornwall Council’s Translation Service uses SmartCAT translation memory software to process translation requests. This creates a ‘translation

Page 82 Information Classification: CONTROLLED

AGENDA ITEM 4.2 � memory’ of aligned (English/Cornish) and segmented (matched phrases and sentences) text that can be searched. Bangor University’s Language Technology Unit is using this translation memory to create a new online search function which will be published on the Akademi Kernewek website. Users will then be able to search a word and see examples of use. This is particularly useful when words can have different meanings in different contexts or when combinations of words can create different meanings. The translation search is functional and the public facing website will be published by the end of June 2020.

Page 83 Information Classification: CONTROLLED

AGENDA ITEM 4.2

Cornish Language 4B: Development of regular online TV programming

Pellwolok an Gernewegva is a social enterprise commissioned by the Rosweyth to produce weekly hour long radio programmes entirely in Cornish and monthly video magazine programmes, called ‘An Mis’ (The Month). The programmes cover news about Cornish language events, people and issues and is really the only media service in and for Cornish speakers. With no regular funding or support, the programmes are produced on a very low budget with content provided by volunteers.

The MHCLG grant has provided financial support for six episodes of An Mis to ensure the service continues through early 2020.

Link to the March 2020 programme on youtube with the service also available on Facebook: https://www.youtube.com/watch?v=hvnIOVEJot4

The grant will also be used by Rosweyth to commission 3 other programmes as an opportunity to trial other programme formats and providers. The first of these was Kan Rag Kernow in February 2020. This is the annual competition to select a song to represent Cornwall at the in . Normally this is a live performance event, but this year the event was filmed for an online poll. Two further programmes will be produced during summer 2020 when lockdown restrictions allow. https://www.youtube.com/watch?v=WYCQlnSewXc

Minko, the winning performer at Kan Rag Kernow 2020, filmed by Pellwolok an Gernewegva.

Page 84 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

Culture 1: Cornish Cultural Distinctiveness Project

The Devolution Deal for Cornwall in 2015 included a Heritage strand, which involved, among other things, the setting up of a forum for Cornish Heritage (Ertach Kernow) and the commissioning by them, with funds from Cornwall Council and the UK Government (via Historic England), of a study of Cornwall’s cultural distinctiveness. What is it that sets Cornwall apart from other places in Britain, and how can we safeguard and strengthen that distinctiveness?

The follow-on project supported by the Ministry of Housing, Communities and Local Government (MHCLG) involved turning the study’s detailed results into material that could be presented to all those with an interest in protecting, managing and reinforcing Cornish distinctiveness. This was done through four work streams.

1. ­ Preparation of an illustrated booklet, Distinctively Cornish, setting out the two approaches to Cornish distinctiveness identified in the study – that which is particular to Cornwall or to a part of Cornwall, and that which is typical or representative of Cornwall. It also introduced the Assessment Framework by which people can determine the significance and implications of distinctiveness. (MHCLG supported text preparation, image selection and design and printing costs.)

2. ­ Launch of the booklet and approach at the UK National Minority Summit at the University of Falmouth in July 2019. (MHCLG funds supported preparation of the presentation.)

3. ­ Preparation of 10 guidance notes advising on application of Distinctiveness Assessment in situations ranging from statutory and local designation, managing buildings and places, neighbourhood and master planning, development management and design, to research and heritage presentation. (MHCLG supported text preparation and wide consultation.)

4. ­ Presentation and training in applications of these notes at workshops held at the Kresen Kernow archive centre in Redruth in November and December 2019 to which a range of professionals and interest groups were invited. (MHCLG supported preparation of presentations and organisation of the days, including lunches for 70 delegates.)

The MHCLG-funded work has raised the profile of the Distinctiveness work considerably, among politicians and the media (via the Summit and the Distinctively Cornish booklet), and among a wide range of professionals, within Cornwall Council (planners, heritage sector, strategists) and beyond (developers, architects, academics, heritage providers, etc). This has prepared the ground for Cornish Cultural Distinctiveness to be a thread running through all parts of the Cornwall Heritage Strategy, currently in preparation. The Strategy will be the

Page 85 Information Classification: CONTROLLED

AGENDA ITEM 4.2 � vehicle through which distinctiveness is carried to all parts of heritage activity in Cornwall in the coming decade.

Cover of Distinctively Cornish booklet. ­

November 2019 workshop at Kresen Kernow, Redruth (photo by Lauren Hatt). ­

Below is one of the ten guidance notes. These are ground-breaking pieces of advice and we expect them to be reviewed to reflect the experience gained from application. The guidance notes will be added to the Cornwall Council Strategic Historic Environment web pages in summer 2020.

Page 86 Information Classification: CONTROLLED

AGENDA ITEM 4.2

Page 87 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

Cornish Culture 2: Ordinalia Nessa

Research and Development Grant 2019/20

Introduction

The Ordinalia is one of Cornwall’s cultural treasures of international significance. The trilogy of medieval mystery plays dating from the mid fourteenth century comprises of Origo Mundi (The Origin of the World), Passio Christi (The Passion of Christ) and Resurrexio Domini (The Resurrection). Written in Cornish with stage directions in Latin – cited to be some of the oldest stage directions in the world – the Ordinalia plays were performed in open air amphitheatres - plen an gwari. They provide evidence of the huge relevance and significance of the Cornish Language, Culture and our unique heritage.

Kresen Kernow, Cornwall’s new archive centre, planned the ‘Out of the Ordinary’ exhibition for June 2020 (now postponed to June 2021). The exhibition will feature Cornish language manuscripts held in national institutions including the Ordinalia on loan from the Bodleian Libraries in Oxford. The exhibition and accompanying NLHF community programme will reveal the stories of these manuscripts.

Hosting the manuscripts at Kresen Kernow presents an unmissable opportunity to celebrate this important part of Cornish history. Alongside the substantial community programme, Cornwall Council has supported research and development into how this occasion can be marked by a cultural event celebrating the Ordinalia in innovative, sensitive, collaborative and high-profile ways.

The Council’s support for Ordinalia forms a part of our Culture Memorandum of Understanding between Arts Council England, The National Lottery Heritage Fund, Historic England, Cornwall and Local Enterprise Partnership and Cornwall Council. The first of its kind nationally, this partnership of national funders gives us all an opportunity to work together to drive ambition and development for Culture and Creative Industries in Cornwall. Through this collaborative approach we are collectively committed to developing and supporting the vital role that Culture and Creative Industries play in Cornwall; in place-making, economic growth and positive social impact.

The intention of the R&D phase (which the MHCLG funding contributed to) was to support the exploration of a range of ideas including approach to performance, exploring the texts themselves and modern responses, and legacy of performances. Each selected organisation was awarded £5,000 to cover their costs for this research and development work, and to produce a thoroughly mapped out proposal for production and staging.

Page 88 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

Three companies were awarded grant funding for research and development: ­

• St.Just Ordinalia Company – the community project used the funding to run a series of 5 workshops to explore: logistics, marketing, legacy, community work and technical. St.Just produced the plays in 2000-2004 and have a strong vision for what they want to achieve. This additional stage enabled the company to explore in more detail how to prepare for a larger scale production and how to maximise the community benefits of the project, such as youth training and working with diverse faith groups. • Rogue Theatre explored how to make the Medieval plays relevant to modern audience, in terms of the content of the plays themselves and the theatrical production approach. Rogue researched themes in the texts and how to engage with local non-theatre-going audiences. The research developed a festival concept for the staging of the Ordinalia, staying true to the theatrical instructions set out in the manuscripts. • Kneehigh Theatre held a series of three workshops with the theatre team and key partners that could be involved in developing the production. These explored how to tell the stories within the Ordinalia in a way that resonates with the community today, how to stage an event in keeping with the original spirit of the Ordinalia, and how to use the language within the plays in accessible but revealing ways. In particular, Kneehigh developed ideas for working with 16-21 year olds to create a production model to enable participation of young people over several months to ensure professional standards and give the team a real development opportunity.

Following the research stage, each company submitted full proposals for productions as part of the Ordinalia Nessa festival. Kneehigh and St.Just were successful and their productions will be staged through summer 2021 after the exhibition of the manuscripts at Kresen Kernow in June 2021.

Page 89 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

Cornish Culture 3: Gorsedh Youth Festival

Kan Rag Kernow Yowynk – Jan/Feb 2020

Aims

To initiate a project to encourage children and young people to engage with their heritage and the Cornish language through creative writing, song composition and performance and at the same time reflect on the potential for a Gorsedh Youth Festival.

Key partners and creative practitioners

KEAP and The Writers’ Block devised and co-ordinated the project and the sharing, Cornwall Music Education Hub gave funding to support the music leaders, Kresen Kernow hosted the initial school workshops and also the sharing event as well as the archive exhibition about Cornish mathematician and astronomer John Couch Adams. Cornwall Council Language Department led on the developing the whole programme and briefing KEAP.

Lead writer: Rebecca Gregson

Cornish lead, writer and performer: Taran Spalding Jenkins

Music Leaders: Matt Douglas (primary), Patrick Bailey (secondary)

Schools

We chose to work with a cluster of schools in the Camborne area as they are within easy reach of both The Writers’ Block and Kresen Kernow. We hoped that the children would return to Kresen Kernow with their parents – some have already.

Also a couple of the schools have a very strong science focus and the subject was fitting for them as well as exploring science through the creative arts.

Primaries: Rosemellin year 4, St John’s Catholic Primary year 5, Weeth year 5 and Penponds years 5 & 6.

Secondary: Camborne Science Year 10

We also invited St Just primary to the sharing event.

The Process

Page 90 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

After a preliminary meeting with all the teachers and workshop leaders at Kresen Kernow in the Autumn 2019. We then booked out Kresen Kernow for 5 full days of workshops.

Each school visited Kresen Kernow and got a sense of the ‘mansion with a million stories’ and the impressive building on their doorstep and they visited the Couch Adams exhibition. At the same time Taran was a plant as Couch Adams himself. He interacted with the children, talked about what he was doing and they quizzed him. He proved a really interesting subject for study both for his achievements and also for his personality.

They then spent the rest of the day creating their lyrics with Rebecca. Everyone contributed to the collective song and Rebecca gave it shape and form.

The following day Taran went into the schools for half a day working with the children to bring in the Cornish language element – repeated lines or chorus or where the emphasis was needed. And then teaching them how to pronounce the words and phrases. He also made a recording for the teachers.

The lyrics and the recordings were then passed over to Matt and Patrick to support the children in composing their own song. They then returned to school on two more occasions to rehearse the children and Matt produced a backing track for the primaries so that they could rehearse on their own. In the primary schools each class produced one song together. One school also included a group of ukulele players. In the secondary school we worked with students who are studying music BTEC so they divided into groups and produced 4 songs, 2 for live performance and 1 pre-recorded. They all played their own instruments.

This process was a key part of the project as it gave the children and teachers an insight into the creative process, gave them a huge amount of ownership and the children created something that they were proud of.

‘The children have said how proud they feel of their song – they can’t believe how good it is!’ teacher feedback

The Sharing

The project was called Kan Rag Kernow Yowynk (Song for Cornwall Youth) to link into an existing project Kan Rag Kernow which is for adult musicians, is competitive and linked to other . There is potential for greater collaboration in the future.

Kresen Kernow was a fabulous venue for hosting this event with lots of space, good acoustics and the staff are very welcoming and keen to open their doors to all. St Just School attended as the ‘guest’ choir and sang the songs they had

Page 91 Information Classification: CONTROLLED

AGENDA ITEM 4.2 � written about Cornish miners from a project with Geevor Tin Mine. Each school introduced and sang their song. There were over 100 parents who attended, along with members of the . The Grand thanked everyone at the end. It was very uplifting.

‘This was really impressive. All the children performed with pride and confidence.’ Teacher’s feedback

Numbers involved

144 primary children

18 secondary school students

11 teachers and TAs

Feedback

Detailed teacher and pupil feedback was collated and is available. It is overwhelmingly positive. They loved visiting Kresen Kernow, they really enjoyed all the workshops and the performing was a great success. They appreciated the input of the specialists and were encouraged by how much the children enjoyed using the Cornish language.

From the children there is a huge amount of pride in the achievement of Cornishman John Couch Adams. This was helped by the fact that they got to meet him! A huge percentage of them enjoyed learning the Cornish language and would like to learn more. They loved that they got to write the songs and they knew which their lines were. And then being able to turn these into a song and perform it was the icing on the cake.

“Best trip ever!” pupil comment.

Budget

The budget was realistic for this scale of project and allowed for some real quality work with the children. If the ambition is to create a larger festival, it would need greater resourcing.

The Future

Page 92 Information Classification: CONTROLLED

AGENDA ITEM 4.2

We feel this model has worked really well. It was incredibly helpful and inspiring to have a heritage partner which could also be a venue.

It was also good that the schools didn’t have to travel too far – most could access minibuses and those that couldn’t asked parents to transport the children. We didn’t have funding for transport but the rest of the project was free to the schools which was brilliant and made it accessible. St Just Primary was able to access funding for transport from the Cornwall Heritage Trust because they were visiting Kresen Kernow.

This model could be replicated in other parts of Cornwall. It does need robust co-ordination in the locality. Or it could happen again in Kresen Kernow but invite schools from further afield with support for transport from Cornwall Heritage Trust. The exhibition was particularly relevant to schools. But I am sure that they could source items if we wanted a topic based project.

The creative practitioners in partnership with the teachers were essential to bring out such good writing, composition and performances.

If it were to happen again, I think this would be a good starting point.

If the project retains the name it would be good to make stronger links to the adult Kan Rag Kernow project.

Page 93 Information Classification: CONTROLLED

AGENDA ITEM 4.2

Page 94 Information Classification: CONTROLLED

AGENDA ITEM 4.2

Page 95 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

Cornish Education: Curriculum Kernewek – Tackling Education Barriers

In 2014, the UK Government officially recognised the Cornish as a national minority under European rules for the protection of national minorities. The decision to recognise the unique identity of the Cornish now affords them the same status under the European Framework Convention for the Protection of National Minorities (FCNM) as the UK's other Celtic people - the Scots, the Welsh and the Irish. This followed upon the recognition of Kernewek (the Cornish language) under the European Charter for the protection of Regional or Minority Languages.

Being recognised as a national minority means that the Cornish have the right to express, preserve, share and develop their distinct culture and identity. Cornwall Council and its partners have been working hard, with limited resources, to raise awareness of the Cornish as a national minority and to encourage the UK Government to fulfil its responsibilities so that the Cornish are treated equally with other Celtic nations.

The Council of Europe's Framework Convention is one of the most comprehensive treaties designed to protect the rights of persons belonging to national minorities. Parties to the Framework Convention undertake to promote the full and effective equality of persons belonging to minorities in all areas of economic, social, political and cultural life together with the conditions that will allow them to express, preserve and develop their culture and identity. None of this can be successfully achieved without a strong focus upon education and the school experience of young people. Cornwall Council’s Together for Families Directorate has prioritised - through its Education Service - work led by Council officers to create an embedded and transformative approach to curriculum development in Cornwall under the Curriculum Kernewek.

Following consultation with the Cabinet at Cornwall Council and the Cornish National Minority Working Group, it was agreed that the Cornish Culture Fund should be split to address two objectives to support Cornish culture in Cornwall: the first centred upon public engagement, awareness and understanding; the second to tackle educational barriers, specifically to:

‘…identify through appropriate research, what barriers to Cornish culture currently exist within the educational curriculum in Cornwall, and address these based on findings.’

Azook were commissioned to carry out this research resulting in the report, Findings Report and Recommendations: existing barriers to, and potential opportunities for teaching and supporting Cornish culture and language (2018). Cornwall Council education service is developing and implementing short and

Page 96 Information Classification: CONTROLLED

AGENDA ITEM 4.2 � medium term actions in order to deliver items 1,2 and 3 of the resultant Cornish National Minority Action Plan that Azook produced. These areas are:

1) Cornwall Council Strategic lead

2) Awareness and Information, and

3) Delivering systematic provision

Items 4 (Expansion through the UK) and 5 (Delivering Systematic provision) are longer term objectives, although elements of 5) are encompassed in the medium term planning. A summary of the Education Service Implementation plan is appended.

Curriculum Kernewek was originally the title given to the Religious Education units developed as part of the Agreed Syllabus for Religious Education. While this name will be retained for the Cornish elements of the RE syllabus it will now also apply to the wider package of curriculum materials developed for all subjects.

Our Ambition for Education

Curriculum Kernewek cannot replace the National Curriculum as Cornwall does not (as yet) have the devolved powers to do this. Young people will still be assessed against English targets, and schools will still be measured against English education standards as specified by the Department for Education (DfE). However the English National Curriculum is a default minimum requirement in law and, therefore, overtime, Curriculum Kernewek will enable schools to teach the National Curriculum from a Cornish perspective, using as many aspects of Cornish life, heritage and culture as possible to achieve the DfE’s expected outcomes. Curriculum Kernewek will pervade every curriculum subject from PE to computing and will eventually cover learning from pre-schools to sixth forms. However, Curriculum Kernewek will differ from curricula in Wales and where they have the devolved power to set their own National standards, specify curriculum subjects, assessment procedures and inspection regimes. Education officers will report back regularly to the Cornish National Minority Working Group on progress with fulfilling this ambition.

Aim

Curriculum Kernewek will provide young people aged 3 to 18 with knowledge, skills and experiences relevant to living in Cornwall in the 21st century. Schools will be given free access to units of learning that meet the requirements of the English National Curriculum whilst developing a deep understanding of:

• Cornish arts

• Cornish heritage and culture

Page 97 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

• Cornish language

• Cornwall’s place in the world

• Environment and sustainability

• My Cornwall (personal experiences as a young person in Cornwall)

It is expected that the curriculum will develop over a significant period (at least two years, and probably more) in collaboration with as many organisations, individuals and schools as possible. Developing the curriculum is ultimately under the direction of, and officers are accountable to, the Strategic Director of Together for Families.

The key considerations will be:

• Assessment

• Experiences

• Knowledge

• Progression

• Skills

Medium Term Plans

This is an overview of the plans to develop Curriculum Kernewek. It does not include all the detail – much will emerge as the project evolves - but it should provide an idea of the key actions over the next twelve months:

• Schools will be recruited and then selected through a survey for head teachers that will allow a representative sample to participate in developing and piloting units of learning. The schools will be selected in order to cover phases from Early Years to Key Stage 5 and to cover the geographical extent of Cornwall. Information about existing Cornish learning, both Cornish ‘elements’ and systematic Cornish curriculum content (as defined in the Azook report), will also be collected. The survey will be distributed through School Messenger to coincide with St Piran’s Day 2020: this will be, in effect, the soft ‘launch’ of the development of the new, expanded, Curriculum Kernewek, raising awareness that work is beginning.

• Simultaneously, a draft curriculum structure will be created for all Key Stages by Michelle Nineham (Curriculum Consultant) and Graeme Plunkett (Senior School Effectiveness Officer). This will draw upon the extant units of work developed by over recent years for projects such as A Sense of Place and will use knowledge gained from Wales, Ireland and Scotland as well as national minority jurisdictions elsewhere in Europe. This work has begun.

Page 98 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

• Discussions with organisations (except schools: see below) that already possess or have developed materials will take place. Decisions about joint working, procurement or other ways to develop the best possible curriculum will be made. A wide range of organisations will be audited about how they can contribute to the curriculum. These discussions will include discussions aimed at resolving any potential issues surrounding intellectual property, copyright and related matters.

• A conference will be held in July to allow all interested parties to contribute to the structure of the curriculum and to explore content. This will bring together: the pilot schools; Cornwall Council departments; charities; individuals; tourism bodies; and other relevant organisations. It would be very useful for members of the Cornish National Minority Working Group to play a key role in informing, supporting and participating in this conference.

• From September, units of learning will start to be developed, beginning with primary schools. This will involve small practitioner-led working parties for each unit, coordinated by Michelle Nineham (see below) who will ensure that aims and expectations are met. Specialists in Cornish culture and identity will be engaged to inform the groups’ work. The units will be piloted in participating schools, monitored, adjusted and evaluated, this work carried out by the Curriculum advisers and Michelle Nineham.

• Following these pilots and reviews, each unit of work will be placed on the Curriculum Kernewek website and professional development sessions will be held to give teachers the skills to deliver the curriculum effectively. The intention is to also engage with initial teacher training providers to ensure that new entrants to the profession are familiar with Curriculum Kernewek and, more importantly, the principles behind it.

Staffing and Resources

Graeme Plunkett is the officer directly responsible for Curriculum Kernewek: he is a full-time School Effectiveness Officer. His post is funded by Together for Families and this work is a part of his general duties.

Michelle Nineham is working as a consultant to plan and implement the new Curriculum Kernewek. She is employed as a freelance advisor who is expected to work on the project for approximately 2 days per month, although this is flexible. This is funded through Education funds allocated for this specific educational development, i.e. Curriculum Kernewek.

Three new full-time curriculum advisors will be recruited imminently. Their role will be to support schools across Cornwall in the development and delivery of the curriculum. It will be an essential part of their role to help develop and to promote the use of Curriculum Kernewek in order to improve learning in these schools. Their roles are therefore not directly a part of the Cornish Curriculum

Page 99 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

Project and are funded by Together for Families. However, the expectation that they will contribute to the development and promotion of Curriculum Kernewek is an important step in embedding a commitment to this work in directorate staff.

Digital Platform

Recently SACRE have launched the new agreed syllabus for RE with four embedded units with Cornish themes and content. There will be opportunities, however, for other RE units to be taught through the previous established RE Curriculum Kernewek materials. It is expected that the next version, to be launched in 2025 will more fully meet the aims and expectations of Curriculum Kernewek.

The RE agreed syllabus curriculum is being hosted on the Curriculum Kernewek website. This will become the site for the entire project over time as materials are developed. Once units are tested and agreed, resources, guides and schemes of work will be uploaded freely accessible to schools through this website which will be maintained and managed by Cornwall Council.

Responding to, and building upon existing work

The strategic plan for Curriculum Kernewek has been based on the findings of:

• Azook: Findings Report and Recommendations: existing barriers to, and potential opportunities for, teaching and supporting Cornish culture and language (2018)

• Why should the Cornish be recognised as a national minority within the UK? (Cornwall Council 2014)

• Cornwall Council’s language strategy and plan

• New Frontiers publication about Cornish culture and heritage prepared by The Cornwall and Isles of Scilly Leadership Board

• School Effectiveness Cornwall service plan

• Together for Families Education Strategy

Existing Work, Ideas and Resources

The following organisations and projects (by no means a definitive list) have already been identified as those which could make a significant contribution to Curriculum Kernewek because they have already made a positive contribution to and impact upon education in Cornwall:

• Azook

• Cornwall Music Education Hub

Page 100 Information Classification: CONTROLLED

AGENDA ITEM 4.2 �

• Cornwall Outdoors

• Go Cornish

• Golden Tree

• The Sense of Place project

• The Writer’s Block (Kernow Education Arts Partnership)

Officers are cognisant and appreciative of the exceptional work that has been created by these commercial and non-commercial bodies for a Cornish curriculum. They are clear that any ‘new’ curriculum and supporting materials will be created in conjunction with these organisations so that accumulated learning and understanding is not lost. Officers will meet with these organisations - and others - during the Spring and Summer terms. It is hoped that these organisations will want to play a key role in the development of the curriculum, from developing the draft structure to training teachers.

There are issues of procurement, collaboration and intellectual property rights (IPR) attached to working with these organisations. Council officers are clear that they wish to respect the work carried out in the past, as well as projects that are currently under way, and will look to find agreements that support the ongoing work of organisations whilst benefitting the new Curriculum. These relationships, including licencing, will be agreed between organisations and Cornwall Council.

Page 101 Information Classification: CONTROLLED AGENDA ITEM 4.3

Cornish Culture and Language 2020-21 – Proposals

Cornish Language Proposals

Proposal Strategic value Capacity/delivery Cost

Project 1A – develop business plan and programming for Cornish language element of Total - £30k: new cultural centre • Cornwall Heritage Trust has acquired Cornwall Heritage Trust is the Redruth Library and intends to develop it This would be a major lead partner and is creating a as an arts, culture and heritage hub milestone for the 10-year project team. • Cornish language is integral to the vision Cornish Language Strategy. and this is an opportunity for the language community to have a base with activities Opportunity to consolidate and supporting infrastructure. It is also a and progress work on the £10k major opportunity to stop working in Framework Convention isolation and develop networks and partnerships. The project as a whole could • The language sector needs to commission contribute to the Redruth some strategic thinking to ensure the HSHAZ if it becomes a language contributes fully to the project, centre of activities and and that the language seizes on the full performances, that could spill range of opportunities of the project. out into the town (rather than • This should be an opportunity for new a set of offices and stores). language activities, more professional delivery, shared costs and overheads, shared promotion and exciting collaborations with artists, sports groups, festivals etc – to address ongoing weaknesses by drawing upon the strengths of others. Project 1B – Creative writing and filming – a short term project to showcase the kind of collaborations that could happen:

Page 102 Information Classification: CONTROLLED AGENDA ITEM 4.3

• Commission 5-10 digital media programmes in Cornish – to provide content in Cornish and develop skills with content related to different issues being addressed by future occupants of the cultural centre £10k • Creative writing sessions. KEAP runs various creative writing sessions in English for various ages and is interested in running similar workshops in Cornish. One of their regular contributors is a young Cornish language poet and this would be an opportunity for him to develop experience of leading workshops. KEAP is interested in trialling this as a way of £10k developing original writing and finding new writing collaborators for projects using Kernewek

Project 2 – accredited assessments • Commission teacher to create Level 2 Contributes to Cornish £5k WJEC assessments (GCSE equivalent) – Language Strategy and CC (Cornish Language Board) prepare assessment tasks and train Education curriculum teachers. WJEC has required us commit to developing Level 2. This will enable us to offer GSCE equivalent, accredited assessments for secondary school students, but needs upfront work to create the assessments and resources.

Project 3 – continued translator training £5k • The project funding from 2019/20 has Contributes to the Cornish Kesva an Taves Kernewek or established a new training programme. Language Strategy. Akademi Kernewek – lead We have had to create our own Builds capacity and trainer already in place from

Page 103 Information Classification: CONTROLLED AGENDA ITEM 4.3

programme, which delayed its start, but we resilience in the Cornish 2019/20 project. would like to develop this further through a community to work with a series of online presentations and wider range of partners. discussions, with the presentations being filmed, formatted and published as advanced teaching resources. No such resource exists for Cornish at present – so this would improve the skills of translators and leave a legacy for future students.

Project 4 – Schools cluster project • Continuation of working with schools and Contributes to Cornish Golden Tree £25k expanding into secondary schools. To Language Strategy – make more effective use of resources, we expanding work with schools would like to trial working with one, or two, and developing the capacity pilot academy trusts and work with them to of the delivery partner. develop a Cornish curriculum – using Link with organisations such Cornish in subject areas, integrated with as IntoBodmin as part of relevant subject matter, as well as activating community events language classes. This would be in town centres. designed to comply with public health restrictions, either completely online, or with a mixture of outdoor activity and online if in school teaching is not possible.

Project 5 – Children’s programmes • Develop further programmes with S4C, Screen Cornwall £25k starting with the Kara Kana series (Love to Sing) • Commission (low budget) original Cornish content – a short story

Programme management – contract Cornish Language Lead £10k

Page 104 Information Classification: CONTROLLED AGENDA ITEM 4.3 management, ensuring contribution to strategic objectives in the Cornish Language Strategy and wider Cornwall Council/MHCLG aims, and translation management.

Total Cornish Language Proposal £100k

Cornish culture

Proposal Strategic value Capacity/delivery Cost

Project 6 - Conference on UK National Minorities Cornwall Council’s Cornish Cornwall Council – Chief £10k • Cornwall hosted the first UK National National Minority Working Executive’s team Minorities conference in 2019 which was Group intends to use the attended by Lord Bourne. We would like to conference to promote host a similar event but encouraging a British positive dialogue about the Isles-wide discussion about how the national Framework Convention and minorities can contribute to cultural and its objectives. economic life in the 21st Century, particularly the place of young people from these communities. This would be developed as an online event.

Project 7 - Cornish £20k • Training for trainers Cornish National Minority • Youth and schools’ engagement Working Group – rather than Association – some school programme rights and duties, this would work already. • School resources to enable more schools allow people to engage with and youth groups to offer Cornish one of the activities that wrestling – to include training video secured national minority • Outreach to adult sports groups to status in a fun, tangible way broaden/integrate as a training and that would at the same time competitive activity for all – engage 5 help to keep the tradition

Page 105 Information Classification: CONTROLLED AGENDA ITEM 4.3

groups eg rugby/football/hockey clubs alive. (mens & womens) • Integrate with Healthy Cornwall Inclusive activity (any programme – offer as new physical activity gender) and already in some to those not suited to other sports schools for PE – contributes • Develop new talent ready for competitions to Healthy Cornwall and CC in in 2021 Education.

Project 8 – Cornish traditional music £20k • Development programme for traditional Cornish National Minority University of – music based on similar programmes in Isle Status – Cornish National Institute of Cornish Studies / of Man, Scotland and Cape Breton. These Music Archive project Lowender Peran / Kan Rag teach traditional music skills to conserve already underway. This Kernow and celebrate the heritage – but project will take the work a encourage innovation and partnerships in step forward from archiving order for the music to evolve and to to supporting young contribute to the distinctiveness of the musicians. The longer-term current music scene. aim is to develop a • Developing song writing and performing in residential music and Cornish language course – and this • Develop talent for participation in could be part of the Redruth international events such as Lorient, Pan Library project. Celtic, Liet etc and for cultural events in Cornwall. Cornwall qualifies for various Cornish Language Strategy international events which can provide an international platform for young performers but they are often expected to also perform traditional music from their home region.

Project 9 – Young voices – creating a positive, £10k inclusive environment Cornish National Minority Federation of Old Cornwall Most British regional accents are now accepted in Status. Societies – but on condition

Page 106 Information Classification: CONTROLLED AGENDA ITEM 4.3 professional life and in the media, but this is not For most , the that they find a relevant the case for Cornish accents or indeed other West accent and dialect are partner to work with young Country accents. Young people can feel pressure probably the most real people. to dilute their identity if they are to be taken aspects of Cornish identity seriously. but they get little or no • Identify barriers to young people with recognition in the media or Cornish accents but focus on creating officially. opportunities – local radio adverts, This project needs announcements, public speaking to show tighter definition by talking to confident, intelligent use of the accent. potential delivery partners For example, is it that advertising agencies (eg youth work, building just don’t have access to Cornish confidence for work, media voiceover artists? Talk to Cornish training programmes) performers and professionals, such as Ed Rowe, who have achieved some success for their perspective • Commission a partner to offer young people a chance to learn how to make short documentaries and to make a series of videos to give voice to young Cornish people to talk about what interests them, what affects them and what they want to do. Aim to give them a voice – both positive stories and stories on problems – in locations with low achieving young people. Target 20 young people creating 5 short films. • As well as the accent, Cornwall has its dialect (not the Celtic language – Kernewek) which is rarely heard in the media. Capture young people using it – both as archive of use in the C21st (not as history) but also to show positive representation.

Page 107 Information Classification: CONTROLLED AGENDA ITEM 4.3

Project 10 - Gorsedh Youth Festival Following the success of Feb 2020 festival with 5 KEAP £15k Camborne schools, we would like to develop the concept further • for 10 schools in 2020/21 • confidence, creative writing, song writing, performing, language learning lead by KEAP, with partners including the Cornwall Music Education Service, Gorsedh Kernow and Cornwall Heritage Trust

Project 11 – Education Development of curriculum, teaching resources, Cornish National Minority CC Education £25k activities and events for schools Status This would build on the framework established in Spring 2019 by creating content for some of the modules.

Total Cornish Culture £100k

12 – Strategic Capacity For project management, ensuring strategic fit Cornish National Minority CC Culture £15k and maximising impact with additional partners. Status

Total Package £215k

Page 108 Information Classification: CONTROLLED AGENDA ITEM 5

Kernow. 4 Mis Metheven 2020

Increase of racist abuse directed at Cornish National Minority

References: a. Cornish granted minority status within the UK HM Gov 24 April 2014 https://www.gov.uk/government/news/cornish-granted-minority-status-within-the-uk b. Cornwall Council statement confirming FCPNM had been adopted in its entirety by UK Govt. issued by Strategy and Engagement, Cornwall Council ref. FOI-101004616280 Dd. 04/10/2019 ‘The UK Government signed up to the Framework Convention in its entirety, including Article 10 and Article 10.3’

Report:

On 23rd March, 2020, the British Government imposed a lockdown as part of the campaign to slow and control the spread of coronavirus Covid 19 in the and legislation was quickly enacted.

The company secretary privatised tourist company ‘Visit Cornwall’, Malcolm Bell, performed a very public volte-face and with the assistance of local mainstream print media launched a campaign to deter the massive tourist influx into Cornwall expected in the weeks ahead.

This was remarkable in that only a very short time before, Mr Bell and the media were declaring Cornwall as being open for business.

Indeed, it was inferred that it might be the ideal place to come to avoid the worst of the coronavirus pandemic. (as an example, a now deleted ‘Cornwall Live’ article dated 5th March, 2020 – ‘Cornwall could be one of the safest places to be as coronavirus hits the UK. ‘Cornwall Live’ is the on line presence of the ‘Cornish Guardian’ ‘West Briton’ and ‘Cornishman’ newspapers’)

Once the government restrictions had been published, Cornish MP (St Austell and ) Cornwall’s appointed representative to the Council of Europe in respect of the Cornish National Minority, made a number of sensible and reasoned public announcements requesting that tourists stay away during this period of pandemic.

The local media then followed with a ‘come back later’ campaign, carefully removing all recent on line articles which called for tourists to continue to come to Cornwall.

The and Cornwall Police also issued a series of sensible warnings to tourists and indeed second home owners, requesting that in view of Cornwall’s limited hospital and in particular intensive care facilities, they stay away from Cornwall for the time being.

This request to stay away was also promulgated in a series of announcements made on behalf of Cornwall Council and indeed other authorities in Cornwall.

‘Cornwall Live’ whilst publishing a number of articles echoing the request to ‘come back later’ then ran a series of articles and re-jigged pieces over a period of several days providing up to date

Page 109 Information Classification: CONTROLLED AGENDA ITEM 5 information on events and matters concerning foul mouthed celebrity cook Gordon Ramsay and his family who had chosen to shelter from the effects of the virus by taking up residence in his multi million pound holiday home on the north coast of Cornwall some three days before the official ‘lock down’ announcement.

These articles were picked up by ‘Cornwall Live’s’ national newspaper owners and generally spread across the wider media.

As a result of this irresponsible journalism, many residents of Cornwall, who for the most part were totally compliant with the ‘lock down’ and ‘stay at home’ advice and laws were increasingly angered with many believing, not without some justification, that ‘Cornwall Live’ was inciting problems, if not hatred.

A series of complaints to the editor of ‘Cornwall Live’ were brushed aside and ignored.

Devon and Cornwall Police assisted by Cornwall Council then set about enforcing the laws in order to save Cornwall’s health services from breaking under the strain of tourism aided by a frightened and worried population.

A major law enforcement and public information operation ensued with the full support of the people of Cornwall who clearly saw the logic and necessity for it.

The people of Cornwall acted in the main, in a sensible manner, and followed the official requests and laws. Several hundred messages were sent to the police and council reporting incoming tourists and second home owners for infringing the laws.

The actions of the people of Cornwall and those serving them are to be commended.

There has sadly been several deaths from the virus both in Cornwall’s health facilities and in nursing, residental and private homes. News of these have hit the population of Cornwall hard.

The actions of the media and ‘Visit Cornwall’ in the run up to the crisis are to be condemned.

As a result of the ‘stay away for now’ campaign, the amount of hatred and abuse shown to Cornish people and indeed the people of Cornwall has become utterly vitriolic, reaching levels not witnessed in many years.

Down the weeks, we have been gathering samples of these remarks made in the media both in Cornwall and without at a UK level.

We attach as an example, a small selection of these comments exactly as written and without amendment (https://kernowmatters.wordpress.com/insult-gallery/ ) and cite the following:

“Too often the abiding perception of Cornwall is of a location devoid of its inhabitants. How often do we hear from visitors: ‘I love Cornwall’? But seldom do we hear: ‘I do like the Cornish’.

The most extreme manifestations of such attitudes sees the Cornish as a species of troglodyte, who under cover of darkness empty the bins and clean the amenities ready for the visitors.

This sort of dismissal is well documented and can be traced in a wide variety of literary and artistic activity: in the writings of D.H. Lawrence, for example, or in films such as ‘Straw Dogs’ where the Cornish are presented as a brutalized people strongly reminiscent of the American ‘red neck’.” (Jonathan Howlett, ‘Putting the Kitsch into Kernow’, Cornish Studies, Second Series 12 (2004), 30–60)

Page 110 Information Classification: CONTROLLED AGENDA ITEM 5

We believe such insults are a clear demonstration of hatred aimed at the Cornish National Minority and look forward to hearing proposals as to firm action to deter future vicious remarks which cause much hurt.

For and on behalf of Kernow Matters to Us (KMTU)

Link to report: https://kernowmatters.wordpress.com/2020/05/13/increase-of-racist-abuse­ directed-at-cornish-national-minority/

Link to a selection of abusive and vitriolic insults recorded: https://kernowmatters.wordpress.com/insult-gallery/

Link Facebook group ‘Kill a Cornishman’: https://kernowmatters.wordpress.com/2020/05/06/facebook-group-kill-a-cornishman/

Link to ‘Every week another London friend catches Covid as we top up our tans’: https://kernowmatters.wordpress.com/2020/05/23/every-week-another-london-friend-catches­ covid-as-we-top-up-our-tans/

Link to 'Covid-19 restrictions eased but anti Cornish vitriol sadly continues' https://kernowmatters.wordpress.com/2020/05/18/covid-19-restrictions-eased-but-anti-cornish­ vitriol-sadly-continues/

Distribution:

The Council of Europe (Framework Convention for the Protection of National Minorities)

The Chief Constable - Devon and Cornwall Police

The Police and Crime Commissioner - Devon and Cornwall Police

Devon & Cornwall Police Diversity Unit

Rt Hon MP Secretary of State for Environment, Food and Rural Affairs

Steve Double MP Cornwall's Representative at the Council of Europe

Scott Mann MP

Sherryl Murray MP

Derek Thomas MP

Cherilyn Mackrory MP

Cllr Julian German - Leader of Cornwall Council

Cllr Dick Cole - Chair Cornish Minority Working Group

Cornwall Council Cornish Minority Working Group

Cornwall Councillors on receipt

Equality and Human Rights Commission

Independent Press Standards Organisation

Page 111 AGENDA ITEM 10.1

Your ref: My ref: Date: 22nd June 2020

Public Bill Committee House of Commons Westminster SW1A 0AA

Dear friends

PARLIAMENTARY CONSTITUENCIES BILL

It is my understanding that the Public Bill Committee is willing to receive written evidence as part of its scrutiny of the Parliamentary Constituencies Bill 2019-21 and I would be grateful if MPs on the Committee could consider the points in this representation.

I am writing this letter in a personal capacity, but I am the leader of – the Party for Cornwall and I also chair Cornwall Council’s cross-party working group on national minority status.

Cornwall is a historic nation, with its own culture, traditions and language, while the Cornish are recognised as a national minority. This places many obligations on the UK Government and, with this in mind, it is my hope that MPs will wish to ensure that the Cornish border which has been in existence for more than one thousand years is respected in all future boundary reviews and no cross-Tamar seats will be created.

The last Boundary Review

The Parliamentary Voting System and Constituencies Act was passed in 2011. It put in place a process to reduce the number of MPs to 600 and ensure that all seats (except for four named examples) would be within 5% of the average UK electorate. This meant that it was statistically impossible to ensure that all Cornish constituencies would lie entirely within the boundaries of Cornwall (and the Isles of Scilly).

When the “Boundary Commission for England” published its proposals for new constituency boundaries, it inevitably included a “Devonwall” parliamentary seat. This caused considerable upset in Cornwall. Hundreds and hundreds of people opposed the new seat and there was even a protest at Polson Bridge on the Cornish border.

Lanhainsworth, Fraddon Hill, Fraddon St Columb, Cornwall TR9 6PQ

Page 112 www.cornwall.gov.uk Since the Parliamentary Voting System and Constituencies Act (2011) came into being, there has been a significant development. The UK Government has recognised the Cornish as a national minority. This alone should lead MPs to ensure that the new legislation includes a clause or clauses to protect Cornish territoriality.

The possibility of a “Devonwall” seat

Whereas the previous boundary review proposed a “Devonwall” constituency, I would acknowledge that a new review carried out in the near future (on the basis of 650 MPs and Cornwall’s present electorate) might not lead to the recommendation of a cross- Tamar constituency.

But the legislation states that a fresh boundary review should be carried out every eight years and, if Cornwall’s population does continue to grow, it would only be a matter of time before the likelihood of a Devonwall constituency arises once again.

It is my view that the Parliamentary Constituencies Bill 2019-21 could and should categorically rule out such a scenario.

The Framework Convention for the Protection of National Minorities

On 24th April 2014, the UK Government recognised the Cornish people through the Framework Convention for the Protection of National Minorities. The official press release stated that “the decision to recognise the unique identity of the Cornish, now affords them the same status … as the UK’s other Celtic people, the Scots, the Welsh and the Irish.”

As well as protecting the culture and identity of national minorities, the Framework Convention also seeks to protect the political integrity of territories associated with such groups.

An Advisory Committee from the Council of Europe visited the United Kingdom in March 2016 to assess how the UK Government and other public bodies were complying with the articles of the Framework Convention. The subsequent opinion published in 2017 raised a range of concerns about public policy in the UK, which including the review into parliamentary constituencies at that time, that it felt would adversely affect the Cornish national minority.

It is my view that the Parliamentary Constituencies Bill 2019-21, as presently drafted, is in conflict with the spirit and intent of the Framework Convention, and the Bill needs to be revised in order to address that conflict.

If the UK Parliament fails to amend the Bill, it will be failing to meet its obligations with regard to the Framework Convention. I would hope that MPs would want to ensure that it properly acts on the commitments that have been made by the UK Government.

A Boundary Commission for Cornwall

The Parliamentary Constituencies Bill 2019-21 ensures that the territories of other national minorities within the United Kingdom (namely the Scots, the Welsh and Northern Irish) are safeguarded and no seats can be proposed which would cross the

Page 113 land borders between England and Scotland or England and Wales. This will principally be achieved through the existence of different Boundary Commissions (for England, , Scotland and Wales) which mean that there is no scenario in which cross-border seats between these four nations could be created.

It is therefore illogical that Cornwall – the territory of another national minority – is not treated in the same manner.

It is my view that it would be best to create a separate Boundary Commission to agree the future parliamentary constituencies for Cornwall. This would ensure that Cornwall’s national border is permanently safeguarded.

Protected constituencies

Just like the Parliamentary Voting System and Constituencies Act (2011), the Parliamentary Constituencies Bill 2019-21 includes the four “protected constituencies” of Orkney and Shetland, Na h-Eileanan an Iar, and the Isle of Wight (2 seats).

One option for MPs would be to amend the Bill in order ensure that all Cornish constituencies would lie entirely within the boundaries of Cornwall (and the Isles of Scilly).

Please do the right thing for Cornwall

It is my hope that MPs will amend the Parliamentary Constituencies Bill 2019-21 in order to respect the Framework Convention and Keep Cornwall Whole.

Thank you,

Dick Cole Cornwall Councillor (St Enoder Division)

Tel: 01726 861869 Mobile: 07791 876607 Email: [email protected]

Page 114 MP Member of Parliament for and Falmouth House of Commons, London SW1A 0AA Tel: 020 7219 3713

Cllr Dick Cole Chairman of the Cornish National Minority Working Group Cornwall Council New County Hall Truro TR1 3AY

22nd June 2020

Dear Cllr Cole

Supporting inclusivity and diversity of the BAME communities in Cornwall

You will no doubt be aware of the significant interest in the BAME and Black Lives Matter movement in Cornwall. A cause for us all to stop and listen to people’s stories of how people have been affected by racism in Cornwall.

Cornwall is a welcoming place. Cornwall welcomed me with open arms a number of years ago and is now the place I am luckily enough to call my home. However, I am well aware that for a number of people this will not be the same story. The stories I hear from constituents affected by racism sadden me. Their pain is clear to hear and see. A place that can be so beautiful, but so hurtful.

I believe that we need to seriously look at how we can address the issues of racism and inclusivity in Cornwall, for all BAME communities. As the local authority in Cornwall, I want to work with Cornwall Council to tackle this issue.

As you know, Cornwall Council already has a Working Group of cross-party elected members, officers and outside representatives that looks at the issue of the Cornish as a national minority. As a national minority, that means the Cornish have the right to express, preserve, share and develop their distinct culture and identity. Cornwall Council and its partners have been working hard to raise awareness of the Cornish as a national minority so that the Cornish are treated equally. The Working Group does excellent work and I was pleased to work with you on the Group’s ambition for the Cornish to have a tick box on the next national census in 2021, which I spoke in favour of in Parliament in May.

I therefore request that Cornwall Council expands this Working Group to look at how it can help promote and be actively inclusive towards the BAME communities that live and work in Cornwall. If this Working Group is not suitable, I would appreciate it if an alternative Working Group could be established promptly.

To tackle the issues around inclusivity, diversity and racism in Cornwall it will take leadership.

I do hope that Cornwall Council take leadership on this matter and look to help make Cornwall a more inclusive, caring and compassionate place to live and grow up in.

I would be delighted to work with you in achieving this.

Kind regards,

Cherilyn Mackrory MP Member of Parliament for Truro and Falmouth Constituency Office: William Street, Truro, TR1 2ED [email protected] 115 Website: www.cherilynmackrory.org.uk Information Classification: CONTROLLED MINUTE NO: 5

Cherilyn Mackrory MP Constituency Office Your ref: Lemon Chapel My ref: KK/st William Street Date: 24 June 2020 Truro TR1 2ED

Dear Cherilyn

Thank you for your open letter to myself and to Cllr Dick Cole in his position as Chair of the Cornish National Minority Working Group, in respect of supporting equality, diversity and the inclusion of our black, Asian and minority ethnic residents.

Your positive offer to work with the Council to help make Cornwall a more inclusive, caring and compassionate place to live and grow up in for our black, Asian and minority ethnic residents is very welcome. The Council is committed to creating a fair and inclusive Cornwall, where we value our unique cultural heritage, celebrate diversity in all its forms, and create an environment where “one and all” have an equal chance of realising their full potential.

You rightly state that addressing issues around inclusivity, diversity and racism in Cornwall requires leadership. The Leader of the Council (who is also the Portfolio Holder for Equality and Diversity) has publicly set out our commitment to create a more equitable and tolerant society, and to continue working alongside our black, Asian and minority ethnic community to understand how we can do more to support them and better tackle the impact that racism and discrimination has on our communities.

Cornwall’s collective response to the pandemic has shown how we truly are “stronger together”, and I am delighted that a range of leaders from across the public, private and voluntary sectors have offered to work with the Council and contribute their talents and passion to address this important issue.

Cornwall Council | Konsel Kernow The Exchange, 4th floor, New County Hall, Truro, TR1 3AY E: [email protected] | T: 0300 1234 100 www.cornwall.gov.uk Information Classification: CONTROLLED

Cornwall Council is establishing a cross-sector Steering Group to bring partners together to provide the collective leadership necessary to achieve meaningful change, working with our black, Asian and minority ethnic residents. I have discussed your offer with the Leader and with Cllr Cole, and we would be delighted to invite you to join this Steering Group representing Cornwall’s MPs. My colleague Jessie Hamshar will be in touch shortly to make the necessary arrangements.

All the best/ Oll an gwella