The GESP Draft Policies and Site Options Consultation Document

Total Page:16

File Type:pdf, Size:1020Kb

The GESP Draft Policies and Site Options Consultation Document The GESP Draft Policies and Site Options Consultation Document Sustainability Appraisal Report Final Report Prepared by LUC June 2020 Project Title: Sustainability Appraisal of the Greater Exeter Strategic Plan Client: East Devon District, Exeter City, Mid Devon District, and Teignbridge District Councils Version Date Version Details Prepared by Checked by Approved by 1 11/05/2020 Draft SA Report for Kieran Moroney Kate Nicholls Taran Greater Exeter Natalie Collins Livingston Strategic Plan: Draft Harry Briggs Policies and Site Kate Nicholls Options Consultation document 2 25/05/2020 Final SA Report for Kieran Moroney Kate Nicholls Taran Greater Exeter Natalie Collins Livingston Strategic Plan: Draft Harry Briggs Policies and Site Kate Nicholls Options Consultation document 3 01/06/2020 Updated Final SA Kieran Moroney Kate Nicholls Taran Report for Greater Natalie Collins Livingston Exeter Strategic Plan: Harry Briggs Draft Policies and Site Kate Nicholls Options Consultation document The GESP Draft Policies and Site Options Consultation document Sustainability Appraisal Report Final Report Prepared by LUC June 2020 Planning & EIA LUC BRISTOL Offices also in: Land Use Consultants Ltd th Registered in England Design 12 Floor Colston Tower London Registered number: 2549296 Landscape Planning Colston Street Bristol Glasgow Registered Office: Landscape Management BS1 4XE Edinburgh 43 Chalton Street Ecology T +44 (0)117 929 1997 London NW1 1JD Mapping & Visualisation [email protected] FS 566056 EMS 566057 LUC uses 100% recycled paper Contents Introduction 1 Background to the GESP 1 Sustainability Appraisal and Strategic Environmental Assessment 1 Other assessments undertaken 2 Structure of this report 2 Methodology 6 Stage A: Scoping 6 SA Stage B: Developing and refining options and assessing effects 10 SA Stage C: Preparing the Sustainability Appraisal report 14 SA Stage D: Consultation on GESP and this SA Report 14 SA Stage E: Monitoring implementation of the GESP 14 Appraisal methodology 14 Difficulties Encountered 20 Sustainability Context for Development in the plan area 21 Review of Plans, Policies and Programmes 21 Relationship between the GESP and other plans and programmes 21 Environmental, Social and Economic Objectives Relevant to the GESP 23 Baseline Information 30 Key Sustainability Issues 30 Sustainability Appraisal Findings for the Policy Options 37 Vision and Priorities and Sustainable Development Policy 37 Strategy Alternatives 40 Climate Emergency 49 Prosperity 58 Housing 67 Movement and Communication 75 Nature 90 Quality Places and Infrastructure 97 Sustainability Appraisal Findings for the Potential Site Options 104 Monitoring 125 Conclusions 126 Next Steps 127 Introduction 1.1 East Devon, Exeter City, Mid Devon and Teignbridge District Councils commissioned LUC in May 2018 to carry out a Sustainability Appraisal (SA) incorporating Strategic Environmental Assessment (SEA) of the Greater Exeter Strategic Plan (GESP). 1.2 This SA Report relates to the Draft Policies and Site Options Consultation (September 2020) version of the GESP and it should be read in conjunction with that document. Background to the GESP 1.3 The GESP will cover the Greater Exeter Authorities of: • East Devon District Council; • Exeter City Council; • Mid Devon District Council; and • Teignbridge District Council. 1.4 Devon County Council is also a partner in this joint planning work. 1.5 The GESP will set out strategic policies for development across the four local planning authority areas for the period covering 2020 to 2040. The individual authorities will produce more detailed Local Plans for their own areas that will sit under and be informed by the GESP. 1.6 It should be noted that around 30% of Dartmoor National Park falls in Teignbridge district and a very small part in Mid Devon. The National Park Authority is a planning authority in its own right and produces its own Park wide plan. The GESP and this SA/SEA report does not cover National Park areas, albeit with the caveat that some data sources quoted in this report may extend or refer to areas that lie beyond the GESP area and there are also cross-boundary matters that are addressed in this report. 1.7 The principles of sustainable development are at the heart of the planning system. The SA process is intended to ensure that through plan-making LPAs have considered social, environmental and economic concerns when producing Development Plan Documents (DPD). The GESP will have the status of a DPD. Sustainability Appraisal and Strategic Environmental Assessment 1.8 Sustainability Appraisal is a statutory requirement of the Planning and Compulsory Purchase Act 2004. It is designed to ensure that the plan preparation process maximises the contribution that a plan makes to sustainable development and minimises any potential adverse impacts. The SA process involves appraising the likely social, environmental and economic effects of the policies and proposals within a plan from the outset of its development. 1.9 Strategic Environmental Assessment (SEA) is also a statutory assessment process, required under the SEA Directive1, transposed in the UK by the SEA Regulations2 (Statutory Instrument 2004, No 1633). The SEA Regulations require the formal assessment of plans and programmes which are likely to have significant effects on the environment and which set the framework for future 1 SEA Directive 2001/42/EC 2 The Environmental Assessment of Plans and Programmes Regulations 2004 (SI 2004/1633), as amended by The Environmental Assessments and Miscellaneous Planning (Amendment) (EU Exit) Regulations 2018 (SI 2018/1232). It should be noted that the purpose of the amendments to the SEA Regulations is to ensure that the law functions correctly after the UK has left the European Union. No substantive changes are made to the way the SEA regime operates. SA of the Greater Exeter Strategic Plan: Draft Policies and Site Options Consultation 1 June 2020 consent of projects requiring Environmental Impact Assessment (EIA)3. The purpose of SEA, as defined in Article 1 of the SEA Directive is “to provide for a high level of protection of the environment and to contribute to the integration of environmental considerations into the preparation and adoption of plans….with a view to promoting sustainable development”. 1.10 SEA and SA are separate processes but have similar aims and objectives. Simply put, SEA focuses on the likely environmental effects of a plan whilst SA includes a wider range of considerations, extending to social and economic impacts. National Planning Practice Guidance4 shows how it is possible to satisfy both requirements by undertaking a joint SA/SEA process, and to present an SA Report that incorporates the requirements of the SEA Regulations. The SA/SEA of the GESP is being undertaken using this integrated approach and throughout this report the abbreviation ‘SA’ should therefore be taken to refer to ‘SA incorporating the requirements of SEA’. 1.11 At the time of writing, the UK including the GESP area is in the midst of the coronavirus pandemic. Clearly, this unprecedented public health crisis will have a wide range of short, medium and long-term impacts, many of which will take time to become clear. The SA addresses ‘human health’ as one of the topics that the SEA Regulations require to be considered; however the SA has not specifically addressed the pandemic when appraising site and policy options. Once the public health situation has evolved and the effects becomes clearer, later iterations of the SA may consider proposals for the GESP in the particular context of the pandemic. The baseline evidence relating to health (see Chapter 3 and Appendix 3) will be updated at each stage to reflect the impacts of the pandemic and to provide up-to-date context for the SA. Other assessments undertaken 1.12 Under Article 6 (3) and (4) of the Directive 92/43/EEC on the Conservation of Natural Habitats and of Wild Fauna and Flora (Habitats Directive) land-use plans, including Development Plan Documents, are also subject to Habitats Regulations Assessment (HRA). The purpose of HRA is to assess the impacts of a land-use plan against the conservation objectives of a European site and to ascertain whether it would adversely affect the integrity of that site. A separate HRA for the GESP is being undertaken and the findings have been drawn on to inform the SA where relevant. Structure of this report 1.13 This report is the SA Report for the Draft Policies and Site Options Consultation (September 2020). Table 1.1 below signposts how the requirements of the SEA Regulations have been met within this report. Table 1.1: Requirements of the SEA Regulations and where these have been addressed in this SA report SEA Regulation Requirements Where covered in this SA Report Preparation of an environmental report in which the likely significant effects on the environment of implementing the plan or programme, and reasonable alternatives taking into account the objectives and geographical scope of the plan or programme, are identified, described and evaluated (Reg. 12). The information to be given is (Schedule 2): a) An outline of the contents, main objectives of the plan or Chapter 1, Chapter 3, Chapter programme, and relationship with other relevant plans and 4 and Appendix 2. programmes b) The relevant aspects of the current state of the environment Chapter 3 and Appendix 3. and the likely evolution thereof without implementation of the plan or programme c) The environmental characteristics of areas likely to be Chapter 3 and Appendix 3. significantly affected 3 Under EU Directives 85/337/EEC and 97/11/EC concerning EIA. 4 http://planningguidance.planningportal.gov.uk/ SA of the Greater Exeter Strategic Plan: Draft Policies and Site Options Consultation 2 June 2020 SEA Regulation Requirements Where covered in this SA Report d) Any existing environmental problems which are relevant to Chapter 3 and Appendix 3. the plan or programme including, in particular, those relating to any areas of a particular environmental importance, such as areas designated pursuant to Directives 79/409/EEC and 92/43/EEC.
Recommended publications
  • Sediment Yields in the Exe Basin: a Longer-Term Perspective
    Sediment Dynamics and the Hydromorphology of Fluvial Systems (Proceedings of a symposium held in 12 Dundee, UK, July 2006). IAHS Publ. 306, 2006. Sediment yields in the Exe Basin: a longer-term perspective ANNA HARLOW, BRUCE WEBB & DES WALLING School of Geography, Archaeology and Earth Resources, Department of Geography, Amory Building, Rennes Drive, Exeter EX4 4RJ, UK [email protected] Abstract In the UK, fine sediment is viewed increasingly as a diffuse pollu- tant due to its role as a vector for the transport of potential contaminants, and in causing siltation, which may have adverse effects on river and estuarine habitats. There is a need, therefore, for river managers to have reliable information on sediment budgets in order to plan measures that will achieve “good” status under the EU Water Framework Directive. As part of a wider sediment-budget investigation in the EU-funded Cycleau Project, detailed records of fine sediment yield over the 10-year period from 1994–2003 have been analysed for the Exe Basin (1500 km2), a principal river system of southwest England. The longer-term average yields in the three major tributaries of the Exe Basin are discussed and results of monitoring of sediment loads at a site near the tidal limit over a one-year period confirm the importance of the River Exe in contributing sediment to the Estuary. Key words diffuse pollution; Exe Basin and estuary; longer-term behaviour; suspended sediment yields INTRODUCTION River systems provide a key pathway along which fine sediment (silt and clay particles of <63 µm in diameter) is transferred from the terrestrial to the estuarine environment.
    [Show full text]
  • First Annual Review of The
    FIRST ANNUAL REVIEW OF THE RIVER EXE CATCHMENT MANAGEMENT PLAN (1997) Key Sites Relating to Issues in the River Exc Annual Review Bridgwater : a ay i: -: WheddotV:Ctoss:3&i Information corrcct as of Oct 1997 River lixc Calchmcnl Management I’lan O Crown Copyright ENVIRONMENT AGENCY 1‘nvtronmcfU Agcncy South West kcpron II II lllllll II 125080 SOUTHWEST REGION RIVER EXE CATCHMENT MANAGEMENT PLAN - ACTION PLAN - FIRST ANNUAL REVIEW Con ten ts: ..................................................................................................................................................... Y.........................................Page N o O ur V ision O f The Ca tc h m en t....................................................................................................................................................................2 1. Introduction ................................................................................................................................................................................................3 1.1 The Environm ent Ag en c y ....................................................................................................................................................................3 1.2 The Environm ent Planning Pr o c e ss..............................................................................................................................................4 1.3 T he Catchm ent steerin g G r o u p.......................................................................................................................................................4
    [Show full text]
  • Black's Guide to Devonshire
    $PI|c>y » ^ EXETt R : STOI Lundrvl.^ I y. fCamelford x Ho Town 24j Tfe<n i/ lisbeard-- 9 5 =553 v 'Suuiland,ntjuUffl " < t,,, w;, #j A~ 15 g -- - •$3*^:y&« . Pui l,i<fkl-W>«? uoi- "'"/;< errtland I . V. ',,, {BabburomheBay 109 f ^Torquaylll • 4 TorBa,, x L > \ * Vj I N DEX MAP TO ACCOMPANY BLACKS GriDE T'i c Q V\ kk&et, ii £FC Sote . 77f/? numbers after the names refer to the page in GuidcBook where die- description is to be found.. Hack Edinburgh. BEQUEST OF REV. CANON SCADDING. D. D. TORONTO. 1901. BLACK'S GUIDE TO DEVONSHIRE. Digitized by the Internet Archive in 2010 with funding from University of Toronto http://www.archive.org/details/blacksguidetodevOOedin *&,* BLACK'S GUIDE TO DEVONSHIRE TENTH EDITION miti) fffaps an* Hlustrations ^ . P, EDINBURGH ADAM AND CHARLES BLACK 1879 CLUE INDEX TO THE CHIEF PLACES IN DEVONSHIRE. For General Index see Page 285. Axniinster, 160. Hfracombe, 152. Babbicombe, 109. Kent Hole, 113. Barnstaple, 209. Kingswear, 119. Berry Pomeroy, 269. Lydford, 226. Bideford, 147. Lynmouth, 155. Bridge-water, 277. Lynton, 156. Brixham, 115. Moreton Hampstead, 250. Buckfastleigh, 263. Xewton Abbot, 270. Bude Haven, 223. Okehampton, 203. Budleigh-Salterton, 170. Paignton, 114. Chudleigh, 268. Plymouth, 121. Cock's Tor, 248. Plympton, 143. Dartmoor, 242. Saltash, 142. Dartmouth, 117. Sidmouth, 99. Dart River, 116. Tamar, River, 273. ' Dawlish, 106. Taunton, 277. Devonport, 133. Tavistock, 230. Eddystone Lighthouse, 138. Tavy, 238. Exe, The, 190. Teignmouth, 107. Exeter, 173. Tiverton, 195. Exmoor Forest, 159. Torquay, 111. Exmouth, 101. Totnes, 260. Harewood House, 233. Ugbrooke, 10P.
    [Show full text]
  • East Midlands Derbyshire
    Archaeological Investigations Project 2004 Geophysical Investigations East Midlands Derbyshire South Derbyshire 7 /1 (H.17.S002) SK 21031756 DE12 8LZ LAND AT WALTON-ON-TRENT A Geophysical Survey on Land at Walton-upon-Trent, Derbyshire Butler, A & Fisher, I Northampton : Northamptonshire Archaeology, 2004, 10pp, figs, refs Work undertaken by: Northamptonshire Archaeology Geophysical prospection was carried out comprising a detailed earth resistance survey and a magnetometer survey of c. 2 ha of land on earthworks. The resistance survey confirmed the earthwork banks and ditches that were apparent on the ground and in addition showed some anomalies that were not visible on the surface. A detailed magnetometer survey was carried out over the same area and provided little new information, possibly due to peculiarities of the local geofluvial substrate. [Au(adp)] Archaeological periods represented: UD 7 /2 (H.17.S001) SK 28302790 DE65 6BW WILLINGTON Geophysical Survey Report. Willington, Derbyshire Donaldson, K Upton-upon-Severn : Stratascan, 2004, 36pp, figs Work undertaken by: Stratascan A detailed magnetic survey was conducted over 12.5 ha of agricultural land and detected a number of geophysical anomalies within the site. Positive linear anomalies within the south-west corner of the site may have represented an extension to archaeological features previously identified during excavations. Several linear and curvilinear anomalies within the eastern half of the site may also have indicated the presence of a subcircular enclosure with internal and external ring ditch features. A positive linear anomaly extending across the centre of the site from north to south corresponded to the location of a parish boundary. Several other positive anomalies also corresponded to the location of drains and ditches and indicated former land divisions.
    [Show full text]
  • Devon Area Report
    /vj(V\ SuVfh \°\ % NRA National Rivers Authority South Western Region DEVON AREA REPORT River Culm Fisheries Survey 1994 February 1995 DEV/FRCJ06/95 Author: J Goodwill Senior Fisheries Technician G R Bateman Area Manager (Devon) CONTENTS 1) INTRODUCTION 2) METHODS 2.1 Site Clustering 2.2 Fieldwork 3) RESULTS AND DISCUSSION 3.1 Salmon 3.2 Trout 3.3 Other Species 4) CONCLUSIONS 5) RECOMMENDATIONS 6) APPENDIX A - RESULTS ENVIRONMENT AGENCY 130095 RIVER CULM FISHERIES SURVEY 1994 1) INTRODUCTION A survey of the populations of freshwater fish at selected sites in the Culm river system was carried out in June and July 1994. The aim of the survey was to assess the distribution and abundance of freshwater fish and to compare with results of previous surveys where possible. Comprehensive surveys of the Culm system have been carried out in 1981 (Hamilton) and 1989. Limited surveys have been carried out in 1977, 1978, 1982, 1984 and 1987. For a brief description of the catchment see Hamilton (1981). 2) METHODS A total of twenty six sites were chosen throughout the catchment. Twenty-four .sites-were- - surveyed quantitatively, the remaining two, semi-quantitatively. Site selection was based upon physical accessibility, geographical distribution and habitat characteristics. Site distribution and locations are shown in Figure 1. Site details are given in Table 1. 2.1 Site Clustering Since 1992, routine sampling has included single-run sites in addition to three-run sites. Sites are clustered on a ' target area' basis r one three-run site is associated with up to four single-run sites. A typical' cluster' will consist of five sites.
    [Show full text]
  • The Evolution of the Rivers of East Devon and South Somerset, UK
    R.W. Gallois THE EVOLUTION OF THE RIVERS OF EAST DEVON AND SOUTH SOMERSET , UK R.W.G ALLOIS Gallois, R.W. 2006. The evolution of the rivers of east Devon and south Somerset, UK. Geoscience in south-west England, 11 , 205-213. With the exception of the River Tone, which appears to have been separated at an early stage from its neighbours to the south by a major fault, the rivers of south Somerset and east Devon were initiated on a southward dipping Tertiary planation surface. The evolutionary histories of the present-day catchments of the rivers Exe and Otter are complex and inter-related. Those of the adjacent Axe and Teign appear to be less complex and may have evolved relatively independently from the Exe-Otter system. The differences in the histories of the catchments are most clearly demonstrated by their terrace systems. The Exe-Otter catchment has 10 or more terrace levels at heights of up to 140 m above the modern floodplain. In contrast, the Axe, Teign and Tone catchments contain only one or two terrace levels all of which are less than 20 m above the present-day valley floor. The explanation suggested here for the difference involves a sequence of river captures that changed the forerunner of the present-day Otter from a major river capable of producing a 3-km wide gravelly braidplain into a minor stream. 92 Stoke Valley Road, Exeter, EX4 5ER, U.K. (E-mail: [email protected]). INTRODUCTION The middle and lower reaches of the River Exe and the There are too few age data to determine the period of time adjacent catchments of the Axe, Otter, Teign and Tone drain an during which the terrace sequences in south-west England area with a complex topographical relief that ranges from over evolved, but comparison with the denudation chronology of 300 m above Ordnance Datum (O.D.) in the Blackdown Hills southern England as a whole suggests that all the terraces to a few metres above O.D.
    [Show full text]
  • Display PDF in Separate
    N f ^ S olMV> UJjmt 2.18 Environmental Protection Internal Report REGIONAL WATER QUALITY MONITORING AND SURVEILLANCE PROGRAMME FOR 1992 IMPACT ASSESSMENT OF EFFLUENT DISCHARGES ON RECEIVING WATERS January 1992 FWS/92/010 Author: R Broome Freshwater Scientist NRA C.V.M. Davies National Rivers Authority Environmental Protection Manager South Wen Region LIST OF CONTENTS 1. Introduction to the 1992 Inpact Assessment Of Effluent Discharges on Receiving waters Programme. 2. Description of programme. 2.1 Sites monitored 2.2 1993 Programme 3. Programme information 4. Schedule Explanation 5. Endorsement 6. Schedule of Sampling and Analysis A p p e n d i x A environment a g e n c y 110036 REGIONAL WATER QUALITY MONITORING AND SURVEILIANCE PROGRAMME FOR 1992 IMPACT ASSESSMENT OF EFFLUENT DISCHARGES ON RECEIVING WATERS TECHNICAL REPORT NUMBER FW5/92/010 SUMMARY The 1992 Impact Assessment of Effluent Discharges on Receiving Waters Programme evolved from a review of the existing 1991 programme, whose primary purpose was to provide data for the review of discharge consents, as result of the newly implemented Water Resources Act Consent register and the Charging for Discharges Scheme. This programme is integrated with the effluent discharge compliance assessment programme, Samples are taken not only of a significant discharge but also of the receiving water immediately upstream of the discharge and at the edge of the mixing zone downstream of the discharge. The 1992 programme has several purposes, such as: - identifying any impact by the discharge on the receiving waters. - characterising upstream water quality. - providing a database against which change can be measured.
    [Show full text]
  • Devon Redlands Area Profile: Supporting Documents
    National Character 148: Devon Redlands Area profile: Supporting documents www.naturalengland.org.uk 1 National Character 148: Devon Redlands Area profile: Supporting documents Introduction National Character Areas map As part of Natural England’s responsibilities as set out in the Natural Environment White Paper1, Biodiversity 20202 and the European Landscape Convention3, we are revising profiles for England’s 159 National Character Areas (NCAs). These are areas that share similar landscape characteristics, and which follow natural lines in the landscape rather than administrative boundaries, making them a good decision-making framework for the natural environment. NCA profiles are guidance documents which can help communities to inform theirdecision-making about the places that they live in and care for. The informationthey contain will support the planning of conservation initiatives at a landscape scale, inform the delivery of Nature Improvement Areas and encourage broader partnership working through Local Nature Partnerships. The profiles will also help to inform choices about how land is managed and can change. Each profile includes a description of the natural and cultural features that shape our landscapes, how the landscape has changed over time, the current key drivers for ongoing change, and a broad analysis of each area’s characteristics and ecosystem services. Statements of Environmental Opportunity (SEOs) are suggested, which draw on this integrated information. The SEOs offer guidance on the critical issues, which could help to achieve sustainable growth and a more secure environmental future. 1 The Natural Choice: Securing the Value of Nature, Defra NCA profiles are working documents which draw on current evidence and (2011; URL: www.official-documents.gov.uk/document/cm80/8082/8082.pdf) 2 knowledge.
    [Show full text]
  • Cullompton Community Emergency Plan
    CULLOMPTON COMMUNITY EMERGENCY PLAN This plan covers the Cullompton area from St Andrew’s Hill in the West to Stoneyford in the East, Bradninch Hill in the South and Hayne Barton to the North. Date of Adoption: July 2016 Reviewed: May 2017 Next Review Date: May 2018 Issue Number: v2 Written by: Cullompton Town Council Contact: Steve Reardon (Assistant Town Clerk) [email protected] 01884 38249 1 CONTENTS Introduction ............................................................................................................................................ 3 Aims and Objectives ................................................................................................................................ 3 Types of Emergency ................................................................................................................................ 4 Activation Procedure and Escalation ...................................................................................................... 4 Community Emergency Response Team (CERT) ..................................................................................... 4 Communications ..................................................................................................................................... 6 Incident Co-ordination and Evacuation Assembly Points ....................................................................... 6 Helicopter Landing Sites ........................................................................................................................
    [Show full text]
  • River Culm, Culm Fly Fishing Club
    River Culm, Culm Fly Fishing Club An advisory visit by the Wild Trout Trust September 2012 1. Introduction This report is the output of a Wild Trout Trust visit undertaken on the River Culm on the Culm Fly Fishing Club’s waters between Hemyock and Culmstock, Devon, national grid reference (NGR) ST138139 to ST101137. The visit was requested by Mr Andy Don, who is a serving member of the Club. The visit was focussed on assessing the habitat and management of the club’s waters. Figure 1: A map showing the Culm Fly Fishing Club's water This section of the river is classified ‘Poor Ecological Status’ under the Water Framework Directive with a target of ‘Moderate Ecological Status’ for 2015. The river is identified in the Environment Agency’s River Basin District plan as water body ID no. GB108045014980. CULM Waterbody ID GB108045014980 Waterbody Name CULM Management Catchment East Devon River Basin District South West Typology Description Mid, Small, Calcareous Hydromorphological Status Not Designated A/HMWB Current Ecological Quality Poor Status Current Chemical Quality Does Not Require Assessment 2015 Predicted Ecological Quality Moderate Status 2015 Predicted Chemical Quality Does Not Require Assessment Overall Risk At Risk Protected Area Yes Number of Measures Listed - (waterbody level only) Comments in this report are based on observations on the day of the site visit and discussions with Mr Don and members of the Culm Fly Fishing Club. Throughout the report, normal convention is followed with respect to bank identification i.e. banks are designated Left Bank (LB) or Right Bank (RB) whilst looking downstream.
    [Show full text]
  • St Andrews 16Pp A5 Guidebook 8 (R10).Indd
    St Andrew’s Church CULLOMPTON -1- 1 2 St Andrew’s Church Cullompton St Andrew’s Church is a history lesson. Start in front of the pulpit between the nave and north aisle and look at the War Memorial window. The main fi gures are St Columba, St Andrew, the Virgin Mary and King Alfred. 1. The fi gures of St St Columba is there because Vicar Watkins Grubb (1937-46), who wrote a massive Columba and St Andrew history of Cullompton (unpublished) thought that St Columba visited this area and on the War Memorial window. gave his name to the river and the town. This has been a source of controversy over 2. This pulpit was donated the centuries. There are 40 diff erent ways of spelling the name of the town and two by William Sykes, minister diff erent ways of pronouncing it. The full story is set out in The Town on the Culm in charge, 1830-34 and vicar 1834-57 and it bears (1985). In fact, just as Culm Davey was originally Coombe Davey and had nothing to his initials. do with the river Culm, Cullompton was Colehampton, the town on the Colebrook. King Alfred is there because Columtune fi rst appears in his will in 872 AD, in which he left his lands here to his son Ethelward. St Mary is there because the church was once dedicated to her. The change to St Andrew took place in the fi fteenth century when the present church was built. There is no documentary evidence to show when the present building was erected, but the nave, with its glorious wagon roof, and the north and south aisles, belong to that century, and the King’s head on the westernmost pillar between the nave and north aisle may be that of Henry IV.
    [Show full text]
  • Desk-Based Assessment Report
    T H A M E S V A L L E Y ARCHAEOLOGICAL S E R V I C E S S O U T H W E S T Western Extension of Hillhead Quarry, Uffculme, Devon Archaeological Desk-based Assessment by Richard Tabor Site Code HQU16/46 (ST 0585 1366) Western Extension of Hillhead Quarry, Uffculme, Devon Archaeological Desk-based Assessment for Aggregate Industries UK Ltd 㼎㼥㻌㻾㼕㼏㼔㼍㼞㼐㻌㼀㼍㼎㼛㼞㻌 㼀㼔㼍㼙㼑㼟㻌㼂㼍㼘㼘㼑㼥㻌㻭㼞㼏㼔㼍㼑㼛㼘㼛㼓㼕㼏㼍㼘㻌㻿㼑㼞㼢㼕㼏㼑㼟㻌 㻔㻿㼛㼡㼠㼔㻌㼃㼑㼟㼠㻕㻌㻸㼠㼐 Site Code HQU 16/46 March 2016 Summary Site name: Western Extension of Hillhead Quarry, Uffculme, Devon Grid reference: ST 0585 1366 Site activity: Archaeological desk-based assessment Project manager: Steve Ford Site supervisor: Richard Tabor Site code: HQU 16/46 Area of site: c. 15.1ha Summary of results: The assessment found no known heritage assets within the site but there is some evidence for features visible from aerial photography and Lidar hence it may be judged to be of moderate archaeological potential. Mineral extraction is necessarily destructive, therefore it is recommended that a programme of suitable archaeological work be undertaken in advance of extraction to preserve the site’s archaeological resource by record. This report may be copied for bona fide research or planning purposes without the explicit permission of the copyright holder. All TVAS unpublished fieldwork reports are available on our website: www.tvas.co.uk/reports/reports.asp. Report edited/checked by: Steve Ford 01.04.16 Steve Preston 01.04.16 i TVAS (South West),Unit 21, Apple Business Centre, Taunton TA2 6BB Tel. (01823) 288 284; Fax (01823) 272 462; email [email protected]; website : www.tvas.co.uk Western Extension of Hillhead Quarry, Uffculme, Devon Archaeological Desk-based Assessment by Richard Tabor Report 16/46 Introduction This report is an assessment of the archaeological potential of approximately 15.1ha of land located to the north west of Uffculme in Devon (centred on NGR ST 0585 1366; Fig.
    [Show full text]