NEWSCLIPPINGS JULY TO DECEMBER 2017 SEWERAGE & DRAINAGE Urban Resource Centre A-2, 2nd floor, Westland Trade Centre, Block 7&8, C-5, Shaheed-e-Millat Road, Karachi. Tel: 021-4559317, Fax: 021-4387692, Email:
[email protected], Website: www.urckarachi.org Facebook: www.facebook.com/URCKHI Twitter: https://twitter.com/urc_karachi Drainage systems fail; DMCs, KMC nowhere in sight As water started to recede from the streets and thoroughfares of the city, it exposed a sorry condition of the roads that had been submerged in water for several hours. Rangers‘ officials, along with machinery and police personnel, were seen Thursday night doing rescue work on the roads of the city. The main thoroughfares, including II Chundrigar Road, University Road, Sharae Quaideen, Sharae Pakistan, Khayaban-e-Bahria, Khayban-e-Shahbaz and the road near the high court had pot holes, while a few of them remained inundated till Friday evening. Karachi braces for rain as Met dept predicts showers across country Advertisement Ad After the heavy downpour on Thursday night, social media was flooded with pictures and videos of the newly-built Tariq Road and University Road, showing the flood on one track of Tariq Road coming from Bahadurabad towards Allah Wali Chowrangi. Meanwhile, on the newly-built section of University Road from Hassan Square till Nipa, the road was submerged in eight inches of rainwater. ―These two new roads can sustain the rain water, as both have storm water drains and are newly-built,‖ claimed on Thursday evening District East Chairperson Moeed Anwar. Karachi swamped – and paralysed However, to his surprise both roads were submerged by late night.